Clint :W/ro Hewan Umar

Project : G+2 Residential Building


Location : Hawassa, East
Subject: Specification ,Bill of Quantity and Engineers Estimate

Summery of Engineers Estimate

Item
Description Unit Total Contract Amount
No.

}^ l. SÓKÝ SK¡Á ¾Ñ”²u< M¡ Ö/ÉU` w`


1.Main Building
G+2 Residential Building
1 A: SUB STRUCTURE

A1. Excavation & earth work Birr… 0.00

A2. Concrete Work Birr… 0.00

A3. Stone Masonry Birr… 0.00

Total Sub Structure A) Birr… 0.00

B: SUPER STRUCTURE
B1. Concrete Work Birr… 0.00

B2. Block Work Birr… 0.00

B3. Roofing Birr… 0.00


B4. Carpentry & Joinery Birr… 0.00

B5. Metal Work Birr… 0.00

B6. Finishing Birr… 0.00

B7. Flooring Birr… 0.00


B8. Painting Birr… 0.00
B9. Glazing Birr… 0.00

B10. Electrical Installation Birr… 121,575.00

B11. Sanitary Installation Birr… 300,050.00

Total Super Structure (B) Birr… 421,625.00

Total Super Structure (A+B) Birr… 421,625.00

15%VAT Birr… 63,243.75

TOTAL Birr… 484,868.75


Client: Umar Abdella
Project : 1B+G+6 Mixed Use Building
Location : Adama
Item Rate (Only
Description Unit
No. Labour Cost)
1.Main Building
G+1 Residential Building

A . Excavation & Earth work


A1. SUB STRUCTURE

1- SITE CLEARING
1.01 Clear of site to a depth of 20 cm and grub
debris and grabbed materials from site. m2

Bulk excavation
1.02 Bulk excavation in ordinary soil to a depth not
exceeding 1500mm m3

1.03 Excavation in ordinary soil for isolated


foundation footing to a depth not exceeding
1500mm below stripped level. m3

1.04 Ditto , but 1500mmnot exceeding 3000mm


depth m3

1.05 Trench excavation in ordinary soil to a depth


not exceeding 1500mm from reduced ground
level m3

Fill

1.06 Fill around the Trench foundation with


imported selected material and compacted in
layers not exceeding 200 mm m3

1.07 Fill around the foundation with imported


selected material and compacted in layers not
exceeding 200 mm m3

Disposal
1.08 Cart away excavated materials per the
instruction of the engineer . m3

1.09 Granular Selected material fill under floor


slab with selected material & compacted in
layers not exceeding 20cm. m3

1.10 250mm thick sound stone hard core finished,


blinded and crushed. m2
Total carried to summary

A 2 - CONCRETE WORK

SUB STRUCTURE

2.01 50mm thick lean concrete in concrete class C-5,


with minimum cement content of 150kg/m3
under footings, floor slab. ,Beam and stone
foundation wall . m2

Reinforced concrete in concrete class C-25


with minimum cement content of 360Kg/M3 cast
into form work and vibrated around road
reinforcement. Form work and steel measured
separate.

2.02 In footings m3

2.03 In foundation column m3

2.05 Grade Beam m3

2.06 15 cm Basement floor slab m3


Provide cut and fix sawn zigba wood form work
to:-

2.08 Footings m2

2.09 Foundation columns m2

2.11 Grade Beam m2


2.13 Steel reinforcement, price shall including
cutting bending tying with wire and placing in
position.

2.14 a) dim 6mm plane bar Kg

b)dim 8mm deformed bar Kg

c)dim 10mm deformed bar Kg

d)dim 12mm deformed bar Kg

e)dim 14mm deformed bar Kg

f)dim 16mm deformed bar Kg

g)dim 20mm deformed bar Kg

h)dim 24mm deformed bar Kg

Total carried to summary

A3- STONE MASONRY

3.01 Stone foundation wall in cement mortar, mix


1:4. m3

Total carried to summary

B. SUPER STRUCTURE
B1- CONCRETE WORK

Reinforced concrete in concrete class C-25,


with minimum cement of 360kg/M3 cast into
form work and vibrated around road
reinforcement. Form work and steel measured
separate.

1.01 In elevation column m3

1.02 In beam and intermediate beam ,top tie beam m3

1.03 In stair case.& landing m3

1.04 150 mm thick floor slab. m2

Provide cut and fix sawn zigba wood form


work to:-

1.06 Elevation column m2

1.07 In beam and intermediate beam top ,tie beam m2

1.08 Stair case and landing m2

1.09 150 mm thick floor slab. m2

1.11 Steel reinforcement, price shall including


cutting bending tying with wire and placing in
position.

a) dim 6mm plane bar Kg

b)dim 8mm deformed bar Kg


c)dim 10mm deformed bar Kg

d)dim 12mm deformed bar Kg

e)dim 14mm deformed bar Kg

f)dim 16mm deformed bar Kg

g)dim 20mm deformed bar Kg

h)dim 24mm deformed bar Kg

i)dim 24mm deformed bar Kg

Total carried to summary

B2 . Block Work

( Super- structure )

2.01 20cm thick hollow block wall bedded on compo


mortar mix 1:3 both side left for plaster.
m2

2.02 Ditto, but 15cm thick. m2

2.02 Ditto, but 10cm thick. m2

B3. Roofing
3.01 Apply average thickness of 3cm cement screed
over the terrace concrete. m2

3.02 Apply 1 (One) layers of flint Coat treatment for


damp proofing or Membrane damp proof
course or (water proofing material )to terrace
& roof slab, (including the necessary primer) as
per manufacturer application procedure. m2

3.03 Roof cover in Harvey tiles or equivalent


material fix to50x70 cm purl in in position &
Price shall include all the necessary upper,
lower ,vertical members as per the drawing
(with all accessories). Roof measured in
Horizontal Projection) m2

3.04 Harvey tiles vally gutter development length


450mm ml

3.05 Harvey tiles Side wall flasing development


length 450 mm ml

Total carried to summary

B4- Carpentry & Joinery

FLUSH WOOD DOORS

Flush wood doors with semi solid core covered


with approved veneer on both sides to a
finished thickness of 4cm. Price shall include
frames hard wood lapping and edgings at sides,
top and bottom and 12cm high kick plate. Door
hardware measured elsewhere.

4.01 Type D1 size 70 x 210 cm No

4.02 Type D2 size 90 x 210 cm No

Total carried to summary


B5. Metal Work

LTZ profilewindows and doors cut and


assembled the size and shape shown
on the schedule of windows and doors
subject to the approval of shop
drawings Price shall include all the
necessary ironmongery door stopper,
cylindrical lock handle. (glazing
measured separetly).

