Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 306

Wednesday

월간 현황 일일 현황

(Status Bulanan) (Daily Status)
구분 실 조시 봉제터
구분 차종 부위 스크래 봉비
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 립덕 Paping 봉제 찜힘 Tulang/
(Divisi) (CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain 치 Jahitan
Pitch Benang overlap
Lips terbuka Pleated / stitch tidak Jahitan
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet ketemu Putus
Timbul
F/C 480 - 2,000 - 160 - -
F/B 860 5 2,000 5,814 300 1 3,333 1
SU2id R/C 260 1 2,000 3,846 80 - -
R/B 820 3 2,000 3,659 240 2 8,333 1
SU2id 소계 (Total) 2,420 9 2,000 3,719 780 3 3,846 - 2 - - - - - - - - - -
Incoming F/C 40 - 2,000 - - -
in AHTI F/B 100 - 2,000 - 40 - -
R/C 80 - 2,000 - 40 - -
KS R/B 120 - 2,000 - 40 - -
3RD CUSH - - 2,000 - - -
3RD BACK 180 1 2,000 5,556 80 - -
KS 소계 (Total) 520 1 2,000 1,923 200 - - - - - - - - - - - - - -
Total Incoming 2,940 10 2,000 3,401 980 3 3,061 - 2 - - - - - - - - - -
F/C 744 - 500 - 266 - -
F/B 744 - 500 - 266 - -
SU2id R/C 372 - 500 - 133 - -
R/B 744 1 500 1,344 266 1 3,759 1
SU2id 소계 (Total) 2,604 1 500 384 931 1 1,074 - - - - - - - - - 1 - -
Assembling F/C 208 - 500 - 54 - -
in AHTI F/B 208 - 500 - 54 - -
R/C 208 - 500 - 54 - -
KS R/B 208 - 500 - 54 - -
3RD CUSH 208 - 500 - 54 - -
3RD BACK 208 - 500 - 54 - -
KS 소계 (Total) 1,248 - 500 - 324 - - - - - - - - - - - - - -
Total Assembling 3,852 1 500 260 1,255 1 797 - - - - - - - - - 1 - -

◈ 품질 현황 (Status kualitas)
Thursday

월간 현황 일일 현황

(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시 봉제터
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 Paping 봉제 찜힘 Tulang/ 짐
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain 치 Jahitan
Pitch Benang overlap
Lips terbuka Pleated / stitch tidak Jahitan
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet ketemu Putus
Timbul
F/C 1,080 - 2,000 - 160 - -
F/B 1,700 9 2,000 5,294 250 1 4,000 1
SU2id R/C 480 2 2,000 4,167 80 - -
R/B 1,580 10 2,000 6,329 200 - -
SU2id 소계 (Total) 4,840 21 2,000 4,339 690 1 1,449 - 1 - - - - - - - - - -
Incoming F/C 40 - 2,000 - -
in AHTI F/B 240 1 2,000 4,167 60 - -
R/C 240 1 2,000 4,167 40 - -
KS R/B 200 - 2,000 - 40 - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 260 1 2,000 3,846 100 1 10,000
KS 소계 (Total) 1,020 3 2,000 2,941 240 1 4,167 - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 930 2 2,151 - 1 - - - - - - - - - -
F/C 1,562 - 500 - 196 - -
F/B 1,562 - 500 - 196 - -
SU2id R/C 781 - 500 - 98 - -
R/B 1,562 1 500 640 196 - -
SU2id 소계 (Total) 5,467 1 500 183 686 - - - - - - - - - - - - - -
Assembling F/C 350 - 500 - 122 - -
in AHTI

KS
Assembling
in AHTI F/B 350 - 500 - 122 - -
R/C 350 - 500 - 122 - -
KS R/B 350 - 500 - 122 - -
3RD CUSH 350 - 500 - 122 - -
3RD BACK 350 - 500 - 122 - -
KS 소계 (Total) 2,100 - 500 - 732 - - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 1,418 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Wednesday

월간 현황 일일 현황

구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제터
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕 jahitan 봉제 찜힘
(Divisi) (CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침
Lips terbuka/o Pleated / stitch tidak 짐
Produksi) Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain 치 Jahitan
Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM duck pen seam Kelipet Jahitan
Scratch Loncat ketemu Putus
F/C 1,080 - 2,000 - 160 - - Timbul
F/B 1,700 9 2,000 5,814 310 3 9,677 1 1
SU2id R/C 480 2 2,000 3,846 100 1 10,000
R/B 1,580 10 2,000 3,659 380 1 2,632
SU2id 소계 (Total) 4,840 21 2,000 3,719 950 5 5,263 - 1 - - - 1 - - - - - -
Incoming F/C 40 - 2,000 - 40 - -
in AHTI F/B 240 1 2,000 - - -
R/C 240 1 2,000 - - -
KS R/B 200 - 2,000 - 40 - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 260 1 2,000 5,556 - -
KS 소계 (Total) 1,020 3 2,000 1,923 80 - - - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 3,401 1,030 5 4,854 - 1 - - - 1 - - - - - -
F/C 1,562 - 500 - 282 - -
F/B 1,562 - 500 - 282 - -
SU2id R/C 781 - 500 - 141 - -
R/B 1,562 1 500 1,344 282 - -
SU2id 소계 (Total) 5,467 1 500 384 987 - - - - - - - - - - - - - -
Assembling F/C 350 - 500 - 32 - -
in AHTI F/B 350 - 500 - 32 - -
R/C 350 - 500 - 32 - -
KS R/B 350 - 500 - 32 - -
3RD CUSH 350 - 500 - 32 - -
3RD BACK 350 - 500 - 32 - -
KS 소계 (Total) 2,100 - 500 - 192 - - - - - - - - - - - - - -
Total Assembling 7,567 1 500 260 1,179 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday

월간 현황 일일 현황

(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시 봉제터
검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕 Paping 봉제 찜힘 Tulang/
(Garis
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain 치 Jahitan
Pitch Benang overlap
Lips terbuka Pleated / stitch tidak Jahitan
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet ketemu Putus
Timbul
F/C 1,080 - 2,000 - - -
F/B 1,700 9 2,000 5,294 - -
SU2id R/C 480 2 2,000 4,167 - -
R/B 1,580 10 2,000 6,329 - -
SU2id 소계 (Total) 4,840 21 2,000 4,339 - - - - - - - - - - - - - - -
Incoming F/C 40 - 2,000 - - -
in AHTI F/B 240 1 2,000 4,167 - -
R/C 240 1 2,000 4,167 - -
KS R/B 200 - 2,000 - - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 260 1 2,000 3,846 - -
KS 소계 (Total) 1,020 3 2,000 2,941 - - - - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 - - - - - - - - - - - - - - -
F/C 1,562 - 500 - - -
F/B 1,562 - 500 - - -
SU2id

Assembling
in AHTI
SU2id R/C 781 - 500 - - -
R/B 1,562 1 500 640 - -
SU2id 소계 (Total) 5,467 1 500 183 - - - - - - - - - - - - - - -
Assembling F/C 350 - 500 - - -
in AHTI F/B 350 - 500 - - -
R/C 350 - 500 - - -
KS R/B 350 - 500 - - -
3RD CUSH 350 - 500 - - -
3RD BACK 350 - 500 - - -
KS 소계 (Total) 2,100 - 500 - - - - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Friday

월간 현황 일일 현황

구분 (Status Bulanan) (Daily Status)
실 조시 봉제터
구분 차종 부위 스크래 봉비
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 립덕 Paping 봉제 찜힘 Tulang/
(Divisi) (CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
Cacat Kain 치
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Lips terbuka Pleated / stitch tidak Jahitan
(Cacat) Kontaminasi Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet ketemu Putus
F/C 1,080 - 2,000 - - - Timbul
F/B 1,700 9 2,000 5,294 - -
SU2id R/C 480 2 2,000 4,167 - -
R/B 1,580 10 2,000 6,329 - -
SU2id 소계 (Total) 4,840 21 2,000 4,339 - - - - - - - - - - - - - - -
Incoming F/C 40 - 2,000 - - -
in AHTI F/B 240 1 2,000 4,167 - -
R/C 240 1 2,000 4,167 - -
KS R/B 200 - 2,000 - - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 260 1 2,000 3,846 - -
KS 소계 (Total) 1,020 3 2,000 2,941 - - - - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 - - - - - - - - - - - - - - -
F/C 1,562 - 500 - - -
F/B 1,562 - 500 - - -
SU2id R/C 781 - 500 - - -
R/B 1,562 1 500 640 - -
SU2id 소계 (Total) 5,467 1 500 183 - - - - - - - - - - - - - - -
Assembling F/C 350 - 500 - - -
in AHTI F/B 350 - 500 - - -
R/C 350 - 500 - - -
KS R/B 350 - 500 - - -
3RD CUSH 350 - 500 - - -
3RD BACK 350 - 500 - - -
KS 소계 (Total) 2,100 - 500 - - - - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 1 shift 1


월간 현황 일일 현황
(Status Bulanan) (Daily Status)

구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비 실 조시 맞지
검사 수량 (누적) 불량 (누적) 검사 수량 불량 직물 결함 Cacat 스크래치 땀수 겹침 립덕 봉제 찜힘 Tulang/ 봉제터짐
Tujuan Pencapaian Pencapaian 오염 Kontaminasi Jahitan 않음 Paping terbuka
stitch tidak
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kain Scratch Pitch overlap Lips duck Pleated / Kelipet Jahitan Putus
PPM PPM PPM Loncat Benang Timbul ketemu

F/C 480 - 2,000 - 480 - - - - - - - - - - - - - -


F/B 860 5 2,000 5,814 860 5 5,814 - 3 - - - 1 - - - - - -
SU2id R/C 260 1 2,000 3,846 260 1 3,846 - - - - - - - - - - - -
R/B 820 3 2,000 3,659 820 3 3,659 - 1 - - - - - - - - - -
SU2id 소계 (Total) 2,420 9 2,000 3,719 2,420 9 3,719 - 4 - - - 1 - - - - - -
Incoming F/C 40 - 2,000 - 40 - - - - - - - - - - - - - -
in AHTI F/B 100 - 2,000 - 100 - - - - - - - - - - - - - -
R/C 80 - 2,000 - 80 - - - - - - - - - - - - - -
KS R/B 120 - 2,000 - 120 - - - - - - - - - - - - - -
3RD CUSH - - 2,000 - - - - - - - - - - - - - - - -
3RD BACK 180 1 2,000 5,556 180 1 5,556 - - - - - - - - - - - -
KS 소계 (Total) 520 1 2,000 1,923 520 1 1,923 - - - - - - - - - - - -
Total Incoming 2,940 10 2,000 3,401 2,940 10 3,401 - 4 - - - 1 - - - - - -
F/C 744 - 500 - 744 - - - - - - - - - - - - - -
F/B 744 - 500 - 744 - - - - - - - - - - - - - -
SU2id R/C 372 - 500 - 372 - - - - - - - - - - - - - -
R/B 744 1 500 1,344 744 1 - - - - - - - - - - 1 - -
SU2id 소계 (Total) 2,604 1 500 384 2,604 1 384 - - - - - - - - - 1 - -
Assembling F/C 208 - 500 - 208 - - - - - - - - - - - - - -
in AHTI F/B 208 - 500 - 208 - - - - - - - - - - - - - -
R/C 208 - 500 - 208 - - - - - - - - - - - - - -
KS R/B 208 - 500 - 208 - - - - - - - - - - - - - -
3RD CUSH 208 - 500 - 208 - - - - - - - - - - - - - -
3RD BACK 208 - 500 - 208 - - - - - - - - - - - - - -
KS 소계 (Total) 1,248 - 500 - 1,248 - - - - - - - - - - - - - -
Total Assembling 3,852 1 500 260 3,852 1 260 - - - - - - - - - 1 - -
11/1/2023

봉제 Jahit

스티치 바늘자 오염 및 손상 합계
주름 텐션문 오조립 굴곡 시접 표시점 되박음 Run of Appeara Aksesoris 손상 Missing
Kerut Jahitan 폭 국 (TTL)
제 Salah gelomba Seam Notch Back Stitch nce tidak ada /
Kerusak stitch
/Wrinkle Tension numpuk Pasang ng Allowance lebar point tack Lubang an
jahitan jarum lepas
kendor -
1
-
1 2
- - - - - - - - - - - - - 1 - 3
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - 1 - 3
-
-
-
1
- - - - - - - - - - - - - - - 1
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - 1

11/2/2023

봉제 Jahit

스티치 바늘자 오염 및 손상 합계
주름 텐션문 오조립 굴곡 시접 표시점 되박음 손상 Missing (TTL)
Kerut Jahitan Salah gelomba Seam 폭 Notch Back 국 Run of Appeara Aksesoris
Kerusak stitch
제 Stitch nce tidak ada /
/Wrinkle Tension numpuk Pasang ng Allowance lebar point tack Lubang an
jahitan jarum lepas
kendor
-
1
-
-
- - - - - - - - - - - - - - - 1
-
-
-
-
-
1 1
- 1 - - - - - - - - - - - - - 1
- 1 - - - - - - - - - - - - - 2
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/3/2023

봉제 Jahit

스티치 바늘자 오염 및 손상 합계
주름 텐션문 오조립 굴곡 시접 표시점 되박음 손상 Missing (TTL)
Kerut Jahitan Salah gelomba Seam 폭 국 Run of Appeara Aksesoris
제 Notch Back Stitch nce tidak ada /
Kerusak stitch
/Wrinkle Tension numpuk Pasang ng Allowance lebar point tack Lubang an
jahitan jarum lepas -
kendor1 3
1 1
1 1
2 1 - - - - - - - - - - - - - 5
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
2 1 - - - - - - - - - - - - - 5
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/4/2023

봉제 Jahit
실 스티치
바늘자 오염 및 손상 합계
주름 텐션문 오조립 굴곡 시접 폭 표시점 되박음 손상 Missing (TTL)
Kerut Jahitan Salah gelomba Seam 국 Run of Appeara Aksesoris
제 margin Notch Back Stitch nce tidak ada /
Kerusak stitch
/Wrinkle Tension numpuk Pasang ng Allowance incorrec point tack Lubang an
jarum lepas
kendor t -
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/5/2023

봉제 Jahit 실
스티치
바늘자 오염 및 손상 합계
주름 텐션문 오조립 굴곡 시접 폭 표시점 되박음 손상 Missing
Kerut Jahitan 국 Run of Appeara Aksesoris (TTL)
제 Salah gelomba Seam margin Notch Back Stitch nce tidak ada /
Kerusak stitch
/Wrinkle Tension numpuk Pasang ng Allowance incorrec point tack Lubang an
jarum lepas -
kendor t
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

01-03 November 2023

봉제 Jahit

오염 및 손상 합계
실 텐션문제 (TTL)
주름 Jahitan 오조립 굴곡 시접 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris 손상 Missing stitch
Tension
Kerut /Wrinkle numpuk Salah Pasang gelombang Seam Allowance lebar jahitan Notch point Back tack Lubang jarum tidak ada / Kerusakan
kendor
lepas

- - - - - - - - - - - - - - - -
- 1 - - - - - - - - - - - - - 5
1 - - - - - - - - - - - - - - 1
1 - - - - - - - - - - - - 1 - 3
2 1 - - - - - - - - - - - 1 - 9
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- 1 - - - - - - - - - - - - - 1
- 1 - - - - - - - - - - - - - 1
2 2 - - - - - - - - - - - 1 - 10
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - 1
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks

40 39 13b ks

40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id
40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id
40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas)

Wednesday

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - 200 - -
F/B 1,700 9 2,000 5,294 260 1 3,846 1
SU2id R/C 480 2 2,000 4,167 60 1 16,667
R/B 1,580 10 2,000 6,329 240 2 8,333 1
SU2id 소계 (Total) 4,840 21 2,000 4,339 760 4 5,263 - 1 - - - - - - - 1 -
Incoming F/C 40 - 2,000 - - -
in AHTI F/B 240 1 2,000 4,167 60 - -
R/C 240 1 2,000 4,167 80 1 12,500 1
KS R/B 200 - 2,000 - 40 - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 260 1 2,000 3,846 - -
KS 소계 (Total) 1,020 3 2,000 2,941 180 1 5,556 - 1 - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 940 5 5,319 - 2 - - - - - - - 1 -
F/C 1,562 - 500 - 256 - -
F/B 1,562 - 500 - 256 - -
SU2id R/C 781 - 500 - 128 - -
R/B 1,562 1 500 640 256 - -
SU2id 소계 (Total) 5,467 1 500 183 896 - - - - - - - - - - - - -
Assembling F/C 350 - 500 - 64 - -
in AHTI F/B 350 - 500 - 64 - -
R/C 350 - 500 - 64 - -
KS R/B 350 - 500 - 64 - -
3RD CUSH 350 - 500 - 64 - -
3RD BACK 350 - 500 - 64 - -
KS 소계 (Total) 2,100 - 500 - 384 - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 1,280 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - 160 - -
F/B 1,700 9 2,000 5,294 250 1 4,000
SU2id R/C 480 2 2,000 4,167 80 - -
R/B 1,580 10 2,000 6,329 240 1 4,167
SU2id 소계 4,840 21 2,000 4,339 730 2 2,740 - - - - - - - - - - -
Incoming F/C 40 - 2,000 - - -
in AHTI (Total)
F/B 240 1 2,000 4,167 60 - -
R/C 240 1 2,000 4,167 80 - -
KS R/B 200 - 2,000 - 40 - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 260 1 2,000 3,846 80 - -
KS 소계 (Total) 1,020 3 2,000 2,941 260 - - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 990 2 2,020 - - - - - - - - - - -
F/C 1,562 - 500 - 256 - -
F/B 1,562 - 500 - 256 - -
SU2id R/C 781 - 500 - 128 - -

Assembling
in AHTI
SU2id
R/B 1,562 1 500 640 256 - -
SU2id 소계 5,467 1 500 183 896 - - - - - - - - - - - - -
Assembling F/C 350 - 500 - 64 - -
in AHTI (Total)
F/B 350 - 500 - 64 - -
R/C 350 - 500 - 64 - -
KS R/B 350 - 500 - 64 - -
3RD CUSH 350 - 500 - 64 - -
3RD BACK 350 - 500 - 64 - -
KS 소계 (Total) 2,100 - 500 - 384 - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 1,280 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Wednesday
월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분 차종 부위
0 목표 달성 달성 봉비 실 조시 맞지 jahitan
(Garis Produksi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 검사 수량 불량 직물 결함 Cacat 스크래치 땀수 겹침 립덕 봉제 찜힘
Tujuan Pencapaian Pencapaian 오염 Kontaminasi Jahitan 않음 terbuka/open Tulang/
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kain Scratch Pitch overlap Lips duck seam Pleated / Kelipet stitch tidak ketemu
PPM PPM PPM Loncat Benang Timbul
F/C 600 - 2,000 - 240 - -
F/B 840 4 2,000 4,762 330 2 6,061 1
SU2id R/C 220 1 2,000 4,545 80 - -
R/B 760 7 2,000 9,211 280 4 14,286 1
SU2id 소계 (Total) 2,420 12 2,000 4,959 930 6 6,452 - 2 - - - - - - - - -
Incoming F/C - - 2,000 - - -
in AHTI F/B 140 1 2,000 7,143 20 1 50,000 1
R/C 160 1 2,000 6,250 - -
KS R/B 80 - 2,000 - - -
3RD CUSH 40 - 2,000 - 40 - -
3RD BACK 80 - 2,000 - - -
KS 소계 (Total) 500 2 2,000 4,000 60 1 16,667 - 1 - - - - - - - - -
Total Incoming 2,920 14 2,000 4,795 990 7 7,071 - 3 - - - - - - - - -
F/C 818 - 500 - 306 - -
F/B 818 - 500 - 306 - -
SU2id R/C 409 - 500 - 153 - -
R/B 818 - 500 - 306 - -
SU2id 소계 (Total) 2,863 - 500 - 1,071 - - - - - - - - - - - - -
Assembling F/C 142 - 500 - 14 - -
in AHTI F/B 142 - 500 - 14 - -
R/C 142 - 500 - 14 - -
KS R/B 142 - 500 - 14 - -
3RD CUSH 142 - 500 - 14 - -
3RD BACK 142 - 500 - 14 - -
KS 소계 (Total) 852 - 500 - 84 - - - - - - - - - - - - -
Total Assembling 3,715 - 500 - 1,155 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 600 - 2,000 - - -
F/B 840 4 2,000 4,762 - -
SU2id R/C 220 1 2,000 4,545 - -
R/B 760 7 2,000 9,211 - -
SU2id 소계 2,420 12 2,000 4,959 - - - - - - - - - - - - - -
Incoming F/C - - 2,000 - - -
in AHTI (Total)
F/B 140 1 2,000 7,143 - -
R/C 160 1 2,000 6,250 - -
KS R/B 80 - 2,000 - - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 80 - 2,000 - - -
KS 소계 (Total) 500 2 2,000 4,000 - - - - - - - - - - - - - -
Total Incoming 2,920 14 2,000 4,795 - - - - - - - - - - - - - -
F/C 818 - 500 - - -
SU2id

Assembling
in AHTI
F/B 818 - 500 - - -
SU2id R/C 409 - 500 - - -
R/B 818 - 500 - - -
SU2id 소계 2,863 - 500 - - - - - - - - - - - - - - -
Assembling F/C 142 - 500 - - -
in AHTI (Total)
F/B 142 - 500 - - -
R/C 142 - 500 - - -
KS R/B 142 - 500 - - -
3RD CUSH 142 - 500 - - -
3RD BACK 142 - 500 - - -
KS 소계 (Total) 852 - 500 - - - - - - - - - - - - - - -
Total Assembling 3,715 - 500 - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Friday

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 600 - 2,000 - - -
F/B 840 4 2,000 4,762 - -
SU2id R/C 220 1 2,000 4,545 - -
R/B 760 7 2,000 9,211 - -
SU2id 소계 2,420 12 2,000 4,959 - - - - - - - - - - - - - -
Incoming F/C - - 2,000 - - -
in AHTI (Total)
F/B 140 1 2,000 7,143 - -
R/C 160 1 2,000 6,250 - -
KS R/B 80 - 2,000 - - -
3RD CUSH 40 - 2,000 - - -
3RD BACK 80 - 2,000 - - -
KS 소계 (Total) 500 2 2,000 4,000 - - - - - - - - - - - - - -
Total Incoming 2,920 14 2,000 4,795 - - - - - - - - - - - - - -
F/C 818 - 500 - - -
F/B 818 - 500 - - -
SU2id R/C 409 - 500 - - -
R/B 818 - 500 - - -
SU2id 소계 2,863 - 500 - - - - - - - - - - - - - - -
Assembling F/C 142 - 500 - - -
in AHTI (Total)
F/B 142 - 500 - - -
R/C 142 - 500 - - -
KS R/B 142 - 500 - - -
3RD CUSH 142 - 500 - - -
3RD BACK 142 - 500 - - -
KS 소계 (Total) 852 - 500 - - - - - - - - - - - - - - -
Total Assembling 3,715 - 500 - - - - - - - - - - - - - - -

SHIFT 2
월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비 실 조시 맞지
검사 수량 (누적) 불량 (누적) 검사 수량 불량 직물 결함 Cacat 스크래치 땀수 겹침 립덕 Paping 봉제 찜힘
Tujuan Pencapaian Pencapaian 오염 Kontaminasi Jahitan 않음 terbuka
Tulang/
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kain Scratch Pitch overlap Lips duck Pleated / Kelipet stitch tidak ketemu
PPM PPM PPM Loncat Benang Timbul

F/C 600 - 2,000 - 600 - - - - - - - - - - - - -


F/B 840 4 2,000 4,762 840 4 4,762 - 2 - - - - - - - - -
SU2id R/C 220 1 2,000 4,545 220 1 4,545 - - - - - - - - - - -
R/B 760 7 2,000 9,211 760 7 9,211 - 1 - - - - - - - 1 -
SU2id 소계 (Total) 2,420 12 2,000 4,959 2,420 12 4,959 - 3 - - - - - - - 1 -
Incoming F/C - - 2,000 - - - - - - - - - - - - - - -
in AHTI F/B 140 1 2,000 7,143 140 1 7,143 - 1 - - - - - - - - -
R/C 160 1 2,000 6,250 160 1 6,250 - 1 - - - - - - - - -
KS R/B 80 - 2,000 - 80 - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - 40 - - - - - - - - - - - - -
3RD BACK 80 - 2,000 - 80 - - - - - - - - - - - - -
Incoming
in AHTI

KS

KS 소계 (Total) 500 2 2,000 4,000 500 2 4,000 - 2 - - - - - - - - -


Total Incoming 2,920 14 2,000 4,795 2,920 14 4,795 - 5 - - - - - - - 1 -
F/C 818 - 500 - 818 - - - - - - - - - - - - -
F/B 818 - 500 - 818 - - - - - - - - - - - - -
SU2id R/C 409 - 500 - 409 - - - - - - - - - - - - -
R/B 818 - 500 - 818 - - - - - - - - - - - - -
SU2id 소계 (Total) 2,863 - 500 - 2,863 - - - - - - - - - - - - -
Assembling F/C 142 - 500 - 142 - - - - - - - - - - - - -
in AHTI F/B 142 - 500 - 142 - - - - - - - - - - - - -
R/C 142 - 500 - 142 - - - - - - - - - - - - -
KS R/B 142 - 500 - 142 - - - - - - - - - - - - -
3RD CUSH 142 - 500 - 142 - - - - - - - - - - - - -
3RD BACK 142 - 500 - 142 - - - - - - - - - - - - -
KS 소계 (Total) 852 - 500 - 852 - - - - - - - - - - - - -
Total Assembling 3,715 - 500 - 3,715 - - - - - - - - - - - - -

Monday SHIFT 1 & 2

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi) (CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips Pleated /
(Cacat) Kontaminasi Scratch Pitch Benang overlap terbuka stitch tidak
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - 360 - - - - - - - - - - - - -
F/B 1,700 9 2,000 5,294 560 2 3,571 - 2 - - - - - - - - -
SU2id R/C 480 2 2,000 4,167 140 1 7,143 - - - - - - - - - - -
R/B 1,580 10 2,000 6,329 480 4 8,333 - 1 - - - - - - - 1 -
SU2id 소계 (Total) 4,840 21 2,000 4,339 1,540 7 4,545 - 3 - - - - - - - 1 -
Incoming F/C 40 - 2,000 - - - - - - - - - - - - - - -
in AHTI F/B 240 1 2,000 4,167 100 - - - - - - - - - - - - -
R/C 240 1 2,000 4,167 120 1 8,333 - 1 - - - - - - - - -
KS R/B 200 - 2,000 - 80 - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - - - - - - - - - - - - - - -
3RD BACK 260 1 2,000 3,846 80 - - - - - - - - - - - - -
KS 소계 (Total) 1,020 3 2,000 2,941 380 1 2,632 - 1 - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 1,920 8 4,167 - 4 - - - - - - - 1 -
F/C 1,562 - 500 - 522 - - - - - - - - - - - - -
F/B 1,562 - 500 - 522 - - - - - - - - - - - - -
SU2id R/C 781 - 500 - 261 - - - - - - - - - - - - -
R/B 1,562 1 500 640 522 1 1,916 - - - - - - - - - 1 -
SU2id 소계 (Total) 5,467 1 500 183 1,827 1 547 - - - - - - - - - 1 -
Assembling F/C 350 - 500 - 118 - - - - - - - - - - - - -
in AHTI F/B 350 - 500 - 118 - - - - - - - - - - - - -
R/C 350 - 500 - 118 - - - - - - - - - - - - -
KS R/B 350 - 500 - 118 - - - - - - - - - - - - -
3RD CUSH 350 - 500 - 118 - - - - - - - - - - - - -
3RD BACK 350 - 500 - 118 - - - - - - - - - - - - -
KS 소계 (Total) 2,100 - 500 - 708 - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 2,535 1 394 - - - - - - - - - 1 -

