CPWA-23

PROJECT DIVISION
SONAPUR PROJECT SUB DIVISION-II

COMPUTERIZED
MEASUREMENT BOOK
CMB No.COM/ITBP/SO's Mess/PD/

Name of work :- Construction of 45 Nos. SO's suites (ASI


Accomodation ) for 33rd bn, ITBP at Karchia Sonapur
(Assam) including water supply, sanitary installation &
internal electrical installation.

Agency Name M/s Khatri Enterprises

Agreement No. 04/CE/EE/PD/2020-21

Serial No. of Bill:- 5th RA Bill


C.P.W.A-23

5TH RUNNING ACCOUNT BILL


Project Division, C.P.W.D., Bamunimaidam,Guwahati
Sonapur Project Sub-Division:-II ,C.P.W.D,Sonapur

Measurement Book
CMB No.COM/ITBP/SO's Mess/PD/

Name of Work : : Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd
bn, ITBP at Karchia Sonapur (Assam) including water supply,
sanitary installation & internal electrical installation.

Agreement No. : 04/CE/EE/PD/2020-21

Agency Name : M/s Khatri Enterprises

Estimated Cost : Rs.59,040,588.00

Tendered amount : Rs.56,885,607.00

Time allowed : 12 (Twevels) Months

Date of start (Stip.) : 10.08.2020

Date of Completion (Stip.) : 09.08.2021

Actual Date of start : 10.08.2020

Actual Date of Completion : In Progress

Page No:(i)
Issued by : Executive Engineer, PD, CPWD, Bamunimaidam,Guwahati. on

Dated Initial of The Clerk in-charge

Issued to Shri G. Patar, Assistant Engineer , SPSDII,Sonapur on

When this book change hands, the transfer expressed in similar terms, should be recorded under the
dated initial of both the relieving and Relieved Officer, below the last entry of measurement made by the
Relived Officer

Dated initial of Sub-Division officer

Date of First entry: 15.05.2023

Date of Last entry: 15.07.2021

Assistant Engineer
Sonapur Project Sub Division:-II
C.P.W.D, Sonapur

Measurement Book
CMB No.COM/ITBP/SO's Mess/PD/

No.: Docketed in Divisional office Measurement Book vide


Page -1 to 3

Name & designation of Officer :


Shri G. Patar, Assistant Engineer , SPSDII,Sonapur

Date of First entry: 15.05.2023

Date of Last entry: 15.07.2021


Page No. (ii)
Certified that the Measurement book contains ( 1 to 3 Pages

Signature of Officer Receiving the Measurement book

Yearly check in the division office vide instruction No.2 Dated


initial of
Particular Date Divisional
Accounta
nt

Project Division-V, C.P.W.D., Bamunimaidam, Guwahati.


Sonapur Projcet Sub-Division:-II, C.P.W.D., Sonapur

Measurement Book

Central PWD code Para 37, Central P.W.A Code Para 208 to 211 and 220 to 223)

NOTE

Officer and subordinate using this book are expected to keep themselves fully conversant with the above
and the other subsidiary rules, as correct up to the date of measurement

CMB No.COM/ITBP/SO's Mess/PD/

Page No.(iii)
Page II - By Divisional Accountant
s
Calculation Selected Defect
Revie
by Divisional Officer discrepancies Dated initial of
wed Dated Divisional Divisional
for re-check etc noticed
gener Initial Accountant Officer
ally Pages

Page No.(iv)
REVIEW NOTES
By Superior Officer of the Department

Pages recording
Value of Dated initials and
measurements Resualt of the
Date measurements designation of the
subjected to test- check exercised
checked Checking Officer
check

Assistant Engineer Executive Engineer


Sonapur Project Sub Division:-II Project Division
CPWD,Sonapur CPWD,Guwahati

Page No. (V)


RECORD ENTRY OF MEASUREMENT

Name of Work construction of 45 Nos. SO'S suites (ASI Accommodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam)
including water supply , saniitary installation & internal electrical installation

04/CE/EE/PD/2020-21
Agreement No.

Name of Agency M/S KHATRI ENTERPRISES


Date of Start(Stp) 8/10/2020
Date of Completion (Stp) 8/9/2021
Time allowed 365 DAYS

Date of Measurement 7/11/2023

Agreement Steel reinforcement for R.C.C work including straightening , cutting , bending placing in position
3.4
No. and binding all complete above plinth level

3.4.1 Thermo-Mechanically Treated bars of Grade Fe-500D or more


Steel (TMT Bars)
Particulars Dia No. x No. x Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

Reinforcement of Lift from 1st floor to 2nd floor

Long Wall
16 mm 2 x 21 x 3.30 = --- --- --- 138.60 --- ---
16 mm 2 x 13 x = --- --- --- 85.80 --- ---
3.30
Short Wall
16 mm 2 x 14 x 3.30 = --- --- --- 92.40 --- ---

16 mm 2 x 14 x 3.30 = --- --- --- --- ---


92.40
Lap
16 mm 1 x 50 x = --- --- --- 40.00 --- ---
0.80
Binder
12 mm 1 x 14 x = --- --- 114.80 --- --- ---
8.20

12 mm 1 x 14 x = --- --- 126.00 --- --- ---


9.00

Total (In M)
= 0.00 0.00 240.80 449.20 0.00 0.00
Weight in Kg 0.395 0.616 0.888 1.579 2.467 3.850

Total Weight (In KG)


= 0.00 0.00 213.83 709.29 0.00 0.00

923.12
Kg
C/O TCMB / P -

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page 8
RECORD ENTRY OF MEASUREMENT

Name of Work construction of 45 Nos. SO'S suites (ASI Accommodation ) for 33rd bn, ITBP at Karchia
Sonapur (Assam) including water supply , saniitary installation & internal electrical installation

04/CE/EE/PD/2020-21
Agreement No.

Name of Agency M/S KHATRI ENTERPRISES


Date of Start(Stp) 8/10/2020
Date of Completion (Stp) 8/9/2021
Time allowed 365 DAYS
Date of Measurement 7/15/2023
Centering and shuttering including strutting, propping etc. and Removal of form for
Agreement No. 3.2 :

Walls (any thickness) including attached pilasters, butteresses, plinth and string courses
3.2.2 :
etc.

Particular Nos x Nos x L x B x H = Quantity Unit

Shuttering of Lift From 1st floor to 2nd floor


Long Wall 1 x 2 x 3.00 x 2.80 x - = 16.80 Sqm

1 x 2 x 2.60 x 2.80 x - = 14.56 Sqm

Deduction Opening -1 x 1 x 1.20 x 2.57 x - = -3.08 Sqm

Short Wall 1 x 2 x 2.30 x 2.80 x - = 12.88 Sqm

1 x 2 x 1.90 x 2.80 x - = 10.64 Sqm

Total Quantity = 51.80 Sqm

C/O TCMB -
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforcd cement concrete work , using coarse aggregate as
well as fine aggregate derived from natural source and cement cocrete as per approved
design mix , including pimping of con crete to site laying but excluding the cost of
centering , shuttering,finishing and reinforecd , including admixture in recommended
Agreement No. 3.6 :
proportion as per IS: 9103 to accelerated, retard setting of concrete , improve workability
without impairing strength and durability as per direction of Engineer-in-Charge.

All works above plinth level upto floor V level


3.6.2 :

Particular Nos x Nos x L x B x H = Quantity Unit


R.C.C of Lift from 1st floor to 2nd floor

Long Wall 1 x 2 x 3.00 x 2.80 x 0.20 = 3.36 Cum

Deduction Opening -1 x 1 x 1.20 x 2.57 x 0.20 = -0.62 Cum

Short Wall 1 x 2 x 1.90 x 2.80 x 0.20 = 2.13 Cum

Total Quantity = 4.87Cum

C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page9+1
RECORD ENTRY OF MEASUREMENT

Date of Measurement:16-07-2023

Steel reinforcement for RCC work including straightening, cutting, bending, placing in position and binding all complete above
Item No - 3.4
plinth level.

Item No - 3.4.1 Thermo-Mechanically Treated bars of Gradee Fe-500D or more


Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Reinforcement of Column R/H Side from 1st Floor to 2nd Floor slab
8MM 10MM 12MM 16MM 20MM 25MM
C-7 (350X600)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Existing Bar 16 mm 1 x 2 x 1.20 = --- --- --- 2.40 --- ---
16 mm 1 x 1 x 1.86 = --- --- --- 1.86 --- ---
16 mm 1 x 1 x 1.80 = --- --- --- 1.80 --- ---
16 mm 1 x 1 x 1.65 = --- --- --- 1.65 --- ---
16 mm 1 x 1 x 1.40 = --- --- --- 1.40 --- ---
16 mm 1 x 1 x 1.60 = --- --- --- 1.60 --- ---
16 mm 1 x 1 x 2.86 = --- --- --- 2.86 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-8 (350X600)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-9 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Existing Bar 16 mm 1 x 1 x 1.35 = --- --- --- 1.35 --- ---
16 mm 1 x 1 x 1.75 = --- --- --- 1.75 --- ---
16 mm 1 x 3 x 0.96 = --- --- --- 2.88 --- ---
16 mm 1 x 1 x 1.00 = --- --- --- 1.00 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.78 = --- --- --- 1.78 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-10 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Existing Bar 16 mm 1 x 1 x 1.72 = --- --- --- 1.72 --- ---
16 mm 1 x 1 x 1.50 = --- --- --- 1.50 --- ---
16 mm 1 x 1 x 1.14 = --- --- --- 1.14 --- ---
16 mm 1 x 1 x 1.45 = --- --- --- 1.45 --- ---
16 mm 1 x 1 x 1.35 = --- --- --- 1.35 --- ---
16 mm 1 x 1 x 1.35 = --- --- --- 1.35 --- ---
16 mm 1 x 1 x 1.68 = --- --- --- 1.68 --- ---
16 mm 1 x 1 x 1.20 = --- --- --- 1.20 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
B/F = 251.04 0.00 34.82 100.40 13.20

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page13-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 251.04 0.00 34.82 100.40 13.20


10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-11 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Existing Bar 16 mm 1 x 1 x 1.25 = --- --- --- 1.25 --- ---
16 mm 1 x 1 x 1.45 = --- --- --- 1.45 --- ---
16 mm 1 x 1 x 1.58 = --- --- --- 1.58 --- ---
16 mm 1 x 1 x 1.42 = --- --- --- 1.42 --- ---
16 mm 1 x 1 x 1.20 = --- --- --- 1.20 --- ---
16 mm 1 x 1 x 1.48 = --- --- --- 1.48 --- ---
16 mm 1 x 1 x 1.57 = --- --- --- 1.57 --- ---
16 mm 1 x 1 x 1.37 = --- --- --- 1.37 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-12 (350X600)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Existing Bar 16 mm 1 x 1 x 1.64 = --- --- --- 1.64 --- ---
16 mm 1 x 1 x 1.37 = --- --- --- 1.37 --- ---
16 mm 1 x 1 x 1.60 = --- --- --- 1.60 --- ---
16 mm 1 x 2 x 1.38 = --- --- --- 2.76 --- ---
16 mm 1 x 1 x 1.59 = --- --- --- 1.59 --- ---
16 mm 1 x 1 x 1.35 = --- --- --- 1.35 --- ---
16 mm 1 x 1 x 0.90 = --- --- --- 0.90 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-13 (350X600)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Existing Bar 16 mm 1 x 1 x 1.47 = --- --- --- 1.47 --- ---
16 mm 1 x 1 x 1.37 = --- --- --- 1.37 --- ---
16 mm 1 x 1 x 1.15 = --- --- --- 1.15 --- ---
16 mm 1 x 2 x 1.45 = --- --- --- 2.90 --- ---
16 mm 1 x 1 x 1.43 = --- --- --- 1.43 --- ---
16 mm 1 x 1 x 1.25 = --- --- --- 1.25 --- ---
16 mm 1 x 1 x 1.40 = --- --- --- 1.40 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-14 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Existing Bar 16 mm 1 x 1 x 1.75 = --- --- --- 1.75 --- ---
16 mm 1 x 1 x 0.87 = --- --- --- 0.87 --- ---
16 mm 1 x 1 x 1.20 = --- --- --- 1.20 --- ---
16 mm 1 x 1 x 1.55 = --- --- --- 1.55 --- ---
B/F = 471.12 0.00 74.79 179.60 39.60

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page14-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 0.00 471.12 0.00 74.79 179.60 39.60


16 mm 1 x 1 x 1.75 = --- --- --- 1.75 --- ---
16 mm 1 x 1 x 1.25 = --- --- --- 1.25 --- ---
16 mm 1 x 1 x 1.62 = --- --- --- 1.62 --- ---
16 mm 1 x 1 x 0.88 = --- --- --- 0.88 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-21 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Existing Bar 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-22 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Existing Bar 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-23 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 20 mm 1 x 1 x 1.64 = --- --- --- --- 1.64 ---
20 mm 1 x 1 x 1.30 = --- --- --- --- 1.30 ---
20 mm 1 x 1 x 1.53 = --- --- --- --- 1.53 ---
20 mm 1 x 1 x 1.50 = --- --- --- --- 1.50 ---
16 mm 1 x 1 x 1.27 = --- --- --- 1.27 --- ---
16 mm 1 x 1 x 1.26 = --- --- --- 1.26 --- ---
16 mm 1 x 1 x 1.54 = --- --- --- 1.54 --- ---
16 mm 1 x 1 x 1.28 = --- --- --- 1.28 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-24 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.37 = --- --- --- 1.37 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.27 = --- --- --- 1.27 --- ---
16 mm 1 x 1 x 1.53 = --- --- --- 1.53 --- ---
16 mm 1 x 1 x 1.34 = --- --- --- 1.34 --- ---
16 mm 1 x 1 x 1.20 = --- --- --- 1.20 --- ---
B/F = 0.00 729.36 0.00 95.65 219.97 128.80

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page15-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 0.00 729.36 0.00 95.65 219.97 128.80


Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-25 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 16 mm 1 x 1 x 1.24 = --- --- --- 1.24 --- ---
16 mm 1 x 1 x 1.43 = --- --- --- 1.43 --- ---
16 mm 1 x 1 x 1.15 = --- --- --- 1.15 --- ---
16 mm 1 x 1 x 1.07 = --- --- --- 1.07 --- ---
16 mm 1 x 1 x 0.97 = --- --- --- 0.97 --- ---
16 mm 1 x 1 x 1.25 = --- --- --- 1.25 --- ---
16 mm 1 x 1 x 0.96 = --- --- --- 0.96 --- ---
16 mm 1 x 1 x 1.27 = --- --- --- 1.27 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-26 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Existing Bar 16 mm 1 x 4 x 1.20 = --- --- --- 4.80 --- ---
16 mm 1 x 1 x 1.60 = --- --- --- 1.60 --- ---
16 mm 1 x 1 x 1.40 = --- --- --- 1.40 --- ---
16 mm 1 x 1 x 1.42 = --- --- --- 1.42 --- ---
16 mm 1 x 1 x 1.32 = --- --- --- 1.32 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-33 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 20 mm 1 x 1 x 1.31 = --- --- --- --- 1.31 ---
20 mm 1 x 1 x 1.45 = --- --- --- --- 1.45 ---
20 mm 1 x 1 x 2.04 = --- --- --- --- 2.04 ---
20 mm 1 x 1 x 2.04 = --- --- --- --- 2.04 ---
16 mm 1 x 1 x 1.31 = --- --- --- 1.31 --- ---
16 mm 1 x 1 x 1.05 = --- --- --- 1.05 --- ---
16 mm 1 x 1 x 1.75 = --- --- --- 1.75 --- ---
16 mm 1 x 1 x 1.67 = --- --- --- 1.67 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-34 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 16 mm 1 x 1 x 1.58 = --- --- --- 1.58 --- ---
16 mm 1 x 1 x 1.95 = --- --- --- 1.95 --- ---
16 mm 1 x 1 x 1.40 = --- --- --- 1.40 --- ---
16 mm 1 x 1 x 1.93 = --- --- --- 1.93 --- ---
16 mm 1 x 1 x 1.73 = --- --- --- 1.73 --- ---
16 mm 1 x 1 x 2.00 = --- --- --- 2.00 --- ---
B/F = 0.00 987.60 0.00 131.90 240.01 221.20

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page16-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 0.00 987.60 0.00 131.90 240.01 221.20


16 mm 1 x 1 x 1.37 = --- --- --- 1.37 --- ---
16 mm 1 x 1 x 1.20 = --- --- --- 1.20 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-35 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 16 mm 1 x 1 x 1.31 = --- --- --- 1.31 --- ---
16 mm 1 x 1 x 1.19 = --- --- --- 1.19 --- ---
16 mm 1 x 1 x 1.17 = --- --- --- 1.17 --- ---
16 mm 1 x 1 x 1.88 = --- --- --- 1.88 --- ---
16 mm 1 x 1 x 1.15 = --- --- --- 1.15 --- ---
16 mm 1 x 1 x 1.19 = --- --- --- 1.19 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.87 = --- --- --- 1.87 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-36 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 16 mm 1 x 1 x 1.18 = --- --- --- 1.18 --- ---
16 mm 1 x 1 x 1.75 = --- --- --- 1.75 --- ---
16 mm 1 x 1 x 1.09 = --- --- --- 1.09 --- ---
16 mm 1 x 1 x 1.19 = --- --- --- 1.19 --- ---
16 mm 1 x 1 x 1.58 = --- --- --- 1.58 --- ---
16 mm 1 x 1 x 1.21 = --- --- --- 1.21 --- ---
16 mm 1 x 1 x 1.21 = --- --- --- 1.21 --- ---
16 mm 1 x 1 x 1.12 = --- --- --- 1.12 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-37 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 16 mm 1 x 1 x 1.18 = --- --- --- 1.18 --- ---
16 mm 1 x 1 x 1.18 = --- --- --- 1.18 --- ---
16 mm 1 x 1 x 1.18 = --- --- --- 1.18 --- ---
16 mm 1 x 1 x 1.19 = --- --- --- 1.19 --- ---
16 mm 1 x 1 x 1.38 = --- --- --- 1.38 --- ---
16 mm 1 x 1 x 1.35 = --- --- --- 1.35 --- ---
16 mm 1 x 1 x 1.59 = --- --- --- 1.59 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-38 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
B/F = 0.00 1245.84 0.00 165.81 240.01 313.60