A. Window
Type W1:size 135x 195cm No

Type W2:size 110x200cm No

Type W3:size 130x160cm No

Type W4:size 75x290cm No

Type W5:size160x230cm No

Type W6:size 150x275cm No

B. Doors

5.4 Type WD1:size 270x 430 cm No

5.6 Type D1:size 170 x 250 cm No

5.7 Type D1:size 80 x 250 cm No

5.8 Type D1:size 200 x 250 cm No

5.9 Type D1:size 310 x 250 cm No

5.11 Supply and fix Metalic handrail with support of


same size. As per the drawings. ml

Total carried to summary

B6. Finishing

6.01 Apply 3 coats of plastering to internal wall


surface in cement mortar mix 1:3. m2

6.02 Ditto, but to concrete ceilings and beams. m2

6.03 Apply 3 coats of plastering to external wall


surface in cement mortar mix 1:3. m2

6.04 Apply with gypsum Cement plastering to


internal wall surface to Satisfy fine Final
smooth. m2

6.1 Ditto, but to concrete ceilings & beams. m2

6.06 Supply and fix gypsum board ceiling supported


by metal profiles. Price shall include the
necessary profiles and.Gypsum corner lists,
m2

Total carried to summary


B7. Flooring
Ceramic Tiles

7.01 30mm thick cement & sand screed to receive


ceramic floor tiles. m2

7.02 Non slippery ceramic floor tiles bedded in


cement & sand mortar mix (1:3) & cement
wash grouting. Color to much ceramic floor.
m2

7.03 200 x 300 x 6mm glazed ceramic wall tile fix to


plastered wall surface with cement wash
grouting. m2

Marble Tiles

7.04 48mm thick cement & sand screed to Marble


Tiles floor tiles. m2

7.05 Marble chips floor tiles bedded in cement &


sand mortar mix (1:3) & cement wash grouting
m2

7.06 Marble to stairs 3cm thick .

a) Trade size 110x 32cm.


ml

7.07 2cm thick black Marble

a Riser size 110x 15cm ml

7.08 3cm thick Marble threshold (door sills) on


cement & sand mortar mix (1:3) bedding. ml

7.09 2cm thick Marble window sills. ml

PVC Tile Flooring

7.10 48mm thick cement and sand screed with


cement mortar mix 1:3 to receive PVC tiles. m2

7.11 Supply and lay 2mm PVC tiles flooring stuck


down to floor with approved type adhesive. m2

7.12 10cm high plastic tile skirting stuck to wall with


approved type adhesive. ml

Terrazzo Tiles

7.13 48mm thick cement and sand screed with


cement mortar mix 1:3 to receive terrazzo tiles. m2

7.14 Supply and lay 3mm terrazzo tiles flooring. m2

7.15 10/2cm high terrazzo tile skirting stuck to wall


with approved type adhesive. ml

Total carried to summary

B8 . Painting

8.01 Prepare and apply by brush 3 coats of


approved plastic emulsion paint to internal wall
surface. m2

8.02 Ditto, but to concrete ceilings and beams. m2

8.03 External wall surface. plastering m2


8.04 To gypsum board ceiling m2

Total carried to summary

B9. Glazing

Supply and fix glass glazing to windows and


doors :-

9.01 Single 4mm thick clear glass . m2

Total carried to summary


Clint :W/ro Hewan Umar
Project : G+2 Residential Building
Location : Hawassa, East
Subject: Specification ,Bill of Quantity and Engineers Estimate
MEASUREMENT TAKE - OFF SHEET

Positive Negative
Item No. Description Unit No Elm Length Width Height Qty Qty
¾w²| zÀRR] }k““i
}^ l. SÓKÝ Yó` S>¡¿ SÖÕ YœOr eó| tS| OÖÕ SÖÕ
G+1 Residential Building
A- SUB -STRUCTURE

A1-Excavation and Earth work

1.01 Clearof site and grub debris and grabbed


materials from site. m2 1 15.000 25.00 375.00
Total 375.00

1.02 Bulk excavation in ordinary soil to a depth


not exceeding 1500mm m3 1 15.000 25.00 0.50 187.50
Total 187.50

1.03 Excavation in ordinary soil for isolated


foundation footing to a depth not
exceeding 1500mm below stripped level. m3
F1 (Footing 1 ) 5 1.70 1.70 1.50 21.67
F2 (Footing 2 ) 4 2.00 2.00 1.50 24.00
F3 (Footing 3 ) 2 2.20 2.20 1.50 14.52
Total 60.20

1.04 Ditto , but 1500mmnot exceeding


3000mm depth m3
F1 (Footing 1 ) 5 1.70 1.70 0.50 7.23
F2 (Footing 2 ) 4 2.00 2.00 0.50 8.00
F3 (Footing 3 ) 2 2.20 2.20 0.50 4.84
Total 20.07

1.05 Trench excavation in ordinary soil to a


depth not exceeding 1500mm from reduced
ground level m3
Service Quarter AxesA&B 2 15.00 1.00 1.00 30.00
Service Quarter Axes1,2,3&4 4 2.70 1.00 1.00 10.80
Main Building Axes 2,3&4 3 11.00 1.00 1.00 33.00
Main Building Axis D 1 5.00 1.00 1.00 5.00
Main Building Axes C,E&F 3 10.00 1.00 1.00 30.00
Total 108.80
1.06 Fill around the Trench foundation with
imported selected material and compacted
in layers not exceeding 200 mm
m3
Service Quarter AxesA&B 2 15.00 0.50 1.00 15.00
Service Quarter Axes1,2,3&4 4 2.70 0.50 1.00 5.40
Main Building Axes 2,3&4 3 11.00 0.50 1.00 16.50
Main Building Axis D 1 5.00 0.50 1.00 2.50
Main Building Axes C,E&F 3 10.00 0.50 1.00 15.00
Total 54.40
1.07 Fill around the foundation with imported
selected material and compacted in layers
not exceeding 200 mm
m3
F1 (Footing 1 ) 5 1.70 1.70 2.00 28.90
F2 (Footing 2 ) 4 2.00 2.00 2.00 32.00
F3 (Footing 3 ) 2 2.20 2.20 2.00 19.36
F1 (Footing Pad ) 5 1.20 1.20 0.30 2.16
F2 (Footing Pad ) 4 1.40 1.40 0.40 3.14
F3 (Footing Pad ) 2 1.60 1.60 0.50 2.56
C1 with F1 5 0.20 0.30 1.70 0.51
C2 with F2 4 0.20 0.30 1.60 0.38
C3 with F3 3 0.20 0.30 1.50 0.27
80.26 9.02
Total 71.24
1.09 Cart away excavated materials per the
instruction of the engineer .
m3
As per Item No 1.01 1 15.000 25.00 0.20 75.00
As per Item No 1.02 1 15.000 25.00 0.50 187.50
As per Item No 1.03 60.20
As per Item No 1.04 20.07
As per Item No 1.05 108.80

Total 451.56
1.10 Granular Selected material fill under
floor slab with selected material &
compacted in layers not exceeding 20cm. m2
1 3.88 2.70 0.50 5.23
2 5.00 2.70 0.50 13.50
1 3.00 5.00 0.50 7.50
1 2.50 5.00 0.50 6.25
3 5.50 5.00 0.50 41.25
Total 73.73
1.11 250mm thick sound stone hard core
finished, blinded and crushed. m2
1 3.88 2.70 10.46
2 5.00 2.70 27.00
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
Total 147.46
A2. Concrete work

2.01 50mm thick lean concrete in concrete class


C-5, with minimum cement content of
150kg/m3 under footings, Basement floor
slab. ,Beam and stone foundation wall .

a) under footing m2
F1 (Footing 1 ) 5 1.70 1.70 14.45
F2 (Footing 2 ) 4 2.00 2.00 16.00
F3 (Footing 3 ) 2 2.20 2.20 9.68
Total 40.13
b) under stone masonry m 2