Wednesday Shift 1 & 2

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - 320 - - - - - - - - - - - - -
F/B 1,700 9 2,000 5,294 500 2 4,000 - 1 - - - - - - - - -
SU2id R/C 480 2 2,000 4,167 160 - - - - - - - - - - - - -
R/B 1,580 10 2,000 6,329 440 1 2,273 - - - - - - - - - - -
Incoming
in AHTI
SU2id

SU2id 소계 4,840 21 2,000 4,339 1,420 3 2,113 - 1 - - - - - - - - -


Incoming F/C 40 - 2,000 - - - - - - - - - - - - - - -
in AHTI (Total)
F/B 240 1 2,000 4,167 120 - - - - - - - - - - - - -
R/C 240 1 2,000 4,167 120 - - - - - - - - - - - - -
KS R/B 200 - 2,000 - 80 - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - - - - - - - - - - - - - - -
3RD BACK 260 1 2,000 3,846 180 1 5,556 - - - - - - - - - - -
KS 소계 (Total) 1,020 3 2,000 2,941 500 1 2,000 - - - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 1,920 4 2,083 - 1 - - - - - - - - -
F/C 1,562 - 500 - 452 - - - - - - - - - - - - -
F/B 1,562 - 500 - 452 - - - - - - - - - - - - -
SU2id R/C 781 - 500 - 226 - - - - - - - - - - - - -
R/B 1,562 1 500 640 452 - - - - - - - - - - - - -
SU2id 소계 5,467 1 500 183 1,582 - - - - - - - - - - - - -
Assembling F/C 350 - 500 - 186 - - - - - - - - - - - - -
in AHTI (Total)
F/B 350 - 500 - 186 - - - - - - - - - - - - -
R/C 350 - 500 - 186 - - - - - - - - - - - - -
KS R/B 350 - 500 - 186 - - - - - - - - - - - - -
3RD CUSH 350 - 500 - 186 - - - - - - - - - - - - -
3RD BACK 350 - 500 - 186 - - - - - - - - - - - - -
KS 소계 (Total) 2,100 - 500 - 1,116 - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 2,698 - - - - - - - - - - - - -

Wednesday SHIFT 1 &2

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - 400 - - - - - - - - - - - - -
F/B 1,700 9 2,000 5,294 640 5 7,813 - 2 - - - 1 - - - - -
SU2id R/C 480 2 2,000 4,167 180 1 5,556 - - - - - - - - - - -
R/B 1,580 10 2,000 6,329 660 5 7,576 - 1 - - - - - - - - -
SU2id 소계 4,840 21 2,000 4,339 1,880 11 5,851 - 3 - - - 1 - - - - -
Incoming F/C 40 - 2,000 - 40 - - - - - - - - - - - - -
in AHTI (Total)
F/B 240 1 2,000 4,167 20 1 50,000 - 1 - - - - - - - - -
R/C 240 1 2,000 4,167 - - - - - - - - - - - - - -
KS R/B 200 - 2,000 - 40 - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - 40 - - - - - - - - - - - - -
3RD BACK 260 1 2,000 3,846 - - - - - - - - - - - - - -
KS 소계 (Total) 1,020 3 2,000 2,941 140 1 7,143 - 1 - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 2,020 12 5,941 - 4 - - - 1 - - - - -
F/C 1,562 - 500 - 588 - - - - - - - - - - - - -
F/B 1,562 - 500 - 588 - - - - - - - - - - - - -
SU2id R/C 781 - 500 - 294 - - - - - - - - - - - - -
R/B 1,562 1 500 640 588 - - - - - - - - - - - - -
SU2id 소계 5,467 1 500 183 2,058 - - - - - - - - - - - - -
Assembling F/C 350 - 500 - 46 - - - - - - - - - - - - -
in AHTI (Total)
F/B 350 - 500 - 46 - - - - - - - - - - - - -
R/C 350 - 500 - 46 - - - - - - - - - - - - -
KS R/B 350 - 500 - 46 - - - - - - - - - - - - -
3RD CUSH 350 - 500 - 46 - - - - - - - - - - - - -
3RD BACK 350 - 500 - 46 - - - - - - - - - - - - -
KS 소계 (Total) 2,100 - 500 - 276 - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 2,334 - - - - - - - - - - - - -

Thursday SHIFT 1 &2

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi) (CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips Pleated /
(Cacat) Kontaminasi Scratch Pitch Benang overlap terbuka stitch tidak
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - - - - - - - - - - - - - - -
F/B 1,700 9 2,000 529 - - - - - - - - - - - - - -
SU2id R/C 480 2 2,000 417 - - - - - - - - - - - - - -
R/B 1,580 10 2,000 633 - - - - - - - - - - - - - -
SU2id 소계 (Total) 4,840 21 2,000 434 - - - - - - - - - - - - - -
Incoming F/C 40 - 2,000 - - - - - - - - - - - - - - -
in AHTI F/B 240 1 2,000 417 - - - - - - - - - - - - - -
R/C 240 1 2,000 417 - - - - - - - - - - - - - -
KS R/B 200 - 2,000 - - - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - - - - - - - - - - - - - - -
3RD BACK 260 1 2,000 385 - - - - - - - - - - - - - -
KS 소계 (Total) 1,020 3 2,000 294 - - - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 410 - - - - - - - - - - - - - -
F/C 1,562 - 500 - - - - - - - - - - - - - - -
F/B 1,562 - 500 - - - - - - - - - - - - - - -
SU2id R/C 781 - 500 - - - - - - - - - - - - - - -
R/B 1,562 1 500 64 - - - - - - - - - - - - - -
SU2id 소계 (Total) 5,467 1 500 18 - - - - - - - - - - - - - -
Assembling F/C 350 - 500 - - - - - - - - - - - - - - -
in AHTI F/B 350 - 500 - - - - - - - - - - - - - - -
R/C 350 - 500 - - - - - - - - - - - - - - -
KS R/B 350 - 500 - - - - - - - - - - - - - - -
3RD CUSH 350 - 500 - - - - - - - - - - - - - - -
3RD BACK 350 - 500 - - - - - - - - - - - - - - -
KS 소계 (Total) 2,100 - 500 - - - - - - - - - - - - - - -
Total Assembling 7,567 1 500 13 - - - - - - - - - - - - - -

Friday SHIFT 1 &2

월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - - - - - - - - - - - - - - -
F/B 1,700 9 2,000 5,294 - - - - - - - - - - - - - -
SU2id R/C 480 2 2,000 4,167 - - - - - - - - - - - - - -
R/B 1,580 10 2,000 6,329 - - - - - - - - - - - - - -
SU2id 소계 4,840 21 2,000 4,339 - - - - - - - - - - - - - -
Incoming F/C 40 - 2,000 - - - - - - - - - - - - - - -
in AHTI (Total)
F/B 240 1 2,000 4,167 - - - - - - - - - - - - - -
R/C 240 1 2,000 4,167 - - - - - - - - - - - - - -
KS R/B 200 - 2,000 - - - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - - - - - - - - - - - - - - -
3RD BACK 260 1 2,000 3,846 - - - - - - - - - - - - - -
KS 소계 (Total) 1,020 3 2,000 2,941 - - - - - - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 - - - - - - - - - - - - - -
F/C 1,562 - 500 - - - - - - - - - - - - - - -
F/B 1,562 - 500 - - - - - - - - - - - - - - -
SU2id R/C 781 - 500 - - - - - - - - - - - - - - -
R/B 1,562 1 500 640 - - - - - - - - - - - - - -
SU2id 소계 5,467 1 500 183 - - - - - - - - - - - - - -
Assembling F/C 350 - 500 - - - - - - - - - - - - - - -
in AHTI (Total)
F/B 350 - 500 - - - - - - - - - - - - - - -
R/C 350 - 500 - - - - - - - - - - - - - - -
KS R/B 350 - 500 - - - - - - - - - - - - - - -
3RD CUSH 350 - 500 - - - - - - - - - - - - - - -
3RD BACK 350 - 500 - - - - - - - - - - - - - - -
KS 소계 (Total) 2,100 - 500 - - - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 1 Shift 1&Shift 2


월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위
(Garis
(Divisi) (CAR) (Bagian)
Produksi)
구분
구분 차종 부위 실 조시
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 직물 결함 봉비 립덕 봉제 찜힘
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 스크래치 땀수 맞지 않음 겹침 Paping Tulang/
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Cacat Jahitan Lips terbuka Pleated / stitch tidak
(Cacat) Kontaminasi Scratch Pitch Benang overlap
inspeksi) Cacat) PPM PPM inspeksi) PPM Kain Loncat duck Kelipet ketemu
Timbul
F/C 1,080 - 2,000 - 1,080 - - - - - - - - - - - - -
F/B 1,700 9 2,000 5,294 1,700 9 5,294 - 5 - - - 1 - - - - -
SU2id R/C 480 2 2,000 4,167 480 2 4,167 - - - - - - - - - - -
R/B 1,580 10 2,000 6,329 1,580 10 6,329 - 2 - - - - - - - 1 -
SU2id 소계 (Total) 4,840 21 2,000 4,339 4,840 21 4,339 - 7 - - - 1 - - - 1 -
Incoming F/C 40 - 2,000 - 40 - - - - - - - - - - - - -
in AHTI F/B 240 1 2,000 4,167 240 1 4,167 - 1 - - - - - - - - -
R/C 240 1 2,000 4,167 240 1 4,167 - 1 - - - - - - - - -
KS R/B 200 - 2,000 - 200 - - - - - - - - - - - - -
3RD CUSH 40 - 2,000 - 40 - - - - - - - - - - - - -
3RD BACK 260 1 2,000 3,846 260 1 3,846 - - - - - - - - - - -
KS 소계 (Total) 1,020 3 2,000 2,941 1,020 3 2,941 - 2 - - - - - - - - -
Total Incoming 5,860 24 2,000 4,096 5,860 24 4,096 - 9 - - - 1 - - - 1 -
F/C 1,562 - 500 - 1,562 - - - - - - - - - - - - -
F/B 1,562 - 500 - 1,562 - - - - - - - - - - - - -
SU2id R/C 781 - 500 - 781 - - - - - - - - - - - - -
R/B 1,562 1 500 640 1,562 1 640 - - - - - - - - - 1 -
SU2id 소계 (Total) 5,467 1 500 183 5,467 1 183 - - - - - - - - - 1 -
Assembling F/C 350 - 500 - 350 - - - - - - - - - - - - -
in AHTI F/B 350 - 500 - 350 - - - - - - - - - - - - -
R/C 350 - 500 - 350 - - - - - - - - - - - - -
KS R/B 350 - 500 - 350 - - - - - - - - - - - - -
3RD CUSH 350 - 500 - 350 - - - - - - - - - - - - -
3RD BACK 350 - 500 - 350 - - - - - - - - - - - - -
KS 소계 (Total) 2,100 - 500 - 2,100 - - - - - - - - - - - - -
Total Assembling 7,567 1 500 132 7,567 1 132 - - - - - - - - - 1 -
24:00:00

11/1/2023

봉제 Jahit
스티치 부자재 미부착 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara
Jahitan Salah gelomban 폭 Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce
numpuk Pasang lebar tidak ada / Kerusakan stitch
Putus /Wrinkle kendor g Allowance point tack jarum
jahitan lepas
-
1
1 1
1 2
1 1 - - - - - - - - - - - - - - 4
-
-
1
-
-
-
- - - - - - - - - - - - - - - - 1
1 1 - - - - - - - - - - - - - - 5
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/2/2023

봉제 Jahit
스티치 부자재 미부착 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara
Jahitan Salah gelomban 폭 Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce
numpuk Pasang lebar tidak ada / Kerusakan stitch
Putus /Wrinkle kendor g Allowance point tack jarum
jahitan lepas
-
1 1
-
1 1
- - - - - - - - - - 1 - - - 1 - 2
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - 1 - - - 1 - 2
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/3/2023

봉제 Jahit

오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 스티치폭 표시점 되박음 바늘자국 Aksesoris (TTL)
Jahitan Run of Stitch Appearance 손상 Kerusakan Missing stitch
Jahitan Putus Kerut /Wrinkle Tension kendor numpuk Salah Pasang gelombang Seam Allowance lebar jahitan Notch point Back tack Lubang jarum tidak ada /
lepas
-
1 2
-
1 1 1 4
- 1 - - - - - - - - 2 - - - 1 - 6
-
1
-
-
-
-
- - - - - - - - - - - - - - - - 1
- 1 - - - - - - - - 2 - - - 1 - 7
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/4/2023

봉제 Jahit
스티치
오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 폭 표시점 되박음 바늘자국 Run of Appeara
손상
(TTL)
Aksesoris Missing
Jahitan Kerut Tension Jahitan Salah gelomban Seam margin Notch Back Lubang Stitch nce tidak ada / Kerusakan stitch
Putus /Wrinkle kendor numpuk Pasang g Allowance incorrec point tack jarum
lepas
t -
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/5/2023

봉제 Jahit
스티치 합계
오염 및 손상
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 폭 표시점 되박음 바늘자국 Run of Appeara
Jahitan Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Salah gelomban Seam margin Notch Back Lubang Stitch nce
numpuk Pasang tidak ada / Kerusakan stitch
Putus /Wrinkle kendor g Allowance incorrec point tack jarum
lepas
t
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

01-03 November 2023

봉제 Jahit

오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 스티치폭 표시점 되박음 바늘자국 Aksesoris (TTL)
Jahitan Run of Stitch Appearance 손상 Kerusakan Missing stitch
Jahitan Putus Kerut /Wrinkle Tension kendor numpuk Salah Pasang gelombang Seam Allowance lebar jahitan Notch point Back tack Lubang jarum tidak ada /
lepas
- - - - - - - - - - - - - - - - -
- - - - - - - - - - 2 - - - - - 4
- 1 - - - - - - - - - - - - - - 1
1 1 - - - - - - - - 1 - - - 2 - 7
1 2 - - - - - - - - 3 - - - 2 - 12
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 2
1 2 - - - - - - - - 3 - - - 2 - 14
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/1/2023

봉제 Jahit

스티치 부자재 미부착 합계


봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara Missing (TTL)
Jahitan Salah gelomban 폭 Aksesoris 손상
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce
numpuk Pasang lebar tidak ada / Kerusakan stitch
Putus /Wrinkle kendor g Allowance point tack jarum
jahitan lepas
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 2
- 1 - - - - - - - - - - - - - - 1
1 - - - - - - - - - - - - - 1 - 4
1 1 - - - - - - - - - - - - 1 - 7
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
1 1 - - - - - - - - - - - - 1 - 8
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1

11/2/2023

봉제 Jahit
스티치 오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara
Jahitan 폭 Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Salah gelomban Seam Notch Back Lubang Stitch nce tidak ada / Kerusakan stitch
Putus /Wrinkle kendor numpuk Pasang g Allowance lebar point tack jarum
jahitan lepas
- - - - - - - - - - - - - - - - -
- - - - - - - - - - 1 - - - - - 2
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - 1 - 1
- - - - - - - - - - 1 - - - 1 - 3
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - 1 - - - - - - - - - - - - - 1
- - 1 - - - - - - - - - - - - - 1
- - 1 - - - - - - - 1 - - - 1 - 4
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/3/2023

봉제 Jahit
스티치 오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara
Jahitan Salah gelomban 폭 Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce tidak ada / Kerusakan stitch
Putus /Wrinkle kendor numpuk Pasang g Allowance lebar point tack jarum
jahitan lepas
- - - - - - - - - - - - - - - - -
- - 1 - - - - - - - 1 - - - - - 5
- 1 - - - - - - - - - - - - - - 1
- 2 - - - - - - - - 1 - - - 1 - 5
- 3 1 - - - - - - - 2 - - - 1 - 11
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- 3 1 - - - - - - - 2 - - - 1 - 12
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/4/2023

봉제 Jahit

스티치 오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara Missing (TTL)
Jahitan Salah gelomban 폭 Aksesoris 손상
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce
numpuk Pasang lebar tidak ada / Kerusakan stitch
Putus /Wrinkle kendor g Allowance point tack jarum
jahitan lepas
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/5/2023

봉제 Jahit
스티치 오염 및 손상 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara
Jahitan Salah gelomban 폭 Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce tidak ada / Kerusakan stitch
Putus /Wrinkle kendor numpuk Pasang g Allowance lebar point tack jarum
jahitan lepas
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
01-03 November 2023

봉제 Jahit

합계
(TTL)
스티치 부자재 미부착 합계
봉제터짐 주름 실 텐션문제 오조립 굴곡 시접 표시점 되박음 바늘자국 Run of Appeara
Jahitan Salah gelomban 폭 Aksesoris 손상 Missing (TTL)
Jahitan Kerut Tension Seam Notch Back Lubang Stitch nce
numpuk lebar tidak ada / Kerusakan stitch
Putus /Wrinkle kendor Pasang g Allowance point tack jarum
jahitan lepas
- - - - - - - - - - - - - - - - -
- - 1 - - - - - - - 2 - - - - - 9
- 2 - - - - - - - - - - - - - - 2
1 2 - - - - - - - - 1 - - - 3 - 10
1 4 1 - - - - - - - 3 - - - 3 - 21
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - 1 - - - - - - - - - - - - - 1
- - 1 - - - - - - - - - - - - - 3
1 4 2 - - - - - - - 3 - - - 3 - 24
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id
40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id
40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas)
24:00:00
Monday
11/6/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 바늘자 부자재 미부착 합계
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 실 텐션문제
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 국 Aksesoris Missing (TTL)
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Cacat Kain 치 Jahitan Tension
tidak ada / stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Lubang
Scratch Loncat kendor
lepas
jarum
F/C 3,000 1 2,000 333 240 1 4,167 1 1
F/B 3,760 16 2,000 4,255 240 1 4,167 1 1
SU2id R/C 1,330 6 2,000 4,511 120 - - -
R/B 3,740 16 2,000 4,278 240 - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 840 2 2,381 2 - - - - - - 2
Incoming F/C 280 - 2,000 - - - -
in AHTI F/B 1,350 4 2,000 2,963 60 - - -
R/C 480 2 2,000 4,167 - - -
KS R/B 480 1 2,000 2,083 - - -
3RD CUSH 320 - 2,000 - 80 - - -
3RD BACK 740 2 2,000 2,703 - - -
KS 소계 (Total) 3,650 9 2,000 2,466 140 - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 980 2 2,041 2 - - - - - - 2
F/C 3,586 - 500 - 268 - - -
F/B 3,586 2 500 558 268 - - -
SU2id R/C 1,927 2 500 1,038 268 - - -
R/B 3,586 2 500 558 268 - - -
SU2id 소계 (Total) 12,685 6 500 473 1,072 - - - - - - - - - -
Assembling F/C 1,318 - 500 - 30 - - -
in AHTI F/B 1,318 - 500 - 30 - - -
R/C 1,318 - 500 - 30 - - -
KS R/B 1,318 1 500 759 30 - - -
3RD CUSH 1,318 - 500 - 30 - - -
3RD BACK 1,318 1 500 759 30 - - -
KS 소계 (Total) 7,908 2 500 253 180 - - - - - - - - - -
Total Assembling 20,593 8 500 388 1,252 - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday 11/7/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 바늘자 오염 및 손상 합계
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 실 텐션문제
(Divisi) (CAR) (Bagian) 불량 직물 결함 국 Aksesoris Missing (TTL)
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Cacat Kain 치 Jahitan Tension
tidak ada / stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Lubang
Scratch Loncat kendor
lepas
jarum
F/C 3,000 1 2,000 333 240 - - -
F/B 3,760 16 2,000 4,255 250 2 8,000 1 1 2
SU2id R/C 1,330 6 2,000 4,511 140 - - -
R/B 3,740 16 2,000 4,278 160 1 6,250 1 1
SU2id 소계 (Total) 11,830 39 2,000 3,297 790 3 3,797 2 - 1 - - - - 3
Incoming F/C 280 - 2,000 - - - -
in AHTI F/B 1,350 4 2,000 2,963 70 1 14,286 1 1
R/C 480 2 2,000 4,167 40 - - -
KS R/B 480 1 2,000 2,083 40 - - -
3RD CUSH 320 - 2,000 - - - -
3RD BACK 740 2 2,000 2,703 - - -
KS 소계 (Total) 3,650 9 2,000 2,466 150 1 6,667 1 - - - - - - 1
Total Incoming 15,480 48 2,000 3,101 940 4 4,255 3 - 1 - - - - 4
F/C 3,586 - 500 - 254 - - -
F/B 3,586 2 500 558 254 - - -
SU2id R/C 1,927 2 500 1,038 127 1 7,874 1 1
R/B 3,586 2 500 558 254 - - -
SU2id 소계 (Total) 12,685 6 500 473 889 1 1,125 1 - - - - - - 1
Assembling
in AHTI
Assembling F/C 1,318 - 500 - 66 - - -
in AHTI F/B 1,318 - 500 - 66 - - -
R/C 1,318 - 500 - 66 - - -
KS R/B 1,318 1 500 759 66 - - -
3RD CUSH 1,318 - 500 - 66 - - -
3RD BACK 1,318 1 500 759 66 - - -
KS 소계 (Total) 7,908 2 500 253 396 - - - - - - - - - -
Total Assembling 20,593 8 500 388 1,285 1 778 1 - - - - - - 1

◈ 품질 현황 (Status kualitas)
Wednesday 11/8/2023
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분 바늘자 오염 및 손상
구분 차종 부위 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 실 텐션문제 합계
(Garis 불량 직물 결함
(Divisi) (CAR) (Bagian) 국 Aksesoris Missing (TTL)
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Cacat Kain 치 Jahitan Tension
tidak ada / stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Lubang
Scratch Loncat kendor
lepas
jarum

F/C 3,000 1 2,000 333 240 - - -


F/B 3,760 16 2,000 4,255 190 - - -
SU2id R/C 1,330 6 2,000 4,511 80 - - -
R/B 3,740 16 2,000 4,278 200 - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 710 - - - - - - - - - -
Incoming F/C 280 - 2,000 - - - -
in AHTI F/B 1,350 4 2,000 2,963 140 - - -
R/C 480 2 2,000 4,167 80 1 12,500 1 1
KS R/B 480 1 2,000 2,083 40 1 25,000 1 1
3RD CUSH 320 - 2,000 - - - -
3RD BACK 740 2 2,000 2,703 40 - - -
KS 소계 (Total) 3,650 9 2,000 2,466 300 2 6,667 1 - - 1 - - - 2
Total Incoming 15,480 48 2,000 3,101 1,010 2 1,980 1 - - 1 - - - 2
F/C 3,586 - 500 - 166 - - -
F/B 3,586 2 500 558 166 - - -
SU2id R/C 1,927 2 500 1,038 83 - - -
R/B 3,586 2 500 558 166 - - -
SU2id 소계 (Total) 12,685 6 500 473 581 - - - - - - - - - -
Assembling F/C 1,318 - 500 - 66 - - -
in AHTI F/B 1,318 - 500 - 66 - - -
R/C 1,318 - 500 - 66 - - -
KS R/B 1,318 1 500 759 66 - - -
3RD CUSH 1,318 - 500 - 66 - - -
3RD BACK 1,318 1 500 759 66 - - -
KS 소계 (Total) 7,908 2 500 253 396 - - - - - - - - - -
Total Assembling 20,593 8 500 388 977 - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday 11/9/2023

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 바늘자 오염 및 손상 합계
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 실 텐션문제
(Divisi) (CAR) (Bagian) 불량 직물 결함 국 Aksesoris Missing (TTL)
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Cacat Kain 치 Jahitan Tension stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Lubang tidak ada /
Scratch Loncat kendor
lepas
F/C 3,000 1 2,000 333 160 - - jarum -
F/B 3,760 16 2,000 4,255 120 1 8,333 1 1
SU2id R/C 1,330 6 2,000 4,511 60 - - -

Incoming
in AHTI
SU2id
R/B 3,740 16 2,000 4,278 200 1 5,000 1 1
SU2id 소계 (Total) 11,830 39 2,000 3,297 540 2 3,704 1 - - - 1 - - 2
Incoming F/C 280 - 2,000 - 80 - - -
in AHTI F/B 1,350 4 2,000 2,963 200 1 5,000 1 1
R/C 480 2 2,000 4,167 - - -
KS R/B 480 1 2,000 2,083 - - -
3RD CUSH 320 - 2,000 - - - -
3RD BACK 740 2 2,000 2,703 120 - - -
KS 소계 (Total) 3,650 9 2,000 2,466 400 1 2,500 1 - - - - - - 1
Total Incoming 15,480 48 2,000 3,101 940 3 3,191 2 - - - 1 - - 3
F/C 3,586 - 500 - 162 - - -
F/B 3,586 2 500 558 162 1 6,173 1 1
SU2id R/C 1,927 2 500 1,038 81 - - -
R/B 3,586 2 500 558 162 - - -
SU2id 소계 (Total) 12,685 6 500 473 567 1 1,764 1 - - - - - - 1
Assembling F/C 1,318 - 500 - 158 - - -
in AHTI F/B 1,318 - 500 - 158 - - -
R/C 1,318 - 500 - 158 - - -
KS R/B 1,318 1 500 759 158 - - -
3RD CUSH 1,318 - 500 - 158 - - -
3RD BACK 1,318 1 500 759 158 1 6,329 1 1
KS 소계 (Total) 7,908 2 500 253 948 1 1,055 1 - - - - - - 1
Total Assembling 20,593 8 500 388 1,515 2 1,320 2 - - - - - - 2

◈ 품질 현황 (Status kualitas)
FRIDAY 11/10/2023

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 합계
(Garis 바늘자 오염 및 손상
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 실 텐션문제 (TTL)
Produksi) 불량 직물 결함 국 Aksesoris Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Cacat Kain 치 Jahitan Tension stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Lubang tidak ada /
Scratch Loncat kendor
lepas
F/C 3,000 1 2,000 333 160 - - jarum -
F/B 3,760 16 2,000 4,255 150 - - -
SU2id R/C 1,330 6 2,000 4,511 50 1 20,000 1 1
R/B 3,740 16 2,000 4,278 160 - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 520 1 1,923 - 1 - - - - - 1
Incoming F/C 280 - 2,000 - 40 - - -
in AHTI F/B 1,350 4 2,000 2,963 150 - - -
R/C 480 2 2,000 4,167 40 - - -
KS R/B 480 1 2,000 2,083 80 - - -
3RD CUSH 320 - 2,000 - - - -
3RD BACK 740 2 2,000 2,703 80 - - -
KS 소계 (Total) 3,650 9 2,000 2,466 390 - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 910 1 1,099 - 1 - - - - - 1
F/C 3,586 - 500 - 154 - - -
F/B 3,586 2 500 558 154 - - -
SU2id R/C 1,927 2 500 1,038 77 - - -
R/B 3,586 2 500 558 154 - - -
SU2id 소계 (Total) 12,685 6 500 473 539 - - - - - - - - - -
Assembling F/C 1,318 - 500 - 126 - - -
in AHTI F/B 1,318 - 500 - 126 - - -
R/C 1,318 - 500 - 126 - - -
KS R/B 1,318 1 500 759 126 - - -
3RD CUSH 1,318 - 500 - 126 - - -
3RD BACK 1,318 1 500 759 126 - - -
KS 소계 (Total) 7,908 2 500 253 756 - - - - - - - - - -
Total Assembling 20,593 8 500 388 1,295 - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 2 SHIFT 1 09- 13 Oktober 2023


