PROJECT DIVISION
SONAPUR PROJECT SUB DIVISION-II
COMPUTERIZED
MEASUREMENT BOOK
CMB No.COM/ITBP/SO's Mess/PD/
Measurement Book
CMB No.COM/ITBP/SO's Mess/PD/
Name of Work : : Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd
bn, ITBP at Karchia Sonapur (Assam) including water supply,
sanitary installation & internal electrical installation.
Page No:(i)
Issued by : Executive Engineer, PD, CPWD, Bamunimaidam,Guwahati. on
When this book change hands, the transfer expressed in similar terms, should be recorded under the
dated initial of both the relieving and Relieved Officer, below the last entry of measurement made by the
Relived Officer
Assistant Engineer
Sonapur Project Sub Division:-II
C.P.W.D, Sonapur
Measurement Book
CMB No.COM/ITBP/SO's Mess/PD/
Measurement Book
Central PWD code Para 37, Central P.W.A Code Para 208 to 211 and 220 to 223)
NOTE
Officer and subordinate using this book are expected to keep themselves fully conversant with the above
and the other subsidiary rules, as correct up to the date of measurement
Page No.(iii)
Page II - By Divisional Accountant
s
Calculation Selected Defect
Revie
by Divisional Officer discrepancies Dated initial of
wed Dated Divisional Divisional
for re-check etc noticed
gener Initial Accountant Officer
ally Pages
Page No.(iv)
REVIEW NOTES
By Superior Officer of the Department
Pages recording
Value of Dated initials and
measurements Resualt of the
Date measurements designation of the
subjected to test- check exercised
checked Checking Officer
check
Date of Measurement:
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Reinforcement of R/H Side 2nd floor slab Beam Re-inforcement
Long Direction
SB-02 (C8-C9-C10-C11-C12 ) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 18.55 = --- --- --- 55.65 --- ---
Bottom Main Bar 16 mm 1 x 3 x 18.55 = --- --- --- 55.65 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Top Extra Bar at C9 16 mm 1 x 1 x 2.60 = --- --- --- 2.60 --- ---
Stirrup
(C8-C9) 10 mm 1 x 22 x 1.42 = --- 31.24 --- --- --- ---
(C9-C10) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
(C10-C11) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
(C11-C12) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Spacer Pin 16 mm 1 x 2 x 0.16 = --- --- --- 0.32 --- ---
SB-03 (C13-C14 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 3.18 = --- --- --- 6.36 --- ---
Bottom Main Bar 16 mm 1 x 2 x 3.18 = --- --- --- 6.36 --- ---
Stirrup
(C13-C14) 10 mm 1 x 12 x 1.42 = --- 17.04 --- --- --- ---
SB-04 (C8-C9 ) (230 X 500) (Lift Bam)
Top Main Bar 12 mm 1 x 2 x 3.72 = --- --- 7.44 --- --- ---
Bottom Main Bar 12 mm 1 x 2 x 3.72 = --- --- 7.44 --- --- ---
Stirrup
(C8-C9) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 4 x 1.38 = 5.52 --- --- --- --- ---
SB-05 (C8-C9 ) (230 X 500) (Lift Bam)
Top Main Bar 12 mm 1 x 2 x 3.72 = --- --- 7.44 --- --- ---
Bottom Main Bar 12 mm 1 x 2 x 3.72 = --- --- 7.44 --- --- ---
Stirrup
(C8-C9) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 4 x 1.38 = 5.52 --- --- --- --- ---
SB-07 (C7-C8) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 4.23 = --- --- --- 8.46 --- ---
Bottom Main Bar 16 mm 1 x 2 x 4.23 = --- --- --- 8.46 --- ---
Extra Bar bottom mid spam 16 mm 1 x 1 x 1.95 = --- --- --- 1.95 --- ---
Stirrup 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 6 x 1.38 = 8.28 --- --- --- --- ---
Spacer Pin 16 mm 1 x 4 x 0.16 = --- --- --- 0.64 --- ---
SB-08 (SB 27- SB 28) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 3.70 = --- --- --- 7.40 --- ---
Bottom Main Bar 16 mm 1 x 2 x 3.70 = --- --- --- 7.40 --- ---
Stirrup 10 mm 1 x 21 x 1.42 = --- 29.82 --- --- --- ---
B/F = 85.56 248.50 29.76 166.05 0.00 0.00
Page no- 2
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 343.62 560.90 41.03 726.88 3.20 0.00
C46-C47 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
C47-C48 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
C48-C49 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
C49-C50 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 13 x 1.38 = 17.94 --- --- --- --- ---
SB-30 (SB24-C9-SB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 3.95 = --- --- 11.85 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 3.95 = --- --- 11.85 --- --- ---
Stirrup 10 mm 1 x 14 x 1.42 = --- 19.88 --- --- --- ---
8 mm 1 x 9 x 1.38 = 12.42 --- --- --- --- ---
SB-30 (SB-31-C11-SB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Stirrup 10 mm 1 x 29 x 1.42 = --- 41.18 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
Lap 12 mm 1 x 3 x 0.60 = --- --- 1.80 --- --- ---
SB-30 (SB-31-C47-SB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Stirrup 10 mm 1 x 28 x 1.42 = --- 39.76 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
SB-30 (SB-31-C49-SB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Stirrup 10 mm 1 x 28 x 1.42 = --- 39.76 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
SB-33 (C9-C10-C11-C12 ) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 15.60 = --- --- --- 46.80 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.60 = --- --- --- 46.80 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrup
C9-C10 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
C10-C11 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
C11-C12 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
SB-35 (C46-C47-C48-C49-C50 ) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 20.37 = --- --- --- 61.11 --- ---