Service Quarter AxesA&B 2 15.00 1.00 30.00


Service Quarter Axes1,2,3&4 4 2.70 1.00 10.80
Main Building Axes 2,3&4 3 11.00 1.00 33.00
Main Building Axis D 1 5.00 1.00 5.00
Main Building Axes C,E&F 3 10.00 1.00 30.00
Total 108.80
c) under GradeBeam m2
Total -
D )under floor slab m 2

Same as article 1.11


147.46
Total 296.39
C-25 Reinforced concrete minimum
cement content 360 kg/m3 filed in to form
work and vibrated around steel
reinforcement (form work and
reinforcementmasered separately)

2.02 In footing m2
F1 (Footing Pad ) 5 1.20 1.20 0.30 2.16
F2 (Footing Pad ) 4 1.40 1.40 0.40 3.14
F3 (Footing Pad ) 2 1.60 1.60 0.50 2.56
Total 7.86
2.03 In foundation column m 3

C1 with F1 5 0.20 0.30 1.70 0.51


C2 with F2 4 0.20 0.30 1.60 0.38
C3 with F3 3 0.20 0.30 1.50 0.27
Total 1.16
2.05 GradeBeam m3
Service Quarter AxesA&B 2 15.00 0.25 0.40 3.00
Service Quarter Axes1,2,3&4 4 2.70 0.25 0.40 1.08
Main Building Axes 2,3&4 3 11.00 0.25 0.40 3.30
Main Building Axis D 1 5.00 0.25 0.40 0.50
Main Building Axes C,E&F 3 10.00 0.25 0.40 3.00
Total 10.88
2.06 10 cm thick Ground floor slab m2
Same as artcle 1.11 147.46

147.46
Proved cut and fix in position steel panel
form work to:
2.08 Footings m2
F1 (Footing Pad ) 5 1.20 1.20 0.30 7.2
F2 (Footing Pad ) 4 1.40 1.40 0.40 8.96
F3 (Footing Pad ) 2 1.60 1.60 0.50 6.4
Total 22.56
2.09 Foundation columns m2
C1 with F1 5 0.20 0.30 1.70 8.5
C2 with F2 4 0.20 0.30 1.60 6.4
C3 with F3 3 0.20 0.30 1.50 4.5
Total 19.40
2.11 GradeBeam m 2

Service Quarter AxesA&B 2 15.00 0.25 0.40 24.00


Service Quarter Axes1,2,3&4 4 2.70 0.25 0.40 8.64
Main Building Axes 2,3&4 3 11.00 0.25 0.40 26.40
Main Building Axis D 1 5.00 0.25 0.40 4.00
Main Building Axes C,E&F 3 10.00 0.25 0.40 24.00
Total 87.04

2.13 Steel reinforcement according to


structural drawings , price shall including
cutting bending in position and placing in
position and tying wire .

a) dim 6mm plane bar kg #REF! #REF!

b)dim 8mm deformed bar kg #REF! #REF!

c)dim 10mm deformed bar kg #REF! #REF!

d)dim 12mm deformed bar kg #REF! #REF!

e)dim 14mm deformed bar kg #REF! #REF!

f)dim 16mm deformed bar kg #REF! #REF!

g)dim 20mm deformed bar kg #REF! #REF!

h)dim 24mm deformed bar kg #REF! #REF!


#REF!
A3- STONE MASONRY

3.01 Stone foundation wall in cement mortar,


mix 1:4. m3
Service Quarter AxesA&B 2 15.00 0.50 1.00 15.00
Service Quarter Axes1,2,3&4 4 2.70 0.50 1.00 5.40
Main Building Axes 2,3&4 3 11.00 0.50 1.00 16.50
Main Building Axis D 1 5.00 0.50 1.00 2.50
Main Building Axes C,E&F 3 10.00 0.50 1.00 15.00

Total 54.40

B. SUPER STRUCTURE
B1- CONCRETE WORK
Reinforced concrete in concrete class C-
25, with minimum cement of 360kg/M3
cast into form work and vibrated around
road reinforcement. Form work and steel
measured separate.

1.01 In elevation column m3


Ground Floor
Column Type 1 5 0.20 0.30 2.70 0.81
Column Type 2 4 0.20 0.30 2.70 0.65
Column Type 3 3 0.20 0.30 2.70 0.49
1st Floor
Column Type 1 5 0.20 0.30 2.70 0.81
Column Type 2 4 0.20 0.30 2.70 0.65
Column Type 3 3 0.20 0.30 2.70 0.49
2nd Floor
Column Type 1 5 0.20 0.30 2.70 0.81
Column Type 2 4 0.20 0.30 2.70 0.65
Column Type 3 3 0.20 0.30 2.70 0.49
Total 5.83
1.02 In beam and intermediate beam ,top tie
beam m3
First Floor
Main Building Axes 2,3&4 3 11.00 0.25 0.35 2.89
Main Building Axis D 1 5.00 0.25 0.35 0.44
Main Building Axes C,E&F 3 10.00 0.25 0.35 2.63
Second Floor 0.00
Main Building Axes 2,3&4 3 11.00 0.25 0.35 2.89
Main Building Axis D 1 5.00 0.25 0.35 0.44
Main Building Axes C,E&F 3 10.00 0.25 0.35 2.63

Total 11.90
TopTop Beam
Service Quarter AxesA&B 2 15.00 0.25 0.30 2.25
Service Quarter Axes1,2,3&4 4 2.70 0.25 0.30 0.81
Main Building Axes 2,3&4 3 11.00 0.25 0.30 2.48
Main Building Axis D 1 5.00 0.25 0.30 0.38
Main Building Axes C,E&F 3 10.00 0.25 0.30 2.25
Total 8.16
1.03 In stair case.& landing m3 Total 20.06
Stair Case 6 5.000 1.10 0.15 4.95
Landing beam 2 2.50 1.30 0.25 1.63
Trade &Riser 24 1.10 0.28 0.17 0.63
12 1.10 0.160 0.17 0.18
Total 7.38
1.04 150 mm thick slab. m2
First Floor
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
2 2.40 1.00 4.80
1 3.00 1.50 4.50
Total 119.30
Second Floor
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
1 2.40 1.00 2.40
1 3.00 1.50 4.50
Total 116.90
Roof Slab (Water tanker)

1 6.30 2.75 17.33

Total 17.33
Total 253.53

Provide cut and fix sawn zigba wood form


work to:-

1.06 Elevation column m2


Ground Floor -
Column Type 1 5 0.20 0.30 2.70 13.50
Column Type 2 4 0.20 0.30 2.70 10.80
Column Type 3 3 0.20 0.30 2.70 8.10
1st Floor
Column Type 1 5 0.20 0.30 2.70 13.50
Column Type 2 4 0.20 0.30 2.70 10.80
Column Type 3 3 0.20 0.30 2.70 8.10
2nd Floor -
Column Type 1 5 0.20 0.30 2.70 13.50
Column Type 2 4 0.20 0.30 2.70 10.80
Column Type 3 3 0.20 0.30 2.70 8.10

Total 97.20
1.07 In beam and intermediate beamtop ,tie
beam m2
First Floor
Main Building Axes 2,3&4 3 11.00 0.25 0.35 31.35
Main Building Axis D 1 5.00 0.25 0.35 4.75
Main Building Axes C,E&F 3 10.00 0.25 0.35 28.50
Second Floor
Main Building Axes 2,3&4 3 11.00 0.25 0.35 31.35
Main Building Axis D 1 5.00 0.25 0.35 4.75
Main Building Axes C,E&F 3 10.00 0.25 0.35 28.50