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page17-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 0.00 1245.84 0.00 165.81 240.01 313.60


Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Existing Bar 16 mm 1 x 1 x 1.29 = --- --- --- 1.29 --- ---
16 mm 1 x 1 x 1.27 = --- --- --- 1.27 --- ---
16 mm 1 x 1 x 1.27 = --- --- --- 1.27 --- ---
16 mm 1 x 1 x 0.85 = --- --- --- 0.85 --- ---
16 mm 1 x 1 x 1.48 = --- --- --- 1.48 --- ---
16 mm 1 x 1 x 1.25 = --- --- --- 1.25 --- ---
16 mm 1 x 1 x 0.95 = --- --- --- 0.95 --- ---
16 mm 1 x 1 x 1.48 = --- --- --- 1.48 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-45 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 20 mm 1 x 1 x 3.55 = --- --- --- --- 3.55 ---
20 mm 1 x 1 x 2.43 = --- --- --- --- 2.43 ---
20 mm 1 x 1 x 3.55 = --- --- --- --- 3.55 ---
20 mm 1 x 1 x 1.30 = --- --- --- --- 1.30 ---
16 mm 1 x 1 x 1.25 = --- --- --- 1.25 --- ---
16 mm 1 x 1 x 1.50 = --- --- --- 1.50 --- ---
16 mm 1 x 1 x 2.90 = --- --- --- 2.90 --- ---
16 mm 1 x 1 x 1.26 = --- --- --- 1.26 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-46 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Existing Bar 20 mm 1 x 1 x 1.32 = --- --- --- --- 1.32 ---
20 mm 1 x 1 x 1.33 = --- --- --- --- 1.33 ---
20 mm 1 x 1 x 1.32 = --- --- --- --- 1.32 ---
20 mm 1 x 1 x 1.35 = --- --- --- --- 1.35 ---
20 mm 1 x 1 x 1.35 = --- --- --- --- 1.35 ---
20 mm 1 x 1 x 1.25 = --- --- --- --- 1.25 ---
20 mm 1 x 1 x 1.20 = --- --- --- --- 1.20 ---
20 mm 1 x 1 x 1.20 = --- --- --- --- 1.20 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-47 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Existing Bar 20 mm 1 x 1 x 1.44 = --- --- --- --- 1.44 ---
20 mm 1 x 1 x 1.50 = --- --- --- --- 1.50 ---
20 mm 1 x 1 x 1.50 = --- --- --- --- 1.50 ---
20 mm 1 x 1 x 1.37 = --- --- --- --- 1.37 ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.12 = --- --- --- 1.12 --- ---
B/F = 0.00 1439.52 0.00 185.88 293.37 379.60

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page18-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 0.00 1439.52 0.00 185.88 293.37 379.60


16 mm 1 x 1 x 1.13 = --- --- --- 1.13 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-48 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Existing Bar 16 mm 1 x 1 x 1.63 = --- --- --- 1.63 --- ---
16 mm 1 x 1 x 1.63 = --- --- --- 1.63 --- ---
16 mm 1 x 1 x 1.49 = --- --- --- 1.49 --- ---
16 mm 1 x 1 x 1.49 = --- --- --- 1.49 --- ---
16 mm 1 x 1 x 1.17 = --- --- --- 1.17 --- ---
16 mm 1 x 1 x 1.17 = --- --- --- 1.17 --- ---
16 mm 1 x 1 x 1.72 = --- --- --- 1.72 --- ---
16 mm 1 x 1 x 1.80 = --- --- --- 1.80 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-49 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Existing Bar 20 mm 1 x 4 x 1.50 = --- --- --- --- 6.00 ---
16 mm 1 x 3 x 1.15 = --- --- --- 3.45 --- ---
16 mm 1 x 1 x 0.65 = --- --- --- 0.65 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-50 (350X500)
Column bar from 1st floor slab upto 2nd Floor slab
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Existing Bar 16 mm 1 x 1 x 1.67 = --- --- --- 1.67 --- ---
16 mm 1 x 1 x 1.10 = --- --- --- 1.10 --- ---
16 mm 1 x 1 x 1.38 = --- --- --- 1.38 --- ---
16 mm 1 x 1 x 1.52 = --- --- --- 1.52 --- ---
16 mm 1 x 1 x 1.67 = --- --- --- 1.67 --- ---
16 mm 1 x 1 x 1.40 = --- --- --- 1.40 --- ---
16 mm 1 x 1 x 1.54 = --- --- --- 1.54 --- ---
16 mm 1 x 1 x 1.65 = --- --- --- 1.65 --- ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
Total (In m) = 0.00 1697.76 0.00 215.14 338.97 419.20
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 0.00 1045.82 0.00 339.71 836.24 1613.92

C/O Page No. 0 3835.69 Kg

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page19-10
Date of Measurment:- 7/25/2023
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Measurmet of R/H Side staire case 3rd flight upto landing reinforcement
(C7-C8) Stair case beam
Main bar bottom 16 mm 1 x 3 x 5.10 = --- --- --- 15.30 --- ---
Top bar 16 mm 1 x 3 x 5.10 = --- --- --- 15.30 --- ---
Stirrups 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups 8 mm 1 x 9 x 1.38 = 12.42 --- --- --- --- ---
(C7-C8) Stair case
Main bar bottom 12 mm 1 x 13 x 5.08 = --- --- 66.04 --- --- ---
Lapping 12 mm 1 x 13 x 0.60 = --- --- 7.80 --- --- ---
Top Main bar 12 mm 1 x 12 x 1.25 = --- --- 15.00 --- --- ---
Middle portion 12 mm 1 x 13 x 0.80 = --- --- 10.40 --- --- ---
Landing to 3rd flight slope 12 mm 1 x 12 x 3.10 = --- --- 37.20 --- --- ---
Bottom to top 12 mm 1 x 13 x 2.20 = --- --- 28.60 --- --- ---
3rd flight to 4th flight 12 mm 1 x 13 x 1.67 = --- --- 21.71 --- --- ---
12 mm 1 x 13 x 1.67 = --- --- 21.71 --- --- ---
12 mm 1 x 13 x 1.67 = --- --- 21.71 --- --- ---
Landing binder 10 mm 1 x 18 x 3.05 = --- 54.90 --- --- --- ---
10 mm 1 x 3 x 1.45 = --- 4.35 --- --- --- ---
3rd flight binder 10 mm 1 x 38 x 1.47 = --- 55.86 --- --- --- ---
(C12-C13) Stair case beam
Main bar bottom 16 mm 1 x 3 x 4.42 = --- --- --- 13.26 --- ---
Top bar 16 mm 1 x 3 x 4.42 = --- --- --- 13.26 --- ---
Stirrups 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups 8 mm 1 x 5 x 1.38 = 6.90 --- --- --- --- ---
(C7-C8) Stair case
Main bar bottom 12 mm 1 x 13 x 4.80 = --- --- 62.40 --- --- ---
Lapping 12 mm 1 x 10 x 0.60 = --- --- 6.00 --- --- ---
Top Main bar 12 mm 1 x 15 x 1.07 = --- --- 16.05 --- --- ---
Middle portion 12 mm 1 x 9 x 0.70 = --- --- 6.30 --- --- ---
Landing to 3rd flight 12 mm 1 x 11 x 2.53 = --- --- 27.83 --- --- ---
Middle portion 12 mm 1 x 9 x 2.35 = --- --- 21.15 --- --- ---
Landing main bar 12 mm 1 x 11 x 1.70 = --- --- 18.70 --- --- ---
12 mm 1 x 10 x 1.70 = --- --- 17.00 --- --- ---
12 mm 1 x 11 x 1.70 = --- --- 18.70 --- --- ---
Landing binder 10 mm 1 x 23 x 2.45 = --- 56.35 --- --- --- ---
10 mm 1 x 6 x 1.21 = --- 7.26 --- --- --- ---
3rd flight binder 10 mm 1 x 34 x 1.15 = --- 39.10 --- --- --- ---

Total (In m) = 19.32 274.62 424.30 57.12 0.00 0.00


0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 7.63 169.17 376.78 90.19 0.00 0.00

C/O TCMB / P - 643.77 Kg

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page20-10
Date of Measurement:08-08-2023
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Measurement for L/H Side 3rd floor slab beam
Linear direction

TB-1(C1-C6)(230×500)

Top Main Bar 16 mm 1 x 3 x 23.65 = --- --- --- 70.95 --- ---
Top Lap 16 mm 1 x 5 x 0.80 = --- --- --- 4.00 --- ---
Bottom Main Bar 16 mm 1 x 3 x 23.65 = --- --- --- 70.95 --- ---
Bottam Lap 16 mm 1 x 5 x 0.80 = --- --- --- 4.00 --- ---
Top Extra Bar at C4 12 mm 1 x 1 x 3.10 = --- --- 3.10 --- --- ---
Top Extra Bar at C5 16 mm 1 x 1 x 3.12 = --- --- --- 3.12 --- ---
Top Exrtra Bar at C6 12 mm 1 x 1 x 2.18 = --- --- 2.18 --- --- ---
Stirrups (C1-C2) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C1-C2) 8 mm 1 x 4 x 1.38 = 5.52 --- --- --- --- ---
Stirrups (C2-C3) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C2-C3) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Stirrups (C3-C4) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C3-C4) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C4-C5) 10 mm 1 x 21 x 1.42 = --- 29.82 --- --- --- ---
Stirrups (C4-C5) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C5-C6) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C5-C6) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Spacer bar 16 mm 1 x 7 x 0.17 = --- --- --- 1.19 --- ---
TB30(C2-C3)(230X500) --- --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 4.20 = --- --- 12.60 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 4.20 = --- --- 12.60 --- --- ---
10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups
8 mm 1 x 8 x 1.38 = 11.04 --- --- --- --- ---
TB30(C3-C4)(230X500) --- --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 7.18 = --- --- 21.54 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.18 = --- --- 21.54 --- --- ---
10 mm 1 x 32 x 1.42 = --- 45.44 --- --- --- ---
Stirrups
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
TB30(C5-C6)(230X500) --- --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 4.20 = --- --- 12.60 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 4.20 = --- --- 12.60 --- --- ---
10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
Stirrups
8 mm 1 x 8 x 1.38 = 11.04 --- --- --- --- ---
TB-32 (Sub Beam)(TB13-TB17)(230×500)
--- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 20.53 = --- --- --- 61.59 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Main Bar 16 mm 1 x 3 x 20.53 = --- --- --- 61.59 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrups 10 mm 1 x 80 x 1.42 = --- 113.60 --- --- --- ---
8 mm 1 x 75 x 1.38 = 103.50 --- --- --- --- ---
TB-06 (C15-C20)(230×500) --- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 23.65 = --- --- --- 70.95 --- ---
Top Lap 16 mm 1 x 5 x 0.80 = --- --- --- 4.00 --- ---
Bottom Main Bar 16 mm 1 x 3 x 23.65 = --- --- --- 70.95 --- ---
B/F = 242.88 353.58 98.76 428.09

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page21-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 242.88 353.58 98.76 428.09
Bottom Lap 16 mm 1 x 6 x 0.80 = --- --- --- 4.80 --- ---
Top Extra Bar at C18 12 mm 1 x 1 x 2.98 = --- --- 2.98 --- --- ---
Top Extra Bar at C19 16 mm 1 x 1 x 2.83 = --- --- --- 2.83 --- ---
Top Extra Bar at C20 12 mm 1 x 1 x 2.30 = --- --- 2.30 --- --- ---
Stirrups (C15-C16) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C15-C16) 8 mm 1 x 6 x 1.38 = 8.28 --- --- --- --- ---
Stirrups (C16-C17) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C16-C17) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Stirrups (C17-C18) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C17-C18) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Stirrups (C18-C19) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C18-C19) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C19-C20) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C19-C20) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Spacer bar 16 mm 1 x 6 x 0.17 = --- --- --- 1.02 --- ---
TB-08 (C27-C32)(230×500) --- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 23.65 = --- --- --- 70.95 --- ---
Top Lap 16 mm 1 x 5 x 0.80 = --- --- --- 4.00 --- ---
Bottom Main Bar 16 mm 1 x 3 x 23.65 = --- --- --- 70.95 --- ---
Bottom Lap 16 mm 1 x 5 x 0.80 = --- --- --- 4.00 --- ---
Top Extra Bar at C30 12 mm 1 x 1 x 3.05 = --- --- 3.05 --- --- ---
Top Extra Bar at C31 16 mm 1 x 1 x 2.90 = --- --- --- 2.90 --- ---
Top Extra Bar at C32 12 mm 1 x 1 x 2.30 = --- --- 2.30 --- --- ---
Stirrups (C27-C28) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C27-C28) 8 mm 1 x 7 x 1.38 = 9.66 --- --- --- --- ---
Stirrups (C28-C29) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C28-C29) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Stirrups (C29-C30) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C29-C30) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C30-C31) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C30-C31) 8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Stirrups (C31-C32) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C31-C32) 8 mm 1 x 14 x 1.38 = 19.32 --- --- --- --- ---
Spacer bar 16 mm 1 x 6 x 0.17 = --- --- --- 1.02 --- ---
TB-34 (Sub Beam)(TB13-TB17)(230×500) --- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 20.53 = --- --- --- 61.59 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottam Main Bar 16 mm 1 x 3 x 20.53 = --- --- --- 61.59 --- ---
Bottam Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrups 10 mm 1 x 80 x 1.42 = --- 113.60 --- --- --- ---
8 mm 1 x 74 x 1.38 = 102.12 --- --- --- --- ---
TB30(C40-C42)(230X500) --- --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 7.28 = --- --- 21.84 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.28 = --- --- 21.84 --- --- ---
10 mm 1 x 32 x 1.42 = --- 45.44 --- --- --- ---
Stirrups
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
Top Lap 12 mm 1 x 1 x 0.60 = --- --- 0.60 --- --- ---
B/F = 564.42 796.62 153.67 718.54 0.00 0.00

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page22-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 564.42 796.62 153.67 718.54 0.00 0.00


Bottam Lap 12 mm 1 x 1 x 0.60 = --- --- 0.60 --- --- ---
TB30(C42-C44)(230X500) --- --- --- --- --- ---
Top Main Bar 12 mm 1 x 3 x 7.23 = --- --- 21.69 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.23 = --- --- 21.69 --- --- ---
10 mm 1 x 32 x 1.42 = --- 45.44 --- --- --- ---
Stirrups
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
Top Lap 12 mm 1 x 1 x 0.60 = --- --- 0.60 --- --- ---
Bottam Lap 12 mm 1 x 1 x 0.60 = --- --- 0.60 --- --- ---
TB-10 (C40-C44)(230×500) --- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 20.65 = --- --- --- 61.95 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottam Main Bar 16 mm 1 x 3 x 20.65 = --- --- --- 61.95 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Top Extra Bar at C42 12 mm 1 x 1 x 3.15 = --- --- 3.15 --- --- ---
Top Extra Bar at C43 16 mm 1 x 1 x 3.20 = --- --- --- 3.20 --- ---
Top Extra Bar at C44 12 mm 1 x 1 x 2.25 = --- --- 2.25 --- --- ---
Stirrups (C40-C41) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C40-C41) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C41-C42) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C41-C42) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C42-C43) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C42-C43) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Stirrups (C43-C44) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C43-C44) 8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Spacer bar 16 mm 1 x 10 x 0.17 = --- --- --- 1.70 --- ---

Lateral Direction --- --- --- --- --- ---


TB-12 (C1-C27)(230×500) --- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 9.60 = --- --- --- 28.80 --- ---
Top Lap 16 mm 1 x 1 x 0.80 = --- --- --- 0.80 --- ---
Bottom Main Bar 16 mm 1 x 3 x 9.60 = --- --- --- 28.80 --- ---
Bottom Lap 16 mm 1 x 1 x 0.80 = --- --- --- 0.80 --- ---
Stirrups (C1-C15) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C1-C15) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Stirrups (C15-C27) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
TB-13 (C2-C40)(230×500)
--- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrups (C2-C16) 10 mm 1 x 25 x 1.42 = --- 35.50 --- --- --- ---
Stirrups (C2-C16) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Stirrups (C16-C28) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
Stirrups (C28-C40) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C28-C40) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
TB-14 (C3-C41)(230×500)
--- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
B/F = 764.52 1099.08 204.25 1109.34 0.00 0.00

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page23-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 764.52 1099.08 204.25 1109.34 0.00 0.00


Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrups (C3-C17) 10 mm 1 x 25 x 1.42 = --- 35.50 --- --- --- ---
Stirrups (C3-C17) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Stirrups (C17-C29) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
Stirrups (C29-C41) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C29-C41) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
TB-15 (C4-C42)(230×500)
--- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Bottom Lap 16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Top Extra Bar at C4 12 mm 1 x 2 x 3.30 = --- --- 6.60 --- --- ---
Top Extra Bar at C18 12 mm 1 x 2 x 3.10 = --- --- 6.20 --- --- ---
Top Extra Bar at C30 12 mm 1 x 2 x 3.10 = --- --- 6.20 --- --- ---
Top Extra Bar at C42 12 mm 1 x 2 x 3.00 = --- --- 6.00 --- --- ---
Stirrups (C4-C18) 10 mm 1 x 25 x 1.42 = --- 35.50 --- --- --- ---
Stirrups (C4-C18) 8 mm 1 x 23 x 1.38 = 31.74 --- --- --- --- ---
Stirrups (C18-C30) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
Stirrups (C30-C42) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C30-C42) 8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
Spacer bar 16 mm 1 x 14 x 0.17 = --- --- --- 2.38 --- ---
TB16 (C5-C43)(230×500)
--- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Top Extra Bar at C5 12 mm 1 x 2 x 3.50 = --- --- 7.00 --- --- ---
Top Extra Bar at C19 16 mm 1 x 2 x 2.90 = --- --- --- 5.80 --- ---
Top Extra Bar at C31 16 mm 1 x 2 x 2.90 = --- --- --- 5.80 --- ---
Top Extra Bar at C43 12 mm 1 x 2 x 3.30 = --- --- 6.60 --- --- ---
Stirrups (C5-C19) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C5-C19) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Stirrups (C19-C31) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
Stirrups (C31-C43) 10 mm 1 x 25 x 1.42 = --- 35.50 --- --- --- ---
Stirrups (C31-C43) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Spacer bar 16 mm 1 x 14 x 0.17 = --- --- --- 2.38 --- ---
TB-17 (C6-C44)(230×500)
--- --- --- --- --- ---
Top Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.90 = --- --- --- 47.70 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Top Extra Bar at C6 20 mm 1 x 1 x 3.50 = --- --- --- --- 3.50 ---
Top Extra Bar at C20 20 mm 1 x 1 x 3.05 = --- --- --- --- 3.05 ---
Top Exrtra Bar at C32 20 mm 1 x 1 x 2.85 = --- --- --- --- 2.85 ---
Top extra Bar at C44 16 mm 1 x 1 x 2.86 = --- --- --- 2.86 --- ---
Stirrups (C6-C20) 10 mm 1 x 25 x 1.42 = --- 35.50 --- --- --- ---
B/F = 946.68 1402.96 242.85 1432.36 9.40 0.00