Bottom Main Bar 16 mm 1 x 3 x 20.37 = --- --- --- 61.11 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrup
C46-C47 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 16 x 1.38 = 22.08 --- --- --- --- ---
Page no- 3
Steel (TMT Bars)
Particulars Dia No. Length
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 663.78 1013.88 192.53 952.30 3.20 0.00
SB-21 (C7-C21-C33-C45) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 15.12 = --- --- --- 45.36 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.12 = --- --- --- 45.36 --- ---
Top Extra Bar at C45 12 mm 1 x 1 x 2.15 = --- --- 2.15 --- --- ---
Top Extra Bar at C33 16 mm 1 x 1 x 2.61 = --- --- --- 2.61 --- ---
Top Extra Bar at C21 20 mm 1 x 1 x 2.52 = --- --- --- --- 2.52 ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Spacer Pin 20 mm 1 x 10 x 0.16 = --- --- --- --- 1.60 ---
Stirrup
C7-C21 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 12 x 1.38 = 16.56 --- --- --- --- ---
C21-C33 10 mm 1 x 17 x 1.42 = --- 24.14 --- --- --- ---
C33-C45 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 20 x 1.38 = 27.60 --- --- --- --- ---
SB-22 (SB12-SB14 ) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 7.00 = --- --- --- 21.00 --- ---
Bottom Main Bar 16 mm 1 x 3 x 7.00 = --- --- --- 21.00 --- ---
Bottom mid span 12 mm 1 x 2 x 4.15 = --- --- 8.30 --- --- ---
Spacer Pin 16 mm 1 x 4 x 0.16 = --- --- --- 0.64 --- ---
Stirrup 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 25 x 1.38 = 34.50 --- --- --- --- ---
SB-23 (C8-SB 10 ) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 7.20 = --- --- --- 21.60 --- ---
Bottom Main Bar 16 mm 1 x 3 x 7.20 = --- --- --- 21.60 --- ---
Top Lap 16 mm 1 x 1 x 0.80 = --- --- --- 0.80 --- ---
Bottom Lap 16 mm 1 x 1 x 0.80 = --- --- --- 0.80 --- ---
Stirrup 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 24 x 1.38 = 33.12 --- --- --- --- ---
SB-24 (C9-C22-C34-C46) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Top Extra Bar at C46 12 mm 1 x 1 x 2.54 = --- --- 2.54 --- --- ---
Top Extra Bar at C34 16 mm 1 x 1 x 2.60 = --- --- --- 2.60 --- ---
Top Extra Bar at C22 16 mm 1 x 1 x 2.60 = --- --- --- 2.60 --- ---
Bottom Extra Bar at mid
12 mm 1 x 1 x 4.50 = --- --- 4.50 --- --- ---
span C22-C9
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Stirrup
C9-C22 10 mm 1 x 21 x 1.42 = --- 29.82 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
C22-C34 10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
C34-C46 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
SB-25 (C10-C23-C35-C47) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Top Extra Bar at C35 12 mm 1 x 2 x 2.45 = --- --- 4.90 --- --- ---
Top Extra Bar at C23 12 mm 1 x 2 x 2.35 = --- --- 4.70 --- --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
B/F = 833.52 1232.56 219.62 1341.55 7.32 0.00
Page no- 4
Steel (TMT Bars)
Particulars Dia No. Length
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 833.52 1232.56 219.62 1341.55 7.32 0.00
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Spacer Pin 20 mm 1 x 6 x 0.16 = --- --- --- --- 0.96 ---
Stirrup
C10-C23 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
C23-C35 10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
C35-C47 10 mm 1 x 24 x 1.42 = --- 34.08 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
SB-26 (C11-C24-C36-C48) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Top Extra Bar at C24 12 mm 1 x 2 x 2.86 = --- --- 5.72 --- --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Spacer Pin 20 mm 1 x 4 x 0.16 = --- --- --- --- 0.64 ---
Stirrup
C11-C24 10 mm 1 x 24 x 1.42 = --- 34.08 --- --- --- ---
8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
C24-C36 10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
C36-C48 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
SB-27 (C12-C25-C37-C49) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Bottom Main Bar 16 mm 1 x 3 x 15.94 = --- --- --- 47.82 --- ---
Top Extra Bar at C49 16 mm 1 x 1 x 2.54 = --- --- --- 2.54 --- ---
Top Extra Bar at C25 16 mm 1 x 1 x 2.60 = --- --- --- 2.60 --- ---
Top Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Bottom Lap 16 mm 1 x 3 x 0.80 = --- --- --- 2.40 --- ---
Spacer Pin 16 mm 1 x 6 x 0.16 = --- --- --- 0.96 --- ---
Stirrup
C12-C25 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
C25-C37 10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
C37-C49 10 mm 1 x 24 x 1.42 = --- 34.08 --- --- --- ---
8 mm 1 x 20 x 1.38 = 27.60 --- --- --- --- ---
SB-28 (C13-SB10) (230 X 500)
Top Main Bar 16 mm 1 x 3 x 7.25 = --- --- --- 21.75 --- ---
Bottom Main Bar 16 mm 1 x 3 x 7.25 = --- --- --- 21.75 --- ---
Bottom Extra bar 12 mm 1 x 1 x 4.20 = --- --- 4.20 --- --- ---
Spacer Pin 16 mm 1 x 4 x 0.16 = --- --- --- 0.64 --- ---
Top Lap 16 mm 1 x 1 x 0.80 = --- --- --- 0.80 --- ---
Bottom Lap 16 mm 1 x 1 x 0.80 = --- --- --- 0.80 --- ---
m
Stirrup 10 1 x 20 x 1.42 = --- 28.4 --- --- --- ---
m
m
8 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
m
B/F = 1039.14 1516.56 229.54 1596.67 8.92 0.00
Page no- 6
Date of Measurement:
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Measurement Of R/H Side 2nd Floor Slab Reinforcement
Long Direction
(C21-C33-C35)to(C26-C38-C50)
Bottom bar 10 mm 1 x 39 x 25.56 = --- 996.84 --- --- --- ---
Crank bar 10 mm 1 x 6 x 25.76 = --- 154.56 --- --- --- ---