Total 129.20
TopTop Beam
Service Quarter AxesA&B 2 15.00 0.25 0.30 25.50
Service Quarter Axes1,2,3&4 4 2.70 0.25 0.30 9.18
Main Building Axes 2,3&4 3 11.00 0.25 0.30 28.05
Main Building Axis D 1 5.00 0.25 0.30 4.25
Main Building Axes C,E&F 3 10.00 0.25 0.30 25.50
Total 92.48
Total 221.68
1.08 Stair case and landing m 2

Stair Case 4 5.000 1.10 0.15 22.00


Landing beam 2 2.50 0.25 0.35 4.75
Trade &Riser 24 1.10 0.28 0.17 4.49
Total 31.24

1.09 150 mm thick floor slab. m2


First Floor
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
2 2.40 1.00 4.80
1 3.00 1.50 4.50
Total 119.30
Second Floor
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
1 2.40 1.00 2.40
1 3.00 1.50 4.50
Total 116.90
Roof Slab (Water tanker)
1 6.30 2.75 17.33

Total 17.33
Total 253.52
B2 . Block Work
( Super- structure )
2.01 20cm thick hollow block wall
bedded on compo mortar mix 1:3
both side left for plaster. m2
Ground Floor
2 2.50 2.70 13.50
1 15.00 2.70 39.75
1 11.50 2.70 30.47
2 4.70 2.70 24.91
1 4.00 2.70 10.80
2 5.20 2.70 27.56
1 4.30 2.70 11.40

First Floor &Secand Floor 4 2.50 2.70 27.00


2 15.00 2.70 79.50
2 11.50 2.70 60.95
4 4.70 2.70 49.82
2 4.00 2.70 21.60
4 5.20 2.70 55.12
2 4.30 2.70 22.79

475.17
Deductions for Doors and windows
openings
Opening for doors 1 2.70 4.30 11.61
4 1.70 2.50 17.00
6 0.80 2.50 12.00
1 2.00 2.50 5.00
2 3.10 2.50 15.50
openings for windows -
1 1.35 1.95 2.63
2 1.10 2.00 4.40
1 1.30 1.60 2.08
3 0.75 2.90 6.52
2 1.60 2.30 7.36
2 1.50 2.75 8.25
-
92.36
Total 382.81
2.02 Ditto, but 15cm thick. m2

Ground Floor
4 2.50 2.70 27.00
1 4.40 2.70 11.66
2 2.90 2.70 15.37
1 5.50 2.70 14.58
1 2.25 2.70 6.08
1 0.73 2.70 1.93
1 0.50 2.70 1.33
1 4.61 2.70 12.22

First Floor &Secand Floor 6 3.50 2.70 56.70


12 0.50 2.70 15.90
2 2.40 2.70 12.72
4 3.60 2.70 38.16
2 3.25 2.70 17.55
1 3.80 2.70 10.07

Deductions for doors


1 1.60 2.10 3.36
15 0.80 2.10 25.20
241.25 28.56

Total 212.69
B3. Roofing
3.01 Apply average thickness of 3cm cement
screed over the terrace concrete. m2
1 6.30 2.750 17.33

Total 17.33
3.02 Apply 1 (One) layers of flint
Coattreatment for damp proofing
orMembrane damp proof course or (water
proofing material )to terrace & roof slab,
(including the necessary primer) as per
manufacturer application procedure.

3 1.00 2.400 7.20


1 1.50 3.000 4.50
Total 11.70

3.03 Roof cover in Harvey tiles or equivalent


material fix to50x70 cm purl in in position
&upper, lower ,vertical members as per
the drawing (with all accessories). Roof
measured in Horizontal Projection)

m2
1 4.60 4.500 20.70
1 6.90 3.900 26.91
1 4.00 5.300 21.20
1 4.70 5.600 26.32
1 5.70 13.70 78.09
Total 173.22

3.04 Harvey tiles vally gutter development


length 1050mm ml
1 - -
1 - -
Total -
3.05 Harvey tiles Side wall flasing
development length 450 mm ml 1 - -
1 - -
Total -
B4- Carpentry & Joinery

FLUSH WOOD DOORS

Flush wood doors with semi solid


core covered with approved veneer
on both sides to a finished
thickness of 4cm. Price shall
include frames hard wood lippings
and edgings at sides, top and
bottom and 12cm high kick plate.
Door hardware measured
elsewhere.

4.01 Type D1 size 80 x 210 cm No 15 15.00


Total 15.00
4.02 Type D2 size 120 x 210 cm No 1 1.00
Total 1.00

B5. Metal Work

Aluminium profilewindows and


doors cut and assembled the size
and shape shown on the schedule
of windows and doors subject to
the approval of shop drawings
Price shall include all the necessary
ironmongery door stopper,
cylindrical lock handle. (glazing
measured separetly).

A. Window

5.1 Type W1:size 135x 195cm No 1.00 1.00 1.00


Total 1.00
5.2 Type W2:size 110x200cm No 1.00 2.00 2.00
Total 2.00
5.3 Type W3:size 130x160cm No 1.00 1.00 1.00
Total 1.00
5.4 Type W4:size 75x290cm No 1.00 3.00 3.00
Total 3.00
5.3 Type W5:size160x230cm No 1.00 2.00 2.00
Total 2.00
5.3 Type W6:size 150x275cm No 1.00 2.00 2.00
Total 2.00

B. Doors

5.4 Type WD1:size 270x 430 cm No 1 1 1.00


Total 1.00
5.6 Type D1:size 170 x 250 cm No 1 4 4.00
Total 4.00
5.7 Type D1:size 80 x 250 cm No 1 6 6.00
Total 6.00
5.8 Type D1:size 200 x 250 cm No 1 1 1.00
Total 1.00
5.9 Type D1:size 310 x 250 cm No 1 2 2.00
Total 2.00

5.11 Supply and fix Metalic handrail


with support of same size. As per
the drawings. ml
Stair case 4 3.20 12.80
Balcony 3 2.20 6.60
3 2.40 7.20
3 6.00 18.00
Total 44.60

6. Finishing

6.01 Apply 3 coats of plastering to internal wall


surface in cement mortar mix 1:3. m2

For 20cm thick wall 1 382.81 382.81


For 15cm thick wall 2 212.69 425.38
Total 808.19

6.02 Ditto, but to concrete ceilings and beams.

Ground Floor
Column Type 1 5 0.20 0.30 2.70 8.10
Column Type 2 4 0.20 0.30 2.70 6.48
Column Type 3 3 0.20 0.30 2.70 4.86
1st Floor
Column Type 1 5 0.20 0.30 2.70 8.10
Column Type 2 4 0.20 0.30 2.70 6.48
Column Type 3 3 0.20 0.30 2.70 4.86
2nd Floor 1.00
Column Type 1 5 0.20 0.30 2.70 8.10
Column Type 2 4 0.20 0.30 2.70 6.48
Column Type 3 3 0.20 0.30 2.70 4.86
Total 53.46
In beam and intermediate beamtop ,tie
beam m2
First Floor
Main Building Axes 2,3&4 3 11.00 0.25 0.20 21.45
Main Building Axis D 1 5.00 0.25 0.20 3.25
Main Building Axes C,E&F 3 10.00 0.25 0.20 19.50
Second Floor 0.20
Main Building Axes 2,3&4 3 11.00 0.25 0.20 21.45
Main Building Axis D 1 5.00 0.25 0.20 3.25
Main Building Axes C,E&F 3 10.00 0.25 0.20 19.50

