SIDRA MEDICAL & RESEARCH CENTRE

INSPECTION CHECK LIST


FOR
INSTALLATION OF DUCTILE IRON PIPES FOR
UNDERGROUND WATER SUPPLY
Description of Work: Tag No. :
Drawing Ref. No.: Location:
System No.: Inspection Request No. :
Contract No.: Project No: 625
INSPECTION ATTRIBUTES
Item Description Accept Reject NA
A) Installation
1. Coating Wrapping applied on pipes & fittings as per spec.
2. Check Polyethylene encasement on pipe done properly
3. Installed material are approved as per material submittal
4. Trench depth is as per specification & approved Drawing
5. Pipe bed compacted as per specification & approved Drawings
6. Size of Pipe and fittings as per approved Drawings
7. Check Supports installed as per approved drawings
8. Check all joint are installed correctly
9. Level, alignment, straightness & Vertically as per drawings
10. Others
B) Hydrostatic Pressure Test
1. Check Installation is approved.
2. All joints are open and not covered during testing
3. Check Pressure Gauges! Pressure relief valve calibrated
4. Check correct rating of Pressure Gauges
5. Test pump capacity and safe, stable test pump support
6. Check Validity of Calibration certificates.
7. Minimum (2) pressure gauges installed at visible location
8. Test medium (Potable Water)
9. Pipeline vented for air trap in system
10. Test Duration 24 hours for inside building pipes
11. Test duration 2 hours for outside Building pipes
12. Test pressure 8 bar or 1.5 times of the system pressure
13. Check no pressure drop / leak in the system
14. Barricade / Safety warning, sign board placed during test
15. Others

Remarks

ACCEPTED BY QK/QC MC/JV QC KEO/QP/QF QC

NAME:

SIGNATURE:

DATE:

QK-08-CL-00002/1 Rev 0

Page 1 of 2
SIDRA MEDICAL & RESEARCH CENTRE
INSPECTION CHECK LIST
FOR
INSTALLATION OF DUCTILE IRON PIPES FOR
UNDERGROUND WATER SUPPLY
Description of Work: Tag No. :
Drawing Ref. No.: Location:
System No.: Inspection Request No. :
Contract No.: Project No: 625
INSPECTION ATTRIBUTES
Item Description Accept Reject NA
C) Post Testing Activities
1. Tested joints to be wrapped as per approved method
2. Polyethylene sleeving installed on joints
3. Identification Tag installed
4. Pipes backfilled & compacted as per specification
5. Concrete encasement under roadway crossing
6. Warning tape for underground installed as per specification
7. Others

Remarks

ACCEPTED BY QK/QC MC/JV QC KEO/QP/QF QC

NAME:

SIGNATURE:

DATE:

QK-08-CL-00002/1 Rev 0

Page 2 of 2