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 바늘자 오염 및 손상 합계
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 실 텐션문제 (TTL)
(Divisi) (CAR) (Bagian) 불량 직물 결함
Produksi) 국 Aksesoris Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Cacat Kain 치 Jahitan Tension stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat kendor Lubang tidak ada /
Scratch lepas
jarum
F/C 1,520 1 2,000 658 1,040 1 4,167 1 - - - - - - 1

F/B 1,810 9 2,000 4,972 950 4 20,500 3 - 1 - - - - 4


SU2id R/C 710 2 2,000 2,817 450 1 20,000 - 1 - - - - - 1
R/B 1,780 5 2,000 2,809 960 2 11,250 1 - - - 1 - - 2

SU2id 소계 5,820 17 2,000 2,921 3,400 8 2,353 5 1 1 - 1 - - 8


F/C 160 - 2,000 - 120 - - - - - - - - - -
Incoming (Total)
F/B 720 2 2,000 2,778 620 2 19,286 2 - - - - - - 2
in AHTI
R/C 240 1 2,000 4,167 160 1 12,500 1 - - - - - - 1

KS R/B 280 1 2,000 3,571 160 1 25,000 - - - 1 - - - 1


3RD CUSH 80 - 2,000 - 80 - - - - - - - - - -
3RD BACK 420 1 2,000 2,381 240 - - - - - - - - - -

KS 소계 (Total) 1,900 5 2,000 2,632 1,380 4 2,899 3 - - 1 - - - 4

Total Incoming 7,720 22 2,000 2,850 4,780 12 2,510 8 1 1 1 1 - - 12

F/C 1,748 - 500 - 1,004 - - - - - - - - - -

F/B 1,748 1 500 572 1,004 1 996 1 - - - - - - 1


SU2id R/C 1,008 1 500 992 636 1 1,572 1 - - - - - - 1

R/B 1,748 1 500 572 1,004 - - - - - - - - - -

SU2id 소계 6,252 3 500 480 3,648 2 548 2 - - - - - - 2


F/C 654 - 500 - 446 - - - - - - - - - -
Assembling (Total)
F/B 654 - 500 - 446 - - - - - - - - - -
in AHTI
R/C 654 - 500 - 446 - - - - - - - - - -

KS R/B 654 - 500 - 446 - - - - - - - - - -


3RD CUSH 654 - 500 - 446 - - - - - - - - - -
3RD BACK 654 1 500 1,529 446 1 2,242 1 - - - - - - 1

KS 소계 (Total) 3,924 1 500 255 2,676 1 374 1 - - - - - - 1

Total Assembling 10,176 4 500 393 6,324 3 474 3 - - - - - - 3


40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks

40 39 1rb ks

40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks

40 40 03b ks

40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas)
Monday

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 200 - -
F/B 3,760 16 2,000 4,255 270 1 3,704 1
SU2id R/C 1,330 6 2,000 4,511 40 - -
R/B 3,740 16 2,000 4,278 240 - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 750 1 1,333 - - - - 1 - - - - -
Incoming F/C 280 - 2,000 - - -
in AHTI F/B 1,350 4 2,000 2,963 60 - -
R/C 480 2 2,000 4,167 - -
KS R/B 480 1 2,000 2,083 40 - -
3RD CUSH 320 - 2,000 - 80 - -
3RD BACK 740 2 2,000 2,703 - -
KS 소계 (Total) 3,650 9 2,000 2,466 180 - - - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 930 1 1,075 - - - - 1 - - - - -
F/C 3,586 - 500 - 238 - -
F/B 3,586 2 500 558 238 - -
SU2id R/C 1,927 2 500 1,038 119 - -
R/B 3,586 2 500 558 238 1 - 1
SU2id 소계 (Total) 12,685 6 500 473 833 1 1,200 1 - - - - - - - - -
Assembling F/C 1,318 - 500 - 50 - -
in AHTI F/B 1,318 - 500 - 50 - -
R/C 1,318 - 500 - 50 - -
KS R/B 1,318 1 500 759 50 - -
3RD CUSH 1,318 - 500 - 50 - -
3RD BACK 1,318 1 500 759 50 - -
KS 소계 (Total) 7,908 2 500 253 300 - - - - - - - - - - - -
Total Assembling 20,593 8 500 388 1,133 1 883 1 - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 160 - -
F/B 3,760 16 2,000 4,255 200 - -
SU2id R/C 1,330 6 2,000 4,511 80 2 25,000 1 1
R/B 3,740 16 2,000 4,278 320 2 6,250 1 1
SU2id 소계 (Total) 11,830 39 2,000 3,297 760 4 5,263 1 1 - - 1 - - - 1 -
Incoming F/C 280 - 2,000 - 40 - -
in AHTI F/B 1,350 4 2,000 2,963 100 - -
R/C 480 2 2,000 4,167 40 - -
KS R/B 480 1 2,000 2,083 - -
3RD CUSH 320 - 2,000 - - -
3RD BACK 740 2 2,000 2,703 - -
KS 소계 (Total) 3,650 9 2,000 2,466 180 - - - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 940 4 4,255 1 1 - - 1 - - - 1 -
F/C 3,586 - 500 - 256 - -
F/B 3,586 2 500 558 256 - -
SU2id R/C 1,927 2 500 1,038 128 1 7,813 1
R/B 3,586 2 500 558 256 - -
SU2id 소계 (Total) 12,685 6 500 473 896 1 1,116 - 1 - - - - - - - -
Assembling F/C 1,318 - 500 - 64 - -
in AHTI F/B 1,318 - 500 - 64 - -
R/C 1,318 - 500 - 64 - -
KS R/B 1,318 1 500 759 64 - -
3RD CUSH 1,318 - 500 - 64 - -
Assembling
in AHTI
KS
3RD BACK 1,318 1 500 759 64 - -
KS 소계 (Total) 7,908 2 500 253 384 - - - - - - - - - - - -
Total Assembling 20,593 8 500 388 1,280 1 781 - 1 - - - - - - - -

◈ 품질 현황 (Status kualitas)
Wednesday

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 200 - -
F/B 3,760 16 2,000 4,255 160 - -
SU2id R/C 1,330 6 2,000 4,511 100 - -
R/B 3,740 16 2,000 4,278 240 1 4,167 1
SU2id 소계 (Total) 11,830 39 2,000 3,297 700 1 1,429 - - - 1 - - - - - -
Incoming F/C 280 - 2,000 - - -
in AHTI F/B 1,350 4 2,000 2,963 150 - -
R/C 480 2 2,000 4,167 - -
KS R/B 480 1 2,000 2,083 - -
3RD CUSH 320 - 2,000 - 40 - -
3RD BACK 740 2 2,000 2,703 80 - -
KS 소계 (Total) 3,650 9 2,000 2,466 270 - - - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 970 1 1,031 - - - 1 - - - - - -
F/C 3,586 - 500 - 174 - -
F/B 3,586 2 500 558 174 - -
SU2id R/C 1,927 2 500 1,038 87 - -
R/B 3,586 2 500 558 174 - -
SU2id 소계 (Total) 12,685 6 500 473 609 - - - - - - - - - - - -
Assembling F/C 1,318 - 500 - 146 - -
in AHTI F/B 1,318 - 500 - 146 - -
R/C 1,318 - 500 - 146 - -
KS R/B 1,318 1 500 759 146 - -
3RD CUSH 1,318 - 500 - 146 - -
3RD BACK 1,318 1 500 759 146 - -
KS 소계 (Total) 7,908 2 500 253 876 - - - - - - - - - - - -
Total Assembling 20,593 8 500 388 1,485 - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 - 160 - -
F/B 3,760 16 2,000 3,590 160 - -
SU2id R/C 1,330 6 2,000 6,452 20 - -
R/B 3,740 16 2,000 5,612 160 - -
SU2id 소계 (Total) 11,830 39 2,000 3,661 500 - - - - - - - - - - - -
Incoming F/C 280 - 2,000 - 80 - -
in AHTI F/B 1,350 4 2,000 3,175 180 1 5,556 1
R/C 480 2 2,000 4,167 - -
KS R/B 480 1 2,000 - 40 - -
3RD CUSH 320 - 2,000 - 80 - -
3RD BACK 740 2 2,000 3,125 160 1 6,250 1
KS 소계 (Total) 3,650 9 2,000 2,286 540 2 3,704 1 - - - 1 - - - - -
Total Incoming 15,480 48 2,000 3,351 1,040 2 1,923 1 - - - 1 - - - - -
F/C 3,586 - 500 - 122 - -
F/B 3,586 2 500 544 122 - -
SU2id R/C 1,927 2 500 1,088 61 - -
R/B 3,586 2 500 544 122 - -
SU2id 소계 (Total) 12,685 6 500 466 427 - - - - - - - - - - - -
Assembling F/C 1,318 - 500 - 186 - -
in AHTI F/B 1,318 - 500 - 186 - -
KS
Assembling
in AHTI
R/C 1,318 - 500 - 186 - -
KS R/B 1,318 1 500 1,506 186 - -
3RD CUSH 1,318 - 500 - 186 - -
3RD BACK 1,318 1 500 - 186 - -
KS 소계 (Total) 7,908 2 500 251 1,116 - - - - - - - - - - - -
Total Assembling 20,593 8 500 384 1,543 - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
FRIDAY

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
F/C 3,000 1 2,000 - 160 - - lepas
F/B 3,760 16 2,000 3,590 320 2 6,250 1 1
SU2id R/C 1,330 6 2,000 6,452 160 1 6,250 1
R/B 3,740 16 2,000 5,612 240 1 4,167 1
SU2id 소계 (Total) 11,830 39 2,000 3,661 880 4 4,545 1 - 1 - 1 1 - - - -
Incoming F/C 280 - 2,000 - - -
in AHTI F/B 1,350 4 2,000 3,175 - -
R/C 480 2 2,000 4,167 40 - -
KS R/B 480 1 2,000 - 40 - -
3RD CUSH 320 - 2,000 - - -
3RD BACK 740 2 2,000 3,125 - -
KS 소계 (Total) 3,650 9 2,000 2,286 80 - - - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,351 960 4 4,167 1 - 1 - 1 1 - - - -
F/C 3,586 - 500 - 230 - -
F/B 3,586 2 500 544 230 1 4,348 1
SU2id R/C 1,927 2 500 1,088 115 - -
R/B 3,586 2 500 544 230 - -
SU2id 소계 (Total) 12,685 6 500 466 805 1 1,242 - - - 1 - - - - - -
Assembling F/C 1,318 - 500 - 76 - -
in AHTI F/B 1,318 - 500 - 76 - -
R/C 1,318 - 500 - 76 - -
KS R/B 1,318 1 500 1,506 76 1 13,158 1
3RD CUSH 1,318 - 500 - 76 - -
3RD BACK 1,318 1 500 - 76 - -
KS 소계 (Total) 7,908 2 500 251 456 1 2,193 - - - 1 - - - - - -
Total Assembling 20,593 8 500 384 1,261 2 1,586 - - - 2 - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 2 SHIFT 2


06-10 Novemb

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 부자재 미부착
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 1,480 - 2,000 - 880 - - - - - - - - - - - -
F/B 1,950 7 2,000 3,590 1,110 3 2,703 - - 1 - 1 1 - - - -
SU2id R/C 620 4 2,000 6,452 400 3 7,500 1 1 - - 1 - - - - -
R/B 1,960 11 2,000 5,612 1,200 4 3,333 1 - - 1 1 - - - 1 -
SU2id 소계 (Total) 6,010 22 2,000 3,661 3,590 10 2,786 2 1 1 1 3 1 - - 1 -
Incoming F/C 120 - 2,000 - 120 - - - - - - - - - - - -
in AHTI F/B 630 2 2,000 3,175 490 1 2,041 1 - - - - - - - - -
R/C 240 1 2,000 4,167 80 - - - - - - - - - - - -
KS R/B 200 - 2,000 - 120 - - - - - - - - - - - -
3RD CUSH 240 - 2,000 - 200 - - - - - - - - - - - -
3RD BACK 320 1 2,000 3,125 240 1 4,167 - - - - 1 - - - - -
KS 소계 (Total) 1,750 4 2,000 2,286 1,250 2 1,600 1 - - - 1 - - - - -
Total Incoming 7,760 26 2,000 3,351 4,840 12 2,479 3 1 1 1 4 1 - - 1 -
F/C 1,838 - 500 - 1,020 - - - - - - - - - - - -
F/B 1,838 1 500 544 1,020 1 980 - - - 1 - - - - - -
SU2id R/C 919 1 500 1,088 510 1 1,961 - 1 - - - - - - - -
R/B 1,838 1 500 544 1,020 1 - 1 - - - - - - - - -
SU2id 소계 (Total) 6,433 3 500 466 3,570 3 840 1 1 - 1 - - - - - -
Assembling F/C 664 - 500 - 522 - - - - - - - - - - - -
in AHTI F/B 664 - 500 - 522 - - - - - - - - - - - -
KS
Assembling
in AHTI
R/C 664 - 500 - 522 - - - - - - - - - - - -
KS R/B 664 1 500 1,506 522 1 1,916 - - - 1 - - - - - -
3RD CUSH 664 - 500 - 522 - - - - - - - - - - - -
3RD BACK 664 - 500 - 522 - - - - - - - - - - - -
KS 소계 (Total) 3,984 1 500 251 3,132 1 319 - - - 1 - - - - - -
Total Assembling 10,417 4 500 384 6,702 4 597 1 1 - 2 - - - - - -

Monday shift 1& shift 2


월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
오염 및 손상
구분 차종 부위 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Garis 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Divisi) (CAR) (Bagian) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang
Produksi) (Cacat) Cacat Kain Scratch tidak ada / Kerusakan stitch
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 440 1 2,273 1 - - - - - - - - -
F/B 3,760 16 2,000 4,255 510 2 3,922 1 - - - 1 - - - - -
SU2id R/C 1,330 6 2,000 4,511 160 - - - - - - - - - - - -
R/B 3,740 16 2,000 4,278 480 - - - - - - - - - - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 1,590 3 1,887 2 - - - 1 - - - - -
Incoming F/C 280 - 2,000 - - - - - - - - - - - - - -
in AHTI F/B 1,350 4 2,000 2,963 120 - - - - - - - - - - - -
R/C 480 2 2,000 4,167 - - - - - - - - - - - - -
KS R/B 480 1 2,000 2,083 40 - - - - - - - - - - - -
3RD CUSH 320 - 2,000 - 160 - - - - - - - - - - - -
3RD BACK 740 2 2,000 2,703 - - - - - - - - - - - - -
KS 소계 (Total) 3,650 9 2,000 2,466 320 - - - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 1,910 3 1,571 2 - - - 1 - - - - -
F/C 3,586 - 500 - 506 - - - - - - - - - - - -
F/B 3,586 2 500 558 506 - - - - - - - - - - - -
SU2id R/C 1,927 2 500 1,038 387 - - - - - - - - - - - -
R/B 3,586 2 500 558 506 1 1,976 1 - - - - - - - - -
SU2id 소계 (Total) 12,685 6 500 473 1,905 1 525 1 - - - - - - - - -
Assembling F/C 1,318 - 500 - 80 - - - - - - - - - - - -
in AHTI F/B 1,318 - 500 - 80 - - - - - - - - - - - -
R/C 1,318 - 500 - 80 - - - - - - - - - - - -
KS R/B 1,318 1 500 759 80 - - - - - - - - - - - -
3RD CUSH 1,318 - 500 - 80 - - - - - - - - - - - -
3RD BACK 1,318 1 500 759 80 - - - - - - - - - - - -
KS 소계 (Total) 7,908 2 500 253 480 - - - - - - - - - - - -
Total Assembling 20,593 8 500 388 2,385 1 419 1 - - - - - - - - -

Tuesday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi) (CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 400 - - - - - - - - - - - -
F/B 3,760 16 2,000 4,255 450 2 4,444 1 - 1 - - - - - - -
SU2id R/C 1,330 6 2,000 4,511 220 2 9,091 1 1 - - - - - - - -
R/B 3,740 16 2,000 4,278 480 3 6,250 1 - - - 1 - - - 1 -
SU2id 소계 (Total) 11,830 39 2,000 3,297 1,550 7 4,516 3 1 1 - 1 - - - 1 -
Incoming F/C 280 - 2,000 - 40 - - - - - - - - - - - -
in AHTI F/B 1,350 4 2,000 2,963 170 1 5,882 1 - - - - - - - - -
R/C 480 2 2,000 4,167 80 - - - - - - - - - - - -
KS R/B 480 1 2,000 2,083 40 - - - - - - - - - - - -
3RD CUSH 320 - 2,000 - - - - - - - - - - - - - -
3RD BACK 740 2 2,000 2,703 - - - - - - - - - - - - -
KS 소계 (Total) 3,650 9 2,000 2,466 330 1 3,030 1 - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 1,880 8 4,255 4 1 1 - 1 - - - 1 -
F/C 3,586 - 500 - 510 - - - - - - - - - - - -
F/B 3,586 2 500 558 510 - - - - - - - - - - - -
SU2id R/C 1,927 2 500 1,038 255 2 7,843 1 1 - - - - - - - -
R/B 3,586 2 500 558 510 - - - - - - - - - - - -
SU2id 소계 (Total) 12,685 6 500 473 1,785 2 1,120 1 1 - - - - - - - -
Assembling F/C 1,318 - 500 - 130 - - - - - - - - - - - -
in AHTI F/B 1,318 - 500 - 130 - - - - - - - - - - - -
R/C 1,318 - 500 - 130 - - - - - - - - - - - -
KS
Assembling
in AHTI
KS R/B 1,318 1 500 759 130 - - - - - - - - - - - -
3RD CUSH 1,318 - 500 - 130 - - - - - - - - - - - -
3RD BACK 1,318 1 500 759 130 - - - - - - - - - - - -
KS 소계 (Total) 7,908 2 500 253 780 - - - - - - - - - - - -
Total Assembling 20,593 8 500 388 2,565 2 780 1 1 - - - - - - - -

Wednesday shift 1& shift 2


월간 현황 일일 현황
구분 봉제 Jahit
구분 차종 부위 (Status Bulanan) (Daily Status) 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi) (CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
F/C 3,000 1 2,000 333 440 - - - - - - - - - lepas - - -
F/B 3,760 16 2,000 4,255 350 - - - - - - - - - - - -
SU2id R/C 1,330 6 2,000 4,511 180 - - - - - - - - - - - -
R/B 3,740 16 2,000 4,278 440 1 2,273 - - - 1 - - - - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 1,410 1 709 - - - 1 - - - - - -
Incoming F/C 280 - 2,000 - - - - - - - - - - - - - -
in AHTI F/B 1,350 4 2,000 2,963 290 - - - - - - - - - - - -
R/C 480 2 2,000 4,167 80 1 12,500 1 - - - - - - - - -
KS R/B 480 1 2,000 2,083 40 1 25,000 - - - - - 1 - - - -
3RD CUSH 320 - 2,000 - 40 - - - - - - - - - - - -
3RD BACK 740 2 2,000 2,703 120 - - - - - - - - - - - -
KS 소계 (Total) 3,650 9 2,000 2,466 570 2 3,509 1 - - - - 1 - - - -
Total Incoming 15,480 48 2,000 3,101 1,980 3 1,515 1 - - 1 - 1 - - - -
F/C 3,586 - 500 - 340 - - - - - - - - - - - -
F/B 3,586 2 500 558 340 - - - - - - - - - - - -
SU2id R/C 1,927 2 500 1,038 170 - - - - - - - - - - - -
R/B 3,586 2 500 558 340 - - - - - - - - - - - -
SU2id 소계 (Total) 12,685 6 500 473 1,190 - - - - - - - - - - - -
Assembling F/C 1,318 - 500 - 212 - - - - - - - - - - - -
in AHTI F/B 1,318 - 500 - 212 - - - - - - - - - - - -
R/C 1,318 - 500 - 212 - - - - - - - - - - - -
KS R/B 1,318 1 500 759 212 - - - - - - - - - - - -
3RD CUSH 1,318 - 500 - 212 - - - - - - - - - - - -
3RD BACK 1,318 1 500 759 212 - - - - - - - - - - - -
KS 소계 (Total) 7,908 2 500 253 1,272 - - - - - - - - - - - -
Total Assembling 20,593 8 500 388 2,462 - - - - - - - - - - - -

thursday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 오염 및 손상
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi)
Produksi)
(CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 320 - - - - - - - - - - - -
F/B 3,760 16 2,000 4,255 280 1 3,571 1 - - - - - - - - -
SU2id R/C 1,330 6 2,000 4,511 80 - - - - - - - - - - - -
R/B 3,740 16 2,000 4,278 360 1 2,778 - - - - - - 1 - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 1,040 2 1,923 1 - - - - - 1 - - -
Incoming F/C 280 - 2,000 - 160 - - - - - - - - - - - -
in AHTI F/B 1,350 4 2,000 2,963 380 2 5,263 2 - - - - - - - - -
R/C 480 2 2,000 4,167 - - - - - - - - - - - - -
KS R/B 480 1 2,000 2,083 40 - - - - - - - - - - - -
3RD CUSH 320 - 2,000 - 80 - - - - - - - - - - - -
3RD BACK 740 2 2,000 2,703 280 1 3,571 - - - - 1 - - - - -
KS 소계 (Total) 3,650 9 2,000 2,466 940 3 3,191 2 - - - 1 - - - - -
Total Incoming 15,480 48 2,000 3,101 1,980 5 2,525 3 - - - 1 - 1 - - -
F/C 3,586 - 500 - 284 - - - - - - - - - - - -
F/B 3,586 2 500 558 284 1 3,521 1 - - - - - - - - -
SU2id R/C 1,927 2 500 1,038 142 - - - - - - - - - - - -
R/B 3,586 2 500 558 284 - - - - - - - - - - - -
SU2id 소계 (Total) 12,685 6 500 473 994 1 1,006 1 - - - - - - - - -
Assembling F/C 1,318 - 500 - 344 - - - - - - - - - - - -
in AHTI F/B 1,318 - 500 - 344 - - - - - - - - - - - -
R/C 1,318 - 500 - 344 - - - - - - - - - - - -
KS R/B 1,318 1 500 759 344 - - - - - - - - - - - -
3RD CUSH 1,318 - 500 - 344 - - - - - - - - - - - -
Assembling
in AHTI
KS
3RD BACK 1,318 1 500 759 344 1 2,907 1 - - - - - - - - -
KS 소계 (Total) 7,908 2 500 253 2,064 1 484 1 - - - - - - - - -
Total Assembling 20,593 8 500 388 3,058 2 654 2 - - - - - - - - -

Friday shift 1& shift 2


월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 부자재 미부착
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi) (CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 320 - - - - - - - - - - - -
F/B 3,760 16 2,000 4,255 470 2 4,255 - - 1 - - 1 - - - -
SU2id R/C 1,330 6 2,000 4,511 210 2 9,524 - 1 - - 1 - - - - -
R/B 3,740 16 2,000 4,278 400 1 2,500 1 - - - - - - - - -
SU2id 소계 (Total) 11,830 39 2,000 3,297 1,400 5 3,571 1 1 1 - 1 1 - - - -
Incoming F/C 280 - 2,000 - 40 - - - - - - - - - - - -
in AHTI F/B 1,350 4 2,000 2,963 150 - - - - - - - - - - - -
R/C 480 2 2,000 4,167 80 - - - - - - - - - - - -
KS R/B 480 1 2,000 2,083 120 - - - - - - - - - - - -
3RD CUSH 320 - 2,000 - - - - - - - - - - - - - -
3RD BACK 740 2 2,000 2,703 80 - - - - - - - - - - - -
KS 소계 (Total) 3,650 9 2,000 2,466 470 - - - - - - - - - - - -
Total Incoming 15,480 48 2,000 3,101 1,870 5 2,674 1 1 1 - 1 1 - - - -
F/C 3,586 - 500 - 384 - - - - - - - - - - - -
F/B 3,586 2 500 558 384 1 2,604 - - - 1 - - - - - -
SU2id R/C 1,927 2 500 1,038 192 - - - - - - - - - - - -
R/B 3,586 2 500 558 384 - - - - - - - - - - - -
SU2id 소계 (Total) 12,685 6 500 473 1,344 1 744 - - - 1 - - - - - -
Assembling F/C 1,318 - 500 - 202 - - - - - - - - - - - -
in AHTI F/B 1,318 - 500 - 202 - - - - - - - - - - - -
R/C 1,318 - 500 - 202 - - - - - - - - - - - -
KS R/B 1,318 1 500 759 202 1 4,950 - - - 1 - - - - - -
3RD CUSH 1,318 - 500 - 202 - - - - - - - - - - - -
3RD BACK 1,318 1 500 759 202 - - - - - - - - - - - -
KS 소계 (Total) 7,908 2 500 253 1,212 1 825 - - - 1 - - - - - -
Total Assembling 20,593 8 500 388 2,556 2 782 - - - 2 - - - - - -
◈ 품질 현황 (Status kualitas) Weekly 2 Shift 1&Shift 2 06-10 Novem