Crank bar 10 mm 1 x 4 x 26.16 = --- 104.64 --- --- --- ---
Top bar 10 mm 1 x 27 x 25.56 = --- 690.12 --- --- --- ---
10 mm 1 x 3 x 25.96 = --- 77.88 --- --- --- ---
Extra top
At (C33-C45) 10 mm 1 x 9 x 1.05 = --- 9.45 --- --- --- ---
At SB22 10 mm 1 x 9 x 1.50 = --- 13.50 --- --- --- ---
At SB24 10 mm 1 x 5 x 2.15 = --- 10.75 --- --- --- ---
At SB25 10 mm 1 x 5 x 2.55 = --- 12.75 --- --- --- ---
At SB26 10 mm 1 x 5 x 2.55 = --- 12.75 --- --- --- ---
At SB27 10 mm 1 x 5 x 2.55 = --- 12.75 --- --- --- ---
At SB29 10 mm 1 x 5 x 1.10 = --- 5.50 --- --- --- ---
(C21-SB07)TO(C26-SB08)
Bottom bar 10 mm 1 x 10 x 25.56 = --- 255.60 --- --- --- ---
10 mm 1 x 1 x 17.56 = --- 17.56 --- --- --- ---
Crank bar 10 mm 1 x 1 x 22.70 = --- 22.70 --- --- --- ---
10 mm 1 x 1 x 25.86 = --- 25.86 --- --- --- ---
10 mm 1 x 1 x 17.86 = --- 17.86 --- --- --- ---
Top bar 10 mm 1 x 7 x 25.56 = --- 178.92 --- --- --- ---
(SB24-SB27) near lift to staire case
Bottom bar 10 mm 1 x 15 x 14.95 = --- 224.25 --- --- --- ---
Crank bar 10 mm 1 x 1 x 15.25 = --- 15.25 --- --- --- ---
Top bar 10 mm 1 x 11 x 14.95 = --- 164.45 --- --- --- ---
Extra top
10 mm 1 x 4 x 4.76 = --- 19.04 --- --- --- ---
10 mm 1 x 4 x 3.40 = --- 13.60 --- --- --- ---
(C9-C12)TO(C49-C46)
Bottom bar 10 mm 1 x 63 x 14.23 = --- 896.49 --- --- --- ---
Crank bar 10 mm 1 x 23 x 14.43 = --- 331.89 --- --- --- ---
Top bar 10 mm 1 x 45 x 14.23 = --- 640.35 --- --- --- ---
Extra top
(SB14-SB35) 10 mm 1 x 17 x 3.40 = --- 57.80 --- --- --- ---
(SB12-SB10) 10 mm 1 x 17 x 3.80 = --- 64.60 --- --- --- ---
(SB02-SB33) 10 mm 1 x 17 x 3.85 = --- 65.45 --- --- --- ---
(SB02-SB04)
Bottom bar 10 mm 1 x 15 x 2.30 = --- 34.50 --- --- --- ---
Top bar 10 mm 1 x 15 x 2.30 = --- 34.50 --- --- --- ---
B/F = 0.00 5182.16 0.00 0.00 0.00 0.00
Sign by Contractor Checked by JE Checked by AE
Page no- 7
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 0.00 5182.16 0.00 0.00 0.00 0.00
(SB05-SB14)
Bottom bar 10 mm 1 x 13 x 10.10 = --- 131.30 --- --- --- ---
Top bar 10 mm 1 x 8 x 10.10 = --- 80.80 --- --- --- ---
Crank bar 10 mm 1 x 6 x 10.20 = --- 61.20 --- --- --- ---
Extra top
10 mm 1 x 4 x 5.53 = --- 22.12 --- --- --- ---
10 mm 1 x 4 x 1.53 = --- 6.12 --- --- --- ---
(SB07-SB14)
Bottom bar 10 mm 1 x 15 x 9.60 = --- 144.00 --- --- --- ---
Top bar 10 mm 1 x 12 x 9.60 = --- 115.20 --- --- --- ---
Crank bar 10 mm 1 x 4 x 9.70 = --- 38.80 --- --- --- ---
Extra top
10 mm 1 x 3 x 4.95 = --- 14.85 --- --- --- ---
10 mm 1 x 3 x 1.53 = --- 4.59 --- --- --- ---
Extra top
(SB21-SB24) 10 mm 1 x 2 x 7.60 = --- 15.20 --- --- --- ---
(SB23-SB24) 10 mm 1 x 1 x 4.51 = --- 4.51 --- --- --- ---
At SB24 10 mm 1 x 2 x 1.85 = --- 3.70 --- --- --- ---
At SB25 10 mm 1 x 5 x 2.53 = --- 12.65 --- --- --- ---
At SB26 10 mm 1 x 5 x 2.53 = --- 12.65 --- --- --- ---
At SB27 10 mm 1 x 2 x 6.26 = --- 12.52 --- --- --- ---
10 mm 1 x 3 x 1.44 = --- 4.32 --- --- --- ---
(SB23-SB27)
Bottom bar 10 mm 1 x 13 x 17.50 = --- 227.50 --- --- --- ---
Top bar 10 mm 1 x 13 x 17.50 = --- 227.50 --- --- --- ---
(SB28-SB29)
Bottom bar 10 mm 1 x 28 x 2.26 = --- 63.28 --- --- --- ---
Top bar 10 mm 1 x 28 x 2.26 = --- 63.28 --- --- --- ---
Short Direction
(C13-C14)TO (C50-SB31)
Bottom bar 10 mm 1 x 11 x 14.23 = --- 156.53 --- --- --- ---
Crank bar 10 mm 1 x 5 x 14.38 = --- 71.90 --- --- --- ---
Top bar 10 mm 1 x 6 x 14.23 = --- 85.38 --- --- --- ---
Extra top
(SB3-SB12) 10 mm 1 x 3 x 9.30 = --- 27.90 --- --- --- ---
(SB14-SB35) 10 mm 1 x 3 x 3.40 = --- 10.20 --- --- --- ---
(SB08-SB14)
Bottom bar 10 mm 1 x 11 x 9.80 = --- 107.80 --- --- --- ---
Corridor area 10 mm 1 x 33 x 2.32 = --- 76.56 --- --- --- ---
Crank bar 10 mm 1 x 4 x 9.90 = --- 39.60 --- --- --- ---
Top bar 10 mm 1 x 6 x 9.80 = --- 58.80 --- --- --- ---
Slab projection
C9 Area
Top & Bottom 10 mm 2 x 28 x 1.61 = --- 90.16 --- --- --- ---
Binder 10 mm 2 x 6 x 5.50 = --- 66.00 --- --- --- ---
B/F = 0.00 7239.08 0.00 0.00 0.00 0.00
Sign by Contractor Checked by JE Checked by AE
Page no- 8
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 0.00 7239.08 0.00 0.00 0.00 0.00
C11 Area
Top & Bottom 10 mm 2 x 46 x 1.61 = --- 148.12 --- --- --- ---
Binder 10 mm 2 x 6 x 8.20 = --- 98.40 --- --- --- ---
C47 Area
Top & Bottom 10 mm 2 x 47 x 1.61 = --- 151.34 --- --- --- ---
Binder 10 mm 2 x 6 x 8.20 = --- 98.40 --- --- --- ---
C49 Area
Top & Bottom 10 mm 2 x 48 x 1.61 = --- 154.56 --- --- --- ---
Binder 10 mm 2 x 6 x 8.20 = --- 98.40 --- --- --- ---
Laping 10 mm 1 x 390 x 0.50 = --- 195.00 --- --- --- ---
Chair 10 mm 1 x 225 x 1.47 = --- 330.75 --- --- --- ---
Reinforcement of 1st floor Stair Case Re-inforcement
Stair case 4th Flight upto slab (C7-C8)
Bottom main upto slab 12 mm 1 x 13 x 4.19 = --- --- 54.47 --- --- ---
Lap 12 mm 1 x 13 x 0.60 = --- --- 7.80 --- --- ---
Top extra bar 12 mm 1 x 12 x 1.37 = --- --- 16.44 --- --- ---
Middle bar 12 mm 1 x 13 x 1.00 = --- --- 13.00 --- --- ---
Slab to 4th flight 12 mm 1 x 12 x 2.70 = --- --- 32.40 --- --- ---
12 mm 1 x 13 x 2.30 = --- --- 29.90 --- --- ---
Binder 10 mm 1 x 45 x 1.46 = --- 65.70 --- --- --- ---
Slab to 5th flight 12 mm 1 x 12 x 1.60 = --- --- 19.20 --- --- ---
12 mm 1 x 12 x 1.60 = --- --- 19.20 --- --- ---
12 mm 1 x 12 x 0.80 = --- --- 9.60 --- --- ---
Chair 10 mm 1 x 6 x 1.39 = --- 8.34 --- --- --- ---
Stair case 4th Flight (C12-C13)
Bottom barupto slab 12 mm 1 x 10 x 4.25 = --- --- 42.50 --- --- ---
