Professional Documents
Culture Documents
EPAD 4x5-S 1
EPAD 4x5-S 1
D C
concrete or
surge steel column
distribution fuse
arrester
transformer cut-out #6 solid
copper wire
1500 min.
steel
(e.g. c-channel)
500 min.
300 min.
grounding rod &
compression
secondary wires connector
4000
fence
concrete pad
door
B service entrance B'
pedestal meter
5000
A A'
D' C'
NOTE:
• Applicable for Distribution Transformer Bank: 3-100 kVA and below that have Secondary Instrument Rated Metering.
• The customer shall provide the secondary wires and its accessories but it is optional for the DU to provide the secondary banking wires only or all the
secondary wires(including its accessories) going to the service entrance pedestal of the customer when the customer could not provide the required
standard materials.
• Units are in millimeter (mm).