Total 88.40
TopTop Beam
Service Quarter AxesA&B 2 15.00 0.25 0.20 19.50
Service Quarter Axes1,2,3&4 4 2.70 0.25 0.20 7.02
Main Building Axes 2,3&4 3 11.00 0.25 0.20 21.45
Main Building Axis D 1 5.00 0.25 0.20 3.25
Main Building Axes C,E&F 3 10.00 0.25 0.20 19.50
Total 70.72
Stair case and landing m 2

Stair Case 4 5.000 1.10 0.15 22.00


Landing beam 2 2.50 0.25 0.35 4.75
Trade &Riser 24 1.10 0.28 0.17 4.49
Total 31.24

150 mm thick floor slab. m2


First Floor
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
2 2.40 1.00 4.80
1 3.00 1.50 4.50
Total 119.30
Second Floor
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
1 2.40 1.00 2.40
1 3.00 1.50 4.50
Total 116.90
Roof Slab (Water tanker)
1 6.30 2.75 17.33

Total 17.33
Total 378.04

6.03 Apply 3 coats of plastering to external


wall surface in cement mortar mix 1:3.
1 382.81 382.81
Total 382.81
6.04 Apply with gypsum Cement plastering to
internal wall surface to Satisfy fine Final
smooth. m2 808.19
Total 808.19
6.05 Ditto, but to concrete ceilings & beams. m2 378.04
Total 378.04

6.07 Supply and fix gypsum board ceiling


supported by metal profiles. Price shall
include the necessary profiles
and.Gypsum corner lists,
m2
1 3.00 5.00 15.00
1 2.50 5.00 12.50
3 5.50 5.00 82.50
2 2.40 1.00 4.80
1 3.00 1.50 4.50
Total 119.30

B7. Flooring
Ceramic Tiles

6.02 30mm thick cement & sand screed


to receive ceramic floor tiles.
m2
53.00
Total 53.00
6.03 Non slippery ceramic floor tiles
bedded in cement & sand mortar
mix (1:3) & cement wash grouting.
Color to much ceramic floor.
m2
Refier Item No7.01 Total 53.00
6.04 300x 200 x 6mm glazed ceramic
wall tile fix to plastered wall
surface with cement wash grouting.
m2
132.00
Total 132.00

Marble Tiles

Marble Tiles

6.05 48mm thick cement & sand screed to


Marble Tiles floor tiles. m2
202.00
Total 202.00

6.06 Marble Chips floor tiles m2


69.44
Total 69.44
6.07 Marble to stairs 3cm thick .

a) Trade size 110x 32cm. ml 24 1.10 0.32 26.40


Total 26.40
6.08 2cm thick black Marble

a Riser size 110x 15cm ml 12 1.10 0.15 13.20


Total 13.20
6.09 3cm thick Marble threshold (door
sills) on cement & sand mortar mix
(1:3) bedding. ml
1 4.30 4.30
4 1.70 6.80
6 0.80 4.80
1 2.00 2.00
2 3.10 6.20
15 0.80 12.00
1 1.20 1.20
Total 37.30
6.10 2cm thick Marble window sills. ml
1 1.35 1.35
2 1.10 2.20
1 1.30 1.30
3 0.75 2.25
2 1.60 3.20
2 1.50 3.00
Total 8.45

PVC Tile Flooring


48mm thick cement and sand screed with
cement mortar mix 1:3 to receive PVC
tiles. m2
202.00
Total 202.00

Supply and lay 2mm PVC tiles flooring


stuck down to floor with approved type
adhesive. m2 1 202.00 202.00
Total 202.00
10cm high plastic tile skirting stuck to wall
with approved type adhesive. ml
101.00
Total 101.00

Terrazzo Tiles

30mm thick cement and sand screed with


cement mortar mix 1:3 to receive terrazzo
tiles. m2
32.00
Total 32.00

Supply and lay 3mm terrazzo tiles flooring.


m2 1 32.00 32.00
Total 32.00

10/2cm high terrazzo tile skirting stuck to


wall with approved type adhesive. ml
27.00
Total 27.00

B8 . Painting

8.01 Prepare and apply by brush 3 coats


of approved plastic emulsion paint
to internal wall surface.
m2 808.19
Total 808.19
8.02 Ditto, but to concrete ceilings and
beams. m2 378.04
Total 378.04
8.03 External wall surface. plastering m2 382.81
Total 382.81
8.04 To gypsum board ceiling m2
1 119.30 119.30
Total 119.30
12. Glazing

Supply and fix glass glazing to


windows and doors :-
12.01 Single 4mm thick clear glass . m2
Windows 28.56
Doors 46.18
Total 74.74
Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure : Footing √ Subject: Specification ,Bill of Quantity and Engineers Estimate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 F1 1 14 18 5 1.62 90 145.80
2 F2 2 14 22 4 2.06 88 181.28
3 F3 2 14 26 2 2.30 52 119.60
4
5
12
Total Length 0.00 0.00 0.00 0.00 446.68 0.00 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 0.00 0.00 0.00 541.38 0.00 0.00 0.00

Checked by : ______________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets
Clint :W/ro Hewan Umar Location : Hawassa, East
Project : G+2 Residential Building

√ Structure :Foundation Columen √ Subject: Specification ,Bill of Quantity and Engeeners Estemate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 C1 Main.B 16 6 5 2.93 30 87.90
2 St 8 10 5 0.90 50 45.00
3 C2 16 8 4 2.93 32 93.76
4 8 9 4 0.90 36 32.40
5 C3 16 4 2 3.09 8 24.72
6 20 4 2 3.09 8 24.72
7 8 8 2 0.90 16 14.40

Total Length 0.00 91.80 0.00 0.00 0.00 206.38 24.72 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 36.26 0.00 0.00 0.00 326.08 61.06 0.00

Checked by : ___________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure :Grade Beam) √ Subject: Specification ,Bill of Quantity and Engeeners Estemate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24

at Axis1,2,3,4
of Service
1 quarter 12 4 4 3.50 16 56.00
2 12 4 2 12.00 8 96.00
3 12 4 2 5.00 8 40.00
4 at AxisC,D&F 16 2 3 10.13 6 30.90
5 14 2 3 5.15 6 30.90
6 14 2 3 6.23 6 37.35
7 at AxisD 16 2 1 5.83 2 11.65
8 14 2 1 5.13 2 10.25
10 at Axis2,3&4 16 2 3 11.23 6 67.35
11 14 2 3 5.75 6 34.50
12 14 2 3 5.73 6 34.35
12 8 551 1 1.30 551 716.30
Total Length 0.00 716.30 0.00 192.00 147.35 109.90 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 282.94 0.00 170.50 178.59 173.64 0.00 0.00

Checked by _________________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure : Floor Slab √ Subject: Specification ,Bill of Quantity and Engeeners Estemate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 Ground floor 8 150 1 12.000 150 1800.00
slab