Lap 12 mm 1 x 10 x 0.60 = --- --- 6.00 --- --- ---
Top extra bar 12 mm 1 x 10 x 1.37 = --- --- 13.70 --- --- ---
Middle bar 12 mm 1 x 10 x 1.00 = --- --- 10.00 --- --- ---
Slab upto 4th flight 12 mm 1 x 10 x 2.90 = --- --- 29.00 --- --- ---
12 mm 1 x 10 x 2.43 = --- --- 24.30 --- --- ---
Binder 10 mm 1 x 41 x 1.14 = --- 46.74 --- --- --- ---
Chair 10 mm 1 x 7 x 1.39 = --- 9.73 --- --- --- ---
Page no- 9
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Measurement for Stirrup For Column and Beam Junction at 2nd Floor Slab of R/H side
C7 10 mm 1 x 4 x 1.78 = --- 7.12 --- --- --- ---
C8 10 mm 1 x 4 x 1.78 = --- 7.12 --- --- --- ---
C9 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C10 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C11 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C12 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C13 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C14 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C21 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C22 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C23 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C24 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C25 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C26 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C33 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C34 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C35 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C36 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C37 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C38 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C45 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C46 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C47 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C48 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C49 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C50 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
Total (In m) = 0.00 165.92 0.00 0.00 0.00 0.00
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 0.00 102.21 0.00 0.00 0.00 0.00
Page no- 10
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in
position and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Reinforcement of Column L/H Side From 3rd floor upto roof slab
C4
Vertical Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C5
Vertical Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C6
Vertical Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
16 mm 1 x 4 x 3.30 = --- --- --- 13.20 --- ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C18
Vertical Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C19
Vertical Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C20
Vertical Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
16 mm 1 x 4 x 3.30 = --- --- --- 13.20 --- ---
B/F = 0.00 320.40 0.00 29.60 133.60 36.40
Page no- 11
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 0.00 320.40 0.00 29.60 133.60 36.40
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C30
Vertical Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C31
Vertical Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C32
Vertical Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
16 mm 1 x 4 x 3.30 = --- --- --- 13.20 --- ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Stirrups 10 mm 1 x 24 x 1.58 = --- 37.92 --- --- --- ---
10 mm 1 x 24 x 0.62 = --- 14.88 --- --- --- ---
Link
10 mm 1 x 24 x 0.47 = --- 11.28 --- --- --- ---
C42
Vertical Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 23 x 1.58 = --- 36.34 --- --- --- ---
10 mm 1 x 23 x 0.62 = --- 14.26 --- --- --- ---
Link
10 mm 1 x 23 x 0.47 = --- 10.81 --- --- --- ---
C43
Vertical Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stirrups 10 mm 1 x 23 x 1.58 = --- 36.34 --- --- --- ---
10 mm 1 x 23 x 0.62 = --- 14.26 --- --- --- ---
Link
10 mm 1 x 23 x 0.47 = --- 10.81 --- --- --- ---
C44
Vertical Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
16 mm 1 x 4 x 3.30 = --- --- --- 13.20 --- ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
16 mm 1 x 4 x 0.80 = --- --- --- 3.20 --- ---
Stirrups 10 mm 1 x 23 x 1.58 = --- 36.34 --- --- --- ---
10 mm 1 x 23 x 0.62 = --- 14.26 --- --- --- ---
Link
10 mm 1 x 23 x 0.47 = --- 10.81 --- --- --- ---
TOTAL = 0.00 760.95 0.00 65.60 275.20 72.80
Provisional Weight considered for Measurements 0.395 0.616 0.888 1.579 2.467 3.850
Weight in Kg 0.00 468.75 0.00 103.58 678.92 280.28
Total (in Kg) 1531.53
C/O TCMB / P -
Page no- 12
Date of Measurement
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and Removal of form for
3.2.6 : Column, Pillars, piers, Abustments, posts and struts
Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess R/H Side Column Shuttering From 2.4 mt upto 2nd floor slab
Page no- 13
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforcd cement concrete work , using coarse aggregate as well
as fine aggregate derived from natural source and cement cocrete as per approved design
mix , including pimping of con crete to site laying but excluding the cost of centering ,
Agreement No. 3.6 : shuttering,finishing and reinforecd , including admixture in recommended proportion as per
IS: 9103 to accelerated, retard setting of concrete , improve workability without impairing
strength and durability as per direction of Engineer-in-Charge.