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page24-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 946.68 1402.96 242.85 1432.36 9.40 0.00


Stirrups (C6-C20) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Stirrups (C20-C32) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
Stirrups (C32-C44) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
Stirrups (C32-C44) 8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
Spacer bar 20 mm 1 x 14 x 0.17 = --- --- --- --- 2.38 ---
TB-31 (Sub Beam)(TB10-TB34) --- --- --- --- --- ---
Top Main Bar 12 mm 4 x 3 x 4.16 = --- --- 49.92 --- --- ---
Bottom Main Bar 12 mm 4 x 3 x 4.16 = --- --- 49.92 --- --- ---
10 mm 4 x 14 x 1.42 = --- 79.52 --- --- --- ---
Stirrups
8 mm 4 x 12 x 1.38 = 66.24 --- --- --- --- ---
TB-31 (Sub Beam)(TB01-TB32) --- --- --- --- --- ---
Top Main Bar 12 mm 4 x 3 x 4.11 = --- --- 49.32 --- --- ---
Bottom Main Bar 12 mm 4 x 3 x 4.11 = --- --- 49.32 --- --- ---
10 mm 4 x 14 x 1.42 = --- 79.52 --- --- --- ---
Stirrups
8 mm 4 x 12 x 1.38 = 66.24 --- --- --- --- ---
Total (In M) = 1139.88 1615.96 441.33 1432.36 11.78
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In KG) = 450.25 995.43 391.90 2261.70 29.06 0.00

C/O TCMB / P - 4128.34 Kg

Date of Measurement: 11-08-2023


Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

Measurement Of L/H Side 3rd Floor Slab Reinforcement

Short Direction

(C6-C44) To ( C5-C43)
Bottom bar 10 mm 1 x 24 x 14.36 = --- 344.64 --- --- --- ---
Crank bar 10 mm 1 x 9 x 14.76 = --- 132.84 --- --- --- ---
(C5-C6) To TB32
Bottom bar 10 mm 1 x 9 x 3.05 = --- 27.45 --- --- --- ---
Bottom bar 10 mm 1 x 21 x 4.95 = --- 103.95 --- --- --- ---
TB-06 to TB-08
Bottom bar 10 mm 1 x 9 x 2.43 = --- 21.87 --- --- --- ---
TB-34 to TB-10
Bottom bar 10 mm 1 x 9 x 3.05 = --- 27.45 --- --- --- ---
Lap 10 mm 1 x 46 x 0.50 = --- 23.00 --- --- --- ---
Top bar 10 mm 1 x 16 x 14.36 = --- 229.76 --- --- --- ---
Extra top 10 mm 1 x 7 x 3.90 = --- 27.30 --- --- --- ---
10 mm 1 x 7 x 3.80 = --- 26.60
10 mm 1 x 6 x 3.60 = --- 21.60
10 mm 1 x 1 x 1.10 = --- 1.10
(C5-C43) To ( C4-C42)
Bottom bar 10 mm 1 x 24 x 14.36 = --- 344.64 --- --- --- ---
Crank bar 10 mm 1 x 9 x 14.76 = --- 132.84 --- --- --- ---
(C4-C5) To TB32 B/F = 1465.04 0.00 0.00 0.00 0.00

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page25-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 1465.04 0.00 0.00 0.00 0.00


Bottom bar 10 mm 1 x 20 x 4.95 = --- 99.00 --- --- --- ---
Bottom bar 10 mm 1 x 9 x 3.05 = --- 27.45 --- --- --- ---
TB-06 to TB-08
Bottom bar 10 mm 1 x 9 x 2.45 = --- 22.05 --- --- --- ---
TB-34 to TB-10
Bottom bar 10 mm 1 x 9 x 3.10 = --- 27.90 --- --- --- ---
Lap 10 mm 1 x 48 x 0.50 = --- 24.00 --- --- --- ---
Top bar 10 mm 1 x 15 x 14.36 = --- 215.40 --- --- --- ---
Extra top 10 mm 1 x 7 x 3.90 = --- 27.30 --- --- --- ---
10 mm 1 x 7 x 3.80 = --- 26.60
10 mm 1 x 7 x 3.60 = --- 25.20
(C3-C4) To ( C41-C42)
Bottom bar 10 mm 1 x 24 x 14.36 = --- 344.64 --- --- --- ---
Crank bar 10 mm 1 x 9 x 14.76 = --- 132.84 --- --- --- ---
(C3-C4) To TB32
Bottom bar 10 mm 1 x 8 x 3.05 = --- 24.40 --- --- --- ---
Bottom bar 10 mm 1 x 20 x 4.95 = --- 99.00 --- --- --- ---
TB-06 to TB-08
Bottom bar 10 mm 1 x 9 x 2.45 = --- 22.05 --- --- --- ---
TB-34 to TB-10
Bottom bar 10 mm 1 x 9 x 3.05 = --- 27.45 --- --- --- ---
Lap 10 mm 1 x 45 x 0.50 = --- 22.50 --- --- --- ---
Top bar 10 mm 1 x 16 x 14.36 = --- 229.76 --- --- --- ---
Extra top 10 mm 1 x 7 x 3.90 = --- 27.30 --- --- --- ---
10 mm 1 x 7 x 3.80 = --- 26.60
10 mm 1 x 7 x 3.60 = --- 25.20
(C2-C3) To ( C40-C41)
Bottom bar 10 mm 1 x 24 x 14.36 = --- 344.64 --- --- --- ---
Crank bar 10 mm 1 x 9 x 14.76 = --- 132.84 --- --- --- ---
(C2-C3) To TB32
Bottom bar 10 mm 1 x 8 x 3.05 = --- 24.40 --- --- --- ---
Bottom bar 10 mm 1 x 22 x 4.95 = --- 108.90 --- --- --- ---
TB-06 to TB-08
Bottom bar 10 mm 1 x 9 x 2.45 = --- 22.05 --- --- --- ---
TB-34 to TB-10
Bottom bar 10 mm 1 x 9 x 3.05 = --- 27.45 --- --- --- ---
Top bar 10 mm 1 x 16 x 14.36 = --- 229.76 --- --- --- ---
Extra top 10 mm 1 x 7 x 3.90 = --- 27.30 --- --- --- ---
10 mm 1 x 7 x 3.80 = --- 26.60
10 mm 1 x 7 x 3.60 = --- 25.20
(C1-C2) To ( C27-C28)
Bottom bar 10 mm 1 x 18 x 8.40 = --- 151.20 --- --- --- ---
Top bar 10 mm 1 x 18 x 8.40 = --- 151.20 --- --- --- ---

Long direction --- --- --- --- --- ---


(C6-C20) To ( C1-C15)
Bottom bar 10 mm 1 x 33 x 22.60 = --- 745.80 --- --- --- ---
10 mm 1 x 4 x 3.30 = --- 13.20 --- --- --- ---
Crank bar 10 mm 1 x 9 x 23.00 = --- 207.00 --- --- --- ---
Top bar 10 mm 1 x 29 x 22.60 = --- 655.40 --- --- --- ---
Extra top 10 mm 1 x 5 x 4.10 = --- 20.50 --- --- --- ---
10 mm 1 x 5 x 2.40 = --- 12.00 --- --- --- ---
10 mm 1 x 5 x 2.20 = --- 11.00 --- --- --- ---
10 mm 1 x 5 x 2.40 = --- 12.00 --- --- --- ---
5890.12 0.00 0.00 0.00 0.00

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page26-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm

C/O = 5890.12 0.00 0.00 0.00 0.00


10 mm 1 x 5 x 1.30 = --- 6.50 --- --- --- ---
(C20-C32) To ( C15-C27)
Bottom bar 10 mm 1 x 13 x 22.60 = --- 293.80 --- --- --- ---
Top bar 10 mm 1 x 13 x 22.60 = --- 293.80 --- --- --- ---
(C32-C44) To ( C28-C40)
Bottom bar 10 mm 1 x 33 x 19.75 = --- 651.75 --- --- --- ---
Crank bar 10 mm 1 x 5 x 20.55 = --- 102.75 --- --- --- ---
Top bar 10 mm 1 x 28 x 19.75 = --- 553.00 --- --- --- ---
Extra top 10 mm 1 x 5 x 1.15 = --- 5.75 --- --- --- ---
10 mm 1 x 5 x 2.35 = --- 11.75 --- --- --- ---
10 mm 1 x 5 x 2.20 = --- 11.00 --- --- --- ---
10 mm 1 x 5 x 2.30 = --- 11.50 --- --- --- ---
10 mm 1 x 5 x 1.30 = --- 6.50 --- --- --- ---
Slab Connected to Bottom of Beam (Bottom ch --- --- --- --- --- ---
Slab at TB-10 (C40-C42) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 49 x 1.63 = --- 79.87 --- --- --- ---
Bottom Main Bar 10 mm 1 x 49 x 1.63 = --- 79.87 --- --- --- ---
Top Distribution Bar 10 mm 1 x 8 x 8.05 = --- 64.40 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 8 x 8.05 = --- 64.40 --- --- --- ---
Slab at TB-10 (C42-C44) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 49 x 1.63 = --- 79.87 --- --- --- ---
Bottom Main Bar 10 mm 1 x 49 x 1.63 = --- 79.87 --- --- --- ---
Top Distribution Bar 10 mm 1 x 8 x 8.05 = --- 64.40 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 8 x 8.05 = --- 64.40 --- --- --- ---
Slab at TB-1 (C2-C3) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 25 x 1.63 = --- 40.75 --- --- --- ---
Bottom Main Bar 10 mm 1 x 25 x 1.63 = --- 40.75 --- --- --- ---
Top Distribution Bar 10 mm 1 x 8 x 4.40 = --- 35.20 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 8 x 4.40 = --- 35.20 --- --- --- ---
Slab at TB-1 (C3-C5) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 54 x 1.63 = --- 88.02 --- --- --- ---
Bottom Main Bar 10 mm 1 x 54 x 1.63 = --- 88.02 --- --- --- ---
Top Distribution Bar 10 mm 1 x 7 x 8.00 = --- 56.00 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 7 x 8.00 = --- 56.00 --- --- --- ---
Slab at TB-1 (C5-C6) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 32 x 1.63 = --- 52.16 --- --- --- ---
Bottom Main Bar 10 mm 1 x 32 x 1.63 = --- 52.16 --- --- --- ---
Top Distribution Bar 10 mm 1 x 7 x 5.55 = --- 38.85 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 7 x 5.55 = --- 38.85 --- --- --- ---
Slab at TB-08 (C27-C28) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 15 x 0.88 = --- 13.20 --- --- --- ---
Bottom Main Bar 10 mm 1 x 15 x 0.88 = --- 13.20 --- --- --- ---
Top Distribution Bar 10 mm 1 x 4 x 2.75 = --- 11.00 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 4 x 2.75 = --- 11.00 --- --- --- ---
Slab at TB-13 (C15-C27) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 17 x 0.88 = --- 14.96 --- --- --- ---
B/F = 9100.62 0.00 0.00 0.00 0.00

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page27-10
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 9100.62 0.00 0.00 0.00 0.00
Bottom Main Bar 10 mm 1 x 17 x 0.88 = --- 14.96 --- --- --- ---
Top Distribution Bar 10 mm 1 x 4 x 3.14 = --- 12.56 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 4 x 3.14 = --- 12.56 --- --- --- ---
Slab at TB-12 (C15-C27) --- --- --- --- --- ---
Top Main Bar 10 mm 1 x 16 x 0.88 = --- 14.08 --- --- --- ---
Bottom Main Bar 10 mm 1 x 16 x 0.88 = --- 14.08 --- --- --- ---
Top Distribution Bar 10 mm 1 x 4 x 2.17 = --- 8.68 --- --- --- ---

Bottom Distribution Bar


10 mm 1 x 4 x 2.17 = --- 8.68 --- --- --- ---
Lap 10 mm 1 x 315 x 0.50 = --- 157.50 --- --- --- ---
Chair 12 mm 1 x 130 x 1.35 = --- --- 175.50 --- --- ---
Total (In m) = 0.00 9343.72 175.50 0.00 0.00 0.00
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 0.00 5755.73 155.84 0.00 0.00 0.00

C/O TCMB / P - 5911.57 kg

Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Measurement for Stirrup For Column and Beam Junction at 3rd Floor Slab
C1 10 mm 1 x 4 x 1.74 = --- 6.96 --- --- --- ---
C2 10 mm 1 x 4 x 1.74 = --- 6.96 --- --- --- ---
C3 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C4 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C5 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C6 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C15 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C16 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C17 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C18 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C19 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C20 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C27 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C28 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C29 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C30 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C31 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C32 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C40 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C41 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C42 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C43 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
C44 10 mm 1 x 4 x 1.54 = --- 6.16 --- --- --- ---
Total (In m) = 0.00 143.28 0.00 0.00 0.00 0.00
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 0.00 88.26 0.00 0.00 0.00 0.00

C/O TCMB / P -

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page28-10
Date of Measurement 7/22/2023
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and Removal of form for
3.2.6 : Column, Pillars, piers, Abustments, posts and struts

Particular Nos x Nos x L x B x H = Quantity Unit

ASOS Mess R/H Side Column Shuttering From 1st floor upto 2.4 m ht for 2nd floor slab
C7 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm

C8 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm

C9 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C10 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C11 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C12 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm

C13 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm

C14 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C21 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C22 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C23 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C24 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C25 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C26 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C33 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C34 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C35 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C36 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C37 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C38 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C45 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C46 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C47 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C48 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C49 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

C50 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm

Total Quantity = 108.00 Sqm


C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page25-6
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforcd cement concrete work , using coarse aggregate as well as fine
aggregate derived from natural source and cement cocrete as per approved design mix ,
including pimping of con crete to site laying but excluding the cost of centering ,
Agreement No. 3.6 :
shuttering,finishing and reinforecd , including admixture in recommended proportion as per IS:
9103 to accelerated, retard setting of concrete , improve workability without impairing strength
and durability as per direction of Engineer-in-Charge.

3.6.2 : All works above plinth level upto floor V level


Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess R/H Side Column R.C.C From 1st floor upto 2.4 m ht for 2nd floor slab
C7 1 x 1 x 0.35 x 0.60 x 2.40 = 0.50 Cum
C8 1 x 1 x 0.35 x 0.60 x 2.40 = 0.50 Cum
C9 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C10 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C11 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C12 1 x 1 x 0.35 x 0.60 x 2.40 = 0.50 Cum
C13 1 x 1 x 0.35 x 0.60 x 2.40 = 0.50 Cum
C14 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C21 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C22 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C23 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C24 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C25 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C26 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C33 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C34 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C35 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C36 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C37 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C38 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C45 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C46 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C47 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C48 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C49 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C50 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
Total Quantity = 11.24 Cum

C/O TCMB - 0

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page26-6
Date of Measurement 7/24/2023
Centering and shuttering including strutting, propping etc. and Removal of form for
Agreement No. 3.2 :

3.2.5 : Lintels, beams, plinth beams, girders, bressuments and cantilvers


Particular Nos x Nos x L x B x H = Quantity Unit
Beam Shuttering for R/H Side staire case 3rd flight
Mid landing beam
C7-C8
Side 1 X 1 X 3.030 X - X 0.500 = 1.52 Sqm
1 X 1 X 3.030 X - X 0.350 = 1.06 Sqm
Bottom 1 X 1 X 3.030 X 0.230 X - = 0.70 Sqm
C12-C13
Side 1 X 1 X 2.550 X - X 0.500 = 1.28 Sqm
1 X 1 X 2.550 X - X 0.350 = 0.89 Sqm
Bottom 1 X 1 X 2.550 X 0.230 X - = 0.59 Sqm
Total Quantity = 6.04 Sqm
C/O TCMB -
Date of Measurement
Centering and shuttering including strutting, propping etc. and Removal of form for
Agreement No. 3.2 :

3.2.7 : Stairs, (eexcluding landings) except spiral-staircases


Particular Nos x Nos x L x B x H = Quantity Unit
C7-C8 Staircase
Waist Slab 1 X 1 X 3.35 X - X 1.500 = 5.03 Sqm
Side 1 X 2 X 3.35 X - X 0.300 = 2.01 Sqm
Riser 11 X 1 X 1.50 X - X 0.150 = 2.48 Sqm
C12-C13 Staircase
Waist Slab 1 X 1 X 3.35 X - X 1.200 = 4.02 Sqm
Side 1 X 2 X 3.35 X - X 0.300 = 2.01 Sqm
Riser 11 X 1 X 1.20 X - X 0.150 = 1.98 Sqm
Total Quantity = 17.53 Sqm
C/O TCMB - 0
Centering and shuttering including strutting, propping etc. and Removal of form for
Agreement No. 3.2 :

3.2.3 : Suspendd floors, roofs, landing, balconies and access platform


Particular Nos x Nos x L x B x H = Quantity Unit
C7-C8 Staire case
Landing slab 1 x 1 x 3.10 x 1.50 x - = 4.65 Sqm
C12-C13 Staire case
Landing slab 1 x 1 x 2.55 x 1.50 x - = 3.83 Sqm
Total Quantity = 8.48 Sqm
C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE

Agreement No. 3.2.8 : Edges of slabs and breaks in floors and wallsfor
3.2.8.1 : Under 20 cm wide
Particular Nos x Nos x L x B x H = Quantity Unit
C7-C8 Staire case
Landing slab side 1 x 2 x 1.50 x - x - = 3.00 mtr

Page27-6
C12-C13 Staire case
Landing slab side 1 x 2 x 1.50 x - x - = 3.00 mtr
Total Quantity = 6.00 mtr
C/O TCMB -
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25 grade
cement concrete for reinforcd cement concrete work , using coarse aggregate as well as fine
aggregate derived from natural source and cement cocrete as per approved design mix ,
including pimping of con crete to site laying but excluding the cost of centering ,
shuttering,finishing and reinforecd , including admixture in recommended proportion as per IS:
Agreement No. 3.6 :
9103 to accelerated, retard setting of concrete , improve workability without impairing strength
and durability as per direction of Engineer-in-Charge.