Total Length 0.00 1800.00 0.00 0.00 0.00 0.00 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 711.00 0.00 0.00 0.00 0.00 0.00 0.00

Checked by : ________________ Approved by _________

Bar /Diametr Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24


Summery To Sub Stracture / Kg - 1,030.20 - 170.50 719.96 499.72 61.06 -
Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure :Stair Case √ Subject: Specification ,Bill of Quantity and Engeeners Estemate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 1stFlight Main.B 1 16 12 2 5.390 24 129.36
2 2 14 12 2 2.53 24 60.72
3 14 12 2 2.03 24 48.72
4 8 49 2 0.85 98 83.30
5 14 12 2 1.63 24 39.00
8 34 2 1.20 68 81.60
2 light
nd
1 16 12 2 5.41 24 129.84
2 14 12 2 2.41 24 57.84
3 14 12 2 2.61 24 62.64
4 8 49 2 0.85 98 83.30
5 8 34 2 1.63 68 110.50

Total Length 0.00 358.70 0.00 528.12 0.00 0.00 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.000 141.687 0.000 468.971 0.000 0.000 0.000 0.000

Checked by : _________________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure : 1st, 2nd and water tanker floor slab Subject: Specification ,Bill of Quantity and Engineers Estimate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 8 18 2 5.13 36 184.5
2 8 20 2 6.13 40 245
3 8 93 2 7.08 186 1315.95
4 8 57 2 7.00 114 798
8 47 2 8.55 94 803.7
6 8 48 2 7.23 96 693.6
8 48 2 6.78 96 650.4
8 18 2 2.35 36 84.42
8 11 2 2.95 22 64.9
8 18 1 8.07 18 145.26
8 42 1 5.95 42 249.9
8 16 1 8.74 16 139.84
10 74 2 3.30 148 488.40
10 32 2 2.73 64 174.72
10 68 2 2.37 136 322.32
10 68 2 3.13 136 425.68
10 34 1 3.25 34 110.50
Total Length 0.00 5375.47 1521.62 0.00 0.00 0.00 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 2123.31 938.84 0.00 0.00 0.00 0.00 0.00

Checked by : ______________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure : 1st and second Floor Beam Subject: Specification ,Bill of Quantity and Engineers Estimate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 at AxisC&E 16 2 2 10.825 4 43.30
2 16 1 2 3.300 2 6.60
2 16 3 2 2.000 6 12.00
2 16 3 2 5.150 6 30.90
2 16 3 2 5.225 6 31.35
4 at AxisD,F,F' 16 2 3 5.725 6 34.35
16 3 3 1.720 9 15.48
6 16 3 3 5.125 9 46.13
7 at Axis2 16 2 1 7.200 2 14.40
8 16 8 1 3.000 8 24.00
9 16 5 1 6.600 5 33.00
at Axis 3& 4 16 2 2 11.200 4 44.80
16 8 2 2.660 16 42.56
16 2 2 1.830 4 7.32
16 4 2 1.400 8 11.20
14 8 2 5.750 16 92.00
8 395 1 1.100 395 434.50
Total Length 0.00 434.50 0.00 0.00 92.00 397.39 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 171.63 0.00 0.00 111.50 627.87 0.00 0.00

Checked by ________________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building

√ Structure :T op Tie Beam Subject: Specification ,Bill of Quantity and Engineers Estimate

Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24

at Axis A&B
2 service q 12 2 2 6.860 4 27.44
3 12 2 2 5.560 4 22.24
4 12 2 2 4.050 4 16.20
5 12 2 2 6.225 4 24.90
6 12 2 2 9.000 4 36.00

at Axis A&B
8 service q 12 2 4 2.93 8 23.44
9 12 2 4 3.230 8 25.84
10 at Axis 2,3& 4 16 2 3 7.400 6 44.40
13 16 2 3 5.95 6 35.70
14 16 2 3 5.725 6 34.35
15 16 3 3 6.78 9 60.98
18 at Axis C,E,F 14 2 3 9.25 6 55.50
19 14 2 3 2.86 6 17.16
20 14 2 3 8.75 6 52.50
22 at Axis D 14 2 1 3.58 2 7.16
23 14 2 1 3.08 2 6.16
24 8 553 1 1.00 553 553.00
Total Length 0.00 553.00 0.00 176.06 138.48 175.43 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.47 3.555
Total weight in kg 0.000 218.435 0.000 156.341 167.838 277.172 0.000 0.000

Checked by _____________ Approved by _________


Reinforcement Bar Measurement Take Off - Sheets Date _12/_07_/2010
Clint :W/ro Hewan Umar Location : Hawassa, East Page _______
Project : G+2 Residential Building
Structure :Elavation Columen(G.Floor) Subject: Specification ,Bill of Quantity and Engeeners Estemate
Sir No of
N0 Location Shape Bar No Dim (Ø) No of Bar Mem Length Total Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24

£nTr l¼Y
}^ l. x iYÒ £nTr l¼Y ¬õ[ƒ n›r nšñr lSƒ /`´Sƒ/ Ö/ÉU`n›r mE6 mE8 mE10 mE12 mE14 mE16 mE20 mE24
1 C1 Main.B 16 10 5 3.700 50 185.00
14 4 5 3.185 20 63.70
3 C2 16 10 4 3.700 40 148.00
14 4 4 3.185 16 50.96
5 C3 20 4 2 3.700 8 29.60
16 10 2 3.185 20 63.70
14 6 2 3.185 12 38.22
C4 Sq 12 4 8 3.700 32 118.40
8 72 2 0.90 144 129.60
8 14 8 0.70 112 78.40

Total Length 0.00 208.00 0.00 0.00 216.58 481.00 0.00 0.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 0.00 82.16 0.00 0.00 262.49 759.98 0.00 0.00

Checked by ___________ Approved by _________

Bar /Diametr Ø6 Ø8 Ø10 Ø12 Ø14 Ø16 Ø20 Ø24


Summery To Super Stracture / Kg 0.000 2737.220 938.840 625.312 541.837 1665.020 0.000 0.000

Unit Price 55.00 63.00 90.000 125.000 210.000 260.000 460.000 585.000
Total Length 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00
Unit Weight kg/m 0.222 0.395 0.617 0.888 1.212 1.580 2.470 3.555
Total weight in kg 20.65 13.29 12.16 11.73 14.44 13.71 15.52 13.71
Clint :W/ro Hewan Umar
Project : G+2 Residential Building
Location : Hawassa, East
Subject: Specification ,Bill of Quantity and Engineers Estimate
Electrical Installation
Item
No. Description Unit Contract Qty Rate Contract Total Amount
¾¨<K ነÖL
}^ l.
SÓKÝ Yó` SK¡Á SÖÕ ªÒ¾¨<K Ñ”²u< M¡ Ö/ÉU` w`

ELECTRICAL INSTALLATIONS

ELECTRICAL WORKS AND INSTALL

SUPPLY AND INSTALL

1 DISTRIBUTION BOARDS

1-1
Flush mounted distribution board MDB-
Dervice with lockable door, complete with
bus terminals of 96A/3ph rating, neutral and
earth bars, and consisting of :-
main switch of 32A/3ph
MDB- and consisting
3pc 25A.ACB 3p
5pc16A.ACB 3p
4pc 10A.ACB1p
1pc 6A.ACB1p

