Mepc 109 - Learning Task No. 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

LEARNING TASK NO.

DON MARIANO MARCOS MEMORIAL STATE UNIVERSITY


MID-LA UNION CAMPUS
COLLEGE OF ENGINEERING
SCORE
LEARNING TASK NO. 1
MEPC 109 – PLANT VISITS & SEMINARS/COLLOQUIA

NAME: __________________________ DUE DATE: FEBRUARY 12, 2022


YEAR & SECTION: __________ TOPIC: CEMENT MANUFACTURING

INSTRUCTIONS:
1. USE NEAT BOND PAPER (SHORT) FOR YOUR ANSWERS AND SOLUTIONS.
2. FOLLOW THE FORMAT ABOVE (HEADINGS, NAME, YEAR & SECTION, DATE, SCORE,
etc. EXCEPT THE HEADER) WHICH WILL BE WRITTEN AT THE UPPER PORTION OF
THE BOND PAPER.
3. INDICATE YOUR SIGNATURE ABOVE PRINTED NAME AT THE LOWER RIGHT PORTION
FOR EVERY PAGE OF YOUR OUTPUT.
4. UPLOAD THE OUTPUT IN PDF FORMAT.
5. WRITE IN ENGINEERING LETTERS WITH 3mm HEIGHT and 2mm SPACING.
6. MARGIN
1 INCH: LEFT
1 INCH: RIGHT
1 INCH: BOTTOM
1 INCH: TOP

QUESTIONS:
1. Describe the two processes (dry and wet) of
cement manufacturing.
2. What are the main raw materials or
ingredients used in manufacturing cement?
3. Draw and label the process flow diagram of
cement manufacturing.
4. What are the different stages in the
production of cement? Describe each stage.
5. Identify and describe the major equipment
of a cement manufacturing plant.

You might also like