3.6.2 : All works above plinth level upto floor V level


Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess R/H Side Staire case RCC work
C7-C8 Staire case
Mid landing beam 1 x 1 x 3.030 x 0.230 x 0.50 = 0.35 Cum
Landing slab 1 x 1 x 3.030 x 1.500 x 0.15 = 0.68 Cum
Waist slab 1 x 1 x 3.350 x 1.500 x 0.15 = 0.75 Cum
Tread & riser 10 x 0.5 x 1.500 x 0.300 x 0.15 = 0.34 Cum
C12-C13 Staire case
Mid landing beam 1 x 1 x 2.550 x 0.230 x 0.50 = 0.29 Cum
Landing slab 1 x 1 x 2.550 x 1.500 x 0.15 = 0.57 Cum
Waist slab 1 x 1 x 3.350 x 1.500 x 0.15 = 0.75 Cum
Tread & riser 10 x 0.5 x 1.200 x 0.300 x 0.15 = 0.27 Cum
Total Quantity = 4.00 Cum

C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE

Page28-6
Date of Measurement 7/25/2023
Centering and shuttering including strutting, propping etc. and Removal of form for
Agreement No. 3.2 :

3.2.6 : Column, Pillars, piers, Abustments, posts and struts


Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess L/H side Column Shuttering From 2nd Floor upto ht of 2.4m
C1 1 x 2 x( 0.350 + 0.600 )x 2.40 = 4.56 sqm

C2 1 x 2 x( 0.350 + 0.600 )x 2.40 = 4.56 sqm

C15 1 x 2 x( 0.350 + 0.500 )x 2.40 = 4.08 sqm

C27 1 x 2 x( 0.350 + 0.500 )x 2.40 = 4.08 sqm


Total Quantity = 17.28 Sqm
C/O TCMB -
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix
M-25 grade cement concrete for reinforcd cement concrete work , using coarse
aggregate as well as fine aggregate derived from natural source and cement
cocrete as per approved design mix , including pimping of con crete to site laying
but excluding the cost of centering , shuttering,finishing and reinforecd , including
Agreement No. 3.6 : admixture in recommended proportion as per IS: 9103 to accelerated, retard
setting of concrete , improve workability without impairing strength and durability
as per direction of Engineer-in-Charge.

3.6.2 : All works above plinth level upto floor V level

Particular Nos x Nos x L x B x H = Quantity Unit

ASOS Mess L/H side Column R.C.C From 2nd Floor upto ht of 2.4m
C1 1 x 1 x 0.35 x 0.60 x 2.40 = 0.50 Cum
C2 1 x 1 x 0.35 x 0.60 x 2.40 = 0.50 Cum
C15 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C27 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
Total Quantity = 1.84 Cum

C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE


Date of Measurement 8/12/2023
Centering and shuttering including strutting, propping etc. and Removal of form for
Agreement No. 3.2 :

3.2.6 : Column, Pillars, piers, Abustments, posts and struts


Particular Nos x Nos x L x B x H = Quantity Unit

ASOS Mess L/H side Column Shuttering From 2.4m ht Upto 3rd Floor slab

C1 1 x 2 x( 0.35 + 0.60 )x 0.75 = 1.43 sqm

C2 1 x 2 x( 0.35 + 0.60 )x 0.75 = 1.43 sqm

C3 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C4 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C5 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C6 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C15 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C16 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C17 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C18 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C19 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C20 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C27 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C28 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C29 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C30 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C31 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C32 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C40 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C41 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C42 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C43 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

C44 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm

Total Quantity = 29.74 Sqm


C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE


Date of Measurement
Providing and laying in position machine batched and machine mixed design mix
M-25 grade cement concrete for reinforcd cement concrete work , using coarse
aggregate as well as fine aggregate derived from natural source and cement
cocrete as per approved design mix , including pimping of con crete to site laying
but excluding the cost of centering , shuttering,finishing and reinforecd , including
Agreement No. 3.6 : admixture in recommended proportion as per IS: 9103 to accelerated, retard
setting of concrete , improve workability without impairing strength and durability
as per direction of Engineer-in-Charge.

3.6.2 : All works above plinth level upto floor V level

Particular Nos x Nos x L x B x H = Quantity Unit


ASOS Mess L/H side Column R.C.C From 2.4m ht Upto 3rd Floor slab
C1 1 x 1 x 0.35 x 0.60 x 0.90 = 0.19 Cum
C2 1 x 1 x 0.35 x 0.60 x 0.90 = 0.19 Cum
C3 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C4 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C5 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C6 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C15 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C16 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C17 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C18 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C19 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C20 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C27 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C28 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C29 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C30 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C31 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C32 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C40 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C41 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C42 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C43 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C44 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum

Total Quantity = 3.74 Cum


C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE


Date of Measurement 8/12/2023

Providing and laying in position machine batched and machine mixed design
mix M-25 grade cement concrete for reinforced cement concrete work, using
coarse aggregate as well as fine aggregate derived from natural sources and
cement content as per approved design mix, including pumping of concrete to
Agreement No. 3.6 :
site of laying but excluding the cost of centering, shuttering, finishing and
reinforcement, including admixtures in recommended proportions as per IS: 9103
to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge

3.6.1 : All works above plinth level upto floor V level


Particulars Nos x Nos x L x B x H = Quantity Unit
Asos mess building L/H Side 3rd floor beam R.C.C
Linear Direction
T.B-01 (C1-C2) 1 X 1 X 2.70 X 0.23 X 0.50 = 0.31 Cum
T.B-01 (C2-C3) 1 X 1 X 4.54 X 0.23 X 0.50 = 0.52 Cum
T.B-01 (C3-C4) 1 X 1 X 4.44 X 0.23 X 0.50 = 0.51 Cum
T.B-01 (C4-C5) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
T.B-01 (C5-C6) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
TB-32 (C2-C16) to (C3-C17)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
TB-32 (C3-C17) to (C4-C18)
1 X 1 X 4.57 X 0.23 X 0.50 = 0.53 cum
TB-32 (C4-C18) to (C5-C19)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
TB-32 (C5-C19) to (C6-C20)
1 X 1 X 4.59 X 0.23 X 0.50 = 0.53 cum
SB-32 (C2-C16) to (C3-C17)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
SB-32 (C3-C17) to (C4-C18)
1 X 1 X 4.57 X 0.23 X 0.50 = 0.53 cum
SB-32 (C4-C18) to (C5-C19)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
SB-32 (C5-C19) to (C6-C20)
1 X 1 X 4.59 X 0.23 X 0.50 = 0.53 cum
TB-06 (C15-C16) 1 X 1 X 2.70 X 0.23 X 0.50 = 0.31 Cum
TB-06 (C16-C17) 1 X 1 X 4.54 X 0.23 X 0.50 = 0.52 Cum
TB-06 (C17-C18) 1 X 1 X 4.44 X 0.23 X 0.50 = 0.51 Cum
TB-06 (C18-C19) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
TB-06 (C19-C20) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
TB-08 (C27-C28) 1 X 1 X 2.70 X 0.23 X 0.50 = 0.31 Cum
TB-08 (C28-C29) 1 X 1 X 4.54 X 0.23 X 0.50 = 0.52 Cum
TB-08 (C29-C30) 1 X 1 X 4.44 X 0.23 X 0.50 = 0.51 Cum
B/F = 10.36 Cum

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particulars Nos x Nos x L x B x H = Quantity Unit
C/O = 10.36 cum
TB-08 (C30-C31) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
TB-08 (C31-C32) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
TB-34 (C40-C28) to (C41-C29)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
TB-34 (C41-C29) to (C42-C30)
1 X 1 X 4.57 X 0.23 X 0.50 = 0.53 cum
TB-34 (C42-C30) to (C43-C31)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
TB-34 (C43-C31) to (C44-C32)
1 X 1 X 4.59 X 0.23 X 0.50 = 0.53 cum
SB-34 (C40-C28) to (C41-C29)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
SB-34 (C41-C29) to (C42-C30)
1 X 1 X 4.57 X 0.23 X 0.50 = 0.53 cum
SB-34 (C42-C30) to (C43-C31)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
SB-34 (C43-C31) to (C44-C32)
1 X 1 X 4.59 X 0.23 X 0.50 = 0.53 cum
TB-10 (C40-C41) 1 X 1 X 4.54 X 0.23 X 0.50 = 0.52 Cum
TB-10 (C41-C42) 1 X 1 X 4.44 X 0.23 X 0.50 = 0.51 Cum
TB-10 (C42-C43) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
TB-10 (C43-C44) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum

TB-30 (Sub Beam)(C2-C3) 1 X 1 X 2.82 X 0.23 X 0.50 = 0.32 Cum

TB-30 (Sub Beam)(C3-C4) 1 X 1 X 2.86 X 0.23 X 0.50 = 0.33 Cum

TB-30 (Sub Beam)(C4-C5) 1 X 1 X 2.72 X 0.23 X 0.50 = 0.31 Cum

TB-30 (Sub Beam)(C5-C6) 1 X 1 X 2.89 X 0.23 X 0.50 = 0.33 Cum

TB-30 (Sub Beam)(C40-C41) 1 X 1 X 2.82 X 0.23 X 0.50 = 0.32 Cum

TB-30 (Sub Beam)(C41-C42) 1 X 1 X 2.85 X 0.23 X 0.50 = 0.33 Cum

TB-30 (Sub Beam)(C42-C43) 1 X 1 X 2.77 X 0.23 X 0.50 = 0.32 Cum

TB-30 (Sub Beam)(C43-C44) 1 X 1 X 2.81 X 0.23 X 0.50 = 0.32 Cum

Lateral Direction
TB-12 (C1-C15) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
TB-12 (C15-C27) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
TB-13 (C2-C16) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
B/F = 21.76 Cum

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particulars Nos x Nos x L x B x H = Quantity Unit
C/O = 21.76 Cum
TB-13 (C16-C28) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
TB-13 (C28-C40) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
TB-14 (C3-C17) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
TB-14 (C17-C29) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
TB-14 (C29-C41) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
TB-15 (C4-C18) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
TB-15 (C18-C30) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
TB-15 (C30-C42) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
TB-16 (C5-C19) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
TB-16 (C19-C31) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
TB-16 (C31-C43) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
TB-17 (C6-C20) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
TB-17 (C20-C32) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
TB-17 (C32-C44) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
TB-31 (Sub Beam)(TB1-TB32)(C2-C6)
4 X 1 X 2.40 X 0.23 X 0.50 = 1.10 Cum
TB-31 (Sub Beam)(TB10-TB34)(C40-C44)
4 X 1 X 2.40 X 0.23 X 0.50 = 1.10 Cum
ASO'S MESS Building L/H Side R.C.C 3rd slab
(TB12-TB13)TO(TB01-TB06)
30)(C2-C3) 1 X 1 X 5.96 X 2.67 X 0.18 = 2.78 Cum

(TB13-TB31)(TB1-TB
30)(C2-C3) 1 X 1 X 2.81 X 1.20 X 0.15 = 0.51 Cum

(TB13-TB31)(TB30-TB
32)(C2-C3) 1 X 1 X 2.81 X 0.98 X 0.15 = 0.41 Cum

(TB31-TB14)(TB01-TB
32)(C2-C3) 1 X 1 X 2.40 X 1.64 X 0.15 = 0.59 Cum

(TB13-TB14)(TB32- X X X X =
1 1 4.66 3.34 0.15 2.33 Cum
TB06)(C16-C17)
(TB14-TB31)(TB01-TB32)(C3- X X X X =
1 1 2.40 1.64 0.15 0.59 Cum
C4)
(TB31-TB15)(TB01-TB30)(C3- X X X X =
1 1 2.86 1.20 0.15 0.51 Cum
C4)
(TB31-TB15)(TB30-TB32)(C3- X X X X =
1 1 2.86 0.98 0.15 0.42 Cum
C4)
(TB14-TB15)(TB32-TB06)(C17- X X X X =
1 1 4.69 3.34 0.15 2.35 Cum
C18)
(TB15-TB31)(TB01-TB30)(C4- X X X X =
1 1 2.72 1.20 0.15 0.49 Cum
C5)
(TB15-TB31)(TB30-TB32)(C4- X X X X =
1 1 2.72 0.98 0.15 0.40 Cum
C5)

B/F = 41.77 Cum

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particulars Nos x Nos x L x B x H = Quantity Unit

C/O = 41.77 Cum

(TB31-TB16)(TB01- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
TB32)(C4-C5)
(TB15-TB16)(TB32- X X X X =
1 1 4.56 3.34 0.15 2.28 Cum
TB06)(C18-C19)

(TB1-TB32)(TB16-TB31)(C5-C6) 1 X 1 X 2.40 X 1.61 X 0.15 = 0.58 Cum

(TB31-TB17)(TB1 X X X X =
1 1 2.89 1.20 0.15 0.52 Cum
-TB30)(C5-C6)
(TB31-TB17)(TB30-TB32)(C5- X X X X =
1 1 2.89 0.98 0.15 0.42 Cum
C6)
(TB16-TB17)(TB32 X X X X =
1 1 4.74 3.34 0.15 2.37 Cum
-TB06)(C19-C20)

(C15-C16) to(C27-C28) 1 X 1 X 2.67 X 1.80 X 0.15 = 0.72 Cum

(C16-C17) to(C28-C29) 1 X 1 X 4.66 X 1.80 X 0.15 = 1.26 Cum

(C17-C18) to(C29-C30) 1 X 1 X 4.69 X 1.80 X 0.15 = 1.27 Cum

(C18-C19) to(C30-C31) 1 X 1 X 4.56 X 1.80 X 0.15 = 1.23 Cum

(C19-C20) to(C31-C32) 1 X 1 X 4.74 X 1.80 X 0.15 = 1.28 Cum

(TB13-TB14)(TB08-TB34)(C28- X X X X =
1 1 4.66 3.10 0.15 2.17 Cum
C29)
(TB34-TB10)(TB13-TB31)(C40- X X X X =
1 1 2.40 1.65 0.15 0.59 Cum
C41)
(TB31-TB14)(TB34- X X X X =
1 1 2.82 1.20 0.15 0.51 Cum
TB30)(C40-C41)
(TB31-TB14)(TB30-TB10)(C40- X X X X =
1 1 2.82 0.98 0.15 0.41 Cum
C41)
(TB14-TB15)(TB08-TB34)(C29- X X X X =
1 1 4.69 3.10 0.15 2.18 Cum
C30)
(TB14-TB31)(TB34- X X X X =
1 1 2.85 1.20 0.15 0.51 Cum
TB30)(C41-C42)
(TB14-TB31)(TB30- X X X X =
1 1 2.85 0.98 0.15 0.42 Cum
TB10)(C41-C42)
(TB34-TB10)(TB31- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
TB15)(C41-C42)
(TB15-TB16)(TB08- X X X X =
1 1 4.56 3.10 0.15 2.12 Cum
TB34)(C30-C31)
(TB34-TB10)(TB15- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
TB31)(C42-C43)
(TB31-TB16)(TB34- X X X X =
1 1 2.77 1.20 0.15 0.50 Cum
TB30)(C42-C43)
B/F = 64.85 Cum

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particulars Nos x Nos x L x B x H = Quantity Unit

C/O = 64.85 Cum


(TB31-TB16)(TB30-TB10)(C42- X X X X =
1 1 2.77 0.98 0.15 0.41 Cum
C43)
(TB16-TB17)(TB08- X X X X =
1 1 4.74 3.10 0.15 2.20 Cum
TB34)(C31-C32)
TB16-TB31)(TB34- X X X X =
1 1 2.81 1.20 0.15 0.51 Cum
TB30)(C43-C44)
(TB16-TB31)(TB30- X X X X =
1 1 2.81 0.98 0.15 0.41 Cum
TB10)(C43-C44)
(TB34-TB10)(TB31-TB17)(C43- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
C44)
Projected Slab Connected To Bottom Of Beam at Balcony

SB-1 (C2-C3) 1 X 1 X 4.68 X 1.20 X 0.10 = 0.56 Cum


SB-1 (C3-C5) 1 X 1 X 7.47 X 1.20 X 0.10 = 0.90 Cum
SB-1 (C5-C6) 1 X 1 X 3.95 X 1.20 X 0.10 = 0.47 Cum
SB-13 (C40-C42) 1 X 1 X 7.56 X 1.20 X 0.10 = 0.91 Cum
SB-13 (C42-C44) 1 X 1 X 7.47 X 1.20 X 0.10 = 0.90 Cum
Slab Connected To Bottom Of Beam at Door & Window (Chajja)
SB-15 (C15-C27) 1 X 1 X 2.44 X 0.60 X 0.10 = 0.15 Cum
SB-16 (C28-C40) 1 X 1 X 2.96 X 0.60 X 0.10 = 0.18 Cum
SB-11 (C27-C28) 1 X 1 X 2.07 X 0.60 X 0.10 = 0.12 Cum
Total Quantity (Cum) = 73.15 Cum
C/O TCMB / P -

Date of Measurement

Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and removal of form for

3.2.5 : Lintels, beams, plinth beams, girders, bressumers and cantilevers.