All complete with three units reserve spaces No 1.00 18,000.00 18,000.00

1-2 Ditto as item No. 1-1 but for SDB-


ResidenceTY1 consisting of:96A/3P
main switch of 32A/3ph
4pc16A.ACB3p
2pc 10A.ACB 1p
1pc 6A.ACB 1p

All complete with three units reserve spaces. No 1.00 12,000.00 12,000.00

2 LIGHT POINTS AND SWITCHES

2-1
Light points fed through PVC insulated
conductor size of 2x2.5 mm sq. in thermo
plastic conduit of f 16mm with junction boxes
insulted screw type connectors as well as
switches (as shown on the drawing ) and all
the necessary accessories. No. 43.00 130.00 5,590.00

3 EXTRA OVER LIGHT POINTS (TYPE


LEG RAND SUNO OR EQUIVALENT)
FOR :-
Item
No. Description Unit Contract Qty Rate Contract Total Amount
¾¨<K ነÖL
}^ l.
SÓKÝ Yó` SK¡Á SÖÕ ªÒ¾¨<K Ñ”²u< M¡ Ö/ÉU` w`

3-1 Flush mounting Single one-way switch, NO 12.00 60.00 720.00

3-2 Flush mounting Double - switch, NO 3.00 80.00 240.00

3-3 Flush mounting two -way switch, NO 16.00 105.00 1,680.00

3-4 Flush mounting Double -way switch, NO 2.00 125.00 250.00

3-5 Inrermidate NO 4.00 95.00 380.00

4 SOCKET OUTLET POINTS


4-1

Socket outlet points 16A/1ph fed 1 through


PVC insulated conductor size of 3x2.5mm sq.
in conduit of f 16mm diameter including
junction boxes with screw type connectors and
all the necessary accessories to be fixed at a
height of 50cm above finished floor level No. 32.00 110.00 3,520.00

4-1.1 Flush mounted Single socket outlet of 16A/1P


7740 20 + 7740 41or equivalent. NO 25.00 45.00 1,125.00

4-1.2
Ditto as item No. 4-1.1 Instant socket outlets. No. 7.00 120.00 840.00

4.1.3 Ditto as item No. 3-1 but for water heater


incorporating 16A isolator (on-off) switch to
be fixed at a height of 1.8m above finished
floor level. Type of socket outlet shall be LEG
RAND Decor 718 20 or equivalent.

No. 2.00 110.00 220.00

4.1.4
Ditto as item No. 3-1 but for 20A/1ph electric
stove and injera metad to be fixed at height
of .30m above finished floor level. Type of
socket outlet shall be LEG RAND Decor 718
24 or equivalent. No. 1.00 115.00 115.00

Telephone Points/Outlets- inside PVC pipe


size of 19mm diameter from riser point to
junction box, and PVC pipe size of 16mm
diameter from junction box to every
individual telephone point. -

5-1 Telephone points fed through twisted pair


category 5E UTP cable inside PVC conduit of
21mm diameter. NO 10.00 110.00 1,100.00
Item
No. Description Unit Contract Qty Rate Contract Total Amount
¾¨<K ነÖL
}^ l.
SÓKÝ Yó` SK¡Á SÖÕ ªÒ¾¨<K Ñ”²u< M¡ Ö/ÉU` w`
5-2
RJ 11 outlet type LEG RAND Suno 7740 38 +
7740 41 or equivalent having category 5E
with 4 contacts complete with clip on support
frame. NO 10.00 95.00 950.00

5-3 Telephone terminal box ( junction box size of


150 x 100mm) . NO 2.00 35.00 70.00

6 BELL CALL SYSTEM


6-1

Push button points fed through PVC insulated


conductors of 2x0.8mm.sq in thermo plastic
conduit of f 13.5 mm, including junction boxes
with covers and screw type connectors as
well as push buttons for flush mounting type
LEG RAND Decor 718 28 or equivalent No. 8.00 80.00 640.00

6-2
Buzzer for flush mounting with transformer of
220/12 V,50 VA and call cancelling push
button to indicate 20 positions) etc.. No. 1.00 1800.00 1,800.00

6-3 Push button switch type type LEGRAND Suno


77740+ 7740 41 or equivalent. No. 8.00 110.00 880.00

7 TV Outlet points
7-1
TV out let point fed through PVC insulated
conductors of 2x0.8 mm. sq.( 75 Ohm) in
conduit of f 13.5mm including junction boxes
with covers for flush mountingas well as TV
socket type LEGRAND Decor 718 41 or
equivalent. NO 10.00 85.00 850.00

7-2
TV outlet type LEGRAND Suno 7740 32 +
7740 41 or equivalent having category 5E
with 4 contacts complete with clip on support
frame. NO 2.00 95.00 190.00
-
7-3 MATV terminal box ( junction box size of 150
x 100mm) terminating incoming line from
riser. NO 2.00 50.00 100.00
-
8 FEEDER CABLES
-
Item
No. Description Unit Contract Qty Rate Contract Total Amount
¾¨<K ነÖL
}^ l.
SÓKÝ Yó` SK¡Á SÖÕ ªÒ¾¨<K Ñ”²u< M¡ Ö/ÉU` w`
8-1 Cables from kwh meter to MDB ( tentative
measurment) and type of cable NYY
4.15.5/kW, size of 4x70/35x16 mmsq. mt. 15.00 130.00 1,950.00
-
8-2 size of 4x 6 mmsq. mt. 150.00 80.00 12,000.00

8-3 size of 4x4 mmsq. mt. 120.00 75.00 9,000.00

8-4 size of 3x2.5 mmsq. mt. 130.00 60.00 7,800.00


-
8-5 size of 3x2.5 mmsq. mt. 75.00 55.00 4,125.00

8-6 size of 2x2.5 mmsq. mt. 85.00 45.00 3,825.00

8-7 size of 2x1 mmsq. mt. 95.00 38.00 3,610.00

9 POWER INTAKE /ENTRY


9-1 Manhole in brick or masonry, internally
plastered with 10cm mass concrete base and
8cm thick including reinforced concrete cover
with lifting lug and size of 600x600x700 mm
No. 2.00 750.00 1,500.00
-
10 CONDUITS AND PIPES

10-1 PVC pipe of 100mm diameter mt. 25.00 19.00 475.00

10-2 PVC pipe of 40mm diameter mt. 75.00 15.00 1,125.00

10-3 PVC pipe of 29mm diameter mt. 85.00 11.00 935.00

10-4 PVC pipe of 21mm diameter mt. 55.00 9.00 495.00

10-5 PVC pipe of 19mm diameter mt. 45.00 7.00 315.00

10-6 PVC pipe of 16mm diameter mt. 150.00 5.00 750.00

11 LOW VOLTAGE SYSTEM EARTHING


SYSTEM

11-1
Low voltage system earthing consisting of 1x
50mm² bare copper conductor (8m) inside
concrete pipe as shown on the drawing
bonded to earth terminal of EEPCO's KWh
meter board,earthing rod od f 16mm
(complete with driving stud, coupler, spike,
and rod-to ca No. 1.00 1,500.00 1,500.00