ASOS Mess R/H Side Column R.C.C From 2.4 mt upto 2nd floor
C7 1 x 1 x 0.35 x 0.60 x 0.90 = 0.19 Cum
C8 1 x 1 x 0.35 x 0.60 x 0.90 = 0.19 Cum
C9 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C10 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C11 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C12 1 x 1 x 0.35 x 0.60 x 0.90 = 0.19 Cum
C13 1 x 1 x 0.35 x 0.60 x 0.90 = 0.19 Cum
C14 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C21 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C22 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C23 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C24 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C25 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C26 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C33 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C34 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C35 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C36 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C37 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C38 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C45 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C46 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C47 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C48 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C49 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C50 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
Total Quantity = 4.28 Cum
C/O TCMB -
Page no- 15
Agreement No. 3.2.8 : Edges of slabs and breaks in floors and wallsfor
3.2.8.1 : Under 20 cm wide
Particular Nos x Nos x L x B x H = Quantity Unit
Slab edge shuttering L.H.S 1st Floor Slab
Chajja Portion
C46-C47-C48 1 x 1 x 7.45 x - x - = 7.45 mtr
1 x 2 x 1.20 x - x - = 2.40 mtr
C48-C49-C50 1 x 1 x 6.79 x - x - = 6.79 mtr
1 x 2 x 1.20 x - x - = 2.40 mtr
C9-C10 1 x 1 x 4.55 x - x - = 4.55 mtr
1 x 2 x 0.98 x - x - = 1.96 mtr
C10-C11-C12 1 x 1 x 7.48 x - x - = 7.48 mtr
1 x 2 x 0.98 x - x - = 1.96 mtr
Extra for additional height in centering, shuttering where ever required with adequate
bracing, propping etc., including cost of de-shuttering and decentering at all levels, over a
E/S-3 : height of 3.5 m, for every additional height of 1 metre or part thereof (Plan area to be
measured).Suspended floors, roofs, landing, beams and balconies (Plan area to be
measured)
Particular Nos x Nos x L x B x H = Quantity Unit
ASOS mess R/H side 2nd floor slab
Entrance lobby
For height from 3.5 mt upto 4.5 mt=4.50-3.50=1.00=1 times
Bottom of slab 1 X 1 X 5.700 X 5.220 X - = 29.75 Sqm
For height from 3.5 mt upto 5.5 mt=5.50-3.50=2.00=2 times
Bottom of slab 1 X 2 X 5.700 X 5.220 X - = 59.51 Sqm
For height from 3.5 mt upto 6.45 mt=6.45-3.50=2.95=3 times
Bottom of slab 1 X 3 X 5.700 X 5.220 X - = 89.26 Sqm
Total Quantity = 178.52 Sqm
C/O TCMB -
Page no- 17
Particular Nos x Nos x L x B x H = Quantity Unit
SB-10 (C24-C25) C/O = 43.37 Sqm
Side 1 X 2 X 4.500 X - X 0.350 = 3.15 Sqm
Bottom 1 X 1 X 4.580 X 0.230 X - = 1.05 Sqm
SB-10 (C25-C26)
Side 1 X 2 X 4.550 X - X 0.350 = 3.19 Sqm
Bottom 1 X 1 X 4.550 X 0.230 X - = 1.05 Sqm
SB-12 (C33-C34)
Side 1 X 2 X 5.700 X - X 0.350 = 3.99 Sqm
Bottom 1 X 1 X 5.700 X 0.230 X - = 1.31 Sqm
SB-12 (C34-C35)
Side 1 X 2 X 4.580 X - X 0.350 = 3.21 Sqm
Bottom 1 X 1 X 4.580 X 0.230 X - = 1.05 Sqm
SB-12 (C35-C36)
Side 1 X 2 X 4.550 X - X 0.350 = 3.19 Sqm
Bottom 1 X 1 X 4.550 X 0.230 X - = 1.05 Sqm
SB-12 (C36-C37)
Side 1 X 2 X 4.500 X - X 0.350 = 3.15 Sqm
Bottom 1 X 1 X 4.580 X 0.230 X - = 1.05 Sqm
SB-12 (C37-C38)
Side 1 X 2 X 4.550 X - X 0.350 = 3.19 Sqm
Bottom 1 X 1 X 4.550 X 0.230 X - = 1.05 Sqm
SB-14 (C45-C46)
Side 1 X 2 X 5.700 X - X 0.500 = 5.70 Sqm
Bottom 1 X 1 X 5.700 X 0.230 X - = 1.31 Sqm
SB-14 (C46-C47)
Side 1 X 1 X 4.580 X - X 0.500 = 2.29 Sqm
1 X 1 X 4.580 X - X 0.350 = 1.60 Sqm
Bottom 1 X 1 X 4.580 X 0.230 X - = 1.05 Sqm
SB-14 (C47-C48)
Side 1 X 1 X 4.550 X - 0.500 = 2.28 Sqm
1 X 1 X 4.550 X - 0.350 = 1.59 Sqm
Bottom 1 X 1 X 4.550 X 0.230 - = 1.05 Sqm
SB-14 (C48-C49)
Side 1 X 1 X 4.500 X - 0.500 = 2.25 Sqm
1 X 1 X 4.500 X - 0.350 = 1.58 Sqm
Bottom 1 X 1 X 4.580 X 0.230 - = 1.05 Sqm
SB-14 (C49-C50)
Side 1 X 1 X 4.550 X - 0.500 = 2.28 Sqm
1 X 1 X 4.550 X - 0.350 = 1.59 Sqm
Bottom 1 X 1 X 4.550 X 0.230 X - = 1.05 Sqm
SB-30 (C9-SB31) (SB31-C11) (C11-SB31) (SB31-C47)(C47-SB31)(SB31-C49)(C49-SB31)
Side 7 X 2 X 2.800 X - 0.350 = 13.72 Sqm
Bottom 7 X 1 X 2.800 X 0.230 X - = 4.51 Sqm
B/F = 118.95 Sqm
Page no- 19
