Download as pdf
Download as pdf
You are on page 1of 5
TP for Piping installation Owmmres Oatecat Omeciie | marin a —s — MABDKOUR Inspection and Test Plan (Piping Installation) ® Tnspecton Coder I MadkarOS % Consakant 3 OWNER 4: CLIENTREP HORA] 11 Wok Pont W:Wiines ——— NEMonitor | Item | Activity 7 ] Characteristic | Reference | Verifying | Device/toois | Freq. Inspection | toheVerfed | Document | GrncrirYaterance | yea Eira | | pot) Ti Dosanataton — | TI | Check Document [Technical Verify the useoflatest | Approved | NA] Priore THE TR drawings(PID/GA/ISO) Specification | rev Document start | for laew revit 2 drawings __| sebmie he TS | Mosel tes [Document [Technical [Review MITC or Approved TNA Hees certfotes fr raw Specification | conformity asperthe | Deemer | man ‘material are revised in & ASME II | project specification | Submittal | work valince pre Parts |aedappbannente |__| project specifications oe - | : 13] Revlon Por Document | Technical} ASME MIPARTC approved | NCA Faro |" | Consumaties Speciation Document mn Corientes 2 ASME Submitial ot __|Parre [Ta Reviewing Tr Document Technical | Callraton Confers | Approved} NCA Frio machines ealiration Speciation Document sare varios Calibration Submit work Cereus | [15 | Rpprval of WPS Document Technical’ RT epor And DT —taproved | POR Specification | report Document a ASME Subs | E - _|seen | MDG-QC-DPo1-FMO4 Rev.00 —_ SS MWARDKOUF Inspection and Test Plan (Piping Installation) 1 Madkour@@) 3 Consuliant __3_ OWNER 4; CLIENT REP (HORAS) —WiWitness RiReview fonitor qf | Eharateistic [Reference [Ascepianee | Vevifping] Devicefook Freq Taspection | tobe Verified | Document | Criteria/Tolerance Document Code | 172] 374] 13] Approval of | Document [Technical | Verify competent Approved | NA | Priorto [HR [WIR technicians | Specification | technicians for Document | start qualification & ASME | prefabrication process | Submittal work | certificates, SEC IX AND Qual. | fe : _ Certificates 7 1.6 | Approval of Method | Document Technical | Verify proper | Approved NA | Prior to statement Specification | sequance of works are | Document | start im accordance with | Submittal work | approved method | = L | 2.0 Fabrication and Testing 2.1 ] Visual inspection for “| -workability | Technical] VT Procedure [Test R) CS pipes and fittings ( Specification Report _| Raw Material) - 2.2 | Check cutting list for [workability | Technical | Approval Drawing Test R the pipe length Specification DG-QC-DPO1-FMO4 Rev.00 — >a WABKOUF Inspection and Test Plan control sheet signed (Qc-DP01-FMoa (Piping Installation) Inspestion Code: I: Madkour(@.O) 2: Consult 3: OWNER 4: CLIENT REPGHORAS) H: Hold Point “W:Witness RReview = jonitor | item | Activity | Characteristic | Reference | Acceptance Verifying | Deviceltools | Freq. Inspection — L 172 [3]4 |23° [Check all parameters |workability | Technical | WPS & V¥ Procedure {Tea Stander H/R WR | | for the fite-up (surface Specification Report | machines preparation, chamfer, HL, ) | | | | | 24 | Apply a Welding workability Technical WPS & VT Procedure | Test ‘Stander H/R |W E | procedure ___| Specification Report__| machines 2.5” | Pipe spools are ‘workability Technical WPS & VT Procedure | Test Stander H/R |W R] fabricated and spool Specification Report | machines Control sheet signed = 2.6 | Pipe supports workability | Technical | WPS & VT Procedure | Test Stander H/R |W © fabrication have been Specification Report machines | |__| inspected and released | 2.7 | Pipe supporshave | workability | Technical | WPS & V¥ Procedure 1 Tex Stander HR [WR been installed and Specification Report | machines |__| accepted 2.8 | Pipe spools have been Technical | WPS & VT Procedurs field welded and spool Specification Rhpor Rev.00 l WABRKOUR Inspection and Test Plan (Piping Installation) =e 1: Madkour(Q.©) — 2: Consulant __3: OWNER 4; CLIENT REP (HORAS) WiWitness RiReview M:Monitor | | Heem | Activity : Characteristic | Reference | Acceptance Verifying | Deviceliook | Freq. | Inspection | fobe Verified | Document | Criteria/Tolersnee Document | 7 2.9 | Apply NDT procedure | workability Technical UT Procedure ‘| Test Stander | for Burt weld Specification Report | machines (ultrasonic test) & ASME | . [seve ft | 2.10/ Apply NDT procedure | workability | Technical | PT Procedure Test Stander || for Fillet weld (guid Specification Report | machines || penetrant test ) & ASME _|secv [R17 [Appi painting workabiliy | Technical | Painting Procedure Tea Siander procedure Specification Report | machines [2.12 | Pipe installation is workability ‘Technical ‘Check punich list Test Stander complete and released Specification Report machines forhydrotesting ——_| ae ale - Hydrostatic testing | workability | Technical | Hydrostatic test Test | Stander Specification | procedure Report machines L —_— _t — Inspection Code: 2. H: HOLD POINT Official notification and next step will not proceed tll the satisTato W: WITNESS Official notification and next step will proceed automlically R: REVIEW Review of submitted Documents/Reportcertificate M: MONITOR NO Official notification Required and next step will proceed automatically MDG-Qc-DPO1-FMO4 4/4 Rev.00

You might also like