12 LIGHT FITTINGS as described here below


or equivalent. -
Item
No. Description Unit Contract Qty Rate Contract Total Amount
¾¨<K ነÖL
}^ l.
SÓKÝ Yó` SK¡Á SÖÕ ªÒ¾¨<K Ñ”²u< M¡ Ö/ÉU` w`
-
12.1 Fitting type No-1-PHILIPHS TCS097 .136
with 1 x 36W fluorescent LAMP. No. 5.00 430.00 2,150.00
-
12.2 Fitting type No-2- Ceiling Mounted
Incandescent Luminary with -18W lamp No. 24.00 490.00 11,760.00
-
12.3 Fitting type No-3- Wall Mounted Incandescent
Luminary with -40W lamp No. 12.00 480.00 5,760.00

12.4 Fitting type No-1-PHILIPHS TCS097 .136


with 2x 36W fluorescent LAMP. No. 2.00 620.00 1,240.00

Total carried to summary 121,575.00


A B C D E F
1
2 Clint :W/ro Hewan Umar
3 Project : G+2 Residential Building
4 Location : Hawassa, East
5 Subject: Specification ,Bill of Quantity and Engineers Estimate
6 Sanitary Installation
7
Item Contract Contract Total
8 Description Unit Rate
No. Qty Amount

9 Yó` ¾¨<K ¾¨<K Ñ”²u< M¡


}^ l. SÓKÝ SK¡Á SÖÕ ነÖL ªÒ Ö/ÉU` w`
10
Basement +G+2 Residential Building
11

12
13 B11.Sanitery Installation
14
1.01 Supply and install pipe, PPR for cold and
hot water distribution to sanitary fixtures,
complete with accessories including
bends, unions Ts, reducers, support, etc.
15 The scope of work includes all incidental
civil works, and testing of the system with
a pressure of 10kg/cm2

16
17 Ø15mm ml 190.00 40.00 7,600.00
18 Ø20 mm ml 120 45.00 5,400.00
19
1.02 Supply and install PPR valves of approved
20 quality for all sanitary fixtures and
including all accessories No 300.00 40.00 12,000.00
21
1.03 Supply and install PPR gate valves of
approved quality complete with unions,
22
elastic water proofing hand wheel and all
required
23
24 Ø15mm No 137.00 25.00 3,425.00
25 Ø20 mm No 35.00 45.00 1,575.00
26
27 SANITARY FIXTURES
1.04 Supply and install hand was basin, size:
500 x 405mm made of white vitreous
china including cold and hot water mixer
28 tap, plug, chain, trap, support and all
required accessories of approved quality.

No 32.00 1,100.00 35,200.00


29
1.05 Supply and install low flush water closet
made of white glazed vitreous china
30 including cistern, plastic seat with cover,
flexible pipe and all required accessories
of approved quality
No 32.00 1,700.00 54,400.00
31

Page 37 of 41
A B C D E F
Item Contract Contract Total
8 Description Unit Rate
No. Qty Amount

9 Yó` ¾¨<K ¾¨<K Ñ”²u< M¡


}^ l. SÓKÝ SK¡Á SÖÕ ነÖL ªÒ Ö/ÉU` w`
1.06 Supply and install shower units made of
enameled cast iron plate with slip
resistant base including chrome plated
32 shower head, mixing valves, waste water
trap and all required accessories Size
700x700mm
No 13.00 950.00 12,350.00
33
1.07 Supply and install bath unit complete with
34 all required accessories and as per the
clients preference No 6.00 2,300.00 13,800.00
35

Page 38 of 41
A B C D E F
Item Contract Contract Total
8 Description Unit Rate
No. Qty Amount

9 Yó` ¾¨<K ¾¨<K Ñ”²u< M¡


}^ l. SÓKÝ SK¡Á SÖÕ ነÖL ªÒ Ö/ÉU` w`
1.08 Supply and install kitchen sink in stainless
steel, bauble bowl with chrome plated
36
mixing valve, chain, plug, drain trap and
complete with all required accessories

No 3.00 650.00 1,950.00


37
1.09 Supply and install electric water heater of
approved quality and including safety
38
valve, non return valves and all required
accessories. Capacity
39 50 Liters No 18.00 1,200.00 21,600.00
1.10 Supply and fix Sauna &steam Bath
40 complete with all necessaries accessories
No 1.00 13,000.00 13,000.00
41
1.11 Supply and install toilet paper holder
42 made of white vitreous china complete No 32.00 70.00
with all accessories 2,240.00
43
1.12 Supply and install soap holder in white
44
vitreous china 150x150mm No 32.00 65.00 2,080.00
45
1.13 Supply and install towel hanger of No
46 approved quality complete with all
accessories 32.00 55.00 1,760.00
47
1.14 Supply and install crystal glass mirror,
48 size 500x400mm including chrome plated
brass clips and screws No 32.00 120.00 3,840.00
49
1.15 Supply and install floor drain made of
PVC including a removable strainer,
50 smell trap and all required items of
approved quality. 50mm diameter

No 32.00 200.00 6,400.00


51
1.16 Supply and install electric driven
centrifugal domestic booster pubp
including isolating valves, non retrn
52 valve, flexivle connectionk float switch,
control panel and all required
accessories.

53 Q = 2.5 l/s
54
55 H = 35m H40
56
57 P = 2.5 kw No. 2.00 8,500.00 17,000.00
58
59 WASTE DRAIN PIPES
60

Page 39 of 41
A B C D E F
Item Contract Contract Total
8 Description Unit Rate
No. Qty Amount

9 Yó` ¾¨<K ¾¨<K Ñ”²u< M¡


}^ l. SÓKÝ SK¡Á SÖÕ ነÖL ªÒ Ö/ÉU` w`
1.16 Supply and install u PVC PN 6 pipes of
approved quality for soil waste and vent
pipes in horizontal branches and vertical
stacks including all necessary fittings such
as bends, Ys, Ts, reducers, support, clamps
and all required. All horizontal branches
shall be laid in a slope of 2%. The unit
61 price shall include all necessary civil
works such as chiseling of walls, slabs,
floors, etc and closing them with concrete
of cement mortar

62 Ø 50 mm ml 140.00 45.00 6,300.00


63 Ø100 mm ml 200.00 65.00 13,000.00
64
65 Ø200 mm ml 50.00 65.00 3,250.00
66 -
67
1.17 Supply and install vent caps made of u
68 PVC on the roof terminals of vent pioes

69 Ø50 mm No 8.00 85.00 680.00


-
70
1.18 Supply and install elevated water tank in
fiber glass with inlet outlet connectors,
71 float valve, drain, overflow, manhole and
all required accessories capacity: 5,000
Liters
No 4.00 7,500.00 30,000.00
72

Page 40 of 41
A B C D E F
Item Contract Contract Total
8 Description Unit Rate
No. Qty Amount

9 Yó` ¾¨<K ¾¨<K Ñ”²u< M¡


}^ l. SÓKÝ SK¡Á SÖÕ ነÖL ªÒ Ö/ÉU` w`
1.19 Construct manholes for sanitary sewer
lines with double brick wall and internally
plastered, including 200mm thick mass
73 concrete base, 80mm thick reinforced
concrete cover with handle. Size internal
600x600
No 12.00 1,600.00 19,200.00
74
1.20 Construct 60 m3septic tank in masons wall No
and concrete slab as per the drawing and
75 in coordination with structural working
drawing
1.00 12,000.00 12,000.00
76
77 Total carried to summary 300,050.00
78

Page 41 of 41