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 부자재 미부착
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 봉비 봉제터짐 주름 실 텐션문제 바늘자국
(Divisi) (CAR) (Bagian) 불량 직물 결함 스크래치 Aksesoris 손상 Missing
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Jahitan Kerut Tension Lubang stitch
(Cacat) Cacat Kain Scratch tidak ada / Kerusakan
inspeksi) Cacat) PPM PPM inspeksi) PPM Loncat Putus /Wrinkle kendor jarum
lepas
F/C 3,000 1 2,000 333 1,920 1 521 1 - - - - - - - - -
F/B 3,760 16 2,000 4,255 2,060 7 3,398 3 - 2 - 1 1 - - - -
SU2id R/C 1,330 6 2,000 4,511 850 4 4,706 1 2 - - 1 - - - - -
R/B 3,740 16 2,000 4,278 2,160 6 2,778 2 - - 1 1 - 1 - 1 -
SU2id 소계 (Total) 11,830 39 2,000 3,297 6,990 18 2,575 7 2 2 1 3 1 1 - 1 -
Incoming F/C 280 - 2,000 - 240 - - - - - - - - - - - -
in AHTI F/B 1,350 4 2,000 2,963 1,110 3 2,703 3 - - - - - - - - -
R/C 480 2 2,000 4,167 240 1 4,167 1 - - - - - - - - -
KS R/B 480 1 2,000 2,083 280 1 3,571 - - - - - 1 - - - -
3RD CUSH 320 - 2,000 - 280 - - - - - - - - - - - -
3RD BACK 740 2 2,000 2,703 480 1 2,083 - - - - 1 - - - - -
KS 소계 (Total) 3,650 9 2,000 2,466 2,630 6 2,281 4 - - - 1 1 - - - -
Total Incoming 15,480 48 2,000 3,101 9,620 24 2,495 11 2 2 1 4 2 1 - 1 -
F/C 3,586 - 500 - 2,024 - - - - - - - - - - - -
F/B 3,586 2 500 558 2,024 2 988 1 - - 1 - - - - - -
SU2id R/C 1,927 2 500 1,038 1,146 2 1,745 1 1 - - - - - - - -
R/B 3,586 2 500 558 2,024 1 494 1 - - - - - - - - -
SU2id 소계 (Total) 12,685 6 500 473 7,218 5 693 3 1 - 1 - - - - - -
Assembling F/C 1,318 - 500 - 968 - - - - - - - - - - - -
in AHTI F/B 1,318 - 500 - 968 - - - - - - - - - - - -
R/C 1,318 - 500 - 968 - - - - - - - - - - - -
KS R/B 1,318 1 500 759 968 1 1,033 - - - 1 - - - - - -
3RD CUSH 1,318 - 500 - 968 - - - - - - - - - - - -
Assembling
in AHTI
KS
3RD BACK 1,318 1 500 759 968 1 1,033 1 - - - - - - - - -
KS 소계 (Total) 7,908 2 500 253 5,808 2 344 1 - - 1 - - - - - -
Total Assembling 20,593 8 500 388 13,026 7 537 4 1 - 2 - - - - - -
24:00:00
11/6/2023

합계
(TTL)

-
1
-
-
1
-
-
-
-
-
-
-
1
-
-
-
1
1
-
-
-
-
-
-
-
1

11/7/2023

합계
(TTL)

-
-
2
2
4
-
-
-
-
-
-
-
4
-
-
1
-
1
-
-
-
-
-
-
-
1

11/8/2023

합계
(TTL)

-
-
-
1
1
-
-
-
-
-
-
-
1
-
-
-
-
-
-
-
-
-
-
-
-
-

11/9/2023

합계
(TTL)

-
-
-
-
-
-
1
-
-
-
1
2
2
-
-
-
-
-
-
-
-
-
-
-
-
-

11/10/2023

합계
(TTL)

-
2
1
1
4
-
-
-
-
-
-
-
4
-
1
-
-
1
-
-
-
1
-
-
1
2

06-10 November 2023

합계
(TTL)

-
3
3
4
10
-
1
-
-
-
1
2
12
-
1
1
1
3
-
-
-
1
-
-
1
4

11/6/2023

합계
(TTL)

1
2
-
-
3
-
-
-
-
-
-
-
3
-
-
-
1
1
-
-
-
-
-
-
-
1

11/7/2023

합계
(TTL)

-
2
2
3
7
-
1
-
-
-
-
1
8
-
-
2
-
2
-
-
-
-
-
-
-
2

11/8/2023

합계
(TTL)

-
-
-
1
1
-
-
1
1
-
-
2
3
-
-
-
-
-
-
-
-
-
-
-
-
-

11/9/2023

합계
(TTL)

-
1
-
1
2
-
2
-
-
-
1
3
5
-
1
-
-
1
-
-
-
-
-
1
1
2

11/10/2023

합계
(TTL)

-
2
2
1
5
-
-
-
-
-
-
-
5
-
1
-
-
1
-
-
-
1
-
-
1
2
06-10 November 2023

합계
(TTL)

1
7
4
6
18
-
3
1
1
-
1
6
24
-
2
2
1
5
-
-
-
1
-
1
2
7
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!
◈ 품질 현황 (Status kualitas)
Monday
월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status) 실 조시 봉제
구분 차종 부위 스크래 봉비
(Garis 목표 달성 검사 수량 달성 오염 립덕 Tulang/
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 땀수 맞지 않음 겹침 Open 찜힘
Cacat Kain 치
Produksi) Tujuan Pencapaian (Kuantitas Pencapaian Kontamin Jahitan Lips stitch
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pitch Benang overlap seam Pleated /
PPM PPM inspeksi) PPM asi Scratch Loncat duck tidak
F/C 4,520 1 2,000 221 200 - - Timbul Kelipet ketemu
F/B 6,370 27 2,000 4,239 300 2 6,667
SU2id R/C 2,210 7 2,000 3,167 120 - -
R/B 6,094 21 2,000 3,446 280 - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 900 2 2,222 - - - - - - - - - - -
Incoming F/C 440 - 2,000 - - -
in AHTI F/B 1,830 5 2,000 2,732 50 - -
R/C 720 2 2,000 2,778 - -
KS R/B 720 1 2,000 1,389 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 40 - -
KS 소계 (Total) 5,130 10 2,000 1,949 90 - - - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 990 2 2,020 - - - - - - - - - - -
F/C 5,946 - 500 - 256 - -
F/B 5,946 4 500 673 256 - -
SU2id R/C 3,107 2 500 644 128 - -
R/B 5,946 3 500 505 256 - -
SU2id 소계 (Total) 20,945 9 500 430 896 - - - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 34 - -
in AHTI F/B 1,780 1 500 562 34 - -
R/C 1,780 - 500 - 34 - -
KS R/B 1,780 1 500 562 34 - -
3RD CUSH 1,780 - 500 - 34 - -
3RD BACK 1,780 1 500 562 34 - -
KS 소계 (Total) 10,680 3 500 281 204 - - - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,100 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제
(Garis 목표 달성 검사 수량 달성 오염 스크래 봉비 립덕 Tulang/
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 땀수 맞지 않음 겹침 Paping 찜힘
Cacat Kain 치
Produksi) Tujuan Pencapaian (Kuantitas Pencapaian Kontamin Jahitan Lips stitch
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pitch Benang overlap terbuka Pleated /
PPM PPM inspeksi) PPM asi Scratch Loncat duck tidak
F/C 4,520 1 2,000 221 160 - - Timbul Kelipet ketemu
F/B 6,370 27 2,000 4,239 300 1 3,333 1
SU2id R/C 2,210 7 2,000 3,167 40 - -
R/B 6,094 21 2,000 3,446 320 1 3,125 1
SU2id 소계 (Total) 19,194 56 2,000 2,918 820 2 2,439 - 1 - 1 - - - - - - -
Incoming F/C 440 - 2,000 - 40 - -
in AHTI F/B 1,830 5 2,000 2,732 - -
R/C 720 2 2,000 2,778 - -
KS R/B 720 1 2,000 1,389 40 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 - -
KS 소계 (Total) 5,130 10 2,000 1,949 80 - - - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 900 2 2,222 - 1 - 1 - - - - - - -
F/C 5,946 - 500 - 250 - -
F/B 5,946 4 500 673 250 - -
SU2id R/C 3,107 2 500 644 125 - -
R/B 5,946 3 500 505 250 - -
SU2id 소계 (Total) 20,945 9 500 430 875 - - - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 36 - -
in AHTI F/B 1,780 1 500 562 36 - -
R/C 1,780 - 500 - 36 - -
KS R/B 1,780 1 500 562 36 - -
3RD CUSH 1,780 - 500 - 36 - -
3RD BACK 1,780 1 500 562 36 - -
KS 소계 (Total) 10,680 3 500 281 216 - - - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,091 - - - - - - - - - - - - -
◈ 품질 현황 (Status kualitas)
Wednesday
월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status) 실 조시 봉제
구분 차종 부위 스크래 봉비
(Garis 목표 달성 검사 수량 달성 오염 립덕 Tulang/
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 땀수 맞지 않음 겹침 Paping 찜힘
Cacat Kain 치
Produksi) Tujuan Pencapaian (Kuantitas Pencapaian Kontamin Jahitan Lips stitch
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pitch Benang overlap terbuka Pleated /
PPM PPM inspeksi) PPM asi Scratch Loncat duck tidak
F/C 4,520 1 2,000 221 - - Timbul Kelipet ketemu
F/B 6,370 27 2,000 4,239 300 - -
SU2id R/C 2,210 7 2,000 3,167 80 - -
R/B 6,094 21 2,000 3,446 200 1 5,000
SU2id 소계 (Total) 19,194 56 2,000 2,918 580 1 1,724 - - - - - - - - - - -
Incoming F/C 440 - 2,000 - - -
in AHTI F/B 1,830 5 2,000 2,732 - -
R/C 720 2 2,000 2,778 - -
KS R/B 720 1 2,000 1,389 - -
3RD CUSH 480 - 2,000 - 40 - -
3RD BACK 940 2 2,000 2,128 40 - -
KS 소계 (Total) 5,130 10 2,000 1,949 80 - - - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 660 1 1,515 - - - - - - - - - - -
F/C 5,946 - 500 - 222 - -
F/B 5,946 4 500 673 222 - -
SU2id R/C 3,107 2 500 644 111 - -
R/B 5,946 3 500 505 222 - -
SU2id 소계 (Total) 20,945 9 500 430 777 - - - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 42 - -
in AHTI F/B 1,780 1 500 562 42 - -
R/C 1,780 - 500 - 42 - -
KS R/B 1,780 1 500 562 42 - -
3RD CUSH 1,780 - 500 - 42 - -
3RD BACK 1,780 1 500 562 42 - -
KS 소계 (Total) 10,680 3 500 281 252 - - - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,029 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
실 조시 봉제
구분 차종 부위 스크래 봉비
(Garis 목표 달성 검사 수량 달성 오염 립덕 Tulang/
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 땀수 맞지 않음 겹침 Paping 찜힘
Cacat Kain 치
Produksi) Tujuan Pencapaian (Kuantitas Pencapaian Kontamin Jahitan Lips stitch
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pitch Benang overlap terbuka Pleated /
PPM PPM inspeksi) PPM asi Scratch Loncat duck tidak
F/C 4,520 1 2,000 221 200 - - Timbul Kelipet ketemu
F/B 6,370 27 2,000 4,239 290 1 3,448
SU2id R/C 2,210 7 2,000 3,167 40 - -
R/B 6,094 21 2,000 3,446 280 - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 810 1 1,235 - - - - - - - - - - -
Incoming F/C 440 - 2,000 - - -
in AHTI F/B 1,830 5 2,000 2,732 30 - -
R/C 720 2 2,000 2,778 40 - -
KS R/B 720 1 2,000 1,389 - -
3RD CUSH 480 - 2,000 - 40 - -
3RD BACK 940 2 2,000 2,128 40 - -
KS 소계 (Total) 5,130 10 2,000 1,949 150 - - - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 960 1 1,042 - - - - - - - - - - -
F/C 5,946 - 500 - 228 - -
F/B 5,946 4 500 673 228 - -
SU2id R/C 3,107 2 500 644 114 - -
R/B 5,946 3 500 505 228 - -
SU2id 소계 (Total) 20,945 9 500 430 798 - - - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 46 - -
in AHTI F/B 1,780 1 500 562 46 - -
R/C 1,780 - 500 - 46 - -
KS R/B 1,780 1 500 562 46 - -
3RD CUSH 1,780 - 500 - 46 - -
3RD BACK 1,780 1 500 562 46 - -
KS 소계 (Total) 10,680 3 500 281 276 - - - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,074 - - - - - - - - - - - - -
◈ 품질 현황 (Status kualitas)
FRIDAY

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제
(Garis 목표 달성 검사 수량 달성 오염 스크래 봉비 립덕 Tulang/
(Divisi)
Produksi)
(CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 땀수 맞지 않음 겹침 Paping 찜힘
Cacat Kain 치
Tujuan Pencapaian (Kuantitas Pencapaian Kontamin Jahitan Lips stitch
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pitch Benang overlap terbuka Pleated /
PPM PPM inspeksi) PPM asi Scratch Loncat duck tidak
Timbul Kelipet ketemu
F/C 4,520 1 2,000 221 200 - -
F/B 6,370 27 2,000 4,239 260 3 11,538 1
SU2id R/C 2,210 7 2,000 3,167 40 - -
R/B 6,094 21 2,000 3,446 280 - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 780 3 3,846 - 1 - - - - - - - - -
Incoming F/C 440 - 2,000 - - -
in AHTI F/B 1,830 5 2,000 2,732 60 - -
R/C 720 2 2,000 2,778 40 - -
KS R/B 720 1 2,000 1,389 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 80 - -
KS 소계 (Total) 5,130 10 2,000 1,949 180 - - - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 960 3 3,125 - 1 - - - - - - - - -
F/C 5,946 - 500 - 230 - -
F/B 5,946 4 500 673 230 - -
SU2id R/C 3,107 2 500 644 115 - -
R/B 5,946 3 500 505 230 - -
SU2id 소계 (Total) 20,945 9 500 430 805 - - - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 44 - -
in AHTI F/B 1,780 1 500 562 44 1 22,727 1
R/C 1,780 - 500 - 44 - -
KS R/B 1,780 1 500 562 44 - -
3RD CUSH 1,780 - 500 - 44 - -
3RD BACK 1,780 1 500 562 44 - -
KS 소계 (Total) 10,680 3 500 281 264 1 3,788 - - 1 - - - - - - - -
Total Assembling 31,625 12 500 379 1,069 1 935 - - 1 - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 3 shift 1

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제
(Garis 목표 달성 검사 수량 달성 오염 스크래 봉비 립덕 Tulang/
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 땀수 맞지 않음 겹침 Paping 찜힘
Cacat Kain 치
Produksi) Tujuan Pencapaian (Kuantitas Pencapaian Kontamin Jahitan Lips stitch
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pitch Benang overlap terbuka Pleated /
PPM PPM inspeksi) PPM asi Scratch Loncat duck tidak
Timbul Kelipet ketemu
F/C 2,280 1 2,000 439 760 - - - - - - - - - - - - -
F/B 3,260 16 2,000 4,908 1,450 7 4,828 - 1 - - - - - - - - -
SU2id R/C 1,030 2 2,000 1,942 320 - - - - - - - - - - - - -
R/B 3,140 7 2,000 2,229 1,360 2 1,471 - - - - - - - - - - -
SU2id 소계 (Total) 9,710 26 2,000 2,678 3,890 9 2,314 - 1 - - - - - - - - -
Incoming F/C 200 - 2,000 - 40 - - - - - - - - - - - - -
in AHTI F/B 860 2 2,000 2,326 140 - - - - - - - - - - - - -
R/C 320 1 2,000 3,125 80 - - - - - - - - - - - - -
KS R/B 320 1 2,000 3,125 40 - - - - - - - - - - - - -
3RD CUSH 160 - 2,000 - 80 - - - - - - - - - - - - -
3RD BACK 620 1 2,000 1,613 200 - - - - - - - - - - - - -
KS 소계 (Total) 2,480 5 2,000 2,016 580 - - - - - - - - - - - - -
Total Incoming 12,190 31 2,000 2,543 4,470 9 2,013 - 1 - - - - - - - - -
F/C 2,934 - 500 - 1,186 - - - - - - - - - - - - -
F/B 2,934 1 500 341 1,186 - - - - - - - - - - - - -
SU2id R/C 1,601 1 500 625 593 - - - - - - - - - - - - -
R/B 2,934 1 500 341 1,186 - - - - - - - - - - - - -
SU2id 소계 (Total) 10,403 3 500 288 4,151 - - - - - - - - - - - - -
Assembling F/C 856 - 500 - 202 - - - - - - - - - - - - -
in AHTI F/B 856 1 500 1,168 202 1 4,950 - - 1 - - - - - - - -
R/C 856 - 500 - 202 - - - - - - - - - - - - -
KS R/B 856 - 500 - 202 - - - - - - - - - - - - -
3RD CUSH 856 - 500 - 202 - - - - - - - - - - - - -
3RD BACK 856 1 500 1,168 202 - - - - - - - - - - - - -
Assembling
in AHTI
KS

KS 소계 (Total) 5,136 2 500 389 1,212 1 825 - - 1 - - - - - - - -


Total Assembling 15,539 5 500 322 5,363 1 186 - - 1 - - - - - - - -
24:00:00
11/13/2023
오염 및
봉제 Jahit
봉제터 시접 스티치 바늘자 손상 합계
주름 실 텐션문제 오조립 굴곡 표시점 되박음 Run of Appeara Aksesor 손상 Missing (TTL)
짐 Kerut Tension Jahitan Salah gelomba Seam 폭 Notch Back 국 Kerusak
Allowan lebar Stitch nce is stitch
Jahitan /Wrinkle kendor numpuk Pasang ng point tack Lubang an
ce tidak
Putus jahitan jarum -
1 1 ada / 2
lepas -
-
1 - 1 - - - - - - - - - - - - - 2
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
1 - 1 - - - - - - - - - - - - - 2
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/14/2023

오염 및
봉제 Jahit
봉제터 시접 스티치 바늘자 손상 합계
주름 실 텐션문제 오조립 굴곡 표시점 되박음 Run of Appeara Aksesor 손상 Missing (TTL)
짐 Kerut Tension Jahitan Salah gelomba
Seam 폭 Notch Back 국 Kerusak stitch
Allowan lebar Stitch nce is
Jahitan /Wrinkle kendor numpuk Pasang ng point tack Lubang an
ce tidak
Putus jahitan jarum -
ada / 1
lepas -
1
- - - - - - - - - - - - - - - - 2
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 2
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
11/15/2023
오염 및
봉제 Jahit
봉제터 시접 스티치 바늘자 손상 합계
주름 실 텐션문제 오조립 굴곡 표시점 되박음 Run of Appeara Aksesor 손상 Missing (TTL)
짐 Kerut Tension Jahitan Salah gelomba
Seam 폭 Notch Back 국 Kerusak stitch
Allowan lebar Stitch nce is
Jahitan /Wrinkle kendor numpuk Pasang ng point tack Lubang an
ce tidak
Putus jahitan jarum -
ada /
-
lepas -
1 1
- 1 - - - - - - - - - - - - - - 1
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- 1 - - - - - - - - - - - - - - 1
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -

11/16/2023

봉제 Jahit 오염 및
봉제터 시접 스티치 바늘자 손상 합계
주름 실 텐션문제 오조립 굴곡 표시점 되박음 Run of Appeara Aksesor 손상 Missing (TTL)
짐 Kerut Tension Jahitan Salah gelomba Seam 폭 Notch Back 국 Kerusak
Allowan lebar Stitch nce is stitch
Jahitan /Wrinkle kendor numpuk Pasang ng point tack Lubang an
ce tidak
Putus jahitan jarum -
ada /
lepas 1 1
-
-
- - - - - - - - - - - - - - - 1 1
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - 1 1
-
-
-
-
- - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
11/17/2023

봉제 Jahit 오염 및
봉제터 시접 스티치 바늘자 손상 합계
주름 실 텐션문제 오조립 굴곡 표시점 되박음 Run of Appeara Aksesor 손상 Missing (TTL)
짐 Kerut Tension Jahitan Salah gelomba Seam 폭 Notch Back 국 Kerusak
Allowan lebar Stitch nce is stitch
Jahitan /Wrinkle kendor numpuk Pasang ng point tack Lubang an
ce tidak
Putus jahitan jarum
ada / -
1 lepas 1 3
-
-
1 - - - - - - - - - - - - - 1 - 3
-
-
-
-
-
-
- - - - - - - - - - - - - - - - -
1 - - - - - - - - - - - - - 1 - 3
-
-
-
-
- - - - - - - - - - - - - - - - -
-
1
-
-
-
-
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - 1

13-17 November 2023

봉제 Jahit 오염 및
봉제터 시접 스티치 바늘자 손상 합계
주름 실 텐션문제 오조립 굴곡 표시점 되박음 Appeara Aksesor 손상 Missing
짐 폭 국 Run of (TTL)
Jahitan Seam
Kerut Tension Salah gelomba Notch Back Stitch nce is Kerusak stitch
Jahitan /Wrinkle numpuk Allowan lebar Lubang
kendor Pasang ng point tack tidak an
Putus ce jahitan jarum
- - - - - - - - - - - - - ada / - - - -
2 - 1 - - - - - - - - - - lepas - 1 1 6
- - - - - - - - - - - - - - - - -
- 1 - - - - - - - - - - - - - - 1
2 1 1 - - - - - - - - - - - 1 1 7
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
2 1 1 - - - - - - - - - - - 1 1 7
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - - 1
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!
◈ 품질 현황 (Status kualitas)
Monday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성
검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM

F/C 4,520 1 2,000 221 - -


F/B 6,370 27 2,000 4,239 180 - -
SU2id R/C 2,210 7 2,000 3,167 80 - -
R/B 6,094 21 2,000 3,446 260 1 3,846 1
SU2id 소계 (Total) 19,194 56 2,000 2,918 520 1 1,923 - 1 - - - - - - -
Incoming F/C 440 - 2,000 - - -
in AHTI F/B 1,830 5 2,000 2,732 60 - -
R/C 720 2 2,000 2,778 40 - -
KS R/B 720 1 2,000 1,389 40 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 - -
KS 소계 (Total) 5,130 10 2,000 1,949 140 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 660 1 1,515 - 1 - - - - - - -
F/C 5,946 - 500 - 242 - -
F/B 5,946 4 500 673 242 - -
SU2id R/C 3,107 2 500 644 121 - -
R/B 5,946 3 500 505 242 - -
SU2id 소계 (Total) 20,945 9 500 430 847 - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 50 - -
in AHTI F/B 1,780 1 500 562 50 - -
R/C 1,780 - 500 - 50 - -
KS R/B 1,780 1 500 562 50 - -
3RD CUSH 1,780 - 500 - 50 - -
3RD BACK 1,780 1 500 562 50 - -
KS 소계 (Total) 10,680 3 500 281 300 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,147 - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성
검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM
F/C 4,520 1 2,000 221 160 - -
F/B 6,370 27 2,000 4,239 270 - -
SU2id R/C 2,210 7 2,000 3,167 180 - -
R/B 6,094 21 2,000 3,446 210 - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 820 - - - - - - - - - - -
Incoming F/C 440 - 2,000 - 40 - -
in AHTI F/B 1,830 5 2,000 2,732 60 - -
R/C 720 2 2,000 2,778 - -
KS R/B 720 1 2,000 1,389 40 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 - -
KS 소계 (Total) 5,130 10 2,000 1,949 140 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 960 - - - - - - - - - - -
F/C 5,946 - 500 - 238 - -
F/B 5,946 4 500 673 238 - -
SU2id R/C 3,107 2 500 644 119 - -
R/B 5,946 3 500 505 238 - -
SU2id 소계 (Total) 20,945 9 500 430 833 - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 58 - -
in AHTI F/B 1,780 1 500 562 58 - -
R/C 1,780 - 500 - 58 - -
KS R/B 1,780 1 500 562 58 - -
3RD CUSH 1,780 - 500 - 58 - -
3RD BACK 1,780 1 500 562 58 - -
KS 소계 (Total) 10,680 3 500 281 348 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,181 - - - - - - - - - - -
◈ 품질 현황 (Status kualitas)
Wednesday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성
검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM
F/C 4,520 1 2,000 221 240 - -
F/B 6,370 27 2,000 4,239 210 2 9,524 1 1
SU2id R/C 2,210 7 2,000 3,167 80 - -
R/B 6,094 21 2,000 3,446 160 1 6,250 1
SU2id 소계 (Total) 19,194 56 2,000 2,918 690 3 4,348 - 1 - - 1 - - 1 -
Incoming F/C 440 - 2,000 - - -
in AHTI F/B 1,830 5 2,000 2,732 60 - -
R/C 720 2 2,000 2,778 40 - -
KS R/B 720 1 2,000 1,389 40 - -
3RD CUSH 480 - 2,000 - 80 - -
3RD BACK 940 2 2,000 2,128 - -
KS 소계 (Total) 5,130 10 2,000 1,949 220 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 910 3 3,297 - 1 - - 1 - - 1 -
F/C 5,946 - 500 - 248 - -
F/B 5,946 4 500 673 248 2 8,065 1
SU2id R/C 3,107 2 500 644 124 - -
R/B 5,946 3 500 505 248 - -
SU2id 소계 (Total) 20,945 9 500 430 868 2 2,304 1 - - - - - - - -
Assembling F/C 1,780 - 500 - 36 - -
in AHTI F/B 1,780 1 500 562 36 - -
R/C 1,780 - 500 - 36 - -
KS R/B 1,780 1 500 562 36 - -
3RD CUSH 1,780 - 500 - 36 - -
3RD BACK 1,780 1 500 562 36 - -
KS 소계 (Total) 10,680 3 500 281 216 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,084 2 1,845 1 - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성
검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM
F/C 4,520 1 2,000 221 200 - -
F/B 6,370 27 2,000 4,239 270 1 3,704
SU2id R/C 2,210 7 2,000 3,167 160 - -
R/B 6,094 21 2,000 3,446 164 - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 794 1 1,259 - - - - - - - - -
Incoming F/C 440 - 2,000 - 40 - -
in AHTI F/B 1,830 5 2,000 2,732 50 - -
R/C 720 2 2,000 2,778 - -
KS R/B 720 1 2,000 1,389 40 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 - -
KS 소계 (Total) 5,130 10 2,000 1,949 130 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 924 1 1,082 - - - - - - - - -
F/C 5,946 - 500 - 226 - -
F/B 5,946 4 500 673 226 - -
SU2id R/C 3,107 2 500 644 113 - -
R/B 5,946 3 500 505 226 - -
SU2id 소계 (Total) 20,945 9 500 430 791 - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 44 - -
in AHTI F/B 1,780 1 500 562 44 - -
R/C 1,780 - 500 - 44 - -
KS R/B 1,780 1 500 562 44 - -
3RD CUSH 1,780 - 500 - 44 - -
3RD BACK 1,780 1 500 562 44 - -
KS 소계 (Total) 10,680 3 500 281 264 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,055 - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
FRIDAY
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
목표 달성 달성
(Divisi) (Garis Produksi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM
F/C 4,520 1 2,000 221 160 - -
F/B 6,370 27 2,000 4,239 230 1 4,348
SU2id R/C 2,210 7 2,000 3,167 60 1 16,667 1
R/B 6,094 21 2,000 3,446 200 1 5,000 1
SU2id 소계 (Total) 19,194 56 2,000 2,918 650 3 4,615 - 2 - - - - - - -
Incoming F/C 440 - 2,000 - 40 - -
in AHTI F/B 1,830 5 2,000 2,732 110 1 9,091
R/C 720 2 2,000 2,778 80 - -
KS R/B 720 1 2,000 1,389 40 - -
3RD CUSH 480 - 2,000 - - -
3RD BACK 940 2 2,000 2,128 - -
KS 소계 (Total) 5,130 10 2,000 1,949 270 1 3,704 - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 920 4 4,348 - 2 - - - - - - -
F/C 5,946 - 500 - 220 - -
F/B 5,946 4 500 673 220 - -
SU2id R/C 3,107 2 500 644 110 - -
R/B 5,946 3 500 505 220 1 - 1
SU2id 소계 (Total) 20,945 9 500 430 770 1 1,299 - - - - - 1 - - -
Assembling F/C 1,780 - 500 - 72 - -
in AHTI F/B 1,780 1 500 562 72 - -
R/C 1,780 - 500 - 72 - -
KS R/B 1,780 1 500 562 72 - -
3RD CUSH 1,780 - 500 - 72 - -
3RD BACK 1,780 1 500 562 72 - -
KS 소계 (Total) 10,680 3 500 281 432 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 1,202 1 832 - - - - - 1 - - -