Particular Nos x Nos x L x B x H = Quantity Unit
C/O = 191.88 Sqm
SB-24 (C9-C22)
Side 1 X 2 X 5.440 X - 0.500 = 5.44 Sqm
Bottom 1 X 1 X 5.440 X 0.230 - = 1.25 Sqm
SB-24 (C22-C34)
Side 1 X 1 X 1.800 X - 0.500 = 0.90 Sqm
1 X 1 X 1.800 X - 0.350 = 0.63 Sqm
Bottom 1 X 1 X 1.800 X 0.230 - = 0.41 Sqm
SB-24 (C34-C46)
Side 1 X 2 X 5.220 X - 0.500 = 5.22 Sqm
Bottom 1 X 1 X 5.220 X 0.230 X - = 1.20 Sqm
SB-25 (C10-C23)
Side 1 X 2 X 5.440 X - 0.350 = 3.81 Sqm
Bottom 1 X 1 X 5.440 X 0.230 - = 1.25 Sqm
SB-25 (C23-C35)
Side 1 X 2 X 1.800 X - 0.350 = 1.26 Sqm
Bottom 1 X 1 X 1.800 X 0.230 - = 0.41 Sqm
SB-25 (C35-C47)
Side 1 X 2 X 5.220 X - 0.350 = 3.65 Sqm
Bottom 1 X 1 X 5.220 X 0.230 X - = 1.20 Sqm
SB-26 (C11-C24)
Side 1 X 2 X 5.440 X - 0.350 = 3.81 Sqm
Bottom 1 X 1 X 5.440 X 0.230 - = 1.25 Sqm
SB-26 (C24-C36)
Side 1 X 2 X 1.800 X - 0.350 = 1.26 Sqm
Bottom 1 X 1 X 1.800 X 0.230 - = 0.41 Sqm
SB-26 (C36-C48)
Side 1 X 2 X 5.220 X - 0.350 = 3.65 Sqm
Bottom 1 X 1 X 5.220 X 0.230 X - = 1.20 Sqm
SB-27 (C12-C25)
Side 1 X 1 X 5.440 X - 0.500 = 2.72 Sqm
1 X 1 X 5.440 X - 0.350 = 1.90 Sqm
Bottom 1 X 1 X 5.440 X 0.230 - = 1.25 Sqm
SB-27 (C25-C37)
Side 1 X 2 X 1.800 X - 0.350 = 1.26 Sqm
Bottom 1 X 1 X 1.800 X 0.230 - = 0.41 Sqm
SB-27 (C37-C49)
Side 1 X 2 X 5.220 X - 0.350 = 3.65 Sqm
Bottom 1 X 1 X 5.220 X 0.230 X - = 1.20 Sqm
SB-29 (C14-C26)
Side 1 X 1 X 5.440 X - 0.500 = 2.72 Sqm
1 X 1 X 5.440 X - 0.350 = 1.90 Sqm
Bottom 1 X 1 X 5.440 X 0.230 - = 1.25 Sqm
SB-29 (C26-C38)
Side 1 X 1 X 1.800 X - 0.500 = 0.90 Sqm
1 X 1 X 1.800 X - 0.350 = 0.63 Sqm
Bottom 1 X 1 X 1.800 X 0.230 - = 0.41 Sqm
SB-29 (C38-C50)
Side 1 X 1 X 5.220 X - 0.500 = 2.61 Sqm
1 X 1 X 5.220 X - 0.350 = 1.83 Sqm
Bottom 1 X 1 X 5.220 X 0.230 X - = 1.20 Sqm
Total Quantity = 255.93 Sqm
C/O TCMB -
Sign by Contractor Checked by JE Checked by AE
Page no- 20
Date of Measurement
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and Removal of form for
3.2.7 : Stairs, (eexcluding landings) except spiral-staircases
Particular Nos x Nos x L x B x H = Quantity Unit
C7-C8 Staircase
Waist Slab 1 X 1 X 3.35 X - X 1.500 = 5.03 Sqm
Side 1 X 2 X 3.35 X - X 0.300 = 2.01 Sqm
Riser 11 X 1 X 1.50 X - X 0.150 = 2.48 Sqm
C12-C13 Staircase
Waist Slab 1 X 1 X 3.35 X - X 1.200 = 4.02 Sqm
Side 1 X 2 X 3.35 X - X 0.300 = 2.01 Sqm
Riser 11 X 1 X 1.20 X - X 0.150 = 1.98 Sqm
Total Quantity = 17.53 Sqm
C/O TCMB -
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforcd cement concrete work , using coarse aggregate as well
as fine aggregate derived from natural source and cement cocrete as per approved design
mix , including pimping of con crete to site laying but excluding the cost of centering ,
Agreement No. 3.6 : shuttering,finishing and reinforecd , including admixture in recommended proportion as per
IS: 9103 to accelerated, retard setting of concrete , improve workability without impairing
strength and durability as per direction of Engineer-in-Charge.
Page no- 21
Particular Nos x Nos x L x B x H = Quantity Unit
C/O = 24.21 Cum
S24 1 x 1 x 4.64 x 3.20 x 0.15 = 2.22 Cum
S25 1 x 1 x 4.65 x 3.20 x 0.15 = 2.23 Cum
S26 1 x 1 x 4.65 x 3.20 x 0.15 = 2.23 Cum
S27 1 x 1 x 2.31 x 1.62 x 0.15 = 0.56 Cum
S28 1 x 1 x 2.73 x 1.12 x 0.15 = 0.46 Cum
S29 1 x 1 x 2.78 x 1.12 x 0.15 = 0.47 Cum
S30 1 x 1 x 2.31 x 1.63 x 0.15 = 0.56 Cum
S31 1 x 1 x 2.31 x 1.62 x 0.15 = 0.56 Cum
S32 1 x 1 x 2.80 x 1.09 x 0.15 = 0.46 Cum
S33 1 x 1 x 2.80 x 1.09 x 0.15 = 0.46 Cum
S34 1 x 1 x 2.31 x 1.62 x 0.15 = 0.56 Cum
S35 1 x 1 x 2.75 x 0.98 x 0.15 = 0.40 Cum
S36 1 x 1 x 2.78 x 0.97 x 0.15 = 0.40 Cum
S37 1 x 1 x 2.80 x 0.96 x 0.15 = 0.40 Cum
S38 1 x 1 x 2.80 x 0.96 x 0.15 = 0.40 Cum
S39 1 x 1 x 5.91 x 5.89 x 0.15 = 5.22 Cum
Slab Projection Bottom of Beam
C46-C47-C48 1 x 1 x 7.45 x 1.20 x 0.10 = 0.89 Cum
C48-C49-C50 1 x 1 x 6.79 x 1.20 x 0.10 = 0.81 Cum
C9-C10 1 x 1 x 4.55 x 0.98 x 0.10 = 0.45 Cum
C10-C11-C12 1 x 1 x 7.48 x 0.98 x 0.10 = 0.73 Cum
Beam R.C.C of 1st Floor slab R.H.S
SB-02 (C8-C9) 1 X 1 X 2.390 X 0.230 X 0.500 = 0.27 Cum
SB-02 (C9-C10) 1 X 1 X 4.590 X 0.230 X 0.500 = 0.53 Cum
SB-02 (C10-C11) 1 X 1 X 4.560 X 0.230 X 0.500 = 0.52 Cum
SB-02 (C11-C12) 1 X 1 X 4.500 X 0.230 X 0.500 = 0.52 Cum
SB-03 (C13-C14) 1 X 1 X 1.690 X 0.230 X 0.500 = 0.19 Cum
SB-04 (C8-C9) 1 X 1 X 2.600 X 0.230 X 0.500 = 0.30 Cum
SB-05 (C8-C9) 1 X 1 X 2.600 X 0.230 X 0.500 = 0.30 Cum
SB-07 (C7-C8) 1 X 1 X 3.070 X 0.230 X 0.500 = 0.35 Cum
SB-08 (C12-C13) 1 X 1 X 2.530 X 0.230 X 0.500 = 0.29 Cum
SB-10 (C21-C22) 1 X 1 X 5.700 X 0.230 X 0.500 = 0.66 Cum