Particular x Nos x L x B x H = Quantity Unit


ASO'S MESS Building L/H Side Shuttering work for R.C.C 3rd floor Slab Beam
Linear Direction
TB-1 (C1-C2)
Outer Side 1 X 1 X 2.70 X 0.50 X - = 1.35 Sqm
1 X 1 X 2.70 X 0.35 X - = 0.95 Sqm
Bottom 1 X 1 X 2.70 X 0.23 X - = 0.62 Sqm
TB-1 (C2-C3)
1 X 1 X 2.69 X 0.30 X - = 0.81 Sqm
Outer Side
1 X 1 X 1.02 X 0.50 X - = 0.51 Sqm
1 X 1 X 2.69 X 0.35 X - = 0.94 Sqm
Inner Side
1 X 1 X 1.62 X 0.35 X - = 0.57 Sqm
B/F = 5.75 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit
C/O = 5.75 sqm
Bottom 1 X 1 X 4.54 X 0.23 X - = 1.04 Sqm
TB-1 (C3-C4)
1 X 1 X 0.90 X 0.50 X - = 0.45 Sqm
Outer Side
1 X 1 X 2.59 X 0.30 X - = 0.78 Sqm
1 X 1 X 1.50 X 0.35 X - = 0.53 Sqm
Inner Side
1 X 1 X 2.59 X 0.35 X - = 0.91 Sqm
Bottom 1 X 1 X 4.44 X 0.23 X - = 1.02 Sqm
TB-1 (C4-C5)
1 X 1 X 2.71 X 0.30 X - = 0.81 Sqm
Outer Side
1 X 1 X 1.02 X 0.50 X - = 0.51 Sqm
1 X 1 X 2.71 X 0.35 X - = 0.95 Sqm
Inner Side
1 X 1 X 1.62 X 0.35 X - = 0.57 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
TB-1 (C5-C6)
1 X 1 X 0.90 X 0.50 X - = 0.45 Sqm
Outer Side
1 X 1 X 2.64 X 0.30 X - = 0.79 Sqm
1 X 1 X 1.50 X 0.35 X - = 0.53 Sqm
Inner Side
1 X 1 X 2.64 X 0.35 X - = 0.92 Sqm
Bottom 1 X 1 X 4.49 X 0.23 X - = 1.03 Sqm
TB-32 (TB13-TB14)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
TB-32 (TB14-TB15)
Side 1 X 2 X 4.57 X 0.35 X - = 3.20 Sqm
Bottom 1 X 1 X 4.57 X 0.23 X - = 1.05 Sqm
TB-32 (TB15-TB16)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
TB-32 (TB16-TB17)
Side 1 X 2 X 4.59 X 0.35 X - = 3.21 Sqm
Bottom 1 X 1 X 4.59 X 0.23 X - = 1.05 Sqm
SB-32 (TB13-TB14)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
SB-32 (TB14-TB15)
Side 1 X 2 X 4.57 X 0.35 X - = 3.20 Sqm
Bottom 1 X 1 X 4.57 X 0.23 X - = 1.05 Sqm
SB-32 (TB15-TB16) B/F = 43.87 sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit
C/O = 43.87 Sqm
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
SB-32 (TB16-TB17)
Side 1 X 2 X 4.59 X 0.35 X - = 3.21 Sqm
Bottom 1 X 1 X 4.59 X 0.23 X - = 1.05 Sqm
TB-06 (C15-C16)
Side 1 X 2 X 2.70 X 0.35 X - = 1.89 Sqm
Bottom 1 X 1 X 2.70 X 0.23 X - = 0.62 Sqm
TB-06 (C16-C17)
Side 1 X 2 X 4.54 X 0.35 X - = 3.18 Sqm
Bottom 1 X 1 X 4.54 X 0.23 X - = 1.04 Sqm
TB-06 (C17-C18)
Side 1 X 2 X 4.44 X 0.35 X - = 3.11 Sqm
Bottom 1 X 1 X 4.44 X 0.23 X - = 1.02 Sqm
TB-06 (C18-C19)
Side 1 X 2 X 4.56 X 0.35 X - = 3.19 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
TB-06 (C19-C20)
Side 1 X 2 X 4.49 X 0.35 X - = 3.14 Sqm
Bottom 1 X 1 X 4.49 X 0.23 X - = 1.03 Sqm
TB-08 (C27-C28)
Side 1 X 2 X 2.70 X 0.35 X - = 1.89 Sqm
Bottom 1 X 1 X 2.70 X 0.23 X - = 0.62 Sqm
TB-08 (C28-C29)
Side 1 X 2 X 4.54 X 0.35 X - = 3.18 Sqm
Bottom 1 X 1 X 4.54 X 0.23 X - = 1.04 Sqm
TB-08 (C29-C30)
Side 1 X 2 X 4.44 X 0.35 X - = 3.11 Sqm
Bottom 1 X 1 X 4.44 X 0.23 X - = 1.02 Sqm
TB-08 (C30-C31)
Side 1 X 2 X 4.56 X 0.35 X - = 3.19 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
TB-08 (C31-C32)
Side 1 X 2 X 4.49 X 0.35 X - = 3.14 Sqm
Bottom 1 X 1 X 4.49 X 0.23 X - = 1.03 Sqm
TB-34 (TB13-TB14)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
TB-34 (TB14-TB15)
Side 1 X 2 X 4.57 X 0.35 X - = 3.20 Sqm
B/f = 98.55 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit
C/O = 98.55 Sqm
Bottom 1 X 1 X 4.57 X 0.23 X - = 1.05 Sqm
TB-34 (TB15-TB16)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
TB-34 (TB16-TB17)
Side 1 X 2 X 4.59 X 0.35 X - = 3.21 Sqm
Bottom 1 X 1 X 4.59 X 0.23 X - = 1.05 Sqm
SB-34 (TB13-TB14)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
SB-34 (TB14-TB15)
Side 1 X 2 X 4.57 X 0.35 X - = 3.20 Sqm
Bottom 1 X 1 X 4.57 X 0.23 X - = 1.05 Sqm
SB-34 (TB15-TB16)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
SB-34 (TB16-TB17)
Side 1 X 2 X 4.59 X 0.35 X - = 3.21 Sqm
Bottom 1 X 1 X 4.59 X 0.23 X - = 1.05 Sqm
TB-10 (C40-C41)
1 X 1 X 0.90 X 0.50 X - = 0.45 Sqm
Outer Side
1 X 1 X 2.81 X 0.30 X - = 0.84 Sqm
1 X 1 X 1.50 X 0.35 X - = 0.53 Sqm
Inner Side
1 X 1 X 2.81 X 0.35 X - = 0.98 Sqm
Bottom 1 X 1 X 4.54 X 0.23 X - = 1.04 Sqm
TB-10 (C41-C42)
1 X 1 X 2.71 X 0.30 X - = 0.81 Sqm
Outer Side
1 X 1 X 0.90 X 0.50 X - = 0.45 Sqm
1 X 1 X 2.71 X 0.35 X - = 0.95 Sqm
Inner Side
1 X 1 X 1.50 X 0.35 X - = 0.53 Sqm
Bottom 1 X 1 X 4.44 X 0.23 X - = 1.02 Sqm
TB-10 (C42-C43)
1 X 1 X 0.90 X 0.50 X - = 0.45 Sqm
Outer Side
1 X 1 X 2.83 X 0.30 X - = 0.85 Sqm
1 X 1 X 1.62 X 0.35 X - = 0.57 Sqm
Inner Side
1 X 1 X 2.83 X 0.35 X - = 0.99 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
TB-10 (C43-C44)
Outer Side 1 X 1 X 2.760 X 0.300 X - = 0.83 Sqm
B/F = 137.73 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit
C/O = 137.73 Sqm
1 X 1 X 0.90 X 0.50 X - = 0.45 Sqm
1 X 1 X 2.76 X 0.35 X - = 0.97 Sqm
Inner Side
1 X 1 X 1.50 X 0.35 X - = 0.53 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
TB-30 (Sub Beam)(C2-C3)
Side 1 X 2 X 2.82 X 0.35 X - = 1.97 Sqm
Bottom 1 X 1 X 2.82 X 0.23 X - = 0.65 Sqm
TB-30 (Sub Beam)(C3-C4)
Side 1 X 2 X 2.86 X 0.35 X - = 2.00 Sqm
Bottom 1 X 1 X 2.86 X 0.23 X - = 0.66 Sqm
TB-30 (Sub Beam)(C4-C5)
Side 1 X 2 X 2.72 X 0.35 X - = 1.90 Sqm
Bottom 1 X 1 X 2.72 X 0.23 X - = 0.63 Sqm
TB-30 (Sub Beam)(C5-C6)
Side 1 X 2 X 2.89 X 0.35 X - = 2.02 Sqm
Bottom 1 X 1 X 2.89 X 0.23 X - = 0.66 Sqm
TB-30 (Sub Beam)(C40-C41)
Side 1 X 2 X 2.82 X 0.35 X - = 1.97 Sqm
Bottom 1 X 1 X 2.82 X 0.23 X - = 0.65 Sqm
TB-30 (Sub Beam)(C41-C42)
Side 1 X 2 X 2.85 X 0.35 X - = 2.00 Sqm
Bottom 1 X 1 X 2.85 X 0.23 X - = 0.66 Sqm
TB-30 (Sub Beam)(C42-C43)
Side 1 X 2 X 2.77 X 0.35 X - = 1.94 Sqm
Bottom 1 X 1 X 2.77 X 0.23 X - = 0.64 Sqm
TB-30 (Sub Beam)(C43-C44)
Side 1 X 2 X 2.81 X 0.35 X - = 1.97 Sqm
Bottom 1 X 1 X 2.81 X 0.23 X - = 0.65 Sqm
Lateral Direction
TB-12 (C1-C15)
Outer Side 1 X 1 X 5.40 X 0.50 X - = 2.70 Sqm
1 X 1 X 0.94 X 0.35 X - = 0.33 Sqm
Inner Side
1 X 1 X 4.23 X 0.50 X - = 2.12 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
TB-12 (C15-C27)
Outer Side 1 X 1 X 1.77 X 0.40 X - = 0.71 Sqm
B/F = 168.80 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit
C/O = 168.80 Sqm
Inner Side 1 X 1 X 1.77 X 0.35 X - = 0.62 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
TB-13 (C2-C16)
1 X 1 X 4.23 X 0.50 X - = 2.12 Sqm
Outer Side
1 X 1 X 0.94 X 0.35 X - = 0.33 Sqm
1 X 1 X 0.92 X 0.35 X - = 0.32 Sqm
Inner Side 1 X 1 X 0.98 X 0.35 X - = 0.34 Sqm
1 X 1 X 3.04 X 0.35 X - = 1.06 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
TB-13 (C16-C28)
Side 1 X 2 X 1.77 X 0.35 X - = 1.24 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
TB-13 (C28-C40)
1 X 1 X 2.69 X 0.40 X - = 1.08 Sqm
Outer Side
1 X 1 X 2.48 X 0.50 X - = 1.24 Sqm
1 X 1 X 2.81 X 0.35 X - = 0.98 Sqm
Inner Side
1 X 1 X 2.13 X 0.35 X - = 0.75 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
TB-14 (C3-C17)
1 X 2 X 2.13 X 0.35 X - = 1.49 Sqm
Side
1 X 2 X 3.04 X 0.35 X - = 2.13 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
TB-14 (C17-C29)
Side 1 X 2 X 1.77 X 0.35 X - = 1.24 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
TB-14 (C29-C41)
1 X 2 X 2.81 X 0.35 X - = 1.97 Sqm
Side 1 X 2 X 0.98 X 0.35 X - = 0.69 Sqm
1 X 2 X 0.92 X 0.35 X - = 0.64 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
TB-15 (C4-C18)
1 X 2 X 0.92 X 0.35 X - = 0.64 Sqm
Side 1 X 2 X 0.98 X 0.35 X - = 0.69 Sqm
1 X 2 X 3.04 X 0.35 X - = 2.13 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
TB-15 (C18-C30) B/F = 197.83 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit
C/O = 197.83 Sqm
Side 1 X 2 X 1.77 X 0.35 X - = 1.24 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
TB-15 (C30-C42)
1 X 2 X 2.81 X 0.35 X - = 1.97 Sqm
Side
1 X 2 X 2.13 X 0.35 X - = 1.49 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
TB-16 (C5-C19)
1 X 2 X 2.13 X 0.35 X - = 1.49 Sqm
Side
1 X 2 X 3.04 X 0.35 X - = 2.13 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
TB-16 (C19-C31)
Side 1 X 2 X 1.77 X 0.35 X - = 1.24 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
TB-16 (C31-C43)
1 X 2 X 2.81 X 0.35 X - = 1.97 Sqm
Side 1 X 2 X 0.98 X 0.35 X - = 0.69 Sqm
1 X 2 X 0.92 X 0.35 X - = 0.64 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
TB-17 (C6-C20)
1 X 1 X 0.92 X 0.35 X - = 0.32 Sqm
Inner Side 1 X 1 X 0.98 X 0.35 X - = 0.34 Sqm
1 X 1 X 3.04 X 0.35 X - = 1.06 Sqm
Outer Side 1 X 1 X 5.40 X 0.50 X - = 2.70 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
TB-17 (C20-C32)
Inner Side 1 X 1 X 1.77 X 0.35 X - = 0.62 Sqm
Outer Side 1 X 1 X 1.77 X 0.50 X - = 0.89 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
TB-17 (C32-C44)
1 X 1 X 2.81 X 0.35 X - = 0.98 Sqm
Inner Side
1 X 1 X 2.13 X 0.35 X - = 0.75 Sqm
Outer Side 1 X 1 X 5.17 X 0.50 X - = 2.59 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
TB-31 (Sub Beam)(TB1-TB32)(C2-C6)
4 X 1 X 1.19 X 0.35 X - = 1.67 Sqm
Side 4 X 1 X 0.98 X 0.35 X - = 1.37 Sqm
4 X 1 X 2.40 X 0.35 X - = 3.36 Sqm
Bottom 4 X 1 X 2.40 X 0.23 X - = 2.21 Sqm
TB-31 (Sub Beam)(TB10-TB34)(C40-C44)
4 X 1 X 2.40 X 0.35 X - = 3.36 Sqm
Side 4 X 1 X 0.98 X 0.35 X - = 1.37 Sqm
4 X 1 X 1.19 X 0.35 X - = 1.67 Sqm
Bottom 4 X 1 X 2.400 X 0.230 X - = 2.21 Sqm
Total Quantity (Sq.m) = 245.44 Sqm
C/O TCMB / P -

Sign by Contractor Checked by JE Checked by AE Checked by EE


Date of Measurement
Centering and shuttering including strutting, propping etc. and removal of
Agreement No. 3.2 :
form for

3.2.3 : suspended floor s, roof ,landings balconies and access platform

Particular x Nos x L x B x H = Quantity Unit


ASO'S MESS Building L/H Side Shuttering Work For R.C.C 3rd Slab
(TB12-TB13)(TB1-TB06)
X 1 X 5.96 X 2.67 X - = 15.91 Sqm

(TB13-TB31)(TB1-TB
30)(C2-C3) X 1 X 2.81 X 1.20 X - = 3.37 Sqm

(TB13-TB31)(TB30-TB
32)(C2-C3) X 1 X 2.81 X 0.98 X - = 2.75 Sqm

(TB31-TB14)(TB01-TB
32)(C2-C3) X 1 X 2.40 X 1.62 X - = 3.89 Sqm

(TB13-TB14)(TB32- X X X X - =
1 4.66 3.34 15.56 Sqm
TB06)(C16-C17)
(TB14-TB31)(TB01-TB32)(C3- X X X X - =
1 2.40 1.62 3.89 Sqm
C4)
(TB31-TB15)(TB01-TB30)(C3- X X X X - =
1 2.86 1.20 3.43 Sqm
C4)
(TB31-TB15)(TB30-TB32)(C3- X X X X - =
1 2.86 0.98 2.80 Sqm
C4)
(TB14-TB15)(TB32-TB06)(C17- X X X X - =
1 4.69 3.34 15.66 Sqm
C18)
(TB15-TB31)(TB01-TB30)(C4- X X X X - =
1 2.72 1.20 3.26 Sqm
C5)
(TB15-TB31)(TB30-TB32)(C4- X X X X - =
1 2.72 0.98 2.67 Sqm
C5)
(TB31-TB16)(TB01- X X X X - =
1 2.40 1.62 3.89 Sqm
TB32)(C4-C5)
(TB15-TB16)(TB32- X X X X - =
1 4.56 3.34 15.23 Sqm
TB06)(C18-C19)

(TB1-TB32)(TB16-TB31)(C5-C6) X 1 X 2.40 X 1.61 X - = 3.86 Sqm

(TB31-TB17)(TB1 X X X X - =
1 2.89 1.20 3.47 Sqm
-TB30)(C5-C6)
(TB31-TB17)(TB30-TB32)(C5- X X X X - =
1 2.89 0.98 2.83 Sqm
C6)
(TB16-TB17)(TB32 X X X X - =
1 4.74 3.34 15.83 Sqm
-TB06)(C19-C20)