◈ 품질 현황 (Status kualitas) Weekly 3 shift 2


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성
검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM

F/C 2,240 - 2,000 - 760 - - - - - - - - - - -


F/B 3,110 11 2,000 3,537 1,160 4 3,448 - 1 - - - - - 1 -
SU2id R/C 1,180 5 2,000 4,237 560 1 1,786 - 1 - - - - - - -
R/B 2,954 14 2,000 4,739 994 3 3,018 - 2 - - 1 - - - -
SU2id 소계 (Total) 9,484 30 2,000 3,163 3,474 8 2,303 - 4 - - 1 - - 1 -

Incoming F/C 240 - 2,000 - 120 - - - - - - - - - - -


in AHTI F/B 970 3 2,000 3,093 340 1 2,941 - - - - - - - - -
R/C 400 1 2,000 2,500 160 - - - - - - - - - - -

KS R/B 400 - 2,000 - 200 - - - - - - - - - - -


3RD CUSH 320 - 2,000 - 80 - - - - - - - - - - -
3RD BACK 320 1 2,000 3,125 - - - - - - - - - - - -
KS 소계 (Total) 2,650 5 2,000 1,887 900 1 1,111 - - - - - - - - -
Total Incoming 12,134 35 2,000 2,884 4,374 9 2,058 - 4 - - 1 - - 1 -
F/C 3,012 - 500 - 1,174 - - - - - - - - - - -
F/B 3,012 3 500 996 1,174 2 1,704 1 - - - - - - - -
SU2id R/C 1,506 1 500 664 587 - - - - - - - - - - -
R/B 3,012 2 500 664 1,174 1 - - - - - - 1 - - -
SU2id 소계 (Total) 10,542 6 500 569 4,109 3 730 1 - - - - 1 - - -

Assembling F/C 924 - 500 - 260 - - - - - - - - - - -


in AHTI F/B 924 - 500 - 260 - - - - - - - - - - -
R/C 924 - 500 - 260 - - - - - - - - - - -

KS R/B 924 1 500 1,082 260 - - - - - - - - - - -


3RD CUSH 924 - 500 - 260 - - - - - - - - - - -
3RD BACK 924 - 500 - 260 - - - - - - - - - - -
KS 소계 (Total) 5,544 1 500 180 1,560 - - - - - - - - - - -
Total Assembling 16,086 7 500 435 5,669 3 529 1 - - - - 1 - - -
Monday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위 검사 수량 (누적
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉비 실 조시 맞지 봉제 찜힘 봉제터짐 주름 실 텐션문제
(Divisi)
Produksi)
(CAR) (Bagian) ) 불량 오염 직물 결함 스크래치
(Akumulasi
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain Scratch
Jahitan 않음 Pleated / Jahitan Kerut Tension
Cacat) PPM PPM inspeksi) PPM Loncat Benang Timbul Kelipet Putus /Wrinkle kendor
inspeksi)

F/C 4,520 1 2,000 221 200 - - - - - - - - - - -


F/B 6,370 27 2,000 4,239 480 2 6,667 - - - - - - 1 - 1
SU2id R/C 2,210 7 2,000 3,167 200 - - - - - - - - - - -
R/B 6,094 21 2,000 3,446 540 1 3,846 - 1 - - - - - - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 1,420 3 4,145 - 1 - - - - 1 - 1
Incoming F/C 440 - 2,000 - - - - - - - - - - - - -
in AHTI F/B 1,830 5 2,000 2,732 110 - - - - - - - - - - -
R/C 720 2 2,000 2,778 40 - - - - - - - - - - -
KS R/B 720 1 2,000 1,389 40 - - - - - - - - - - -
3RD CUSH 480 - 2,000 - - - - - - - - - - - - -
3RD BACK 940 2 2,000 2,128 40 - - - - - - - - - - -
KS 소계 (Total) 5,130 10 2,000 1,949 230 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 1,650 3 3,535 - 1 - - - - 1 - 1
F/C 5,946 - 500 - 498 - - - - - - - - - - -
F/B 5,946 4 500 673 498 - - - - - - - - - - -
SU2id R/C 3,107 2 500 644 249 - - - - - - - - - - -
R/B 5,946 3 500 505 498 - - - - - - - - - - -
SU2id 소계 (Total) 20,945 9 500 430 1,743 - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 84 - - - - - - - - - - -
in AHTI F/B 1,780 1 500 562 84 - - - - - - - - - - -
R/C 1,780 - 500 - 84 - - - - - - - - - - -
KS R/B 1,780 1 500 562 84 - - - - - - - - - - -
3RD CUSH 1,780 - 500 - 84 - - - - - - - - - - -
3RD BACK 1,780 1 500 562 84 - - - - - - - - - - -
KS 소계 (Total) 10,680 3 500 281 504 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 2,247 - - - - - - - - - - -

Tuesday shift 1& shift 2


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
목표 달성 달성
(Divisi) (Garis Produksi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 검사 수량 불량 스크래치 봉비 실 조시 맞지 않음 봉제 찜힘 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Scratch Jahitan Loncat Benang Timbul Pleated / Kelipet Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM

F/C 4,520 1 2,000 221 320 - - - - - - - - - - -


F/B 6,370 27 2,000 4,239 570 1 1,754 - - - 1 - - - - -
SU2id R/C 2,210 7 2,000 3,167 220 - - - - - - - - - - -
R/B 6,094 21 2,000 3,446 530 1 1,887 - 1 - - - - - - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 1,640 2 1,220 - 1 - 1 - - - - -

Incoming F/C 440 - 2,000 - 80 - - - - - - - - - - -


in AHTI F/B 1,830 5 2,000 2,732 60 - - - - - - - - - - -
R/C 720 2 2,000 2,778 - - - - - - - - - - - -
KS R/B 720 1 2,000 1,389 80 - - - - - - - - - - -
3RD CUSH 480 - 2,000 - - - - - - - - - - - - -
3RD BACK 940 2 2,000 2,128 - - - - - - - - - - - -
KS 소계 (Total) 5,130 10 2,000 1,949 220 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 1,860 2 1,075 - 1 - 1 - - - - -
F/C 5,946 - 500 - 488 - - - - - - - - - - -
F/B 5,946 4 500 673 488 - - - - - - - - - - -
SU2id R/C 3,107 2 500 644 244 - - - - - - - - - - -
R/B 5,946 3 500 505 488 - - - - - - - - - - -
SU2id 소계 (Total) 20,945 9 500 430 1,708 - - - - - - - - - - -

Assembling F/C 1,780 - 500 - 94 - - - - - - - - - - -


in AHTI F/B 1,780 1 500 562 94 - - - - - - - - - - -

KS
Assembling
in AHTI

R/C 1,780 - 500 - 94 - - - - - - - - - - -


KS R/B 1,780 1 500 562 94 - - - - - - - - - - -
3RD CUSH 1,780 - 500 - 94 - - - - - - - - - - -
3RD BACK 1,780 1 500 562 94 - - - - - - - - - - -
KS 소계 (Total) 10,680 3 500 281 564 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 2,272 - - - - - - - - - - -

Wednesday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위 검사 수량 (누적 실 조시 맞지 봉제 찜힘 봉제터짐
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉비 주름 실 텐션문제
(Divisi) (CAR) (Bagian) ) 불량 오염 직물 결함 스크래치
Produksi)
(Akumulasi
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain Scratch
Jahitan 않음 Pleated / Jahitan Kerut Tension
Cacat) PPM PPM inspeksi) PPM Loncat Benang Timbul Kelipet Putus /Wrinkle kendor
inspeksi)

F/C 4,520 1 2,000 221 240 - - - - - - - - - - -


F/B 6,370 27 2,000 4,239 510 2 3,922 - 1 - - - - - 1 -
SU2id R/C 2,210 7 2,000 3,167 160 - - - - - - - - - - -
R/B 6,094 21 2,000 3,446 360 2 5,556 - - - - 1 - - 1 -
SU2id 소계 (Total) 19,194 56 2,000 2,918 1,270 4 3,150 - 1 - - 1 - - 2 -
Incoming F/C 440 - 2,000 - - - - - - - - - - - - -
in AHTI F/B 1,830 5 2,000 2,732 60 - - - - - - - - - - -
R/C 720 2 2,000 2,778 40 - - - - - - - - - - -
KS R/B 720 1 2,000 1,389 40 - - - - - - - - - - -
3RD CUSH 480 - 2,000 - 120 - - - - - - - - - - -
3RD BACK 940 2 2,000 2,128 40 - - - - - - - - - - -
KS 소계 (Total) 5,130 10 2,000 1,949 300 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 1,570 4 2,548 - 1 - - 1 - - 2 -
F/C 5,946 - 500 - 470 - - - - - - - - - - -
F/B 5,946 4 500 673 470 2 4,255 1 - - - - - - - -
SU2id R/C 3,107 2 500 644 235 - - - - - - - - - - -
R/B 5,946 3 500 505 470 - - - - - - - - - - -
SU2id 소계 (Total) 20,945 9 500 430 1,645 2 1,216 1 - - - - - - - -
Assembling F/C 1,780 - 500 - 78 - - - - - - - - - - -
in AHTI F/B 1,780 1 500 562 78 - - - - - - - - - - -
R/C 1,780 - 500 - 78 - - - - - - - - - - -
KS R/B 1,780 1 500 562 78 - - - - - - - - - - -
3RD CUSH 1,780 - 500 - 78 - - - - - - - - - - -
3RD BACK 1,780 1 500 562 78 - - - - - - - - - - -
KS 소계 (Total) 10,680 3 500 281 468 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 2,113 2 947 1 - - - - - - - -

Thursday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위
(Garis 검사 수량 (누적 실 조시 맞지 봉제 찜힘 봉제터짐
(Divisi) (CAR) (Bagian) 불량 (누적) 목표 달성 검사 수량 달성 봉비 주름 실 텐션문제
Produksi) ) 불량 오염 직물 결함 스크래치
(Akumulasi
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain Scratch
Jahitan 않음 Pleated / Jahitan Kerut Tension
Cacat) PPM PPM inspeksi) PPM Loncat Benang Timbul Kelipet Putus /Wrinkle kendor
inspeksi)

F/C 4,520 1 2,000 221 400 - - - - - - - - - - -

SU2id

Incoming
in AHTI
F/B 6,370 27 2,000 4,239 560 2 3,571 - - - - - - - - -
SU2id R/C 2,210 7 2,000 3,167 200 - - - - - - - - - - -
R/B 6,094 21 2,000 3,446 444 - - - - - - - - - - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 1,604 2 1,247 - - - - - - - - -
Incoming F/C 440 - 2,000 - 40 - - - - - - - - - - -
in AHTI F/B 1,830 5 2,000 2,732 80 - - - - - - - - - - -
R/C 720 2 2,000 2,778 40 - - - - - - - - - - -
KS R/B 720 1 2,000 1,389 40 - - - - - - - - - - -
3RD CUSH 480 - 2,000 - 40 - - - - - - - - - - -
3RD BACK 940 2 2,000 2,128 40 - - - - - - - - - - -
KS 소계 (Total) 5,130 10 2,000 1,949 280 - - - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 1,884 2 1,062 - - - - - - - - -
F/C 5,946 - 500 - 454 - - - - - - - - - - -
F/B 5,946 4 500 673 454 - - - - - - - - - - -
SU2id R/C 3,107 2 500 644 227 - - - - - - - - - - -
R/B 5,946 3 500 505 454 - - - - - - - - - - -
SU2id 소계 (Total) 20,945 9 500 430 1,589 - - - - - - - - - - -
Assembling F/C 1,780 - 500 - 90 - - - - - - - - - - -
in AHTI F/B 1,780 1 500 562 90 - - - - - - - - - - -
R/C 1,780 - 500 - 90 - - - - - - - - - - -
KS R/B 1,780 1 500 562 90 - - - - - - - - - - -
3RD CUSH 1,780 - 500 - 90 - - - - - - - - - - -
3RD BACK 1,780 1 500 562 90 - - - - - - - - - - -
KS 소계 (Total) 10,680 3 500 281 540 - - - - - - - - - - -
Total Assembling 31,625 12 500 379 2,129 - - - - - - - - - - -

Friday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위 검사 수량 (누적
(Divisi)
(Garis
(CAR) (Bagian) 불량 (누적) 목표 달성 검사 수량 달성 봉비 실 조시 맞지 봉제 찜힘 봉제터짐 주름 실 텐션문제
Produksi) ) 불량 오염 직물 결함 스크래치
(Akumulasi
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain Scratch
Jahitan 않음 Pleated / Jahitan Kerut Tension
Cacat) PPM PPM inspeksi) PPM Loncat Benang Timbul Kelipet Putus /Wrinkle kendor
inspeksi)

F/C 4,520 1 2,000 221 360 - - - - - - - - - - -


F/B 6,370 27 2,000 4,239 490 4 8,163 - 1 - - - - 1 - -
SU2id R/C 2,210 7 2,000 3,167 100 1 10,000 - 1 - - - - - - -
R/B 6,094 21 2,000 3,446 480 1 2,083 - 1 - - - - - - -
SU2id 소계 (Total) 19,194 56 2,000 2,918 1,430 6 4,196 - 3 - - - - 1 - -
Incoming F/C 440 - 2,000 - 40 - - - - - - - - - - -
in AHTI F/B 1,830 5 2,000 2,732 170 1 5,882 - - - - - - - - -
R/C 720 2 2,000 2,778 120 - - - - - - - - - - -
KS R/B 720 1 2,000 1,389 40 - - - - - - - - - - -
3RD CUSH 480 - 2,000 - - - - - - - - - - - - -
3RD BACK 940 2 2,000 2,128 80 - - - - - - - - - - -
KS 소계 (Total) 5,130 10 2,000 1,949 450 1 3,704 - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 1,880 7 7,473 - 3 - - - - 1 - -
F/C 5,946 - 500 - 450 - - - - - - - - - - -
F/B 5,946 4 500 673 450 - - - - - - - - - - -
SU2id R/C 3,107 2 500 644 225 - - - - - - - - - - -
R/B 5,946 3 500 505 450 1 2,222 - - - - - 1 - - -
SU2id 소계 (Total) 20,945 9 500 430 1,575 1 635 - - - - - 1 - - -
Assembling F/C 1,780 - 500 - 116 - - - - - - - - - - -
in AHTI

KS
Assembling
in AHTI F/B 1,780 1 500 562 116 1 8,621 - - 1 - - - - - -
R/C 1,780 - 500 - 116 - - - - - - - - - - -
KS R/B 1,780 1 500 562 116 - - - - - - - - - - -
3RD CUSH 1,780 - 500 - 116 - - - - - - - - - - -
3RD BACK 1,780 1 500 562 116 - - - - - - - - - - -
KS 소계 (Total) 10,680 3 500 281 696 1 1,437 - - 1 - - - - - -
Total Assembling 31,625 12 500 379 2,271 2 881 - - 1 - - 1 - - -
◈ 품질 현황 (Status kualitas) Weekly 3 shift 1 & shift 2
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 (누적
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉비 실 조시 맞지 봉제 찜힘 봉제터짐 주름 실 텐션문제
(Divisi)
Produksi)
(CAR) (Bagian) ) 불량 오염 직물 결함 스크래치
(Akumulasi
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian
Kontaminasi Cacat Kain Scratch
Jahitan 않음 Pleated / Jahitan Kerut Tension
Cacat) PPM PPM inspeksi) PPM Loncat Benang Timbul Kelipet Putus /Wrinkle kendor
inspeksi)
F/C 4,520 1 2,000 221 1,520 - - - - - - - - - - -
F/B 6,370 27 2,000 4,239 2,610 11 4,215 - 2 - 1 - - 2 1 1
SU2id R/C 2,210 7 2,000 3,167 880 1 1,136 - 1 - - - - - - -
R/B 6,094 21 2,000 3,446 2,354 5 2,124 - 3 - - 1 - - 1 -
SU2id 소계 (Total) 19,194 56 2,000 2,918 7,364 17 2,309 - 6 - 1 1 - 2 2 1
Incoming F/C 440 - 2,000 - 160 - - - - - - - - - - -
in AHTI F/B 1,830 5 2,000 2,732 480 1 2,083 - - - - - - - - -
R/C 720 2 2,000 2,778 240 - - - - - - - - - - -
KS R/B 720 1 2,000 1,389 240 - - - - - - - - - - -
3RD CUSH 480 - 2,000 - 160 - - - - - - - - - - -
3RD BACK 940 2 2,000 2,128 200 - - - - - - - - - - -
KS 소계 (Total) 5,130 10 2,000 1,949 1,480 1 676 - - - - - - - - -
Total Incoming 24,324 66 2,000 2,713 8,844 18 2,035 - 6 - 1 1 - 2 2 1
F/C 5,946 - 500 - 2,360 - - - - - - - - - - -
F/B 5,946 4 500 673 2,360 2 847 1 - - - - - - - -
SU2id R/C 3,107 2 500 644 1,180 - - - - - - - - - - -
R/B 5,946 3 500 505 2,360 1 424 - - - - - 1 - - -
SU2id 소계 (Total) 20,945 9 500 430 8,260 3 363 1 - - - - 1 - - -
Assembling F/C 1,780 - 500 - 462 - - - - - - - - - - -
in AHTI F/B 1,780 1 500 562 462 1 2,165 - - 1 - - - - - -
R/C 1,780 - 500 - 462 - - - - - - - - - - -
KS R/B 1,780 1 500 562 462 - - - - - - - - - - -
3RD CUSH 1,780 - 500 - 462 - - - - - - - - - - -
3RD BACK 1,780 1 500 562 462 - - - - - - - - - - -
KS 소계 (Total) 10,680 3 500 281 2,772 1 361 - - 1 - - - - - -
Total Assembling 31,625 12 500 379 11,032 4 363 1 - 1 - - 1 - - -
24:00:00
11/13/2023

합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum

-
-
-
1
- - - - 1
-
-
-
-
-
-
- - - - -
- - - - 1
-
-
-
-
- - - - -
-
-
-
-
-
-
- - - - -
- - - - -

11/14/2023

합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum

-
-
-
-
- - - - -
-
-
-
-
-
-
- - - - -
- - - - -
-
-
-
-
- - - - -
-
-
-
-
-
-
- - - - -
- - - - -
11/15/2023

합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum

-
2
-
1
- - - - 3
-
-
-
-
-
-
- - - - -
- - - - 3
-
1 2
-
-
- - - 1 2
-
-
-
-
-
-
- - - - -
- - - 1 2

11/16/2023

합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum

-
1 1
-
-
1 - - - 1
-
-
-
-
-
-
- - - - -
1 - - - 1
-
-
-
-
- - - - -
-
-
-
-
-
-
- - - - -
- - - - -

11/17/2023
합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum
-
1 1
1
1
- 1 - - 3
-
1 1
-
-
-
-
- - 1 - 1
- 1 1 - 4
-
-
-
1
- - - - 1
-
-
-
-
-
-
- - - - -
- - - - 1

13-17 November 2023

합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum

- - - - -
1 1 - - 4
- - - - 1
- - - - 3
1 1 - - 8
- - - - -
- - 1 - 1
- - - - -
- - - - -
- - - - -
- - - - -
- - 1 - 1
1 1 1 - 9
- - - - -
- - - 1 2
- - - - -
- - - - 1
- - - 1 3
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - 1 3
11/13/2023

합계
바늘자국
표시점 손상 Missing (TTL)
Lubang stitch
Notch point Kerusakan
jarum

- - - - -
- - - - 2
- - - - -
- - - - 1
- - - - 3
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 3
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

11/14/2023

합계
표시점 바늘자국 (TTL)
손상 Kerusakan Missing stitch
Notch point Lubang jarum

- - - - -
- - - - 1
- - - - -
- - - - 1
- - - - 2
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 2
- - - - -
- - - - -
- - - - 1
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

11/15/2023

합계
바늘자국
표시점 손상 Missing (TTL)
Lubang stitch
Notch point Kerusakan
jarum

- - - - -
- - - - 2
- - - - -
- - - - 2
- - - - 4
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 4
- - - - -
- - - 1 2
- - - - -
- - - - -
- - - 1 2
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - 1 2

11/16/2023

합계
바늘자국 (TTL)
표시점 손상 Missing
Lubang stitch
Notch point Kerusakan
jarum

- - - - -
1 - - 1 2
- - - - -
- - - - -
1 - - 1 2
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
1 - - 1 2
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -
- - - - -

11/17/2023

합계
바늘자국 (TTL)
표시점 손상 Missing
Lubang stitch
Notch point Kerusakan
jarum

- - - - -
- 1 1 - 4
- - - - 1
- - - - 1
- 1 1 - 6
- - - - -
- - 1 - 1
- - - - -
- - - - -
- - - - -
- - - - -
- - 1 - 1
- 1 2 - 7
- - - - -
- - - - -
- - - - -
- - - - 1
- - - - 1
- - - - -
- - - - 1
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 1
- - - - 2
13-17 November 2023

합계
바늘자국
표시점 손상 Missing (TTL)
Lubang stitch
Notch point Kerusakan
jarum
- - - - -
1 1 1 1 11
- - - - 1
- - - - 5
1 1 1 1 17
- - - - -
- - 1 - 1
- - - - -
- - - - -
- - - - -
- - - - -
- - 1 - 1
1 1 2 1 18
- - - - -
- - - 1 2
- - - - 1
- - - - 1
- - - 1 3
- - - - -
- - - - 1
- - - - -
- - - - -
- - - - -
- - - - -
- - - - 1
- - - 1 4
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas)
Monday
월간 현황 일일 현황
봉제
(Status Bulanan) (Daily Status)
구분 실 조시 봉제터
구분 차종 부위 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕 봉제 찜힘 Tulang/
(Garis 불량 오염 직물 결함 땀수
(Divisi) (CAR) (Bagian) 맞지 않음 겹침 Open 짐
Kontaminasi Cacat Kain 치
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Lips seam Pleated / stitch
(Cacat) Pitch Benang overlap tidak Jahitan
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet
Timbul ketemu Putus
F/C 5,840 1 2,000 171 160 - -
F/B 8,150 34 2,000 4,172 120 - -
SU2id R/C 2,710 9 2,000 3,321 80 - -
R/B 7,864 24 2,000 3,052 120 - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 480 - - - - - - - - - - - - - -
Incoming F/C 520 - 2,000 - 40 - -
in AHTI F/B 2,710 5 2,000 1,845 280 - -
R/C 900 2 2,000 2,222 40 - -
KS R/B 980 1 2,000 1,020 40 - -
3RD CUSH 720 - 2,000 - 40 - -
3RD BACK 1,300 3 2,000 2,308 120 1 8,333 1
KS 소계 (Total) 7,130 11 2,000 1,543 560 1 1,786 - 1 - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 1,040 1 962 - 1 - - - - - - - - - -
F/C 7,516 - 500 - 168 - -
F/B 7,516 4 500 532 168 - -
SU2id R/C 3,892 2 500 514 84 - -
R/B 7,516 4 500 532 168 - -
SU2id 소계 (Total) 26,440 10 500 378 588 - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - 108 - -
in AHTI F/B 2,396 1 500 417 108 - -
R/C 2,396 - 500 - 108 - -
KS R/B 2,396 1 500 417 108 - -
3RD CUSH 2,396 - 500 - 108 - -
3RD BACK 2,396 1 500 417 108 - -
KS 소계 (Total) 14,376 3 500 209 648 - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 1,236 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday

월간 현황 일일 현황
봉제
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제터
검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕 Paping 봉제 찜힘
(Garis Tulang/
(Divisi)
Produksi)
(CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
Kontaminasi Cacat Kain 치
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Lips Pleated / stitch
(Cacat) Pitch Benang overlap terbuka
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet tidak Jahitan
Timbul ketemu Putus
F/C 5,840 1 2,000 171 160 - -
F/B 8,150 34 2,000 4,172 270 2 7,407 1
SU2id R/C 2,710 9 2,000 3,321 100 - -
R/B 7,864 24 2,000 3,052 200 1 5,000 1
SU2id 소계 (Total) 24,564 68 2,000 2,768 730 3 4,110 - 2 - - - - - - - - - -
Incoming F/C 520 - 2,000 - - -
in AHTI F/B 2,710 5 2,000 1,845 50 - -
R/C 900 2 2,000 2,222 40 - -
KS R/B 980 1 2,000 1,020 40 - -
3RD CUSH 720 - 2,000 - - -
3RD BACK 1,300 3 2,000 2,308 - -
KS 소계 (Total) 7,130 11 2,000 1,543 130 - - - - - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 860 3 3,488 - 2 - - - - - - - - - -
F/C 7,516 - 500 - 206 - -
F/B 7,516 4 500 532 206 - -
SU2id R/C 3,892 2 500 514 103 - -
R/B 7,516 4 500 532 206 - -
SU2id 소계 (Total) 26,440 10 500 378 721 - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - 60 - -
in AHTI F/B 2,396 1 500 417 60 - -
R/C 2,396 - 500 - 60 - -
KS R/B 2,396 1 500 417 60 - -
3RD CUSH 2,396 - 500 - 60 - -
3RD BACK 2,396 1 500 417 60 - -
Assembling
in AHTI
KS

KS 소계 (Total) 14,376 3 500 209 360 - - - - - - - - - - - - - -


Total Assembling 40,816 13 500 319 1,081 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Wednesday