SB-10 (C22-C23) 1 X 1 X 4.580 X 0.230 X 0.500 = 0.53 Cum
SB-10 (C23-C24) 1 X 1 X 4.550 X 0.230 X 0.500 = 0.52 Cum
SB-10 (C24-C25) 1 X 1 X 4.500 X 0.230 X 0.500 = 0.52 Cum
SB-10 (C25-C26) 1 X 1 X 4.550 X 0.230 X 0.500 = 0.52 Cum
SB-12 (C33-C34) 1 X 1 X 5.700 X 0.230 X 0.500 = 0.66 Cum
SB-12 (C34-C35) 1 X 1 X 4.580 X 0.230 X 0.500 = 0.53 Cum
SB-12 (C35-C36) 1 X 1 X 4.550 X 0.230 X 0.500 = 0.52 Cum
SB-12 (C36-C37) 1 X 1 X 4.500 X 0.230 X 0.500 = 0.52 Cum
SB-12 (C37-C38) 1 X 1 X 4.550 X 0.230 X 0.500 = 0.52 Cum
SB-14 (C45-C46) 1 X 1 X 5.700 X 0.230 X 0.500 = 0.66 Cum
SB-14 (C46-C47) 1 X 1 X 4.580 X 0.230 X 0.500 = 0.53 Cum
SB-14 (C47-C48) 1 X 1 X 4.550 X 0.230 X 0.500 = 0.52 Cum
SB-14 (C48-C49) 1 X 1 X 4.500 X 0.230 X 0.500 = 0.52 Cum
SB-14 (C49-C50) 1 X 1 X 4.550 X 0.230 X 0.500 = 0.52 Cum
SB-21 (C7-C21) 1 X 1 X 5.440 X 0.230 X 0.500 = 0.63 Cum
SB-21 (C21-C33) 1 X 1 X 1.800 X 0.230 X 0.500 = 0.21 Cum
SB-21 (C33-C45) 1 X 1 X 5.220 X 0.230 X 0.500 = 0.60 Cum
SB-22 (SB12-SB14) 1 X 1 X 5.890 X 0.230 X 0.500 = 0.68 Cum
SB-23(FB 10-C8) 1 X 1 X 6.250 X 0.230 X 0.500 = 0.72 Cum
SB-24 (C9-C22) 1 X 1 X 5.440 X 0.230 X 0.500 = 0.63 Cum
SB-24 (C22-C34) 1 X 1 X 1.800 X 0.230 X 0.500 = 0.21 Cum
B/F = 59.88 Cum
Page no- 22
Particular Nos x Nos x L x B x H = Quantity Unit
C/O = 59.88 Cum
SB-24 (C34-C46) 1 X 1 X 5.220 X 0.230 X 0.500 = 0.60 Cum
SB-25 (C10-C23) 1 X 1 X 5.440 X 0.230 X 0.500 = 0.63 Cum
SB-25 (C23-C35) 1 X 1 X 1.800 X 0.230 X 0.500 = 0.21 Cum
SB-25 (C35-C47) 1 X 1 X 5.220 X 0.230 X 0.500 = 0.60 Cum
SB-26 (C11-C24) 1 X 1 X 5.440 X 0.230 X 0.500 = 0.63 Cum
SB-26 (C24-C36) 1 X 1 X 1.800 X 0.230 X 0.500 = 0.21 Cum
SB-26 (C36-C48) 1 X 1 X 5.220 X 0.230 X 0.500 = 0.60 Cum
SB-27 (C12-C25) 1 X 1 X 5.440 X 0.230 X 0.500 = 0.63 Cum
SB-27 (C25-C37) 1 X 1 X 1.800 X 0.230 X 0.500 = 0.21 Cum
SB-27 (C37-C49) 1 X 1 X 5.220 X 0.230 X 0.500 = 0.60 Cum
SB-29 (C14-C26) 1 X 1 X 5.440 X 0.230 X 0.500 = 0.63 Cum
SB-29 (C26-C38) 1 X 1 X 1.800 X 0.230 X 0.500 = 0.21 Cum
SB-29 (C38-C50) 1 X 1 X 5.220 X 0.230 X 0.500 = 0.60 Cum
SB-30 (C9-SB31) (SB31-C11) (C11-SB31) (SB31-C47)(C47-SB31)(SB31-C49)(C49-SB31)
7 X 1 X 2.800 X 0.230 X 0.500 = 2.25 Cum
SB-31(FB02- FB33) 3 X 1 X 2.500 X 0.230 X 0.500 = 0.86 Cum
SB-31(FB35- FB14) 4 X 1 X 2.500 X 0.230 X 0.500 = 1.15 Cum
SB-33 (C9-C10) 1 X 1 X 4.620 X 0.230 X 0.500 = 0.53 Cum
SB-33 (C10-C11) 1 X 1 X 4.620 X 0.230 X 0.500 = 0.53 Cum
SB-33 (C11-C12) 1 X 1 X 4.680 X 0.230 X 0.500 = 0.54 Cum
SB-35 (C46-C47) 1 X 1 X 4.620 X 0.230 X 0.500 = 0.53 Cum
SB-35 (C47-C48) 1 X 1 X 4.620 X 0.230 X 0.500 = 0.53 Cum
SB-35 (C48-C49) 1 X 1 X 4.680 X 0.230 X 0.500 = 0.54 Cum
SB-35 (C49-C50) 1 X 1 X 4.670 X 0.230 X 0.500 = 0.54 Cum
StairCase RCC 4th Flight
C7-C8
Waist Slab 1 X 1 X 3.35 X 1.500 X 0.150 = 0.75 cum
Tread & Riser 10 X 0.5 X 1.50 X 0.300 X 0.150 = 0.34 Cum
C12-C13
Waist Slab 1 X 1 X 3.35 X 1.200 X 0.150 = 0.60 cum
Tread & Riser 10 X 0.5 X 1.20 X 0.300 X 0.150 = 0.27 Cum
Total Quantity = 76.20 Cum
C/O TCMB -
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and Removal of form for
3.2.6 : Column, Pillars, piers, Abustments, posts and struts
Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess L/H Side Column R.C.C From 3rd floor upto roof slab 2.40 MT ht
C4 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C5 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C6 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C18 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C19 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C20 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C30 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C31 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C32 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C42 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C43 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C44 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
Total Quantity = 48.96 Sqm
C/O TCMB -
Page no- 23
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforcd cement concrete work , using coarse aggregate as well
as fine aggregate derived from natural source and cement cocrete as per approved design
mix , including pimping of con crete to site laying but excluding the cost of centering ,
Agreement No. 3.6 : shuttering,finishing and reinforecd , including admixture in recommended proportion as per
IS: 9103 to accelerated, retard setting of concrete , improve workability without impairing
strength and durability as per direction of Engineer-in-Charge.
