Purpose Statement- The purpose of the UNSW Solar Farm development project is to strategically
position UNSW for its 2025 goals by establishing a sustainable renewable energy source and
fostering innovation, while also contributing to academic excellence and social impact.
Scope Statement- This project involves engineering, procurement, and construction of a 20MW PV
solar farm, expandable to 30MW, on a 35-hectare UNSW site in rural NSW, integrated into the
electrical grid. Key components include PV cell installation, logistics coordination, infrastructure,
electrical systems, and a control room for monitoring and research. The project aims to supply UNSW
with renewable energy, align with its 2025 objectives, foster innovation, and support academic
excellence. Constraints include a budget of $25M and a time duration of 1 year and 10 months,
ending on 30 August 2025. The solar farm will provide 20MW initially, with infrastructure designed
for future expansion to 30MW to support research and development.
WBS: UNSW Developmental PV Solar Farm Project
1. UNSW
Developmental
PV Solar Farm
Project
1.1 Project 1.2 Engineering 1.3 Procurement 1.4 Construction 1.5 Performance 1.6 Training
Management and Design and Logistics and Installation Testing Transfer
1.1.1 Initiation 1.1.4 Risk 1.1.5 Project 1.3.1 Vendor 1.5.1 Test 1.6.1 Training
1.1.2 Planning 1.1.3 Stakeholder 1.1.6 Project 1.2.1 Conceptual 1.4.1 Site
and Project Assessment and Monitoring and Selection and Planning and Program
and Scheduling Managemnt Closure Design Preparation
Charter Management Control Contracts Procedures Development
1.1.6.1
1.2.2 Detailed 1.3.2 Material 1.4.2 Mechanical 1.5.2 1.6.2 Training
Stakeholders
Engineering and Equipment Plant Installation Performance Test Delivery
Feedback
Procurement