BAR BENDING SCHEDULE

1. Introduction
2. Reinforcement Details
3. Basic Calculation of B.B.S
4. How to use B.B.S Excel Sheet & Print out
5. B.B.S Examples
6. How to manage on site for rebar fabrication &
erection
I. INTRODUCTION

 Moment Resisting Frame


1. Ordinary Moment Resisting Frame
2. Intermediate Moment Resisting Frame
3. Special Moment Resisting Frame

 For Residential Buildings (Special Moment Resisting Frame)


1. Bago 5. Putoa-O
2. Dawei 6. Pyinmana
3. Myitkyina 7. Sagaing
4. Naypyitaw 8. Taungoo
SEISMIC DESIGN CATEGORY OF OCCUPANCY CATEGORY II AND III ACCORDING TO MNBC-2020
OCCUPANCY CATEGORY OF BUILDING AND
OTHER STRUCTURES
2. REINFORCEMENT DEATAILS
2.1. Reinforcement Details of O.M.R.F
2.2. Reinforcement Details of I.M.R.F
2.3. Reinforcement Details of S.M.R.F
2.4. Tension Development Length and Tension Splice Length
2.5. Compression Development Length and Compression Splice Length
2.6. Minimum Inside Bend Diameters and Standard Hook Geometry for Stirrups, Ties and Hoops
2.7. Standard Hook Geometry for Development of Deformed Bars in Tension
2.8. Specified Concrete cover and Minimum and Maximum Spacing of Reinforcement
2.9. Concrete Cover of Beam and Column Edge
2.10. Reinforcement Details of Step Beam and Step Slab
2.11. General Considerations
2.1. REINFORCEMENT DETAILS OF O.M.R.F
2.2. REINFORCEMENT DETAILS OF I.M.R.F
2.3.1. REINFORCEMENT DETAILS OF S.M.R.F (COLUMN)
2.3.2. REINFORCEMENT DETAILS OF S.M.R.F (BEAM)
2.4. TENSION DEVELOPMENT LENGTH AND TENSION SPLICE
LENGTH

For f’c = 2500 psi, fy = 60 ksi, db = 16mm


Ld = 48 db = 48 x 16/25.4 = 30.2 in = 2’6.2”

Ld > 2’3” (Hook is required at the end of Rebar.)

For f’c = 2500 psi, fy = 40 ksi, db = 16mm


Ld = 32 db = 32 x 16/25.4 = 20.2 in = 1’8.2”

Ld < 2’3” (Hook isn’t required at the end of Rebar.)


2.4. TENSION DEVELOPMENT LENGTH AND TENSION SPLICE
LENGTH

For f’c = 2500 psi, fy = 40 ksi, db = 16mm


Ld = 32 db = 32 x 16/25.4 = 20.2 in = 1’8.2”
For f’c = 2500 psi, fy = 60 ksi, db = 10mm
Ld = 48 db = 48 x 10/25.4 = 18.9 in = 1’6.9”

If Ld > L/3 (Hook is required at the end of Rebar.) For f’c = 2500 psi, fy = 50 ksi, db = 16mm
Ld = 40 db = 40 x 16/25.4 = 25.2 in = 2’1.2”
If Ld < L/3 (Hook isn’t required at the end of Rebar.)

For f’c = 2500 psi, fy = 60 ksi, db = 16mm


Ld = 48 db = 48 x 16/25.4 = 30.2 in = 2’6.2”
2.5.COMPRESSION DEVELOPMENT LENGTH AND COMPRESSION
SPLICE LENGTH
2.5.1. INTERACTION DIAGRAM
2.6. MINIMUM INSIDE BEND DIAMETERS AND STANDARD
HOOK GEOMETRY FOR STIRRUPS, TIES AND HOOPS
2.7. STANDARD HOOK GEOMETRY FOR DEVELOPMENT OF
DEFORMED BARS IN TENSION
2.8. SPECIFIED CONCRETE COVER AND MINIMUM AND
MAXIMUM SPACING OF REINFORCEMENT
2.9. CONCRETE COVER OF BEAM AND COLUMN EDGE
2.10.1. REINFORCEMENT DETAILS OF STEP BEAM
2.10.1. REINFORCEMENT DETAILS OF STEP SLAB
2.11. GENERAL CONSIDERATIONS
3. BASIC CALCULATION OF B.B.S
3.1. Sample of Rebar Bending
3.2. Formula of Beam, Stirrups and Ties
3.3. Calculation for Square Footing
3.4. Calculation for Rectangular Footing
3.1. SAMPLE OF REBAR BENDING
3.2. FORMULA OF BEAM, STIRRUPS AND TIES

