This tool box talk discussed crew responsibilities and SATIP inspection levels for offshore hook up, upgrade modification, SCADA installation, and commissioning support work. The QC supervisor, crew supervisor, coating inspector, painters and blasters were assigned responsibilities to ensure painting activities are conducted according to approved procedures. SATIP refers to Saudi Aramco Typical Inspection Plan, and SATIP-H-100-01 defines inspection levels including surveillance, witness points, and hold points that require QA/QC notification and attendance.
This tool box talk discussed crew responsibilities and SATIP inspection levels for offshore hook up, upgrade modification, SCADA installation, and commissioning support work. The QC supervisor, crew supervisor, coating inspector, painters and blasters were assigned responsibilities to ensure painting activities are conducted according to approved procedures. SATIP refers to Saudi Aramco Typical Inspection Plan, and SATIP-H-100-01 defines inspection levels including surveillance, witness points, and hold points that require QA/QC notification and attendance.
This tool box talk discussed crew responsibilities and SATIP inspection levels for offshore hook up, upgrade modification, SCADA installation, and commissioning support work. The QC supervisor, crew supervisor, coating inspector, painters and blasters were assigned responsibilities to ensure painting activities are conducted according to approved procedures. SATIP refers to Saudi Aramco Typical Inspection Plan, and SATIP-H-100-01 defines inspection levels including surveillance, witness points, and hold points that require QA/QC notification and attendance.
This tool box talk discussed crew responsibilities and SATIP inspection levels for offshore hook up, upgrade modification, SCADA installation, and commissioning support work. The QC supervisor, crew supervisor, coating inspector, painters and blasters were assigned responsibilities to ensure painting activities are conducted according to approved procedures. SATIP refers to Saudi Aramco Typical Inspection Plan, and SATIP-H-100-01 defines inspection levels including surveillance, witness points, and hold points that require QA/QC notification and attendance.
1. QC Supervisor shall ensure that all Painting activities are
conducted as per plan schedules and as per the requirement of the approved procedure. 2. The Crew Supervisor shall be responsible for all painting activities maintain equipment and tools for painting in good working condition and ensure compliance with the approved coating procedure. 3. Coating Inspector shall perform all coating inspection related activities and provide the necessary data for painting reports prior to client review and approval & shall be SAUDI ARAMCO approved / qualified. 4. Painter and Blaster: They shall be SAUDI ARAMCO approved / qualified. Painter & Blaster is responsible for the field work and shall work according to crew Supervisor instructions and maintain all tools and equipment for painting. Painters and blasters shall have valid JCC’s (Job clearance Card) prior to start of work. 5. SATIP: Saudi Aramco Typical Inspection Plan 6. SATIP-H-100-01 Inspection levels 7. Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization 8. Witness Point: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present. 9. Hold Point: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.