Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

With leakages (ms) After fixing leakages (ms)

d
Time on Load Time on Unload Time on Load Time on Unload
1 02:57.71 0:53.31 01:03.84 02:55.91
2 02:39.80 0:52.61 01:03.78 02:55.71
Average 2.800 0.884 1.050 2.920

Free air delivery (FAD) Compressor Capacity 2.7 m3/min


Daily Operating Hours 16 hours/day
Compressor Rated Power 18.5 kW

With leakages
Time on Load - ON (minutes) T 2.800000
Time on Unload - OFF (minutes) t 0.884000
Compressor Capacity (m3/min) Q 2.7
Daily operating Time (Hours) h 16
Specific power for compressed air at the facility 𝑃=(𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟 𝑅𝑎𝑡𝑒
3.1 P 109.63
(kWh/m3)
𝐿=𝑇/((𝑇+𝑡))×𝑄
System Leakage Quantity (m3/min) L 2.05

Daily loss of electricity (kWh) 215,973.94 𝐷𝑎𝑖𝑙𝑦 𝑙𝑜𝑠𝑠 𝑜𝑓 𝑒𝑙𝑒𝑐


3.2 Annual energy loss (kWh) 78,830,488.60

3.4 After fixing Leakages


Time on Load - ON (minutes) T 1.050
Time on Unload - OFF (minutes) t 2.920
Compressor Capacity (m3/min) Q 2.7
Daily operating Time (Hours) h 16
Specific power for compressed air at the facility 𝑃=(𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟 𝑅𝑎𝑡𝑒
P 109.63
(kWh/m3)
𝐿=𝑇/((𝑇+𝑡))×𝑄
System Leakage Quantity (m3/min) L 0.71

Daily loss of electricity (kWh) 75,155.67 𝐷𝑎𝑖𝑙𝑦 𝑙𝑜𝑠𝑠 𝑜𝑓 𝑒𝑙𝑒𝑐


Annual energy loss (kWh) 27,431,818.64
𝑃=(𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟 𝑅𝑎𝑡𝑒𝑑 𝑃𝑜𝑤𝑒𝑟×ℎ)/𝑄

𝐿=𝑇/((𝑇+𝑡))×𝑄

𝐷𝑎𝑖𝑙𝑦 𝑙𝑜𝑠𝑠 𝑜𝑓 𝑒𝑙𝑒𝑐𝑡𝑟𝑖𝑐𝑖𝑡𝑦=𝐿×60×ℎ×𝑃

𝑃=(𝐶𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑜𝑟 𝑅𝑎𝑡𝑒𝑑 𝑃𝑜𝑤𝑒𝑟×ℎ)/𝑄

𝐿=𝑇/((𝑇+𝑡))×𝑄

𝐷𝑎𝑖𝑙𝑦 𝑙𝑜𝑠𝑠 𝑜𝑓 𝑒𝑙𝑒𝑐𝑡𝑟𝑖𝑐𝑖𝑡𝑦=𝐿×60×ℎ×𝑃

You might also like