월간 현황 일일 현황
봉제
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제터
검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕 Paping 봉제 찜힘
(Garis Tulang/
(Divisi) (CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
Kontaminasi Cacat Kain 치
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Lips stitch
(Cacat) Pitch Benang overlap terbuka Pleated /
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet tidak Jahitan
Timbul ketemu Putus
F/C 5,840 1 2,000 171 240 - -
F/B 8,150 34 2,000 4,172 320 1 3,125
SU2id R/C 2,710 9 2,000 3,321 80 1 12,500 1
R/B 7,864 24 2,000 3,052 180 1 5,556 1
SU2id 소계 (Total) 24,564 68 2,000 2,768 820 3 3,659 1 - - - - - - - - 1 - -
Incoming F/C 520 - 2,000 - - -
in AHTI F/B 2,710 5 2,000 1,845 80 - -
R/C 900 2 2,000 2,222 40 - -
KS R/B 980 1 2,000 1,020 40 - -
3RD CUSH 720 - 2,000 - 80 - -
3RD BACK 1,300 3 2,000 2,308 - -
KS 소계 (Total) 7,130 11 2,000 1,543 240 - - - - - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 1,060 3 2,830 1 - - - - - - - - 1 - -
F/C 7,516 - 500 - 172 - -
F/B 7,516 4 500 532 172 - -
SU2id R/C 3,892 2 500 514 86 - -
R/B 7,516 4 500 532 172 - -
SU2id 소계 (Total) 26,440 10 500 378 602 - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - 96 - -
in AHTI F/B 2,396 1 500 417 96 - -
R/C 2,396 - 500 - 96 - -
KS R/B 2,396 1 500 417 96 - -
3RD CUSH 2,396 - 500 - 96 - -
3RD BACK 2,396 1 500 417 96 - -
KS 소계 (Total) 14,376 3 500 209 576 - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 1,178 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday
월간 현황 일일 현황
봉제
(Status Bulanan) (Daily Status)
구분 실 조시 봉제터
구분 차종 부위 스크래 봉비
(Garis 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 립덕 Paping 봉제 찜힘
Tulang/
(Divisi) (CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
Kontaminasi Cacat Kain 치
Produksi) (Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Lips stitch
(Cacat) Pitch Benang overlap terbuka Pleated /
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet tidak Jahitan
Timbul ketemu Putus
F/C 5,840 1 2,000 171 200 - -
F/B 8,150 34 2,000 4,172 130 2 15,385 1
SU2id R/C 2,710 9 2,000 3,321 60 1 16,667
R/B 7,864 24 2,000 3,052 220 1 4,545
SU2id 소계 (Total) 24,564 68 2,000 2,768 610 4 6,557 - 1 - - - - - - - - - -
Incoming F/C 520 - 2,000 - - -
in AHTI F/B 2,710 5 2,000 1,845 110 - -
R/C 900 2 2,000 2,222 20 - -
KS R/B 980 1 2,000 1,020 60 - -
3RD CUSH 720 - 2,000 - 40 - -
3RD BACK 1,300 3 2,000 2,308 40 - -
KS 소계 (Total) 7,130 11 2,000 1,543 270 - - - - - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 880 4 4,545 - 1 - - - - - - - - - -
F/C 7,516 - 500 - 238 - -
F/B 7,516 4 500 532 238 - -
SU2id R/C 3,892 2 500 514 119 - -
R/B 7,516 4 500 532 238 - -
SU2id 소계 (Total) 26,440 10 500 378 833 - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - 44 - -
in AHTI F/B 2,396 1 500 417 44 - -
R/C 2,396 - 500 - 44 - -
KS R/B 2,396 1 500 417 44 - -
Assembling
in AHTI
KS
3RD CUSH 2,396 - 500 - 44 - -
3RD BACK 2,396 1 500 417 44 - -
KS 소계 (Total) 14,376 3 500 209 264 - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 1,097 - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
FRIDAY
월간 현황 일일 현황
봉제
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 봉제터
검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 스크래 봉비 립덕 Paping 봉제 찜힘
(Garis Tulang/
(Divisi) (CAR) (Bagian) 불량 오염 직물 결함 땀수 맞지 않음 겹침 짐
Kontaminasi Cacat Kain 치
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Jahitan Lips stitch
Produksi)
(Cacat) Pitch Benang overlap terbuka Pleated /
inspeksi) Cacat) PPM PPM inspeksi) PPM Scratch Loncat duck Kelipet tidak Jahitan
Timbul ketemu Putus
F/C 5,840 1 2,000 171 - -
F/B 8,150 34 2,000 4,172 - -
SU2id R/C 2,710 9 2,000 3,321 - -
R/B 7,864 24 2,000 3,052 - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 - - - - - - - - - - - - - - -
Incoming F/C 520 - 2,000 - - -
in AHTI F/B 2,710 5 2,000 1,845 - -
R/C 900 2 2,000 2,222 - -
KS R/B 980 1 2,000 1,020 - -
3RD CUSH 720 - 2,000 - - -
3RD BACK 1,300 3 2,000 2,308 - -
KS 소계 (Total) 7,130 11 2,000 1,543 - - - - - - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 4 shift 1


월간 현황 일일 현황
봉제 J
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비
검사 수량 (누적) 불량 (누적) 검사 수량 불량 직물 결함 Cacat 스크래치 땀수 실 조시 맞지 않음 겹침 립덕 Paping 봉제 찜힘 Tulang/ 봉제터짐
Tujuan Pencapaian Pencapaian 오염 Kontaminasi Jahitan terbuka stitch tidak
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kain Scratch Pitch Benang Timbul overlap Lips duck Pleated / Kelipet Jahitan Putus
PPM PPM PPM Loncat ketemu
F/C 3,040 1 2,000 329 760 - - - - - - - - - - - - - -
F/B 4,100 21 2,000 5,122 840 5 5,952 - 1 - - - - - - - - - -
SU2id R/C 1,350 4 2,000 2,963 320 2 6,250 1 - - - - - - - - - - -
R/B 3,860 10 2,000 2,591 720 3 4,167 - - - - - - - - - 1 - -
SU2id 소계 (Total) 12,350 36 2,000 2,915 2,640 10 3,788 1 1 - - - - - - - 1 - -
Incoming F/C 240 - 2,000 - 40 - - - - - - - - - - - - - -
in AHTI F/B 1,380 2 2,000 1,449 520 - - - - - - - - - - - - - -
R/C 460 1 2,000 2,174 140 - - - - - - - - - - - - - -
KS R/B 500 1 2,000 2,000 180 - - - - - - - - - - - - - -
3RD CUSH 320 - 2,000 - 160 - - - - - - - - - - - - - -
3RD BACK 780 2 2,000 2,564 160 1 6,250 - 1 - - - - - - - - - -
KS 소계 (Total) 3,680 6 2,000 1,630 1,200 1 833 - 1 - - - - - - - - - -
Total Incoming 16,030 42 2,000 2,620 3,840 11 2,865 1 2 - - - - - - - 1 - -
F/C 3,718 - 500 - 784 - - - - - - - - - - - - - -
F/B 3,718 1 500 269 784 - - - - - - - - - - - - - -
SU2id R/C 1,993 1 500 502 392 - - - - - - - - - - - - - -
R/B 3,718 1 500 269 784 - - - - - - - - - - - - - -
SU2id 소계 (Total) 13,147 3 500 228 2,744 - - - - - - - - - - - - - -
Assembling F/C 1,164 - 500 - 308 - - - - - - - - - - - - - -
in AHTI F/B 1,164 1 500 859 308 - - - - - - - - - - - - - -
R/C 1,164 - 500 - 308 - - - - - - - - - - - - - -
KS R/B 1,164 - 500 - 308 - - - - - - - - - - - - - -
Assembling
in AHTI

KS
3RD CUSH 1,164 - 500 - 308 - - - - - - - - - - - - - -
3RD BACK 1,164 1 500 859 308 - - - - - - - - - - - - - -
KS 소계 (Total) 6,984 2 500 286 1,848 - - - - - - - - - - - - - -
Total Assembling 20,131 5 500 248 4,592 - - - - - - - - - - - - - -
24:00:00
11/20/2023

봉제 Jahit 부자재

시접 스티치 바늘자 미부착 합계
주름 텐션문 오조립 표시점 되박음 Run of Appeara Aksesor
Jahitan 굴곡 Seam 폭 국 손상 Missing (TTL)
Kerut 제 Salah Notch Back Stitch nce is
gelombang Allowan lebar Kerusakan stitch
/Wrinkle Tension numpuk Pasang point tack Lubang tidak
ce jahitan jarum
kendor ada / -
lepas -
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
1
- - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - 1
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/21/2023

봉제 Jahit 오염 및

시접 스티치 바늘자 손상 합계
주름 텐션문 오조립 표시점 되박음 Run of Appeara Aksesor
Jahitan 굴곡 Seam 폭 국 손상 Missing (TTL)
Kerut 제 Salah Notch Back Stitch nce is
gelombang Allowan lebar Kerusakan stitch
/Wrinkle Tension numpuk Pasang point tack Lubang tidak
ce jahitan jarum
kendor ada / -
1 lepas 2
-
1
- - - - - - - - - 1 - - - - - 3
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - 1 - - - - - 3
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/22/2023

봉제 Jahit 오염 및

시접 스티치 바늘자 손상 합계
주름 텐션문 오조립 표시점 되박음 Run of Appeara Aksesor
Jahitan 굴곡 Seam 폭 국 손상 Missing (TTL)
Kerut 제 Salah Notch Back Stitch nce is
gelombang Allowan lebar Kerusakan stitch
/Wrinkle Tension numpuk Pasang point tack Lubang tidak
ce jahitan jarum
kendor ada / -
1 lepas 1
1
1
- - - - - - - - - 1 - - - - - 3
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - 1 - - - - - 3
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/23/2023

봉제 Jahit 오염 및

시접 스티치 바늘자 손상 합계
주름 텐션문 오조립 표시점 되박음 Run of Appeara Aksesor
Jahitan Salah 굴곡 Seam 폭 국 손상 Missing (TTL)
Kerut 제 Notch Back Stitch nce is
gelombang Allowan lebar Kerusakan stitch
/Wrinkle Tension numpuk Pasang point tack Lubang tidak
ce jahitan jarum
kendor ada / -
1 lepas 2
1 1
1 1
1 - - - - - - - - 2 - - - - - 4
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
1 - - - - - - - - 2 - - - - - 4
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

11/24/2023

봉제 Jahit 오염 및

시접 스티치 바늘자 손상 합계
주름 텐션문 오조립 표시점 되박음 Run of Appeara Aksesor
Jahitan 굴곡 Seam 폭 국 손상 Missing (TTL)
Kerut 제 Salah Notch Back Stitch nce is stitch
gelombang Allowan lebar Kerusakan
/Wrinkle Tension numpuk Pasang point tack Lubang tidak
ce jahitan jarum
kendor ada / -
lepas -
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -

20-24 November 2023

봉제 Jahit

부자재 미부착 합계
실 텐션문제 시접 (TTL)
주름 오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Tension Jahitan Seam 손상 Kerusakan Missing stitch
Kerut /Wrinkle numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
kendor Allowance
lepas
- - - - - - - - - - - - - - - -
1 - - - - - - - - 1 - - - - - 3
- - - - - - - - - 1 - - - - - 2
- - - - - - - - - 1 - - - - - 2
1 - - - - - - - - 3 - - - - - 7
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - 1
- - - - - - - - - - - - - - - 1
1 - - - - - - - - 3 - - - - - 8
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!
◈ 품질 현황 (Status kualitas)
24:00:00
Monday 11/20/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi)
Produksi)
(CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
(Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 160 - - -
F/B 8,150 34 2,000 4,172 120 - - -
SU2id R/C 2,710 9 2,000 3,321 - - -
R/B 7,864 24 2,000 3,052 320 - - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 600 - - - - - - - - -
Incoming F/C 520 - 2,000 - 40 - - -
in AHTI F/B 2,710 5 2,000 1,845 210 - - -
R/C 900 2 2,000 2,222 - - -
KS R/B 980 1 2,000 1,020 40 - - -
3RD CUSH 720 - 2,000 - - - -
3RD BACK 1,300 3 2,000 2,308 80 - - -
KS 소계 (Total) 7,130 11 2,000 1,543 370 - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 970 - - - - - - - - -
F/C 7,516 - 500 - 170 - - -
F/B 7,516 4 500 532 170 - - -
SU2id R/C 3,892 2 500 514 85 - - -
R/B 7,516 4 500 532 170 - - -
SU2id 소계 (Total) 26,440 10 500 378 595 - - - - - - - - -
Assembling F/C 2,396 - 500 - 100 - - -
in AHTI F/B 2,396 1 500 417 100 - - -
R/C 2,396 - 500 - 100 - - -
KS R/B 2,396 1 500 417 100 - - -
3RD CUSH 2,396 - 500 - 100 - - -
3RD BACK 2,396 1 500 417 100 - - -
KS 소계 (Total) 14,376 3 500 209 600 - - - - - - - - -
Total Assembling 40,816 13 500 319 1,100 - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday 11/21/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
불량 오염 직물 결함 바늘자국 손상
(TTL)
(Divisi) (CAR) (Bagian) 누적)
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 160 - - -
F/B 8,150 34 2,000 4,172 200 2 10,000 1 1 2
SU2id R/C 2,710 9 2,000 3,321 - - -
R/B 7,864 24 2,000 3,052 260 - - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 620 2 3,226 - 1 - - - 1 2
Incoming F/C 520 - 2,000 - - - -
in AHTI F/B 2,710 5 2,000 1,845 120 - - -
R/C 900 2 2,000 2,222 40 - - -

KS R/B 980 1 2,000 1,020 40 - - -


3RD CUSH 720 - 2,000 - 40 - - -
3RD BACK 1,300 3 2,000 2,308 40 - - -
KS 소계 (Total) 7,130 11 2,000 1,543 280 - - - - - - - - -

Total Incoming 31,694 79 2,000 2,493 900 2 2,222 - 1 - - - 1 2


F/C 7,516 - 500 - 168 - - -
F/B 7,516 4 500 532 168 - - -
SU2id R/C 3,892 2 500 514 84 - - -
R/B 7,516 4 500 532 168 - - -
SU2id 소계 (Total) 26,440 10 500 378 588 - - - - - - - - -
Assembling F/C 2,396 - 500 - 104 - - -
in AHTI F/B 2,396 1 500 417 104 - - -
R/C 2,396 - 500 - 104 - - -
KS R/B 2,396 1 500 417 104 - - -
Assembling
in AHTI
KS
3RD CUSH 2,396 - 500 - 104 - - -
3RD BACK 2,396 1 500 417 104 - - -
KS 소계 (Total) 14,376 3 500 209 624 - - - - - - - - -
Total Assembling 40,816 13 500 319 1,212 - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Wednesday 11/22/2023

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi) (CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
F/C inspeksi)
5,840 1 2,000 171 - - -
F/B 8,150 34 2,000 4,172 300 - - -
SU2id R/C 2,710 9 2,000 3,321 120 - - -
R/B 7,864 24 2,000 3,052 200 - - -
SU2id 소계 24,564 68 2,000 2,768 620 - - - - - - - - -
Incoming F/C 520 - 2,000 - - - -
in AHTI (Total)
F/B 2,710 5 2,000 1,845 30 - - -
R/C 900 2 2,000 2,222 - - -
KS R/B 980 1 2,000 1,020 - - -
3RD CUSH 720 - 2,000 - 40 - - -
3RD BACK 1,300 3 2,000 2,308 40 - - -
KS 소계 (Total) 7,130 11 2,000 1,543 110 - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 730 - - - - - - - - -
F/C 7,516 - 500 - 188 - - -
F/B 7,516 4 500 532 188 - - -
SU2id R/C 3,892 2 500 514 94 - - -
R/B 7,516 4 500 532 188 - - -
SU2id 소계 26,440 10 500 378 658 - - - - - - - - -
Assembling F/C 2,396 - 500 - 86 - - -
in AHTI (Total)
F/B 2,396 1 500 417 86 - - -
R/C 2,396 - 500 - 86 - - -
KS R/B 2,396 1 500 417 86 - - -
3RD CUSH 2,396 - 500 - 86 - - -
3RD BACK 2,396 1 500 417 86 - - -
KS 소계 (Total) 14,376 3 500 209 516 - - - - - - - - -
Total Assembling 40,816 13 500 319 1,174 - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday 11/23/2023

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi)
Produksi)
(CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
(Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 240 - - -
F/B 8,150 34 2,000 4,172 320 - - -
SU2id R/C 2,710 9 2,000 3,321 60 - - -
R/B 7,864 24 2,000 3,052 270 - - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 890 - - - - - - - - -
Incoming F/C 520 - 2,000 - - - -
in AHTI F/B 2,710 5 2,000 1,845 - - -
R/C 900 2 2,000 2,222 - - -
KS R/B 980 1 2,000 1,020 - - -
3RD CUSH 720 - 2,000 - - - -
3RD BACK 1,300 3 2,000 2,308 40 - - -
KS 소계 (Total) 7,130 11 2,000 1,543 40 - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 930 - - - - - - - - -
F/C 7,516 - 500 - 260 - - -
F/B 7,516 4 500 532 260 - - -
SU2id R/C 3,892 2 500 514 130 - - -
R/B 7,516 4 500 532 260 1 3,846 1 1
SU2id 소계 (Total) 26,440 10 500 378 910 1 1,099 - 1 - - - - 1
Assembling F/C 2,396 - 500 - 18 - - -
in AHTI
KS
Assembling
in AHTI F/B 2,396 1 500 417 18 - - -
R/C 2,396 - 500 - 18 - - -
KS R/B 2,396 1 500 417 18 - - -
3RD CUSH 2,396 - 500 - 18 - - -
3RD BACK 2,396 1 500 417 18 - - -
KS 소계 (Total) 14,376 3 500 209 108 - - - - - - - - -
Total Assembling 40,816 13 500 319 1,018 1 982 - 1 - - - - 1

◈ 품질 현황 (Status kualitas)
FRIDAY 11/24/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi)
Produksi)
(CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
(Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 - - -
F/B 8,150 34 2,000 4,172 - - -
SU2id R/C 2,710 9 2,000 3,321 - - -
R/B 7,864 24 2,000 3,052 - - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 - - - - - - - - - -
Incoming F/C 520 - 2,000 - - - -
in AHTI F/B 2,710 5 2,000 1,845 - - -
R/C 900 2 2,000 2,222 - - -
KS R/B 980 1 2,000 1,020 - - -
3RD CUSH 720 - 2,000 - - - -
3RD BACK 1,300 3 2,000 2,308 - - -
KS 소계 (Total) 7,130 11 2,000 1,543 - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 - - - - - - - - - -
F/C 7,516 - 500 - - - -
F/B 7,516 4 500 532 - - -
SU2id R/C 3,892 2 500 514 - - -
R/B 7,516 4 500 532 - - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - -
Assembling F/C 2,396 - 500 - - - -
in AHTI F/B 2,396 1 500 417 - - -
R/C 2,396 - 500 - - - -
KS R/B 2,396 1 500 417 - - -
3RD CUSH 2,396 - 500 - - - -
3RD BACK 2,396 1 500 417 - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 3 shift 2


20-24 November 2023
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 합계
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 검사 수량 달성 (TTL)
검사 수량 (누적) 불량 (누적) 불량 봉제 찜힘 주름 바늘자국
Tujuan Pencapaian (Kuantitas Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain 손상 Kerusakan
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pleated / Kelipet Kerut /Wrinkle Lubang jarum
PPM PPM inspeksi) PPM

F/C 2,800 - 2,000 - 560 - - - - - - - - -


F/B 4,050 13 2,000 3,210 940 2 2,128 - 1 - - - 1 2
SU2id R/C 1,360 5 2,000 3,676 180 - - - - - - - - -
R/B 4,004 14 2,000 3,497 1,050 - - - - - - - - -
SU2id 소계 (Total) 12,214 32 2,000 2,620 2,730 2 733 - 1 - - - 1 2

Incoming F/C 280 - 2,000 - 40 - - - - - - - - -


in AHTI F/B 1,330 3 2,000 2,256 360 - - - - - - - - -
R/C 440 1 2,000 2,273 40 - - - - - - - - -

KS R/B 480 - 2,000 - 80 - - - - - - - - -


3RD CUSH 400 - 2,000 - 80 - - - - - - - - -
3RD BACK 520 1 2,000 1,923 200 - - - - - - - - -
KS 소계 (Total) 3,450 5 2,000 1,449 800 - - - - - - - - -
Total Incoming 15,664 37 2,000 2,362 3,530 2 567 - 1 - - - 1 2
F/C 3,798 - 500 - 786 - - - - - - - - -

SU2id

Assembling
in AHTI
F/B 3,798 3 500 790 786 - - - - - - - - -
SU2id R/C 1,899 1 500 527 393 - - - - - - - - -
R/B 3,798 3 500 790 786 1 - - 1 - - - - 1
SU2id 소계 (Total) 13,293 7 500 527 2,751 1 364 - 1 - - - - 1

Assembling F/C 1,232 - 500 - 308 - - - - - - - - -


in AHTI F/B 1,232 - 500 - 308 - - - - - - - - -
R/C 1,232 - 500 - 308 - - - - - - - - -

KS R/B 1,232 1 500 812 308 - - - - - - - - -


3RD CUSH 1,232 - 500 - 308 - - - - - - - - -
3RD BACK 1,232 - 500 - 308 - - - - - - - - -
KS 소계 (Total) 7,392 1 500 135 1,848 - - - - - - - - -
Total Assembling 20,685 8 500 387 4,599 1 364 - 1 - - - - 1

Monday shift 1& shift 2 11/20/2023


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 합계
목표 달성 검사 수량 달성
(Divisi) (Garis Produksi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 봉제 찜힘 주름 바늘자국 (TTL)
Tujuan Pencapaian (Kuantitas Pencapaian 오염 Kontaminasi 직물 결함 Cacat Kain 손상 Kerusakan
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Pleated / Kelipet Kerut /Wrinkle Lubang jarum
PPM PPM inspeksi) PPM

F/C 5,840 1 2,000 171 320 - - - - - - - - -


F/B 8,150 34 2,000 4,172 240 - - - - - - - - -
SU2id R/C 2,710 9 2,000 3,321 80 - - - - - - - - -
R/B 7,864 24 2,000 3,052 440 - - - - - - - - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 1,080 - - - - - - - - -

Incoming F/C 520 - 2,000 - 80 - - - - - - - - -


in AHTI F/B 2,710 5 2,000 1,845 490 - - - - - - - - -
R/C 900 2 2,000 2,222 40 - - - - - - - - -
KS R/B 980 1 2,000 1,020 80 - - - - - - - - -
3RD CUSH 720 - 2,000 - 40 - - - - - - - - -
3RD BACK 1,300 3 2,000 2,308 200 1 5,000 - 1 - - - - 1
KS 소계 (Total) 7,130 11 2,000 1,543 930 1 1,075 - 1 - - - - 1
Total Incoming 31,694 79 2,000 2,493 2,010 1 498 - 1 - - - - 1
F/C 7,516 - 500 - 338 - - - - - - - - -
F/B 7,516 4 500 532 338 - - - - - - - - -
SU2id R/C 3,892 2 500 514 169 - - - - - - - - -
R/B 7,516 4 500 532 338 - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 1,183 - - - - - - - - -

Assembling F/C 2,396 - 500 - 208 - - - - - - - - -


in AHTI F/B 2,396 1 500 417 208 - - - - - - - - -
R/C 2,396 - 500 - 208 - - - - - - - - -
KS R/B 2,396 1 500 417 208 - - - - - - - - -
3RD CUSH 2,396 - 500 - 208 - - - - - - - - -
3RD BACK 2,396 1 500 417 208 - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 1,248 - - - - - - - - -
Total Assembling 40,816 13 500 319 2,336 - - - - - - - - -

Tuesday shift 1& shift 2 11/21/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi) (CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 320 - - - - - - - - -
F/B 8,150 34 2,000 4,172 470 4 8,511 - 2 - - 1 1 4
SU2id R/C 2,710 9 2,000 3,321 100 - - - - - - - - -
R/B 7,864 24 2,000 3,052 460 1 2,174 - 1 - - - - 1

Incoming
in AHTI
SU2id

SU2id 소계 (Total) 24,564 68 2,000 2,768 1,350 5 3,704 - 3 - - 1 1 5


Incoming F/C 520 - 2,000 - - - - - - - - - - -
in AHTI F/B 2,710 5 2,000 1,845 170 - - - - - - - - -
R/C 900 2 2,000 2,222 80 - - - - - - - - -
KS R/B 980 1 2,000 1,020 80 - - - - - - - - -
3RD CUSH 720 - 2,000 - 40 - - - - - - - - -
3RD BACK 1,300 3 2,000 2,308 40 - - - - - - - - -
KS 소계 (Total) 7,130 11 2,000 1,543 410 - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 1,760 5 2,841 - 3 - - 1 1 5
F/C 7,516 - 500 - 374 - - - - - - - - -
F/B 7,516 4 500 532 374 - - - - - - - - -
SU2id R/C 3,892 2 500 514 187 - - - - - - - - -
R/B 7,516 4 500 532 374 - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 1,309 - - - - - - - - -
Assembling F/C 2,396 - 500 - 164 - - - - - - - - -
in AHTI F/B 2,396 1 500 417 164 - - - - - - - - -
R/C 2,396 - 500 - 164 - - - - - - - - -
KS R/B 2,396 1 500 417 164 - - - - - - - - -
3RD CUSH 2,396 - 500 - 164 - - - - - - - - -
3RD BACK 2,396 1 500 417 164 - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 984 - - - - - - - - -
Total Assembling 40,816 13 500 319 2,293 - - - - - - - - -

Wednesday shift 1& shift 2 11/22/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi)
Produksi)
(CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
(Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)

F/C 5,840 1 2,000 171 240 - - - - - - - - -


F/B 8,150 34 2,000 4,172 620 1 1,613 - - - - 1 - 1
SU2id R/C 2,710 9 2,000 3,321 200 1 5,000 1 - - - - - 1
R/B 7,864 24 2,000 3,052 380 1 2,632 - - 1 - - - 1
SU2id 소계 (Total) 24,564 68 2,000 2,768 1,440 3 2,083 1 - 1 - 1 - 3
Incoming F/C 520 - 2,000 - - - - - - - - - - -
in AHTI F/B 2,710 5 2,000 1,845 110 - - - - - - - - -
R/C 900 2 2,000 2,222 40 - - - - - - - - -
KS R/B 980 1 2,000 1,020 40 - - - - - - - - -
3RD CUSH 720 - 2,000 - 120 - - - - - - - - -
3RD BACK 1,300 3 2,000 2,308 40 - - - - - - - - -
KS 소계 (Total) 7,130 11 2,000 1,543 350 - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 1,790 3 1,676 1 - 1 - 1 - 3
F/C 7,516 - 500 - 360 - - - - - - - - -
F/B 7,516 4 500 532 360 - - - - - - - - -
SU2id R/C 3,892 2 500 514 180 - - - - - - - - -
R/B 7,516 4 500 532 360 - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 1,260 - - - - - - - - -
Assembling F/C 2,396 - 500 - 182 - - - - - - - - -
in AHTI F/B 2,396 1 500 417 182 - - - - - - - - -
R/C 2,396 - 500 - 182 - - - - - - - - -
KS R/B 2,396 1 500 417 182 - - - - - - - - -
3RD CUSH 2,396 - 500 - 182 - - - - - - - - -
Assembling
in AHTI

KS

3RD BACK 2,396 1 500 417 182 - - - - - - - - -


KS 소계 (Total) 14,376 3 500 209 1,092 - - - - - - - - -
Total Assembling 40,816 13 500 319 2,352 - - - - - - - - -

Thursday shift 1& shift 2 11/23/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi)
Produksi)
(CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
(Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)

F/C 5,840 1 2,000 171 440 - - - - - - - - -


F/B 8,150 34 2,000 4,172 450 2 4,444 - 1 - 1 - - 2
SU2id R/C 2,710 9 2,000 3,321 120 1 8,333 - - - - 1 - 1
R/B 7,864 24 2,000 3,052 490 1 2,041 - - - - 1 - 1
SU2id 소계 (Total) 24,564 68 2,000 2,768 1,500 4 2,667 - 1 - 1 2 - 4
Incoming F/C 520 - 2,000 - - - - - - - - - - -
in AHTI F/B 2,710 5 2,000 1,845 110 - - - - - - - - -
R/C 900 2 2,000 2,222 20 - - - - - - - - -
R/B 980 1 2,000 1,020 60 - - - - - - - - -
KS
3RD CUSH 720 - 2,000 - 40 - - - - - - - - -
3RD BACK 1,300 3 2,000 2,308 80 - - - - - - - - -
KS 소계 (Total) 7,130 11 2,000 1,543 310 - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 1,810 4 2,210 - 1 - 1 2 - 4
F/C 7,516 - 500 - 498 - - - - - - - - -
F/B 7,516 4 500 532 498 - - - - - - - - -
SU2id R/C 3,892 2 500 514 249 - - - - - - - - -
R/B 7,516 4 500 532 498 1 2,008 - 1 - - - - 1
SU2id 소계 (Total) 26,440 10 500 378 1,743 1 574 - 1 - - - - 1
Assembling F/C 2,396 - 500 - 62 - - - - - - - - -
in AHTI F/B 2,396 1 500 417 62 - - - - - - - - -
R/C 2,396 - 500 - 62 - - - - - - - - -
R/B 2,396 1 500 417 62 - - - - - - - - -
KS
3RD CUSH 2,396 - 500 - 62 - - - - - - - - -
3RD BACK 2,396 1 500 417 62 - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 372 - - - - - - - - -
Total Assembling 40,816 13 500 319 2,115 1 473 - 1 - - - - 1