(C15-C16) to(C27-C28) X 1 X 2.80 X 1.80 X - = 5.04 Sqm

(C16-C17) to(C28-C29) X 1 X 4.66 X 1.80 X - = 8.39 Sqm

B/F = 131.73 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


Particular x Nos x L x B x H = Quantity Unit

C/O = 131.73 Sqm

(C17-C18) to(C29-C30) X 1 X 4.69 X 1.80 X - = 8.44 Sqm

(C18-C19) to(C30-C31) X 1 X 4.56 X 1.80 X - = 8.21 Sqm

(C19-C20) to(C31-C32) X 1 X 4.74 X 1.80 X - = 8.53 Sqm

(TB13-TB14)(TB08-TB34)(C28- X X X X - =
1 4.74 3.10 14.69 Sqm
C29)
(TB34-TB10)(TB13-TB31)(C40- X X X X - =
1 2.40 1.62 3.89 Sqm
C41)
(TB31-TB14)(TB34- X X X X - =
1 2.82 1.20 3.38 Sqm
TB30)(C40-C41)
(TB31-TB14)(TB30-TB10)(C40- X X X X - =
1 2.82 0.98 2.76 Sqm
C41)
(TB14-TB15)(TB08-TB34)(C29- X X X X - =
1 4.69 3.10 14.54 Sqm
C30)
(TB14-TB31)(TB34- X X X X - =
1 2.85 1.20 3.42 Sqm
TB30)(C41-C42)
(TB14-TB31)(TB30- X X X X - =
1 2.85 0.98 2.79 Sqm
TB10)(C41-C42)
(TB34-TB10)(TB31- X X X X - =
1 2.40 1.62 3.89 Sqm
TB15)(C41-C42)
(TB15-TB16)(TB08- X X X X - =
1 4.56 3.10 14.14 Sqm
TB34)(C30-C31)
(TB34-TB10)(TB15- X X X X - =
1 2.40 1.62 3.89 Sqm
TB31)(C42-C43)
(TB31-TB16)(TB34- X X X X - =
1 2.77 1.20 3.32 Sqm
TB30)(C42-C43)
(TB31-TB16)(TB30-TB10)(C42- X X X X - =
1 2.77 0.98 2.71 Sqm
C43)
(TB16-TB17)(TB08- X X X X - =
1 4.74 3.10 14.69 Sqm
TB34)(C31-C32)
TB16-TB31)(TB34- X X X X - =
1 2.81 1.20 3.37 Sqm
TB30)(C43-C44)
(TB16-TB31)(TB30- X X X X - =
1 2.81 0.98 2.75 Sqm
TB10)(C43-C44)
(TB34-TB10)(TB31-TB17)(C43- X X X X - =
1 2.40 1.62 3.89 Sqm
C44)
Projected Slab Connected To Bottom Of Beam at Balcony
TB-1 (C2-C3)
Bottom X 1 X 4.68 X 1.20 X - = 5.62 Sqm
X 1 X 4.68 X 0.10 X - = 0.47 Sqm
Side
X 2 X 1.20 X 0.10 X - = 0.24 Sqm
TB-1 (C3-C5)
Bottom X 1 X 7.47 X 1.20 X - = 8.96 Sqm
B/F = 270.32 Sqm

Sign by Contractor Checked by JE Checked by AE Checked by EE


C/O = 270.32 Sqm
X 1 X 7.47 X 0.10 X - = 0.75 Sqm
Side
X 2 X 1.20 X 0.10 X - = 0.24 Sqm
TB-1 (C5-C6)
Bottom X 1 X 3.95 X 1.20 X - = 4.74 Sqm
X 1 X 3.95 X 0.10 X - = 0.40 Sqm
Side
X 2 X 1.20 X 0.10 X - = 0.24 Sqm
TB-10 (C40-C42)
Bottom X 1 X 7.56 X 1.20 X - = 9.07 Sqm
X 1 X 7.56 X 0.10 X - = 0.76 Sqm
Side
X 2 X 1.20 X 0.10 X - = 0.24 Sqm
TB-10 (C42-C44)
Bottom X 1 X 7.47 X 1.20 X - = 8.96 Sqm
X 1 X 7.47 X 0.10 X - = 0.75 Sqm
Side
X 2 X 1.20 X 0.10 X - = 0.24 Sqm
Slab Connected To Bottom Of Beam at Door & Window (Sazza)
TB-12 (C15-C27)
Bottom X 1 X 2.44 X 0.60 X - = 1.46 Sqm
Side X 1 X 2.44 X 0.10 X - = 0.24 Sqm
X 2 X 0.60 X 0.10 X - = 0.12 Sqm
TB-13 (C28-C40)
Bottom X 1 X 2.96 X 0.60 X - = 1.78 Sqm
X 1 X 2.90 X 0.10 X - = 0.29 Sqm
Side
X 1 X 0.60 X 0.10 X - = 0.06 Sqm
TB-08 (C27-C28)
Bottom X 1 X 2.07 X 0.60 X - = 1.24 Sqm
X 1 X 1.47 X 0.10 X - = 0.15 Sqm
Side
X 1 X 0.600 X 0.100 X - = 0.06 Sqm
Total Quantity (Sqm) = 302.11 Sqm
C/O TCMB / P - 0

Sign by Contractor Checked by JE Checked by AE Checked by EE


Agreement No. 3.2.8 : Edges of slabs and breaks in floors and wallsfor
3.2.8.1 : Under 20 cm wide
Particular x Nos x L x B x H = Quantity Unit
Slab edge shuttering
Projected Slab Connected To Bottom Of Beam at Balcony
TB-1 (C2-C3) 1 X 4.68 X - - = 4.68 mtr
Side 2 X 1.20 X - - = 2.40 mtr
TB-1 (C3-C5) 1 X 7.47 X - - = 7.47 mtr
2 X 1.20 X - - = 2.40 mtr
Side

TB-1 (C5-C6) 1 X 3.95 X - - = 3.95 mtr


2 X 1.20 X - - = 2.40 mtr
Side

TB-1 (0C40-C42) 1 X 7.56 X - - = 7.56 mtr


2 X 1.20 X - - = 2.40 mtr
Side

TB-10 (C42-C44) 1 X 7.47 X - - = 7.47 mtr


2 X 1.20 X - - = 2.40 mtr
Side

Slab Connected To Bottom Of Beam at Door & Window (chajja)


TB-12 (C15-C27) 1 X 2.440 X - - = 2.44 mtr
Side 2 X 0.600 X - - = 1.20 mtr

TB-13 (C28-C40) 1 X 2.900 X - - = 2.90 mtr


1 X 0.600 X - - = 0.60 mtr
Side

TB-08 (C27-C28) 1 X 1.470 X - - = 1.47 mtr


Side 1 X 0.600 X - - = 0.60 mtr
Total Quantity = 52.34 mtr

C/O TCMB -

Sign by Contractor Checked by JE Checked by AE Checked by EE


ABSTRACT OF COST 5th R.A. Bill
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia
1 Name of work : Sonapur (Assam) including water supply, sanitary installation & internal electrical
installation.
2 Agreement No- : 04/CE/EE/PD/2020-21
3 Agency - : M/s Khatri Enterprises
4 Date of Start : 10.08.2020

5 Date of Complittion : 09.08.2021

6 Time Allowed : 12 (Twelve) months

7 Date of completion (Actual) : Work in Progress

8 Date of Abstract : 6/26/2023


9 Sl.No Of Bill : 5th R.A bill

Item Rate
Description B/F Page No. Quantity Unit :
No. Agmnt in this bill

Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding
1.2 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated
earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
1.2.1 All kinds of soil
Agrt. Qnty - 1080.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 1109.13

Total 1109.13 cum :


As per agreement qty. 1080.00 cum 175.55 175.55 cum :
Qty upto Deviation Limit 29.13 cum 175.55 175.55 cum :

Earth Work in excavation by mechanical means ( Hydraulic exavator) / manual means in foundation trenches
1.3 or drains (not exceeding 1.5m in width or 10 sqm on plan), including getting out the excavated soil and
disposal of surplus excavated soil as directed within a lead of 50m

1.3.1 All Kinds of Soil


Agrt. Qnty - 192.00 Cum
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 159.63
cum
Total 159.63 227.00 227.00 :
cum cum

Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding
1.5.1
20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m.

Agrt. Qnty - 1015.00Cum


Qty. B/F CMB No COM/ITBP/PD-II/860
1137.75
vide Page No. cum
Total 1137.75 cum 160.05 160.05 cum :

1.6 Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.

1.6.1 All kinds of soil

Agrt. Qnty - 269.00 Cum


Qty. B/F CMB No COM/ITBP/PD-II/860
:
vide Page No. 315.68 cum
Total 315.68 cum :
As per agreement qty. 269.00 cum 65.65 65.65 cum :
Qty upto Deviation Limit 46.68 cum 65.65 65.65 cum :
B/F =
c/O =
Supplying and filling in plinth with sand under floors, including watering, ramming, consolidation and dressing
1.7
complete.
Agrt. Qnty -103.00 cum
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 71.62 cum
Total 71.62 cum 1265.05 1265.05 cum :
Providing and laying in position cement concrete of specified grade excluding the cost of centering and
2.1
shuttering - All work upto plinth level:

1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural sources : 10 graded stone aggregate 40 mm
2.1.2
nominal size derived from natural sources )
Agrt. Qnty - 142.97 Cum
Qty. B/F CMB No COM/ITBP/PD-II/860
86.86
vide Page No. cum
Total 86.86 cum 5524.40 5524.40 cum :
3.2 Centering and shuttering including strutting, propping etc. and removal of form for
3.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Agrt. Qnty - 413.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
386.26
vide Page No. sqm
Total 386.26 sqm 234.05 234.05 Sqm :
3.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Agrt. Qnty - 367.24 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
93.92 sqm
vide Page No.
Qty B/F TCMB 51.80 sqm
Total 145.72 sqm 500.05 500.05 Sqm :
3.2.3 suspended floor s, roof ,landings balconies and access platform
Agrt. Qnty - 2273.75 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
868.07 sqm
vide Page No.
Qty B/F TCMB 8.48 sqm
Qty B/F TCMB 302.11 sqm
Total 1178.66 sqm 546.55 546.55 Sqm :
3.2.5
Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Agrt. Qnty - 2964.90 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 1183.71 sqm

Qty B/F TCMB 6.04 sqm


Qty B/F TCMB 245.44 sqm
Total 1435.19 sqm 432.70 432.70 Sqm :
3.2.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Agrt. Qnty - 998.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
605.33 sqm
vide Page No.
Qty B/F TCMB 108.00 sqm
Qty B/F TCMB 17.28 sqm
Qty B/F TCMB 29.74 sqm
Total 760.35 sqm 579.15 579.15 Sqm :
3.2.7 Stairs,(excluding landings) except spiral-staircases
Agrt. Qnty - 159.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
67.23 sqm
vide Page No.
Qty B/F TCMB 17.53 sqm
Total 84.76 sqm 579.15 579.15 Sqm :
B/F =
3.2.8 Edges of slabs and breaks in floors and wallsfor C/O =
3.2.8.1 Under 20 cm wide
Agrt. Qnty - 212.00 mtr
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 143.68
mtr.
Qty B/F TCMB 6.00 mtr.
Qty B/F TCMB 52.34 mtr.
Total 202.02 mtr. 159.65 159.65 mtr :
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
3.3
complete upto plinth level.
3.3.1 Thermo-Mechanically Treated bars of grade Fe-500D or more..
Agrt. Qnty - 37500.00 kg
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 23685.45

Total 23685.45 kg 75.55 75.55 kg :


Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
3.4
complete above plinth level.
3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more..
Agrt. Qnty - 67000.00 kg
Qty. B/F CMB No COM/ITBP/PD-II/860
41185.42 Kg
vide Page No.
Qty B/F TCMB 923.12 Kg
Qty B/F TCMB 4128.34 Kg
Qty B/F TCMB 5911.57 Kg
Qty B/F TCMB 88.26 Kg
Qty B/F TCMB 3835.69 Kg
Qty B/F TCMB 643.77 Kg
Total 56716.17 kg 75.55 75.55 kg :

Providing and laying in position machine batched and machine mixed design mix M-25 grade cement
concrete for reinforced cement concrete work, using coarse aggregate as well as fine aggregate derived
from natural sources and cement content as per approved design mix, including pumping of concrete to site
3.6
of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including
admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as per direction of Engineer-in-charge

3.6.1 All works upto plinth level.


Agrt. Qnty - 265.00 cum
Qty. B/F CMB No COM/ITBP/PD-II/860
263.19 Cum
vide Page No.
Total 263.19 cum 8084.30 8084.30 cum :
3.6.2 All works above plinth level upto floor V level
Agrt. Qnty - 560.00 cum
Qty. B/F CMB No COM/ITBP/PD-II/860
267.51 Cum
vide Page No.
Qty B/F TCMB 4.87 Cum
Qty B/F TCMB 11.24 Cum
Qty B/F TCMB 4.00 Cum
Qty B/F TCMB 1.84 Cum
Qty B/F TCMB 3.74 Cum
Qty B/F TCMB 73.15 Cum
Total 366.35 cum
Total (A) 76.89 cum 9098.00 6823.50 cum
Total (B) 289.46 cum 9098.00 9098.00 cum

4.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in :

4.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)


Agrt. Qnty - 88.00cum
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 48.03
Total 48.03 cum 7879.85 7879.85 cum :
10.1 12 mm Cement Plaster of Mix :
10.1.1 1:4 (1 Cement : 4 coarse sand)
Agrt. Qnty - 3220.00 sqm
Qty. B/F CMB No COM/ITBP/PD-II/860
vide Page No. 262.00 sqm

Total 262.00 sqm 231.05 231.05 sqm :

Total :
Contractor enhancement. @3.65% (below) :
Gross value upto work done
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable
E/S-1 material within 50 metres lead as per direction of Engineer-in-charge.
:

In Cement Mortar :
Qty. B/F CMB No COM/ITBP/PD-II/860
10.18 cum
vide Page No.
Total 10.18 cum 1698.45 1273.84 cum :

E/S-2 Add for using extra cement in the items of design mix over and above the specified cement content therein

Qty B/F TCMB 35 Qtl


Total 0.00 Qtl 0.00 0.00 Qtl :

Gross value upto work done


Less already paid in 4TH RA Bill
Gross value in this bill :
RECOVERIES:
1 Security Deposit @ 2.5% on "Gross value " : 60694.00
Already recovered in pervious bill :
Now to be recovered : 60694.00

2 Income Tax @2% on 2,427,754.08 : 48555.00

3 WWC @1% on 2,427,754.08 : 24278.00

4 CGST @ 1% on 2,427,754.08 : 24278.00

5 SGST @ 1% on 2,427,754.08 : 24278.00

TOTAL RECOVERY: : (-)

Net value in this bill :


Say = Rs.

Certify that:-
1. The work has been done as per CPWD specification and agreement
2. No Govt. T&P has been issued to the contractor
3. No Labour complaint has been received so far.
4. Water has been arranged by the contractor at his own source.
5. Contractor has engaged technical staff.
6. F.N.Labour report has been submitted by the contractor

Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
5th R.A. Bill

Gross value upto work done


Less already paid in 4th RA Bill
Gross value in this bill :

RECOVERIES:
1 Security Deposit @ 2.5% on "Gross value " : 60694.00
Already recovered in pervious bill :
Now to be recovered : 60694.00

2 Income Tax @2% on 2,427,754.08 : 48555.00

3 WWC @1% on 2,427,754.08 : 24278.00

4 CGST @ 1% on 2,427,754.08 : 24278.00

5 SGST @ 1% on 2,427,754.08 : 24278.00

6 Mildstone S.L no 1 to 4 = 4% already withheld at 4th R.A Bill

TOTAL RECOVERY: : (-)

Net value in this bill :


Say = Rs.

Certify that:-
1. The work has been done as per CPWD specification and agreement
2. No Govt. T&P has been issued to the contractor
3. No Labour complaint has been received so far.
4. Water has been arranged by the contractor at his own source.
5. Contractor has engaged technical staff.
6. F.N.Labour report has been submitted by the contractor

Executive Engineer
Project Division
Page 1 CPWD, guwahati-15
bn, ITBP at Karchia
ternal electrical

Amount

189594.00
5113.77

36236.01

182096.89

17659.85
3064.54
433765.06
433765.06

90602.88

479849.38

90404.15

72867.29

644196.62

621006.71

440356.70

49088.75
2922137.54
2922137.54

32252.49

1789435.75

4284906.51

2127706.92

524658.92
2633507.08

378469.20

60535.10

14753609.51
-538506.75
14215102.76
12967.67

0.00

14228070.43
11800316.35
2427754.08

-182083.00

2245671.08
Rs.2,245,671.00

Engineer
ect Division
Assam
14228070.43
11800316.35
2427754.08

-182083.00

2245671.08
Rs.2,245,671.00

Engineer
Division
wahati-15
Abstract of steel

Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur
1 Name of Work:-
(Assam) including water supply, sanitary installation & internal electrical installation.

2 Agreement No.:- 04/CE/EE/PD/2020-21

3 Agency:- M/s Khatri Enterprises

4 Sl.No Of Bill 5th R.A Bill

5 Date of Entry 8/25/2023


Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all
3.4
complete above plinth level.
Thermo-Mechanically Treated bars of grade Fe-500D or more.
3.4.1

REINFORCEMENT (TMT BAR)


Item Page Total in
Reference MB No.
No. No. 8mm 10 mm 12 mm 16 mm 20mm 25 mm ( Kg )

B/F TCMB 0.00 0.00 213.83 709.29 0.00 0.00 923.12

B/F TCMB 450.25 995.43 391.90 2261.70 29.06 0.00 4128.34

B/F TCMB 0.00 5755.73 155.84 0.00 0.00 0.00 5911.57

B/F TCMB 0.00 88.26 0.00 0.00 0.00 0.00 88.26

B/F TCMB 0.00 1045.82 0.00 339.71 836.24 1613.92 3835.69

B/F TCMB 7.63 169.17 376.78 90.19 0.00 0.00 643.77

Total 457.88 8054.41 1138.35 3400.89 865.30 1613.92 15530.75

Total In(Kg) Kg Kg Kg Kg Kg Kg kg

Junior Engineer Assistant Engineer


Sonapur Project Sub Division-II Sonapur Project Sub Division-II
CPWD, Assam CPWD, Assam
INNER SHEET
4th R.A Bill
1 Name of work Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam) including water
supply, sanitary installation & internal electrical installation.

2 Agreement No. 04/CE/EE/PD/2020-21


3 Name of Agency M/s Khatri Enterprises
4 Stp. date of start 10.08.2020
5 Stp. date of completion 09.08.2021
6 Actual date of completion Work in Progress
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
1.2 Earth work in excavation by mechanical means (Hydraulic excavator)/manual
means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm
on plan) including getting out and disposal of excavated earth lead upto 50 m
and lift upto 1.5 m, as directed by Engineer-in-charge.