To Find Numbers of Stirrups and Ties

For same spacing of stirrups or ties

Numbers = ( l1 + l2 + … + ln ) / S

For different spacing of stirrups for beam

Stirrups Nos: = [ ( l1 + l2 + … + ln ) – 4h x n ] / S + 4h x n / So

Where,
n = number of beam
l 1, l 2, l n = clear length of beam
h = beam depth
S = spacing of stirrups at mid span
So = spacing of stirrups within 2h
Calculate a, b, c = ?
For different spacing of stirrups for beam
a = c = 10 in for 16mmØ, 12.5 in for 20mmØ (90° Hook) ( 2.7 )
C = lo + lsc ( I.M.R.F )
b = ( L1 + L2 + … ) – 2 x side cover C = 2 x lo + lst ( S.M.R.F )

Where, Tie Nos: = [ ( l1 + l2 + … + ln ) – C x n ] / S + C x n / So


Side Cover = 2” for column to column ( 2.9 )
= 2.5” for secondary beam and slab rebar at beam ( 2.9 )
Tie Nos: = [ ( l – C ) / S + C/So ] x n
3.3. CALCULATION FOR SQUARE FOOTING

Footing Size = 6’ x 6’

Rebar for Footing, “ B and L “

a = c = 5 in for 16mmØ (180° Hook) ( 2.7 )

b = width – 2 cover = 6 – 2 x 3/12 = 5.5’ = 5’ 6”

N=2x[b/S+1]

= 2 x [ ( 5.5 x 12) / 6 + 1 ]

= 2 ( 66 / 6 +1 )

= 2 ( 12 )

= 24 nos

Where,
Cover = 3” for footing ( 2.8 )
S = Spacing of Rebar
Width = B = L
3.4. CALCULATION FOR RECTANGULAR FOOTING

Footing Size = 4’ x 5’

Rebar for Footing Width, “ B “

a = c = 4.5 in for 12mmØ (180° Hook) ( 2.7 )

b = B – 2 cover = 4 – 2 x 3/12 = 3.5’ = 3’ 6”

N = ( L – 2 cover ) / S + 1 = ( 5 x 12 – 2 x 3 ) / 6 + 1 = 54 / 6 +1 = 10 nos

Rebar for Footing Length, “ L “

a = c = 4.5 in for 12mmØ (180° Hook) ( 2.7 )

b = L – 2 cover = 5 – 2 x 3/12 = 4.5’ = 4’ 6”

N = ( B – 2 cover ) / S + 1 = ( 4 x 12 – 2 x 3 ) / 6 + 1 = 42 / 6 +1 = 8 nos

Where,
Cover = 3” for footing ( 2.8 )
S = Spacing of Rebar
4. HOW TO USE B.B.S EXCEL SHEET & PRINT OUT
4.1. Bar Bending Schedule Photo
4.2. Input data for B.B.S (Table-1)
4.3. Waste Management (Table-2)
4.4. Print View of Bar Bending Schedule (Table-3)
4.5. Rebar Quantity
4.1. BAR BENDING SCHEDULE PHOTO
4.2. INPUT DATA FOR B.B.S (TABLE-1)

Unit for ► a, b, c, d, e, f, g
4.3. WASTE MANAGEMENT (TABLE-2)

ေပ လိလ င် ►
B.B.S တွင ် Waste ၏ Length ကိ
မေပ လိလ င် ► X

Co

Waste မယ၍ ြဖတ်


ရမည့် သံေချာင်း
အေရအတွက်
4.4. PRINT VIEW OF BAR BENDING SCHEDULE (TABLE-3)

ြဖတ်ရမည့် သံေချာင်းအေရအတွက် သံေချာင်းြဖတ်ရမည့အ


် ည်

Co ခသ cco g
◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ
◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ
Rebar Segments for Bending
(Fig + Space bar + Number)

လိချင်တပ
ဲ့ ံရဲ နံ့ ပါတ်ကိ ိက်ထည့ရ
် င် ပံေပ လာမယ်။
4.5. REBAR QUANTITY

သံတစ်ေချာင်းအ ည် Co ခသ cc g
◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ
◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ◌ါ
www.facebook.com/profile.php?id=100009306350580

B.B.S Part 1
https://drive.google.com/file/d/1o94YwSm9QgapQeBTNruy1WflhPAaEIFi/view?usp=drivesdk

B.B.S Part 2
https://drive.google.com/file/d/1pqv8p4U0pyNCKZ_YIH79mI7w6ayWl2QS/view?usp=drivesdk

B.B.S Excel Sheet V5


https://docs.google.com/spreadsheets/d/1rbUiAPXdn5tjZA-
KVCHHgMnsTYu7TGEk/edit?usp=drivesdk&ouid=105655714793209775894&rtpof=true&sd=true

Reinforcement Detailings PDF Books


https://drive.google.com/drive/folders/1o0gLdpCXJ2KAC0le36oloA0eDtMFynnu
THANKS

Any Question per 10000 ks.

You might also like