Friday shift 1& shift 2 11/24/2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 검사 수량 (
구분 차종 부위 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi) (CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 - - - - - - - - - -
F/B 8,150 34 2,000 4,172 - - - - - - - - - -
SU2id R/C 2,710 9 2,000 3,321 - - - - - - - - - -
R/B 7,864 24 2,000 3,052 - - - - - - - - - -
SU2id 소계 (Total) 24,564 68 2,000 2,768 - - - - - - - - - -
Incoming
in AHTI
Incoming F/C 520 - 2,000 - - - - - - - - - - -
in AHTI F/B 2,710 5 2,000 1,845 - - - - - - - - - -
R/C 900 2 2,000 2,222 - - - - - - - - - -
KS R/B 980 1 2,000 1,020 - - - - - - - - - -
3RD CUSH 720 - 2,000 - - - - - - - - - - -
3RD BACK 1,300 3 2,000 2,308 - - - - - - - - - -
KS 소계 (Total) 7,130 11 2,000 1,543 - - - - - - - - - -
Total Incoming 31,694 79 2,000 2,493 - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - -
SU2id R/C 3,892 2 500 514 - - - - - - - - - -
R/B 7,516 4 500 532 - - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - -
Assembling F/C 2,396 - 500 - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - -
KS R/B 2,396 1 500 417 - - - - - - - - - -
3RD CUSH 2,396 - 500 - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - -
◈ 품질 현황 (Status kualitas) Weekly 4 shift 1 & shift 2 20-24 November 2023

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 ( 합계
(Garis 불량 (누적) 목표 달성 검사 수량 달성 봉제 찜힘 주름
(Divisi) (CAR) (Bagian) 누적) 불량 오염 직물 결함 바늘자국 손상 (TTL)
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian Pleated / Kerut
(Akumulasi (Cacat) Kontaminasi Cacat Kain Lubang jarum Kerusakan
Cacat) PPM PPM inspeksi) PPM Kelipet /Wrinkle
inspeksi)
F/C 5,840 1 2,000 171 1,320 - - - - - - - - -
F/B 8,150 34 2,000 4,172 1,780 7 3,933 - 3 - 1 2 1 7
SU2id R/C 2,710 9 2,000 3,321 500 2 4,000 1 - - - 1 - 2
R/B 7,864 24 2,000 3,052 1,770 3 1,695 - 1 1 - 1 - 3
SU2id 소계 (Total) 24,564 68 2,000 2,768 5,370 12 2,235 1 4 1 1 4 1 12
Incoming F/C 520 - 2,000 - 80 - - - - - - - - -
in AHTI F/B 2,710 5 2,000 1,845 880 - - - - - - - - -
R/C 900 2 2,000 2,222 180 - - - - - - - - -
KS R/B 980 1 2,000 1,020 260 - - - - - - - - -
3RD CUSH 720 - 2,000 - 240 - - - - - - - - -
3RD BACK 1,300 3 2,000 2,308 360 1 2,778 - 1 - - - - 1
KS 소계 (Total) 7,130 11 2,000 1,543 2,000 1 500 - 1 - - - - 1
Total Incoming 31,694 79 2,000 2,493 7,370 13 1,764 1 5 1 1 4 1 13
F/C 7,516 - 500 - 1,570 - - - - - - - - -
F/B 7,516 4 500 532 1,570 - - - - - - - - -
SU2id R/C 3,892 2 500 514 785 - - - - - - - - -
R/B 7,516 4 500 532 1,570 1 637 - 1 - - - - 1
SU2id 소계 (Total) 26,440 10 500 378 5,495 1 182 - 1 - - - - 1
Assembling F/C 2,396 - 500 - 616 - - - - - - - - -
in AHTI F/B 2,396 1 500 417 616 - - - - - - - - -
R/C 2,396 - 500 - 616 - - - - - - - - -
KS R/B 2,396 1 500 417 616 - - - - - - - - -
3RD CUSH 2,396 - 500 - 616 - - - - - - - - -
3RD BACK 2,396 1 500 417 616 - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 3,696 - - - - - - - - -
Total Assembling 40,816 13 500 319 9,096 1 110 - 1 - - - - 1
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id
40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas)
Monday

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위
(Garis 실 조시 맞지
(Divisi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 오염 스크래 봉비
Produksi) 불량 직물 결함 Cacat 땀수 않음 겹침 립덕 Open 봉제 찜힘
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian Kontami
Kain 치 Jahitan
Pitch seam
inspeksi) Cacat) PPM PPM inspeksi) PPM nasi Benang overlap Lips duck Pleated / Kelipet
Scratch Loncat
Timbul
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 24,564 68 4,000 2,768 - - - - - - - - - - - - -
Incoming F/C
(Total) 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 26,440 10 500 378 - - - - - - - - - - - - -
Assembling F/C
(Total) 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday

월간 현황 일일 현황
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시 맞지
(Divisi)
(Garis
(CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 목표 달성 검사 수량 달성 오염 스크래 봉비
Produksi) 불량 직물 결함 Cacat 땀수 않음 겹침 립덕 Paping 봉제 찜힘
(Akumulasi (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat)
Pencapaian Kontami
Kain 치 Jahitan
Pitch terbuka Pleated / Kelipet
inspeksi) Cacat) PPM PPM inspeksi) PPM nasi Benang overlap Lips duck
Scratch Loncat
F/C 5,840 1 4,000 171 - - Timbul
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 24,564 68 4,000 2,768 - - - - - - - - - - - - -
Incoming F/C
(Total) 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 26,440 10 500 378 - - - - - - - - - - - - -
Assembling F/C
(Total) 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
Assembling
in AHTI
KS
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Wednesday
월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비
검사 수량 (누적) 불량 (누적) 검사 수량 불량 오염 스크래치 땀수 실 조시 맞지 않음 겹침 립덕 Paping 봉제 찜힘
Tujuan Pencapaian Pencapaian 직물 결함 Cacat Kain Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kontaminasi Scratch Pitch Benang Timbul overlap Lips duck Pleated / Kelipet
PPM PPM PPM Loncat
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday
월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비
검사 수량 (누적) 불량 (누적) 검사 수량 불량 오염 스크래치 땀수 실 조시 맞지 않음 겹침 립덕 Paping 봉제 찜힘
Tujuan Pencapaian Pencapaian 직물 결함 Cacat Kain Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kontaminasi Scratch Pitch Benang Timbul overlap Lips duck Pleated / Kelipet
PPM PPM PPM Loncat
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -

SU2id R/C 2,710 9 4,000 3,321 - -


R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - -
in AHTI
F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
R/C 3,892 2 500 514 - -
SU2id
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI
F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
Assembling
in AHTI

KS

KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - -


Total Assembling 40,816 13 500 319 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
FRIDAY
월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비
검사 수량 (누적) 불량 (누적) 검사 수량 불량 오염 스크래치 땀수 실 조시 맞지 않음 겹침 립덕 Paping 봉제 찜힘
Tujuan Pencapaian Pencapaian 직물 결함 Cacat Kain Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kontaminasi Scratch Pitch Benang Timbul overlap Lips duck Pleated / Kelipet
PPM PPM PPM Loncat
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 5 shift 1


월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분 구분 차종 부위
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비
검사 수량 (누적) 불량 (누적) 검사 수량 불량 오염 스크래치 땀수 실 조시 맞지 않음 겹침 립덕 Paping 봉제 찜힘
Tujuan Pencapaian Pencapaian 직물 결함 Cacat Kain Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Kuantitas inspeksi) (Cacat) Kontaminasi Scratch Pitch Benang Timbul overlap Lips duck Pleated / Kelipet
PPM PPM PPM Loncat
F/C 3,040 1 4,000 329 - - - - - - - - - - - - -
F/B 4,100 21 4,000 5,122 - - - - - - - - - - - - -
SU2id R/C 1,350 4 4,000 2,963 - - - - - - - - - - - - -
R/B 3,860 10 4,000 2,591 - - - - - - - - - - - - -
SU2id 소계 (Total) 12,350 36 4,000 2,915 - - - - - - - - - - - - -
Incoming F/C 240 - 4,000 - - - - - - - - - - - - - -
in AHTI F/B 1,380 2 4,000 1,449 - - - - - - - - - - - - -
R/C 460 1 4,000 2,174 - - - - - - - - - - - - -
KS R/B 500 1 4,000 2,000 - - - - - - - - - - - - -
3RD CUSH 320 - 4,000 - - - - - - - - - - - - - -
3RD BACK 780 2 4,000 2,564 - - - - - - - - - - - - -
KS 소계 (Total) 3,680 6 4,000 1,630 - - - - - - - - - - - - -
Total Incoming 16,030 42 4,000 2,620 - - - - - - - - - - - - -
F/C 3,718 - 500 - - - - - - - - - - - - - -
F/B 3,718 1 500 269 - - - - - - - - - - - - -
SU2id R/C 1,993 1 500 502 - - - - - - - - - - - - -
R/B 3,718 1 500 269 - - - - - - - - - - - - -
SU2id 소계 (Total) 13,147 3 500 228 - - - - - - - - - - - - -
Assembling F/C 1,164 - 500 - - - - - - - - - - - - - -
in AHTI F/B 1,164 1 500 859 - - - - - - - - - - - - -
R/C 1,164 - 500 - - - - - - - - - - - - - -
KS R/B 1,164 - 500 - - - - - - - - - - - - - -
3RD CUSH 1,164 - 500 - - - - - - - - - - - - - -
3RD BACK 1,164 1 500 859 - - - - - - - - - - - - -
KS 소계 (Total) 6,984 2 500 286 - - - - - - - - - - - - -
Total Assembling 20,131 5 500 248 - - - - - - - - - - - - -
24:00:00
10/30/2023

봉제 Jahit
오염 및
손상 합계
실 시접 스티치 바늘자
Tulang/ 봉제터짐 주름 오조립 굴곡 표시점 되박음 (TTL)
텐션문제 Seam 폭 국 Run of Appeara Aksesor 손상 Missing
Jahitan Salah gelomba
stitch tidak Jahitan Kerut
Allowan lebar
Notch Back Stitch nce is Kerusakan stitch
ketemu Putus /Wrinkle Tension numpuk Pasang ng point tack Lubang tidak
kendor ce jahitan jarum
ada / -
lepas -
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

10/31/2023

봉제 Jahit 오염 및
실 시접 스티치 바늘자 손상 합계
Tulang/ 봉제터짐 주름
텐션문제
오조립 굴곡
Seam 폭
표시점 되박음
국 Run of Appeara Aksesor 손상 Missing (TTL)
Jahitan Salah gelomba
stitch tidak Jahitan Kerut
Allowan lebar
Notch Back Stitch nce is Kerusakan stitch
ketemu Putus /Wrinkle Tension numpuk Pasang ng point tack Lubang tidak
kendor ce jahitan jarum
ada / -
lepas -
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

11/1/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
봉제터짐 주름 실 텐션문제 오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Tulang/ Jahitan Seam 손상 Kerusakan Missing stitch
stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

11/2/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
봉제터짐 주름 실 텐션문제 오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Tulang/ Jahitan Seam 손상 Kerusakan Missing stitch
stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-

- - - - - - - - - - - - - - - - - -

-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
-
-
-
-

- - - - - - - - - - - - - - - - - -

-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

11/3/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
봉제터짐 주름 실 텐션문제 오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Tulang/ Jahitan Seam 손상 Kerusakan Missing stitch
stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -

27-31 Maret 2023

봉제 Jahit

부자재 미부착 합계
시접 (TTL)
봉제터짐 주름 실 텐션문제 오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Tulang/ Jahitan Seam 손상 Kerusakan Missing stitch
stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
2/27/2023

2/28/2023
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks

40 39 13b ks

40 40 0rb su2id

40 40 03c ks
#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas)
Monday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 실 조시 맞지
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 달성 봉비
검사 수량 (누적) 불량 (누적) 불량 직물 결함 스크래치 땀수 않음 겹침 립덕 Open seam 봉제 찜힘 Tulang/ 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian Pencapaian Jahitan
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Cacat Kain Scratch Pitch Benang overlap Lips duck Pleated / Kelipet stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM PPM Loncat
Timbul
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
F/C 520 - 4,000 - - -
Incoming
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
R/C 3,892 2 500 514 - -
SU2id
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -

Assembling F/C 2,396 - 500 - - -


in AHTI
F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Tuesday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 실 조시 맞지
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 검사 수량 달성 봉비
검사 수량 (누적) 불량 (누적) 불량 직물 결함 스크래치 땀수 않음 겹침 립덕 Paping 봉제 찜힘 Tulang/ 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian (Kuantitas Pencapaian Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Cacat Kain Scratch Pitch Benang overlap Lips duck Pleated / Kelipet stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM inspeksi) PPM Loncat
Timbul
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -
◈ 품질 현황 (Status kualitas)
Wednesday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 실 조시 맞지
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 검사 수량 달성 봉비
검사 수량 (누적) 불량 (누적) 불량 직물 결함 스크래치 땀수 않음 겹침 립덕 Paping 봉제 찜힘 Tulang/ 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian (Kuantitas Pencapaian Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Cacat Kain Scratch Pitch Benang overlap Lips duck Pleated / Kelipet stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM inspeksi) PPM Loncat
Timbul
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas)
Thursday
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 실 조시 맞지
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 검사 수량 달성 봉비
검사 수량 (누적) 불량 (누적) 불량 직물 결함 스크래치 땀수 않음 겹침 립덕 Paping 봉제 찜힘 Tulang/ 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian (Kuantitas Pencapaian Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Cacat Kain Scratch Pitch Benang overlap Lips duck Pleated / Kelipet stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM inspeksi) PPM Loncat
Timbul
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
F/C 520 - 4,000 - - -
Incoming
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
F/C 2,396 - 500 - - -
Assembling
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -
◈ 품질 현황 (Status kualitas)
FRIDAY
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 실 조시 맞지
목표 달성 검사 수량 달성 봉비
(Divisi) (Garis Produksi) (CAR) (Bagian) 검사 수량 (누적) 불량 (누적) 불량 직물 결함 스크래치 땀수 않음 겹침 립덕 Paping 봉제 찜힘 Tulang/ 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian (Kuantitas Pencapaian Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Cacat Kain Scratch Pitch Benang overlap Lips duck Pleated / Kelipet stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM inspeksi) PPM Loncat
Timbul
F/C 5,840 1 4,000 171 - -
F/B 8,150 34 4,000 4,172 - -
SU2id R/C 2,710 9 4,000 3,321 - -
R/B 7,864 24 4,000 3,052 - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - -
in AHTI F/B 2,710 5 4,000 1,845 - -
R/C 900 2 4,000 2,222 - -
KS R/B 980 1 4,000 1,020 - -
3RD CUSH 720 - 4,000 - - -
3RD BACK 1,300 3 4,000 2,308 - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - -
F/B 7,516 4 500 532 - -
SU2id R/C 3,892 2 500 514 - -
R/B 7,516 4 500 532 - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - -
in AHTI F/B 2,396 1 500 417 - -
R/C 2,396 - 500 - - -
KS R/B 2,396 1 500 417 - -
3RD CUSH 2,396 - 500 - - -
3RD BACK 2,396 1 500 417 - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -

◈ 품질 현황 (Status kualitas) Weekly 5 shift 2


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)
구분 구분 차종 부위 실 조시 맞지
(Divisi) (Garis Produksi) (CAR) (Bagian) 목표 달성 검사 수량 달성 봉비
검사 수량 (누적) 불량 (누적) 불량 직물 결함 스크래치 땀수 않음 겹침 립덕 Paping 봉제 찜힘 Tulang/ 봉제터짐 주름 실 텐션문제
Tujuan Pencapaian (Kuantitas Pencapaian Jahitan terbuka
(Akumulasi inspeksi) (Akumulasi Cacat) (Cacat) Cacat Kain Scratch Pitch Benang overlap Lips duck Pleated / Kelipet stitch tidak ketemu Jahitan Putus Kerut /Wrinkle Tension kendor
PPM PPM inspeksi) PPM Loncat
Timbul
F/C 2,800 - 4,000 - - - - - - - - - - - - - - - - -
F/B 4,050 13 4,000 3,210 - - - - - - - - - - - - - - - -
SU2id R/C 1,360 5 4,000 3,676 - - - - - - - - - - - - - - - -
R/B 4,004 14 4,000 3,497 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 12,214 32 4,000 2,620 - - - - - - - - - - - - - - - -
Incoming F/C 280 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 1,330 3 4,000 2,256 - - - - - - - - - - - - - - - -
R/C 440 1 4,000 2,273 - - - - - - - - - - - - - - - -
KS R/B 480 - 4,000 - - - - - - - - - - - - - - - - -
3RD CUSH 400 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 520 1 4,000 1,923 - - - - - - - - - - - - - - - -
KS 소계 (Total) 3,450 5 4,000 1,449 - - - - - - - - - - - - - - - -
Total Incoming 15,664 37 4,000 2,362 - - - - - - - - - - - - - - - -
F/C 3,798 - 500 - - - - - - - - - - - - - - - - -
F/B 3,798 3 500 790 - - - - - - - - - - - - - - - -
SU2id R/C 1,899 1 500 527 - - - - - - - - - - - - - - - -
R/B 3,798 3 500 790 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 13,293 7 500 527 - - - - - - - - - - - - - - - -
Assembling F/C 1,232 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 1,232 - 500 - - - - - - - - - - - - - - - - -
R/C 1,232 - 500 - - - - - - - - - - - - - - - - -
KS R/B 1,232 1 500 812 - - - - - - - - - - - - - - - -
3RD CUSH 1,232 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 1,232 - 500 - - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,392 1 500 135 - - - - - - - - - - - - - - - -
Total Assembling 20,685 8 500 387 - - - - - - - - - - - - - - - -

Monday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분
구분 차종 부위
(Garis
(Divisi) (CAR) (Bagian)
Produksi)
구분 실 조시
구분 차종 부위 검사 수량 ( 달성 직물 실
(Garis 불량 (누적) 목표 달성 검사 수량 스크래 봉비 맞지 립덕 봉제 찜힘 봉제터짐 주름
누적) 불량 Pencapaia 결함 땀수 겹침 Open Tulang/
Kerut 텐션문제
(Divisi) (CAR) (Bagian)
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat) n 치 Jahitan
Pitch 않음 overlap Lips seam Pleated / stitch tidak Jahitan
(Akumulasi Cacat) PPM PPM inspeksi) Cacat /Wrinkle Tension
PPM Scratch Loncat Benang duck Kelipet ketemu Putus
inspeksi) Kain kendor
Timbul

F/C 5,840 1 4,000 171 - - - - - - - - - - - - - - - -


F/B 8,150 34 4,000 4,172 - - - - - - - - - - - - - - - -
SU2id R/C 2,710 9 4,000 3,321 - - - - - - - - - - - - - - - -
R/B 7,864 24 4,000 3,052 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,710 5 4,000 1,845 - - - - - - - - - - - - - - - -
R/C 900 2 4,000 2,222 - - - - - - - - - - - - - - - -
KS R/B 980 1 4,000 1,020 - - - - - - - - - - - - - - - -
3RD CUSH 720 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 1,300 3 4,000 2,308 - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id R/C 3,892 2 500 514 - - - - - - - - - - - - - - - -
R/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - - - - - - - -
KS R/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
3RD CUSH 2,396 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -

Tuesday shift 1& shift 2

월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

구분 실 조시
구분 차종 부위 검사 수량 ( 직물 실
(Garis 달성 스크래 봉비
(Divisi) (CAR) (Bagian) 불량 (누적) 목표 달성 검사 수량 맞지 립덕 봉제 찜힘 봉제터짐 주름
Produksi) 누적) 불량 Pencapaia 결함 땀수 겹침 Open Tulang/ 텐션문제
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat) n 치 Jahitan
Pitch 않음 overlap Lips seam Pleated / stitch tidak Jahitan Kerut
(Akumulasi Cacat) PPM PPM inspeksi) Cacat /Wrinkle Tension
PPM Scratch Loncat Benang duck Kelipet ketemu Putus
inspeksi) Kain kendor
Timbul

F/C 5,840 1 4,000 171 - - - - - - - - - - - - - - - -


F/B 8,150 34 4,000 4,172 - - - - - - - - - - - - - - - -
SU2id R/C 2,710 9 4,000 3,321 - - - - - - - - - - - - - - - -
R/B 7,864 24 4,000 3,052 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,710 5 4,000 1,845 - - - - - - - - - - - - - - - -
R/C 900 2 4,000 2,222 - - - - - - - - - - - - - - - -
KS R/B 980 1 4,000 1,020 - - - - - - - - - - - - - - - -
Incoming
in AHTI

KS
3RD CUSH 720 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 1,300 3 4,000 2,308 - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id R/C 3,892 2 500 514 - - - - - - - - - - - - - - - -
R/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - - - - - - - -
KS R/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
3RD CUSH 2,396 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -

Wednesday shift 1& shift 2


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

실 조시
구분 검사 수량 ( 달성 직물 실
구분 차종 부위 불량 (누적) 목표 달성 검사 수량 스크래 봉비 맞지 립덕 봉제 찜힘 봉제터짐 주름
(Divisi)
(Garis
(CAR) (Bagian) 누적) 불량 Pencapaia 결함 땀수 겹침 Open Tulang/ 텐션문제
Produksi) (Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat) n 치 Jahitan
Pitch 않음 overlap Lips seam Pleated / stitch tidak Jahitan Kerut
(Akumulasi Cacat) PPM PPM inspeksi) Cacat /Wrinkle Tension
PPM Scratch Loncat Benang duck Kelipet ketemu Putus
inspeksi) Kain kendor
Timbul

F/C 5,840 1 4,000 171 - - - - - - - - - - - - - - - -


F/B 8,150 34 4,000 4,172 - - - - - - - - - - - - - - - -
R/C 2,710 9 4,000 3,321 - - - - - - - - - - - - - - - -
SU2id
R/B 7,864 24 4,000 3,052 - - - - - - - - - - - - - - - -
SU2id 소계 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
(Total)
Incoming F/C 520 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,710 5 4,000 1,845 - - - - - - - - - - - - - - - -
R/C 900 2 4,000 2,222 - - - - - - - - - - - - - - - -
KS R/B 980 1 4,000 1,020 - - - - - - - - - - - - - - - -
3RD CUSH 720 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 1,300 3 4,000 2,308 - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
R/C 3,892 2 500 514 - - - - - - - - - - - - - - - -
SU2id
R/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id 소계 26,440 10 500 378 - - - - - - - - - - - - - - - -
(Total)
Assembling F/C 2,396 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - - - - - - - -
KS R/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
3RD CUSH 2,396 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -
Thursday shift 1& shift 2
월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

실 조시
구분 검사 수량 ( 달성 직물 실
구분 차종 부위 불량 (누적) 목표 달성 검사 수량 스크래 봉비 맞지 립덕 봉제 찜힘 봉제터짐 주름
(Garis 누적) 불량 Pencapaia 결함 땀수 겹침 Open Tulang/
(Divisi)
Produksi)
(CAR) (Bagian) (Akumulasi Tujuan Pencapaian (Kuantitas 치 Jahitan 않음 overlap Lips seam Pleated / stitch tidak Jahitan Kerut 텐션문제
(Akumulasi (Cacat) n Cacat Pitch
Cacat) PPM PPM inspeksi) Scratch Loncat Benang duck Kelipet ketemu Putus /Wrinkle Tension
inspeksi) PPM Kain kendor
Timbul

F/C 5,840 1 4,000 171 - - - - - - - - - - - - - - - -


F/B 8,150 34 4,000 4,172 - - - - - - - - - - - - - - - -
R/C 2,710 9 4,000 3,321 - - - - - - - - - - - - - - - -
SU2id
R/B 7,864 24 4,000 3,052 - - - - - - - - - - - - - - - -
SU2id 소계 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
(Total)
Incoming F/C 520 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,710 5 4,000 1,845 - - - - - - - - - - - - - - - -
R/C 900 2 4,000 2,222 - - - - - - - - - - - - - - - -
R/B 980 1 4,000 1,020 - - - - - - - - - - - - - - - -
KS
3RD CUSH 720 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 1,300 3 4,000 2,308 - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
R/C 3,892 2 500 514 - - - - - - - - - - - - - - - -
SU2id
R/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id 소계 26,440 10 500 378 - - - - - - - - - - - - - - - -
(Total)
Assembling F/C 2,396 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - - - - - - - -
R/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS
3RD CUSH 2,396 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -

Friday shift 1& shift 2


월간 현황 일일 현황
봉제 Jahit
(Status Bulanan) (Daily Status)

실 조시
구분 검사 수량 ( 달성 직물 실
구분 차종 부위 불량 (누적) 목표 달성 검사 수량 스크래 봉비 맞지 립덕 봉제 찜힘 봉제터짐 주름
(Garis 누적) 불량 Pencapaia 결함 땀수 겹침 Open Tulang/
(Divisi)
Produksi)
(CAR) (Bagian) (Akumulasi Tujuan Pencapaian (Kuantitas 치 Jahitan 않음 overlap Lips seam Pleated / stitch tidak Jahitan Kerut 텐션문제
(Akumulasi (Cacat) n Cacat Pitch
Cacat) PPM PPM inspeksi) Scratch Loncat Benang duck Kelipet ketemu Putus /Wrinkle Tension
inspeksi) PPM Kain kendor
Timbul

F/C 5,840 1 4,000 171 - - - - - - - - - - - - - - - -


F/B 8,150 34 4,000 4,172 - - - - - - - - - - - - - - - -
R/C 2,710 9 4,000 3,321 - - - - - - - - - - - - - - - -
SU2id
R/B 7,864 24 4,000 3,052 - - - - - - - - - - - - - - - -

Incoming
in AHTI
SU2id

SU2id 소계 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -


(Total)
Incoming F/C 520 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,710 5 4,000 1,845 - - - - - - - - - - - - - - - -
R/C 900 2 4,000 2,222 - - - - - - - - - - - - - - - -
R/B 980 1 4,000 1,020 - - - - - - - - - - - - - - - -
KS
3RD CUSH 720 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 1,300 3 4,000 2,308 - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
R/C 3,892 2 500 514 - - - - - - - - - - - - - - - -
SU2id
R/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id 소계 26,440 10 500 378 - - - - - - - - - - - - - - - -
(Total)
Assembling F/C 2,396 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - - - - - - - -
R/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS
3RD CUSH 2,396 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -
◈ 품질 현황 (Status kualitas) Weekly 5 shift 1 & shift 2