1.2.1 All kinds of soil


Total 1109.13 Cum
As Per Agrrement Qty. 1080.00 cum 175.55 175.55 189,594.00 189,594.00 0.00
Qty Upto Deviation Limit 29.13 cum 175.55 175.55 5,113.77 5,113.77 0.00
1.3 Earth Work in excavation by mechanical means ( Hydraulic exavator) / manual
means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm
on plan), including getting out the excavated soil and disposal of surplus
excavated soil as directed within a lead of 50m
1.3.1 All Kinds of Soil
Total 159.63 cum 227.00 227.00 36,236.01 36,236.01 0.00
1.5.1 Filling available excavated earth (excluding rock) in trenches, plinth, sides of
foundation etc. in layers not exceeding 20cm in depth, consolidating each
deposited layer by ramming and watering, lead up to 50m and lift upto 1.5m.

Total 1137.75 Cum 160.05 160.05 182,096.89 182,096.89 0.00


1.6 Extra for every additional lift of 1.5 m or part thereof in excavation / banking
excavated or stacked materials.
1.6.1 All kinds of soil
Total 315.68 Cum
As Per Agrrement Qty. 269.00 Cum 65.65 65.65 17,659.85 17,659.85 0.00
Qty Upto Deviation Limit 46.68 Cum 65.65 65.65 3,064.54 3,064.54 0.00
1.7 Supplying and filling in plinth with sand under floors, including watering,
ramming, consolidation and dressing complete.
Total 71.62 Cum 1265.05 1265.05 90,602.88 90,602.88 0.00
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
2.1 Providing and laying in position cement concrete of specified grade excluding the
cost of centering and shuttering - All work upto plinth level:

2.1.2 1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural sources : 10
graded stone aggregate 40 mm nominal size derived from natural sources )

Total 86.86 Cum 5524.40 5524.40 479,849.38 479,849.38 0.00


3.2 Centering and shuttering including strutting, propping etc. and removal of form for

3.2.1 Foundations, footings, bases of columns, etc. for mass concrete


Total 386.26 Sqm 234.05 234.05 90,404.15 90,404.15 0.00
3.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string
courses etc.

Total 145.72 Sqm 500.05 500.05 72,867.29 46,964.70 25902.59


3.2.3 suspended floor s, roof ,landings balconies and access platform

Total 1178.66 Sqm 546.55 546.55 644,196.62 474,443.66 169752.96


3.2.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers.

Total 1435.19 Sqm 432.70 432.70 621,006.71 512,191.32 108815.39


3.2.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Total 760.35 Sqm 579.15 579.15 440,356.70 350,576.87 89779.83
3.2.7 Stairs,(excluding landings) except spiral-staircases
Total 84.76 Sqm 579.15 579.15 49,088.75 38,936.25 10152.50
3.2.8 Edges of slabs and breaks in floors and wallsfor
3.2.8.1 Under 20 cm wide
Total 202.02 mtr 159.65 159.65 32,252.49 22,938.51 9313.98
3.3 Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.

3.3.1 Thermo-Mechanically Treated bars of grade Fe-500D or more..

Total 23685.45 Kg 75.55 75.55 1,789,435.75 1,789,435.75 0.00


Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete above plinth level.

3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more..


Total 56716.17 Kg 75.55 75.55 4,284,906.51 3,111,558.48 1173348.03
3.6 Providing and laying in position machine batched and machine mixed design
mix M-25 grade cement concrete for reinforced cement concrete work, using
coarse aggregate as well as fine aggregate derived from natural sources
and cement content as per approved design mix, including pumping of concrete
to site of laying but excluding the cost of centering, shuttering, finishing and
reinforcement, including admixtures in recommended proportions as per IS: 9103
to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge

3.6.1 All works upto plinth level.


Total 263.19 Cum 8084.30 8084.30 2,127,706.92 2,127,706.92 0.00
3.6.2 All works above plinth level upto floor V level

Total 366.35 cum


Total (A) 76.89 cum 9098.00 6823.50 524,658.92 624,896.13 -100237.21
Total (B) 289.46 cum 9098.00 9098.00 2,633,507.08 1,600,611.14 1032895.94
4.1 Brick work with common burnt clay F.P.S. (non modular) bricks of class
designation 7.5 in foundation and plinth in :
4.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)
Total 48.03 cum 7879.85 7879.85 378,469.20 378,469.20 0.00
10.1 12 mm Cement Plaster of Mix :
10.1.1 1:4 (1 Cement : 4 coarse sand)
Total 262.00 sqm 231.05 231.05 60,535.10 60,535.10 0.00
Total 14,753,609.51 12,233,885.50 2519724.01
Contractor enhancement. @3.65% (below) -538,506.75 -446,536.82 -91,969.93
Total 14,215,102.76 11,787,348.68 2,427,754.08
Rate Since
Item No. Description of Items Qty. Unit Upto date In previous bill
Agmnt In this bill Previous
E/S-1 Demolishing brick work manually/ by mechanical means including stacking of
serviceable material and disposal of unserviceable material within 50 metres lead
as per direction of Engineer-in-charge.
In Cement Mortar
Total 10.18 cum 1698.45 1273.84 12,967.67 12,967.67 0.00

E/S-2 Add for using extra cement in the items of design mix over and above the
specified cement content therein

Total 189.12 Qtl 0.00 0.00 - - 0.00

Total 14,228,070.43 11,800,316.35 2,427,754.08

Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
Based On DSR 2021 Item No 5.35
EIS-II Add for using extra cement in the items of design mix over and
above the specified cement content therein

Code Description Unit Quantity Rate Amount


Details of cost for 1 Quintal.
MATERIAL:

0367 Portland Cement tonne 0.100 7343.80 734.38


2209 Carriage of Cement tonne 0.100 0.00 0.00
TOTAL 734.38
7.34
Add for water charge @ 1 %
Total 741.72

Add for 12% GST applicable on work contract


by reversible method (multiplying fqactor 104.21
0.1405)

Total 845.94
126.89
Add for contractor’s profit and over-heads @ 15%
Total 972.83

Cost of 1 Quintal 972.83


Say 972.85
PROFORMA FOR SUBMISSION OF BILL

5th R.A Bill


1 Name of work : : Construction of 45 Nos. SO
Accomodation ) for 33rd bn, ITBP at
(Assam) including water supply, sani
internal electrical installation.

2 Agreement No. : 04/CE/EE/PD/2020-21

3 Estimate amount : 5,90,40,588.00

4 Tendered Amount : 5,68,85,607.00

5 Name of Agency: : M/s Khatri Enterprises

6 Time Allowed as per agreement: : 12 (Twelve) months


7 Work in Progress/ Date of Completion : Work in progress

8 Is there any delay in completion whether : Yes


application of extension of Time Received.

9 Amount of Test Check by the AE : Yes

10 Is theoritcal calculation statement submitted : NA


for the item of store issued?

11 Is any balance materials? if so whose : Nil


custody these are?

12 Is Cement Register maintain in proper : Yes


form ?

13 Is materials issued upto date shown in the : Nil


recovery statement?

14 Is approved design & drawings being : Yes


followed?

15 Is dia-wise statement of steel submitted? : Yes

16 How much Extra/Sub Item Executed? : Nil

17 Wheather proper permission obtained to : Nil


execute the exta Subs. Item?

18 Position of abnormally high low rate item : No any


statement
19 Is foundation and other imprtant item : Nil
recorded as per CPWD 23AE

20 Is all item Executed as per CPWD : Yes


Specification?

21 Where from water supplied for the work? : Tube well

22 Is any Departmental T & P issued? : No

23 Completion report if recorded in case of final :


bill

24 Is labour report submitted timely? (Report to : Yes


be enclosed)

25 Is Engineer (Diploma/ Degree) holder : Yes


engaged by the Contractor?

26 Position of Dismentled materilas : Nil

27 Any other point to be brough to the notice of : Nil


the Divisional officer
PROFORMA FOR SUBMISSION OF BILL

5th R.A Bill


Construction of 45 Nos. SO's suites (ASI
Accomodation ) for 33rd bn, ITBP at Karchia Sonapur
(Assam) including water supply, sanitary installation &
internal electrical installation.

04/CE/EE/PD/2020-21

5,90,40,588.00

5,68,85,607.00

M/s Khatri Enterprises

12 (Twelve) months
Work in progress

No any
Assistant Engineer
SPSD-II, Project Division
CPWD, (Assam)
5th R/A Bill C.P.W.A.-26 (Revised)
RUNNING ACCOUNT BILL
(Referred to in Paragraph 10-2-10 and 10-2-12)
(Final Payment must invariably the made on forms Printed on Yellow paper which should not be used for intermediate payment)

(For Contractor : This form provides for (1) advance payment (2) Payment for Measured Works. The form of Account Secured Advance wh
has been printed separately should be attached, where necessary).

Division : PD Sub Division: -

Cash Book voucher No. :


M/s Khatri Enterprises
Name of Contractor :
Name of work : Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd
ITBP at Karchia Sonapur (Assam) including water supply, san
installation & internal electrical installation.

Serial No. of this Bill : 5th R.A bill


No. & Date of the previous bill of this work :
Reference to Agreement No. : 04/CE/EE/PD/2020-21
Date of written Order to commence work:- :
Date of actual completion of work:- : Work in progress

I. ACCOUNT OF WORK EXECUTED


Payment on the basis of actual
Item of works (grouped under "sub-head" and measurements
Unit Rate
"sub-works" of estimate) Since previous
Up-to-date bill
1 2 3 4 5 6
Rs. P. Rs. P. Rs. P.

[Details as per Inner sheet enclosed]


Certified that

1. The work has been done as per CPWD specification as per direction of Engineer in charge

2. No Govt. T&P has been issued to the contractor

3. No Labour complaint has been received so far.

4. Water and electricity has been arranged by the contractor at his own source.

5. Clause 36 has been complied


6. F.N.Labour report has been submitted by the contractor

7) Necessary Mandatory tests have been conducted.

Total value of work done to date(a) Rs. 14228070.43


Deduct value of work shown on previous Bill. 11800316.35
Net value of work since previous bill(F) Rs. 2427754.08

N.B.-- When there are two or more entries in column 6 relating to each Sub-head of estimate they should in case of work the accoun
of which are kept by sub-heads be totalled and the recorded in column 7 for posting the work abstract.
II. Certificate & Signature

1. The measurement on which are based the entires in column 1 to 6 of account I were verified by JE, SPSD-II on ____________
are recorded at Computer Measurement Book No.

2. Certified that in addition to and quite a part from the quantities of work actually executed as shown in column 4 of the account I so
work has actually been done in connection with several items and the value of such work after deducting there from proportionate
amount of required advance if any ultimately recoverable on account of the materials used therein) is in no case less than the advan
payment as per item 2 of the memorandum if payments made or proposed to be made for the convenience of the contractor in
anticipation of and subject to the result of detailed measurements which will be made as such as possible.

Dated Signature of Officer (………………………………….


preparing the Bill Assistant Engineer
SPSD-II, Project Division
CPWD, Sonapur Assam

Dated Signature of Dated Signature of Officer (………………………………….


Contractor authorising payment (Rank …………………………..)

* This certificate must be signed by Sub Divisional Officer or Divisional Officer.


* This signature is necessary only when the officer who prepares the bill is not the officer who authorizes the
payment. In case a case the two signature are essential.
III Memorandum of Payments

1 Total value of work actually measured, as per Acct. 1, col. 5 entry (A)
2 Total up-to-date, advance payment for work not yet measured, as per details give
below : Rs. P.
a) Total as per Previous bill (-)

b) Since previous bill………………………….as per page………..………..of ) (Advance payment)


M. B. No……………………………………… (D)
3
Total 'up-to-date secured advance on security of materials as per annexure form (26-A) Col. 8 Entry (C)
….. …… …. ….. …..
4 Total Items (1-2+3) ….. …… …. ….. …..
5 Deduct amounts withhold-----
Figure for work abstract (a) From Previous bill as per last Running Account bill ….
Rs. P. (b) From this bill Rs. P.
6 Balance i.e. "up-to-date" payments item 4--5) ----(K*)
7. Total amount of payments already made as per entry (K) of last Running Acc
Bill Voucher
Less No….advance
Mobilisation dated ………..….. forwarded with accounts for CMB No.
Less Secured Advance advance
8. Payments now to be made as detailed below :
Rs. P. Rs. P.
a) By recovery of amount creditable
to this work (a)
…..………C.O.T.….……………… 0.00
Total 5 (b) + 8 (a) (G)
b) By recovery amount creditable to
other work or heads of account--- (b)

i) Security Deposit 2.5% 60,694.00


ii) EMD already deposite
Now to be recovered 60,694.00
iii) Income tax Recovery @2% 48,555.00
iv) LW Cess deduct @ 1% on 24,278.00
v) CGST @ 1% 24,278.00
vi) SGST @ 1% 24,278.00

Net Payable Amount


Pay Rs. 2245671/-

Dated initials of Disbursing Officer


Executive Engineer
Project Division
CPWD, Guwahati-15
Received Rs.
as per above memorandum on acount of this work.
Received Rs.
Dated ……………………… STAMP

* Witness ………………… Signature of Contractor

Checked Account Clerk Divisional Accountant

Paid by me vide cheque **No. Dated………


Dated initials of person actually making the payment

*This figure should be tested to see that it agree with the total of item 7 & 8.
If the net amount be paid is less than Rs.10 and it cannot be included in cheque the payment should be made in cash this entry b
alteered suitable and the alteration attested by dated initials.

@ Here specify the net amount payable vide item 8 (C)


== The Payee's acknowledgement should be for the amount paid as per item 8 (i.e.a+b+c)
* Payment should be attested by some known person when payee's acknowledgement is given by a mark seal or th
impression.

Remarks
This space is reserved for any remarks which the Disbursing Officer of the Divisional Officer may wish to recorded in respe
the execution of the work check of measurements or the state of contractor's amount.

FOR USE IN DIVISIONAL OFFICE

Checked

Accounts Clerk Divisional Accountant

FOR USE IN ACCOUNTANT GENERAL'S OFFICE

Computer Classification

Checked with schedule


of rates / checked with
rates as per agreement

Auditor Superintendent Gazetted Officer


C.P.W.A.-26 (Revised)
UNNING ACCOUNT BILL
red to in Paragraph 10-2-10 and 10-2-12)
on forms Printed on Yellow paper which should not be used for intermediate payment)

e payment (2) Payment for Measured Works. The form of Account Secured Advance which
ed separately should be attached, where necessary).

SPSD-II

Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,


ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.

5th R.A bill

04/CE/EE/PD/2020-21

ACCOUNT OF WORK EXECUTED

Remarks

7
6 relating to each Sub-head of estimate they should in case of work the accounts
corded in column 7 for posting the work abstract.

in column 1 to 6 of account I were verified by JE, SPSD-II on ____________ and

e quantities of work actually executed as shown in column 4 of the account I some


al items and the value of such work after deducting there from proportionate
ble on account of the materials used therein) is in no case less than the advance
ts made or proposed to be made for the convenience of the contractor in
asurements which will be made as such as possible.

Dated Signature of Officer (………………………………….

SPSD-II, Project Division


CPWD, Sonapur Assam

Dated Signature of Officer (………………………………….


authorising payment (Rank …………………………..)

who prepares the bill is not the officer who authorizes the
sential.
` P.
14228070.43

11800316.35

0.00
2427754.08

0.00

2427754.08

----(K*)
. Total amount of payments already made as per entry (K) of last Running Account
Bill Voucher No…. dated ………..….. forwarded with accounts for CMB No.
0.00

2427754.08

182083.00

2245671.08

2245671.00

Dated initials of Disbursing Officer


Executive Engineer
Project Division
CPWD, Guwahati-15

this work.

Signature of Contractor

Dated………
nd it cannot be included in cheque the payment should be made in cash this entry being
initials.

nown person when payee's acknowledgement is given by a mark seal or thumb

Remarks
h the Disbursing Officer of the Divisional Officer may wish to recorded in respect of
ts or the state of contractor's amount.

USE IN DIVISIONAL OFFICE

Divisional Accountant

ACCOUNTANT GENERAL'S OFFICE

Reviewed
RECOVERY STATEMENT

DIVISION: Project Division, CPWD, Guwahati Sub-division: SPSDII,Sonapur _____________________


Sl No. of Bill 5th R/A Bill
Name of work: Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam) including water supply,
sanitary installation & internal electrical installation.

Work Order no: 04/CE/EE/PD/2020-21 Agency: M/s Khatri Enterprises

2427754.08
GROSS TOTAL VALUE OF WORK DONE

1. Security Deposit 2.5% on Gross/Tendered Amount Rs.________ 0.00 i.e. Rs. 60694.00

2. Income Tax 2% on Rs.________0.00 i.e. Rs. 48555.00

3. WWC 1% Rs.________48555.00 i.e. Rs. 24278.00

4. Education Cess 3% on I.T. and S.C. Rs.________0.00 i.e. Rs. 0.00

5. Labour welfare cess 1% on Gross value Rs.________ 0.00 i.e. Rs. 0.00

6. GST 2%
(a) CGST 1% Rs.________ 0.00 i.e. Rs. 24278.00
(b) SGST 1% Rs.________ 0.00 i.e. Rs. 24278.00

7 Forest Royalty (As per Statement) Rs.________ 0.00 i.e. Rs. 0.00
Total recovery Rs. 182083.00

Assistant Engineer
SPSD II,PD
Assam,Guwahati
5th R.A Bill

PART RATE STATEMENT


1 Name of Work: Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,
ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.

2 Agency: M/s Khatri Enterprises


6 Date of Start (Stp.): 10.08.2020
7 Date of Completion(Stp.): 09.08.2021
8 Time Allowed: 365 Days
Rate
Sl. No. Description Qty Provisional Per Remarks
Full
Rate

Providing and laying in position machine


batched and machine mixed design mix M-25
grade cement concrete for reinforced cement
concrete work, using coarse aggregate as well
as fine aggregate derived from natural
sources and cement content as per approved
design mix, including pumping of concrete to
3.6
site of laying but excluding the cost of
centering, shuttering, finishing and
reinforcement, including admixtures in
recommended proportions as per IS: 9103 to
accelerate, retard setting of concrete, improve
workability without impairing strength and
durability as per direction of Engineer-in-charge

Curing on Progress.
28 Days Test Report
3.6.2 All works upto plinth level. 76.89 9098.00 6823.50 Cum Awaited

Demolishing brick work manually/ by mechanical


means including stacking of serviceable material
E/S-1 and disposal of unserviceable material within 50
metres lead as per direction of Engineer-in-
charge.

