Professional Documents
Culture Documents
Sample Contour and Sections
Sample Contour and Sections
Sample Contour and Sections
CPD -1.000 m
A B C D
RAISED CHIMNEY
0.0 0.0 0.0 0.0
TOWER TYPE DC+0
GRID SIZE 1M x 1M
ne
Li
n
tio
ec s
Bi
D1
D CJ_T-88 D1
B
BENCHING DETAILS-cj_t-13
D2 A3 0
CUT
CUT
CJ_T-13
FILL
PIT
CUT
CJ_T-13
FILL
PIT
Cut/Fill Summary
Name Cut Factor Fill Factor 2d Area Cut Fill Net
PIT-A EXCAVATION VOLUME 1.000 1.000 5.00sq.m 17.25 Cu. M. 0.00 Cu. M. 17.25 Cu. M.<Cut>
PIT-B EXCAVATION VOLUME 1.000 1.000 4.00sq.m 13.80 Cu. M. 0.00 Cu. M. 13.80 Cu. M.<Cut>
PIT-C EXCAVATION VOLUME 1.000 1.000 5.00sq.m 16.78 Cu. M. 0.00 Cu. M. 16.78 Cu. M.<Cut>
PIT-D EXCAVATION VOLUME 1.000 1.000 5.00sq.m 17.25 Cu. M. 0.00 Cu. M. 17.25 Cu. M.<Cut>
BENCHING VOLUME 1.000 1.000 231.00sq.m 577.32 Cu. M. 38.57 Cu. M. 538.74 Cu. M.<Cut> BENCHING DETAIS-cj_
Totals 250.00sq.m 642.40 Cu. M. 38.57 Cu. M. 603.83 Cu. M.<Cut>
Note: This is Preliminarybenching and excavation quantities, the actual quantities must be worked out A3 0
based on the final benched level and as per Instructions of the EIC(Engineer In-charge).