월간 현황 일일 현황
봉제 Jahit
구분 (Status Bulanan) (Daily Status)
구분 차종 부위 실 조시
(Garis 검사 수량 ( 달성 직물 실
불량 (누적) 목표 달성 검사 수량 스크래 봉비 맞지 립덕
(Divisi) (CAR) (Bagian)
누적) 불량 Pencapaia 결함 땀수 겹침 Paping 봉제 찜힘 Tulang/ 봉제터짐 주름
Kerut 텐션문제
Produksi)
(Akumulasi Tujuan Pencapaian (Kuantitas
(Cacat) n 치 Jahitan
Pitch 않음 overlap Lips terbuka Pleated / stitch tidak Jahitan
(Akumulasi Cacat) PPM PPM inspeksi) Cacat /Wrinkle Tension
PPM Scratch Loncat Benang duck Kelipet ketemu Putus
inspeksi) Kain kendor
F/C 5,840 1 4,000 171 - - - - - - - Timbul- - - - - - - - -
F/B 8,150 34 4,000 4,172 - - - - - - - - - - - - - - - -
SU2id R/C 2,710 9 4,000 3,321 - - - - - - - - - - - - - - - -
R/B 7,864 24 4,000 3,052 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 24,564 68 4,000 2,768 - - - - - - - - - - - - - - - -
Incoming F/C 520 - 4,000 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,710 5 4,000 1,845 - - - - - - - - - - - - - - - -
R/C 900 2 4,000 2,222 - - - - - - - - - - - - - - - -
KS R/B 980 1 4,000 1,020 - - - - - - - - - - - - - - - -
3RD CUSH 720 - 4,000 - - - - - - - - - - - - - - - - -
3RD BACK 1,300 3 4,000 2,308 - - - - - - - - - - - - - - - -
KS 소계 (Total) 7,130 11 4,000 1,543 - - - - - - - - - - - - - - - -
Total Incoming 31,694 79 4,000 2,493 - - - - - - - - - - - - - - - -
F/C 7,516 - 500 - - - - - - - - - - - - - - - - -
F/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id R/C 3,892 2 500 514 - - - - - - - - - - - - - - - -
R/B 7,516 4 500 532 - - - - - - - - - - - - - - - -
SU2id 소계 (Total) 26,440 10 500 378 - - - - - - - - - - - - - - - -
Assembling F/C 2,396 - 500 - - - - - - - - - - - - - - - - -
in AHTI F/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
R/C 2,396 - 500 - - - - - - - - - - - - - - - - -
KS R/B 2,396 1 500 417 - - - - - - - - - - - - - - - -
3RD CUSH 2,396 - 500 - - - - - - - - - - - - - - - - -
3RD BACK 2,396 1 500 417 - - - - - - - - - - - - - - - -
KS 소계 (Total) 14,376 3 500 209 - - - - - - - - - - - - - - - -
Total Assembling 40,816 13 500 319 - - - - - - - - - - - - - - - -
24:00:00
10/31/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Jahitan Seam 손상 Kerusakan Missing stitch
numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas

-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

11/1/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Jahitan Seam 손상 Kerusakan Missing stitch
numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
11/2/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Jahitan Seam 손상 Kerusakan Missing stitch
numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

11/3/2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Jahitan Seam 손상 Kerusakan Missing stitch
numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
11/4/2023
봉제 Jahit
오염 및 손상 합계
시접
오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris (TTL)
Jahitan Seam 손상 Kerusakan Missing stitch
numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
-
-
-
-
- - - - - - - - - - - - - -
-
-
-
-
-
-
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

30-31 Oktober 2023

봉제 Jahit

오염 및 손상 합계
시접 (TTL)
오조립 굴곡 스티치폭 표시점 되박음 바늘자국 Run of Stitch Appearance Aksesoris
Jahitan Seam 손상 Kerusakan Missing stitch
numpuk Salah Pasang gelombang lebar jahitan Notch point Back tack Lubang jarum tidak ada /
Allowance
lepas
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

10/31/2023

봉제 Jahit

합계
(TTL)
부자재
시접 스티치 바늘자 합계
오조립 표시점 되박음 미부착
Jahitan Salah 굴곡 Seam 폭 국 Run of Appeara 손상 Missing (TTL)
Notch Back Stitch nce Aksesoris
gelombang Allowan lebar Kerusakan stitch
numpuk Pasang point tack Lubang tidak ada /
ce jahitan jarum
lepas

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

11/1/2023

봉제 Jahit

합계
시접 스티치 바늘자 오염 및 손상
오조립 표시점 되박음 (TTL)
Jahitan Salah 굴곡 Seam 폭 국 Run of Appeara Aksesoris 손상 Missing
Notch Back Stitch nce
numpuk Pasang gelombang Allowan lebar tidak ada / Kerusakan stitch
point tack Lubang
ce jahitan jarum lepas

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

11/2/2023

봉제 Jahit

시접 스티치 바늘자 오염 및 손상
오조립 표시점 되박음 합계
Jahitan Salah 굴곡 Seam 폭 국 Run of Appeara Aksesoris 손상 Missing (TTL)
Notch Back Stitch nce
numpuk Pasang gelombang Allowan lebar Lubang tidak ada / Kerusakan stitch
point tack
ce jahitan jarum lepas

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
11/3/2023

봉제 Jahit

시접 스티치 바늘자 오염 및 손상
오조립 표시점 되박음 합계

Jahitan Salah 굴곡 Seam 폭 국 Run of Appeara Aksesoris 손상 Missing (TTL)


Notch Back Stitch nce
numpuk Pasang gelombang Allowan lebar tidak ada / Kerusakan stitch
point tack Lubang
ce jahitan jarum lepas

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

11/4/2023

봉제 Jahit

시접 스티치 바늘자 오염 및 손상
오조립 표시점 되박음 합계
Jahitan Salah 굴곡 Seam 폭 국 Run of Appeara Aksesoris 손상 Missing (TTL)
Notch Back Stitch nce
numpuk Pasang gelombang Allowan lebar tidak ada / Kerusakan stitch
point tack Lubang
ce jahitan jarum lepas

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -
- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

- - - - - - - - - - - - - -

30-31 Oktober 2023

봉제 Jahit
부자재
시접 스티치 바늘자 합계
오조립 표시점 되박음 미부착
(TTL)

Jahitan 굴곡 Seam 폭 국 Run of Appeara 손상 Missing


Salah Notch Back Stitch nce Aksesoris Kerusakan stitch
gelombang Allowan lebar
numpuk Pasang point tack Lubang tidak ada /
ce jahitan jarum
- - - - - - - - - - lepas - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
- - - - - - - - - - - - - -
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!

40 40 0rb su2id

20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 03c ks

#REF!
◈ 품질 현황 (Status kualitas) MONTHLY OKTOBER 2023
월간 현황 일일 현황
(Status Bulanan) (Daily Status)
구분
구분 차종 부위 검사 수량 (누적
(Garis 불량 (누적) 목표 달성 검사 수량 달성
(Divisi)
Produksi)
(CAR) (Bagian) ) 불량
(Akumulasi Tujuan Pencapaian (Kuantitas Pencapaian
(Akumulasi (Cacat)
Cacat) PPM PPM inspeksi) PPM
inspeksi)
F/C 5,840 1 4,000 171 5,840 1 171
F/B 8,150 34 4,000 4,172 8,150 34 4,172

SU2id R/C 2,710 9 4,000 3,321 2,710 9 3,321


R/B 7,864 24 4,000 3,052 7,864 24 3,052
SU2id 소계 (Total) 24,564 68 4,000 2,768 24,564 68 2,768

Incoming F/C 520 - 4,000 - 520 - -


in AHTI
F/B 2,710 5 4,000 1,845 2,710 5 1,845
R/C 900 2 4,000 2,222 900 2 2,222
KS R/B 980 1 4,000 1,020 980 1 1,020
3RD CUSH 720 - 4,000 - 720 - -
3RD BACK 1,300 3 4,000 2,308 1,300 3 2,308
KS 소계 (Total) 7,130 11 4,000 1,543 7,130 11 1,543
Total Incoming 31,694 79 4,000 2,493 31,694 79 2,493
F/C 7,516 - 500 - 7,516 - -
F/B 7,516 4 500 532 7,516 4 532

SU2id R/C 3,892 2 500 514 3,892 2 514

Assembling
SU2id
R/B 7,516 4 500 532 7,516 4 532
SU2id 소계 (Total) 26,440 10 500 378 26,440 10 378
Assembling F/C 2,396 - 500 - 2,396 - -
in AHTI
F/B 2,396 1 500 417 2,396 1 417
R/C 2,396 - 500 - 2,396 - -
KS R/B 2,396 1 500 417 2,396 1 417
3RD CUSH 2,396 - 500 - 2,396 - -
3RD BACK 2,396 1 500 417 2,396 1 417
KS 소계 (Total) 14,376 3 500 209 14,376 3 209
Total Assembling 40,816 13 500 319 40,816 13 319
봉제 Jahit
부자재
실 합계
직물 결함 봉제 찜힘 봉제터짐 주름 오조립 시접 바늘자국 미부착
오염 스크래치 굴곡 손상
(TTL)
Cacat Pleated / Jahitan Kerut 텐션문제 Salah Seam Lubang Aksesoris
Kontaminasi Scratch gelombang Kerusakan
Kain Kelipet Putus /Wrinkle Tension Pasang Allowance jarum tidak ada /
kendor
lepas
- 1 - - - - - - - - - - - 1
- 13 - - 2 3 3 - - - 5 - 2 34
1 2 2 - - 3 - - - - 1 - - 9
- 8 - 2 2 4 - - - - 3 - 4 24

1 24 2 2 4 10 3 - - - 9 - 6 68

- - - - - - - - - - - - - -

- 4 - - - - - - - - - - 1 5
- 2 - - - - - - - - - - - 2
- - - - - - 1 - - - - - - 1
- - - - - - - - - - - - - -
- 1 - - - 1 1 - - - - - - 3
- 7 - - - 1 2 - - - - - 1 11
1 31 2 2 4 11 5 - - - 9 - 7 79
- - - - - - - - - - - - - -
1 1 - - 1 - - - - - - - - 4
- 1 1 - - - - - - - - - - 2
- 2 - 2 - - - - - - - - - 4

1 4 1 2 1 - - - - - - - - 10

- - - - - - - - - - - - - -
- - 1 - - - - - - - - - - 1
- - - - - - - - - - - - - -
- - - - 1 - - - - - - - - 1
- - - - - - - - - - - - - -
- 1 - - - - - - - - - - - 1
- 1 1 - 1 - - - - - - - - 3
1 5 2 2 2 - - - - - - - - 13
02-10-2023 03-10-2023

Daily Status Daily Status


구분 차종 부위
(Divisi) (CAR) (Bagian) NG sewing tidak
Sudah rework NG Supplier Sudah rework
rework
F/C
F/B
SU2id R/C 1
R/B
SU2id 소계 (Total) - - - 1
F/C
F/B
R/C
KS R/B
3RD CUSH
3RD BACK
KS 소계 (Total) - - - -
Grand Total - - - 1
MONTLY OKTOBER 2023

월간 현황
(Status Bulanan)
구분 차종 부위
Akumulasi NG AHTI 리워크 (누적) NG Sewing
(Divisi) (CAR) (Bagian) NG Supplier tidak bisa
Incoming & Assy Akumulasi Sudah
Rework rework /CMI
F/C 1 4 - -
F/B 38 47 33 -
SU2id R/C 11 9 1 25
R/B 28 31 13 28
SU2id 소계 (Total) 78 91 47 53
F/C - - - -
F/B 6 12 18 -
R/C 2 3 7 -
KS R/B 2 17 10 5
3RD CUSH - 5 1 -
3RD BACK 4 11 9 -
KS 소계 (Total) 14 48 45 5
GRAND TOTAL 92 139 92 58
03-10-2023 04-10-2023 05-10-2024 06-10-2024 06-10-2024

Daily Status 일일 현황 일일 현황 일일 현황 일일 현황 일일 현황
(Daily Status) (Daily Status) (Daily Status) (Daily Status) (Daily Status
NG sewing tidak NG sewing tidak NG sewing tidak NG sewing tidak NG sewing tidak
NG Supplier Sudah rework NG Supplier Sudah rework NG Supplier Sudah rework NG Supplier Sudah rework NG Supplier Sudah rework
rework rework rework rework rework

1 3 1 5 1 2 5 1 1 10
1
2 1 1 1 1 4
1 - 3 1 - 7 1 - 3 6 - 2 2 - 15
1 4
1 2
1 1 2
1
1 4 1
- - - - - 1 2 - 7 1 - - 2 - 6
1 - 3 1 - 8 3 - 10 7 - 2 4 - 21

1 4 1

1
일일 현황 일일 현황 일일 현황 일일 현황 일일 현황
(Daily Status) (Daily Status) (Daily Status) (Daily Status) (Daily Status)
NG sewing tidak NG sewing tidak NG sewing tidak NG sewing tidak NG sewing tidak
NG Supplier Sudah rework NG Supplier Sudah rework NG Supplier Sudah rework NG Supplier Sudah rework NG Supplier
rework rework rework rework rework
4
2 1 2 12 2 21 10
1 1 6 25
6 3 4 20 1 28
8 - 1 1 - 3 12 - 11 4 - 45 11 53
1 5 6 5 8
1 1 5
1 3 2 5 2 7 3 5
5
4 1 1 2 4 1 1
6 - 2 1 - 4 9 - 15 7 - 13 17 5
14 - 3 2 - 7 21 - 26 11 - 58 28 58
40 40 0rb su2id

20 19 13b ks

40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 0rb su2id

20 19 13b ks

40 40 03b ks

40 40 03c ks

40 39 1rb ks

40 39 13b ks

40 40 0rb su2id

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id

40 40 0rb su2id
20 19 13b ks
40 40 03b ks
40 40 03c ks
40 39 1rb ks
40 39 13b ks
40 40 0rb su2id
#REF!

#REF!
#REF!

#REF!

#REF!
#REF!
TABEL PPM BULAN 6
3,000
2,768

2,500

2,000

1,500

1,000

532
500

-
-
Line 1 Line 2 Line 3 Lin

Line Line 1 Line 2 Line 3 Line 4

PPM 2,768 - 532 417


chart PPM

PPM

417

Line 4
공정누락 (Proses Yang Hilang)
4

3
3

- - - -
-
LINE 1 LINE 2 LINE 3 LINE 4

Line LINE 1 LINE 2 LINE 3 LINE 4

실 텐션문제
Tension kendor
3 - - -
lang)

- - -
30 Tabel Defect Tertinggi Bulan 6

25 24

20

15

10
10
6
5
2 2 2
1
- - - - - - - - - - - - - - - - -
-
LINE 1 LINE 2 LINE 3 LINE 4

주름 겹침 손상 Kerusakan 직물 결함 Cacat Kain 봉제 찜힘


Kerut /Wrinkle overlap Pleated / K

Line LINE 1 LINE 2 LINE 3 LINE 4

주름
Kerut /Wrinkle
10 - - -

겹침
overlap
- - - -

손상 Kerusakan 6 - - -

직물 결함 Cacat Kain 24 - 2 1
봉제 찜힘
Pleated / Kelipet
2 - 2 -
Paping terbuka - - - -
ertinggi Bulan 6

1
- - -
LINE 4

직물 결함 Cacat Kain 봉제 찜힘 Paping terbuka


Pleated / Kelipet
봉제터 봉제
직물 결함 주름 스크래
짐 찜힘
Cacat Kerut / 치
Kain 12 Wrinkle12 Scratch10 Jahitan 5 Pleated /3
Putus Kelipet

직물
오염 스크래 봉비
결함 겹침
Kontami 치 Jahitan
overlap 1
nasi Cacat
1 12
Scratch Loncat
10 1
Kain
오염 및 실
바늘
손상 봉비 텐션
오염
굴곡 Aksesor 손상 Jahit 겹침 문제 자국
Konta Lub
gelomba is Kerusa an over Ten ang
minas
ng 2 tidak 2 kan 2 1 Lon1 lap 1 sion1
i jaru
1

ada / cat ken m


lepas dor

오염


바늘 손상
손상
봉제 봉제터 주름 텐션 굴곡 자국 Aks
찜힘 짐 Kerut / 문제 gelo Lub esor
Ker
Pleated /3 Jahitan 5 Wrinkl12 Tensi1 mba2 ang1 is 2
e on ng jaru tida usak2
Kelipet Putus
kendo m k손상 an
r Kerusakan
ada /
lepa4%
s
오염 및 손 ,

상 봉
Aksesoris Ja
tidak ada / Lo
상 봉
Aksesoris Ja
tidak ada / Lo
lepas
4%
굴곡
gelombang
4%
봉제 찜힘
Pleated /
Kelipet
6%

봉제터짐
Jahitan
Putus
9%
봉비
Jahitan Lo
4%
스크
래치
Scrat
ch
40%
Mis
오염 및
sing 스크래치 손상 직물 결함 텐션문제

봉비
Jahitan
오조립
Salah
바늘자국
Lubang
Kontamina Cacat Kain
stitc Scratch si &
Kerusakan
Tension
kendor
Loncat Pasang jarum

h 1

SU2ID DEFFECT/CAC
Mis 오염 및
실 텐션문제
sing 되박음 바늘자국 Lubang
Run of Appearan 손상 손상
Tension kendor
Kerusaka
Aksesoris
stitc Back tack Stitch ce

2%
jarum tidak ada / n
0 lepas 0
h 1 0 0 0 4

손상
usakan 겹침 바늘자국
4% overlap Lubang jarum
2% 2%

Missin
봉비 2
oris Jahitan
da / Loncat
Missin
봉비 2
oris Jahitan
da / Loncat
s 2%


bang
%
제 찜힘
ated /
lipet
6%

봉제터짐
Jahitan
Putus
9%
스크래치
top 3 of sew
Scratch
19%
스크래치
top 3 of sew
Scratch
19%

봉비 겹침 오염
overlap
n Loncat
4% 4%
CT/CACAT IN INCOMING
문제
endor

바늘자국
bang jarum
2%
Missing stitch
2%
직물 결함
Missing stitch
2%
직물 결함
Cacat Kain
22%

주름
Kerut /
Wrinkle
22%

sewing ng
22%

sewing ng

오염 Kontam-
inasi
4%
C
G



n

주름
Kerut /
Wrinkle
22%
22%

am-
직물
결함
Cacat
Kain
48%
Kain
48%
직물 결함 Cacat 스크래치 오염
Kain Scratch Kontaminasi
10 8 1

실 텐션문제 시접 굴곡 봉제터짐
손상 Kerusakan
Tension kendor Seam Allowance gelombang Jahitan Putus

3 2 1 1 1
봉제터짐
Jahitan
Putus

0 스

,

Sc
c
c
42
굴곡
gelo
mba
gelo
mba
ng
13%
오염 및

주름 손상 봉비 오조립 바늘자국
스크래치 직물 결함 텐션문제
Kerut Scratch Kontamina Cacat Kain Tension Jahitan Salah Lubang
/Wrinkle si & Loncat Pasang jarum
Kerusakan kendor

STATUS O


스크
오염 및
바늘자국 손상 손상

Ko
되박음 Run of Appearan
Lubang Stitch ce Aksesoris Kerusaka
Back tack
jarum tidak ada / n
0 0 0 0 0 lepas 0 4

래치
Scrat
ch
ch
42%
top 3 of sewin
시접
시접
Seam Allowanc
25%
TUS OF FABRIC NG

오염
Kontami-
nasi
5%
ewing ng 실텐
션문

Ten-
sion
kend
kend
or
38%
wance
G 직물
결함
Ca-
cat
Kain
53%
실텐
션문

en-
on
end
end
or
8%
차종 부위
(CAR) (Bagian) 달성
Pencapaian
F/C -
SU2id
Incoming in
F/B 58,211 일일 불량 PPM
AHTI R/C 42,667
R/B 28,082 70,000
F/C 306 60,000 58,211
SU2id F/B 613
Assembling 50,000
in AHTI R/C 1,838 42,667
R/B - 40,000
30,000 28,082

20,000
10,000
- 306
-
F/C F/B R/C R/B F/C
SU2id Incoming in AHTI SU
일 불량 PPM

28,082

306 613 1,838 -


R/B F/C F/B R/C R/B
AHTI SU2id Assembling in AHTI
차종 부위
(CAR) (Bagian) 달성
Pencapaian
F/C -
F/B 25,723 일일 불량 PPM
KS Incoming R/C 27,273
in AHTI R/B 18,713 30,000
3RD CUSH 12,336
25,000
3RD BACK 21,168
F/C 578 20,000
F/B 1,734
KS R/C -
Assembling 15,000
in AHTI R/B 1,734
3RD CUSH 4,046 10,000
3RD BACK 1,156
5,000

-
F/C F/B R/C R/B 3RD 3RD F/C
CUSH BACK
KS Incoming in AHTI
일일 불량 PPM

3RD 3RD F/C F/B R/C R/B 3RD 3RD


CUSH BACK CUSH BACK
HTI KS Assembling in AHTI
직물 결함 Cacat 스크래치 오염
Kain Scratch Kontaminasi
36 14 2

주름 봉제터짐 굴곡 봉제 찜힘
손상 Kerusakan
Kerut /Wrinkle Jahitan Putus gelombang Pleated / Kelipet

7 2 2 1 1
굴곡
gelom
bang
15%
bang
15%

봉제
터짐
Jahi-
tan
Jahi-
tan
Putus
15%
봉제터짐
Jahitan
Putus

,
top 3 of sewin


hi-
n
hi-
n
us
%
오염 및

주름 손상 봉비 오조립 바늘자국
스크래치 직물 결함 텐션문제
Kerut Scratch Kontamina Cacat Kain Tension Jahitan Salah Lubang

STAT
/Wrinkle si & Loncat Pasang jarum
Kerusakan kendor

스크
래치
Scra
tch
27%
ewing ng 주름
Kerut
/
Wrin
kle
Wrin
kle
54%
STATUS OF FABRIC NG

오염
Kontami-
nasi
4%
주름
Kerut
/
Wrin
kle
Wrin
kle
54%
C NG
직물
결함
Cacat
Kain
69%
차종 부위
(CAR) (Bagian) 달성
Pencapaian
F/C -
SU2id F/B 37,097
Incoming in
AHTI R/C 50,000
R/B 34,091

일일
F/C 2,841
SU2id F/B -
Assembling
in AHTI R/C 17,045
R/B -
60,000
50,000
50,000

40,000 37,097

30,000

20,000

10,000
-
-
F/C F/B R/C
SU2id Incoming in
일일 불량 PPM

50,000

7,097
34,091

17,045

2,841
- -
F/B R/C R/B F/C F/B R/C R/B
2id Incoming in AHTI SU2id Assembling in AHTI
차종 부위
(CAR) (Bagian) 달성
Pencapaian
SU2ID F/C 0 0
KS F/B 75,676 15,054

R/C 90,000 16,667


Incoming in
ahti R/B 13,889 8,333
3RD CUSH 16,340 12,500
3RD BACK 10,526 13,084
F/C 1,258 - 10000
F/B 1,258 2,833
Assembling R/C 1,626 -
in ahti R/B - 8,499
3RD CUSH - - 9000
3RD BACK - 5,666

8000

7000

6000

5000

4000

3000

2000

1000
1000

100000

90,000
90000

80000
75,676

70000

60000

50000

40000

30000

20000 16,667 16,340


15,054 13,889

10000 8,333

0 0
0
F/C F/B R/C R/B 3RD
10000 8,333

0 0
0
F/C F/B R/C R/B 3RD
SU2ID KS Incoming in ah
일일 불량 PPM

16,340
3,889 13,084
12,500
10,526
8,333

2,833 1,626
1,258 1,258
- -
R/B 3RD CUSH 3RD BACK F/C F/B R/C
12,500 13,084
10,526
8,333

2,833 1,626
1,258 1,258
- -
R/B 3RD CUSH 3RD BACK F/C F/B R/C
Incoming in ahti Assemb
8,499
5,666
833 1,626
- - - - -
R/C R/B 3RD CUSH 3RD BACK
8,499
5,666
833 1,626
- - - - -
R/C R/B 3RD CUSH 3RD BACK
Assembling in ahti
▣ Weekly report 7/18 - 7/22
봉제터짐 굴곡 바늘자국 손상 주름
Jahitan Putus gelombang Lubang jarum Kerusakan Kerut /Wrinkle
6 3 3 3 2

오염 및 손상
봉제터짐 스크래치 직물 결함 Cacat 봉제 찜힘
Kontaminasi &
Jahitan Putus Scratch Kain Pleated / Kelipet
Kerusakan
11 10 7 4 1

KS DEFECT / CACAT ASS

누락
실 조시 맞지 Aksesoris
않음 tidak ada
주름 Benang
Kerut / Timbul
Wrinkle
손상 바늘자국
Kerusakan Lubang jarum
누락 Appearan
실 조시 맞지 않음 굴곡
Aksesoris ce
Benang Timbul gelombang
tidak ada
1 1 1 1

봉비 실 조시 맞지 않음 굴곡 Appearan
Jahitan Loncat Benang Timbul gelombang ce
1 1 1 1

T / CACAT ASSEMBLING IN AHTI

누락
시 맞지 Aksesoris 봉제터짐
음 tidak ada Jahitan Putus
ang
bul
굴곡
gelombang
s

bang
차종 부위
(CAR) (Bagian) 달성
Pencapaian

직물 결함 Cacat Kain 12

주름 12
Kerut /Wrinkle 14
스크래치 10
Scratch
봉제터짐 5 12 12
Jahitan Putus 12
봉제 찜힘 3
Pleated / Kelipet
굴곡 2
gelombang
오염 및 손상
10
10
Aksesoris 2
tidak ada /
lepas
손상 Kerusakan 2

오염 Kontaminasi 1 8
봉비 1
Jahitan Loncat
겹침 1
overlap
실 텐션문제 6
1
Tension kendor 5
바늘자국 1
Lubang jarum
Missing stitch 1
4

0
Cacat Kain

스크래치
직물 결함

Scratch
Wrinkle
Kerut /
주름

12 12 10 5 3 2 2
2
주름
Kerut /
Wrinkle

10
스크래치

2
Scratch

1
5
봉제터짐
Jahitan Putus

1
3
봉제 찜힘

1
Pleated / Ke-
lipet

1
2
굴곡
gelombang

1
2
오염 및 손상

1
Aksesoris
tidak ada /
lepas

2
손상
Kerusakan

1
오염
Kontami-
nasi
SU2ID DEFECT / CACAT INCOMING
1
오염
Kontami-
nasi

1
봉비
Jahitan
Loncat

1
겹침
overlap
NCOMING IN AHTI

1
실 텐션문제
Tension
kendor

1
바늘자국
Lubang jarum

1
Missing stitch
▣ Weekly Report Assembling in AHTI 8/22 - 8/26

▣ Weekly Report Assembling in AHTI 8/22 - 8/26


▣ Weekly Report Incoming in AHTI 8/22 - 8/26

▣ Weekly Report Incoming in AHTI 8/22 - 8/26


▣ Weekly Report SU2ID 7/18 - 7/22

▣ Weekly Report KS 7/18 - 7/22


▣ Weekly report 7/18 - 7/22
▣ Weekly report 7/18 - 7/22

You might also like