Extra Item not to be


In Cement Mortar 10.18 1698.45 1273.84 cum
Sanctioned Yet

Assistant Engineer/SPSD-II Executive Engineer


Theoritical Consumption of Cement Statement
1 Name of Work: Construction of 45 Nos. SO's suites (ASI Accomodation )
for 33rd bn, ITBP at Karchia Sonapur (Assam) including
water supply, sanitary installation & internal electrical
installation.

2 Agency: M/s Khatri Enterprises


3 Agreement No.: 04/CE/EE/PD/2020-21
4 Time Allowed: 12 (Twelve) months
5 Sl. No. of bill 5th RA Bill
Sl. N. Description of item Qty Unit Co. off (In Qtl) Cement Reqd.
Providing and laying in position cement concrete of
2.1 specified grade excluding the cost of centering and
shuttering - All work upto plinth level:
1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from
2.1.2 natural sources : 10 graded stone aggregate 40 mm 86.86 Cum 1.30 (Qtl/cum) 112.92 Qntal
nominal size derived from natural sources )

Providing and laying in position machine batched and


machine mixed design mix M-25 grade cement concrete
for reinforced cement concrete work, using coarse
aggregate as well as fine aggregate derived from
natural sources and cement content as per approved
design mix, including pumping of concrete to site of
3.6
laying but excluding the cost of centering, shuttering,
finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate,
retard setting of concrete, improve workability without
impairing strength and durability as per direction of
Engineer-in-charge:

3.6.1 All works upto plinth level. 263.19 Cum 4.076 (Qtl/cum) 1,072.76 Qntal
3.6.2 All works above plinth level upto floor V level 366.35
47.95 Cum 4.076 (Qtl/cum) 195.44 Qntal
318.40 Quantity Excuted By R.M.C

Brick work with common burnt clay F.P.S. (non modular)


4.1
bricks of class designation 7.5 in foundation and plinth in :

4.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) 48.03 cum 0.625 (Qtl/cum) 30.02 Qntal
10.1 12 mm Cement Plaster of Mix :
10.1.1 1:4 (1 Cement : 4 coarse sand) 262.00 sqm 0.055 (Qtl/Sqm) 14.33 Qntal

1,425.47
Variation (+2%) 28.51 Qtl
1,453.98 Qtl
2,908.00 Bags
Variation (-2%) 28.51 Qtl
2,879.49 Bags
Qty brought at site = 2895.00 Bags
Actual Consumption = 2865.00 Bags
Balance = 30.00 Bags

Junior Engineer Assistant Engineer


Sonapur Project Sub Division-II Sonapur Project Sub Division-II
CPWD, Assam CPWD, Assam
Dia Wise Steel Consumption Statement
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam) including water
Name of Work : supply, sanitary installation & internal electrical installation.

Agency: M/s Khatri Enterprises

Agreement No. : 04/CE/EE/PD/2020-21

Date of Start as per agreement 10.08.2020

Stipulated Date of completion : 09.08.2021

Serial No of This Bill : 5th R.A Bill

Thermo Mechanically Treated Bars


Description Page No. Total Unit
8 mm 10 mm 12mm 16 mm 20 mm 25 mm
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
3.3 upto plinth level.

3.3.1 Thermo-Mechanically Treated bars of grade Fe-500D or more..

upto 4TH R.A Bill 1007.31 4096.32 4178.86 11489.85 899.94 2013.17 23685.45

Total (A) = 1007.31 4096.32 4178.86 11489.85 899.94 2013.17 23685.45 Kgs
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
3.4 above plinth level.

3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more..

upto 4TH R.A Bill 2424.70 17907.01 2507.78 10881.22 2968.88 3976.05 40665.64

In this Bill 457.88 8054.41 1138.35 3400.89 865.30 1613.92 15530.75

Total (B) = 2882.58 25961.42 3646.13 14282.11 3834.18 5589.97 56196.39 Kgs

TOTAL (A+B) 3889.89 30057.74 7824.99 25771.96 4734.12 7603.14 79881.84 Kgs

Add 3% Wastage 116.70 901.73 234.75 773.16 142.02 228.09 2396.45 Kgs

GRAND TOTAL 4006.59 30959.47 8059.74 26545.12 4876.14 7831.23 82278.29 Kgs

TOTAL (In M.T) 4.01 30.96 8.06 26.55 4.88 7.83 82.28 M.T

Brought at site (In M.T) 5.57 35.00 9.66 29.37 9.47 9.56 98.63 M.T

Junior Engineer Assistant Engineer


SPSD CPWD SPSD, CPWD
C.P.W.A-26A
ACCOUNTS OF SECURED ADVANCES (Referred to in Paragraphs 10.2.12)
Division: Project Division II Sub-Division: SPSD-II Name of Contractor: M/s Khatri Enterprises
Name of work:- Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.

S.No. of the Bill to which the accounts pertains: 5th RA Bill


Reference to Agreement No : 04/CE/EE/PD/2020-21 Cash Book Voucher No. Dated
Account of secured advances allowed on the security of material brought to site
Reasons for non
Deduct qty. Full Rates as Reference of Divn.
Qty. out *Qty outstanding I/c Reduced rate **Up-to-date clearance of advance
utilised in works assessed by Description of Officers written
standing from qty. brought to site Unit at which Amount of when outstanding for
measured since the Divisional materials orders authorising
previous Bill since previous bill advance is paid advance more than three
previous Bill Officer the advance.
Months.
1 2 3 4 5 6 7 8 9 10
16.19 16.19 0.00 36950.00 TMT Bars MT 26960.00 0.00

0.00
Say 0.00
* Total amount outstanding as per this account © Rs. 0.00
Deduct :- amount outstanding as per entry (C) of Annexure to previous bil Rs. 0.00
Net Amount since Previous bill (in words) 0.00
(-) (E) Rs. 0.00

* Entries relating to each description of materials should be posted thus in column 3 first enter the difference between quantities in column 1 and 2 then show below this entry, the
quantities of any brought to site against which a f
** Entries in column 8 show the money values of the total quantities outstanding as per column 3.
*** Certified (1) that the plus quantities of materials shown in the column 3 of the account have actually been brought by the Contractor at site of the work and the Contractor has not
previously received any advance on these quantities.
(2) that these materials are of an imperishable nature and all required by the contractor for use on the work in connection with the items for which rates for finished work have been
agreed upon .
(3) that a formal agreement in form 31 signed and executed by the Contractor in accordance with the pragraphs 10.2.24 (a) of the CPWD Account Code is recorded in the Divisional
Office
(4) The quality of materilas is as per the specifications.

Dated Signature of Officer preparing the bill (Rank) Dated Signature of Officer authorising payment (Rank)
Assistant Engineer(Civil) Executive Engineer
Sonapur Project Sub Division-II Project Division-II
CPWD, Guwahati-15 CPWD, Guwahati-15.
*** These Certificate must be signed by the Sub-Divisional or Divisional Officer.
# This signature is necessary only when officer who prepares the bill is not the Officeer who authorises the payment.
In such case the two signatures are essential.
0 7/1/2023 TO 7/15/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.

3. Agreement no:- 04/CE/EE/PD/2020-21

4. Stipulated Date of Start:- 10.08.2020

5. Stipulated Date of Completion:- 09.08.2021

(A) Number of Workers employed (B) Wages Paid (E) No.


Of
Total Amount female
Daily Rate
Sl. NO. Category Male Female Total Paid dg. The (C) workers (F) The (G)
of Wages (D) Amount of
period Working who accident that Remarks
overtime wages
Hours have occurred drg. (if any)
been
I II III IV V I II allowed
to

1. Unskilled 105 105 ₹ 550.00 57750 8:00 AM


to 12:00
2. Semiskilled 51 51 ₹ 650.00 33150 Noon &
3. Skilled 32 32 ₹ 700.00 22400 1:00 PM
to 5:00
4. Highly Skilled 25 25 ₹ 800.00 20000 PM

TOTAL : ₹ 133,300.00

Signature of Contractor

Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 7/16/2023 TO 7/31/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.

3. Agreement no:- 04/CE/EE/PD/2020-21

4. Stipulated Date of Start:- 10.08.2020

5. Stipulated Date of Completion:- 09.08.2021


(E) No.
(A) Number of Workers employed (B) Wages Paid Of
female
Total Amount (C) workers (F) The (G)
Daily Rate (D) Amount of
Sl. NO. Category Male Female Total Paid dg. The Working who accident that Remarks
of Wages overtime wages
period Hours have occurred drg. (if any)
been
I II III IV V I II allowed
1. Unskilled 98 98 ₹ 550.00 53900 to
8:00 AM
to 12:00
2. Semiskilled 65 65 ₹ 650.00 42250 Noon &
3. Skilled 40 40 ₹ 700.00 28000 1:00 PM
to 5:00
4. Highly Skilled 26 26 ₹ 800.00 20800 PM

TOTAL : ₹ 144,950.00

Signature of Contractor

Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 8/1/2023 TO 8/15/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.

3. Agreement no:- 04/CE/EE/PD/2020-21

4. Stipulated Date of Start:- 10.08.2020

5. Stipulated Date of Completion:- 09.08.2021

(A) Number of Workers employed (B) Wages Paid (E) No.


Of
Total Amount female
Daily Rate (C) workers (F) The (G)
Sl. NO. Category Male Female Total Paid dg. The (D) Amount of
of Wages Working who accident that Remarks
period overtime wages
Hours have occurred drg. (if any)
been
I II III IV V I II allowed
to

1. Unskilled 112 112 ₹ 550.00 61600 8:00 AM


to 12:00
2. Semiskilled 84 84 ₹ 650.00 54600 Noon &
3. Skilled 71 71 ₹ 700.00 49700 1:00 PM
to 5:00
4. Highly Skilled 36 36 ₹ 800.00 28800 PM

TOTAL : ₹ 194,700.00

Signature of Contractor

Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 8/16/2023 TO 8/25/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.

3. Agreement no:- 04/CE/EE/PD/2020-21

4. Stipulated Date of Start:- 10.08.2020

5. Stipulated Date of Completion:- 09.08.2021


(E) No.
(A) Number of Workers employed (B) Wages Paid Of
female
Total Amount (C) workers (F) The (G)
(D) Amount of
Daily Rate Working who accident that Remarks
Sl. NO. Category Male Female Total Paid dg. The overtime wages
of Wages Hours have occurred drg. (if any)
period
been
allowed
I II III IV V I II to
1. Unskilled 84 84 ₹ 550.00 46200 8:00 AM
to 12:00
2. Semiskilled 60 60 ₹ 650.00 39000 Noon &
3. Skilled 45 45 ₹ 700.00 31500 1:00 PM
to 5:00
4. Highly Skilled 24 24 ₹ 800.00 19200 PM

TOTAL : ₹ 135,900.00

Signature of Contractor

Date :
TEST CHECK STATEMENT
1 Name of Work :- Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at
Karchia Sonapur (Assam) including water supply, sanitary installation & internal
electrical installation.

2 Agreement No. :- 04/CE/EE/PD/2020-21


3 Agency :- M/s Khatri Enterprises
4 Division :- PD
5 Sub-Division :- SPSD-II
6 Serial No. of Bill :- 5th R.A Bill

Ref. of Amount of
SL
No.
Description of Items MB & Quantity Amount of AE Test Check EE Test
page Check

Upto 4th R.A Bill Rs. 6,746,977.00


In This Bill
Upto Date Total Rs. 6,746,977.00

Amount in this bill ` 2,427,754.08


Gross amount of Work ` 14,228,070.43

47.42

Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
r 33rd bn, ITBP at
tallation & internal

Remarks

Engineer
ect Division
Assam
MANDATORY TEST
5th R.A Bill
1 Name of Work: Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia
Sonapur (Assam) including water supply, sanitary installation & internal electrical
installation.
2 Agency: M/s Khatri Enterprises
3 Agreement No.: 04/CE/EE/PD/2020-21
4 Estimated Cost: Rs.59,040,588.00
5 Tender Amount: 5,68,85,607.00

6 Date of Start (Stp.): 10.08.2020

Date of
7 09.08.2021
Completion(Stp.):
8 Time Allowed: 365 Days

Remarks/
Frequency as per No. of tests No of tests
Sl. No. Description of item Qty Upto date Qty Reasons for
specification required. actually done
shortfall, if any.

5 nos Report
Awaited ( Work
suspended
1 Water Test 22 Months 3 Months 8 Nos 8 Nos 8 Nos 14/7/21-7/3/22
17/3/22-5/10/22
12/10/22-
14/3/23)
2 Steel Test
8mm dia 5.57 tonne 25 tonnes 1 No. 1 No. 4 No. Satisfactory
10mm dia 35.00 tonne 35 tonnes 2 No. 2 No. 5 No. Satisfactory
12 mm dia 9.66 tonne 35 tonnes 2 No. 2 No. 4 No. Satisfactory
16mm dia 29.37 tonne 35 tonnes 2 No. 2 No. 5 No. Satisfactory
20mm dia 9.47 tonne 35 tonnes 2 No. 2 No. 4 No. Satisfactory
25mm dia 9.56 tonne 45 tonnes 1 Nos. 1 Nos. 3 No. Satisfactory
1Nos test Report
3 Cement Test 2895.00 Bags 1000 Bags 3 Nos. 3 Nos. 6 Nos. Awaited
1Nos lab test
4 Cube Test of RCC M-25 629.54 Cum 50 Cum 14 Nos. 14 Nos. 31 Nos. Report Awaited
1Nos test Report
5 Slump Test M-25 629.54 Cum 50 Cum 14 Nos. 14 Nos. 54 Nos. Awaited
8 Brick test 24000.00 Nos. 50000 Nos. 1 Nos. 1 Nos. 1 Nos. Satisfactory
6 Coarse Sand
i) Bulking Test 358.11 Cum 20 Cum 18 Nos. 14 Nos. 17 Nos. Satisfactory
ii) Silt Content Test. 358.11 Cum 20 Cum 18 Nos. 14 Nos. 17 Nos. Satisfactory
iii) Particle Size Distribution. 358.11 Cum 40 Cum 9 Nos. 7 Nos. 8 Nos. Satisfactory

7 Stone Aggregate
(i) 40 mm stone aggregate 56.46 Cum
(a) Particle Size Distribution 56.46 Cum 40 cum 2 Nos. 2 Nos. 3 Nos. Satisfactory
(b) Deleterious Material 56.46 Cum 40 cum 2 Nos. 2 Nos, 3 Nos. Satisfactory
(ii) 20 mm stone aggregate 379.69 Cum
(a) Particle Size Distribution 379.69 Cum 40 cum 10 Nos. 10 Nos. 12 Nos. Satisfactory
(b) Deleterious Material 379.69 Cum 40 cum 10 Nos. 10 Nos, 12 Nos. Satisfactory
(iii) 10 mm stone aggregate 176.67 Cum
(a) Particle Size Distribution 176.67 Cum 40 cum 5 Nos. 5 Nos. 7 Nos. Satisfactory
(b) Deleterious Material 176.67 Cum 40 cum 5 Nos. 5 Nos, 7 Nos. Satisfactory

Junior Engineer Assistant Engineer


SPSD-II, Project Division SPSD-II, Project Division
CPWD, (Assam) CPWD, (Assam)
FOREST
5th R.A B
1 Name of Work: #REF!

2 Agency: M/s Khatri Enterprises


3 Agreement No.: 04/CE/EE/PD/2020-21
4 Estimated Cost: 5,90,40,588.00
5 Tender Amount: 56,885,607.00
10.08.2020
6 Date of Start (Stp.):

09.08.2021
7 Date of Completion(Stp.):

8 Time Allowed: 365 Days


Coarse Sand Fine Sand
Quantity Coeff of Coeff of
Item No. Sub-Head and Item of works Unit exeacuted in consumption Quantity
consumption
this bill consumed
(Cum Per (Cum Per
(Cum)
Unit) Unit)

2.1 Providing and laying position


cement concrete of specified grade
excluding the cost of centering and
shuttering - All work up to plinth
level:
2.1.2 1:5:10 ( 1 cement : 5 course sand :
10 graded stone aggregate 40 mm cum 86.86 0.47 40.82
nominal size)

3.6 Providing and laying in position


machine batched and machine
mixed design mix M-25 …. @ 330
kg/cum. Excess or less cement
used as peer design mix is payable
or recoverable separately.
3.6.1 All work up to plinth level cum 263.19 0.425 111.86
3.6.2 All work above plinth level upto floor cum 366.35 0.425 155.70

4.1 Brick wark with common burnt clay


F.P.S. (non modular ) bricks of
class designation 7.5 in foundation
and plinth in.

4.1.2 cement mortar 1:6 (1 cement : 6


coarse sand ) cum 48.03 0.25 12.01

10.1 12 mm Cement Plaster of Mix :


10.1.1 1:4 (1 cement : 4 coarse sand ) sqm 262.00 0.144 37.73
Total = 358.11

Contractor Junior Engineer


FOREST PRODUCT
5th R.A Bill

Fine Sand 40 mm Aggregate 20 mm Aggregate 10 mm Aggregate Bricks


Coeff of Coeff of Coeff of Coeff of Quantity consumed
Quantity Quantity Quantity Quantity consumption (Nos.)
consumption consumption consumption
consumed consumed consumed consumed (Cum Per
(Cum Per (Cum Per (Cum Per
(Cum) (Cum) (Cum) (Cum) Unit)
Unit) Unit) Unit)

0.65 56.46 0.24 20.85

0.57 150.02 0.28 73.69


0.57 208.82 0.28 102.58

450.00 21614.00
56.46 379.69 176.27 21614.00

nior Engineer Assistant Engineer


Fly Ash Bricks
Coeff of Quantity
consumption consumed
(Cum Per (Nos.)
Unit)
0.00