ASOS Mess L/H Side Column R.C.C From 3rd floor upto roof slab 2.4mt ht
C4 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C5 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C6 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C18 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C19 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C20 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C30 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C31 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C32 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C42 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C43 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
C44 1 x 1 x 0.35 x 0.50 x 2.40 = 0.42 Cum
Total Quantity = 5.04 Cum
C/O TCMB -
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and Removal of form for
3.2.6 : Column, Pillars, piers, Abustments, posts and struts
Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess L/H Side Column R.C.C From 2.4 mt height upto Roof slab
C4 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C5 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C6 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C18 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C19 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C20 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C30 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C31 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C32 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C42 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C43 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
C44 1 x 2 x( 0.35 + 0.50 )x 0.75 = 1.28 sqm
Porch front round column from 2.4 mt upto 3.90mt
C51 1 x 2 x 3.14 x 0.15 x 1.50 = 9.87 sqm
C52 1 x 2 x 3.14 x 0.15 x 1.50 = 9.87 sqm
Page no- 24
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforcd cement concrete work , using coarse aggregate as well
as fine aggregate derived from natural source and cement cocrete as per approved design
mix , including pimping of con crete to site laying but excluding the cost of centering ,
Agreement No. 3.6 : shuttering,finishing and reinforecd , including admixture in recommended proportion as per
IS: 9103 to accelerated, retard setting of concrete , improve workability without impairing
strength and durability as per direction of Engineer-in-Charge.
ASOS Mess L/H Side Column R.C.C From 2.4 mt height upto Roof slab
C4 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C5 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C6 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C18 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C19 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C20 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C30 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C31 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C32 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C42 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C43 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
C44 1 x 1 x 0.35 x 0.50 x 0.90 = 0.16 Cum
Porch front round column 2.4 mt to 3.90mt
C51 1 x 3.14 x 0.15 x 0.15 x 1.50 = 0.11 Cum
C52 1 x 3.14 x 0.15 x 0.15 x 1.50 = 0.11 Cum
Total Quantity = 2.14 Cum
C/O TCMB -
Sign by Contractor Checked by JE Checked by AE
Page no- 25
Date of Measurement:
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Reinforcement of L/H Side Roof slab Beam Re-inforcement
Long Direction
RB-01 (C4-C5-C6) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Bottom Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Stirrup
(C4-C5) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
(C5-C6) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
RB-06 (C18-C19-C20 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Bottom Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Stirrup
(C18-C19) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
(C19-C20) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
RB-08 (C30-C31-C32 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Bottom Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Stirrup
(C30-C31) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
(C31-C32) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
RB-10 (C42-C43-C44 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Bottom Main Bar 16 mm 1 x 2 x 11.00 = --- --- --- 22.00 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Stirrup
(C42-C43) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
(C43-C44) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 17 x 1.38 = 23.46 --- --- --- --- ---
RB-32 (RB-12 TO RB-14 (230 X 500)
Top Main Bar 12 mm 1 x 3 x 10.80 = --- --- 32.40 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 10.80 = --- --- 32.40 --- --- ---
Top Lap 12 mm 1 x 3 x 0.60 = --- --- 1.80 --- --- ---
Bottom Lap 12 mm 1 x 3 x 0.60 = --- --- 1.80 --- --- ---
Stirrup
(C4-C5) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 18 x 1.38 = 24.84 --- --- --- --- ---
(C5-C6) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 18 x 1.38 = 24.84 --- --- --- --- ---
B/F = 237.36 284.00 68.40 188.80 0.00 0.00
Page no- 26
Steel (TMT Bars)
Particulars Dia No. Length
Page13-10
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 237.36 284.00 68.40 188.80 0.00 0.00
RB-34 (RB-12 TO RB-14) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 10.80 = --- --- 32.40 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 10.80 = --- --- 32.40 --- --- ---
Top Lap 12 mm 1 x 3 x 0.60 = --- --- 1.80 --- --- ---
Bottom Lap 12 mm 1 x 3 x 0.60 = --- --- 1.80 --- --- ---
Stirrup
(C42-C43) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 18 x 1.38 = 24.84 --- --- --- --- ---
(C43-C44) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 18 x 1.38 = 24.84 --- --- --- --- ---
RB-30 (C4-RB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 4.00 = --- --- 12.00 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 4.00 = --- --- 12.00 --- --- ---
Stirrup
10 mm 1 x 17 x 1.42 = --- 24.14 --- --- --- ---
8 mm 1 x 8 x 1.38 = 11.04 --- --- --- --- ---
RB-30 (C6-RB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 3.90 = --- --- 11.70 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 3.90 = --- --- 11.70 --- --- ---
Stirrup
10 mm 1 x 16 x 1.42 = --- 22.72 --- --- --- ---
8 mm 1 x 8 x 1.38 = 11.04 --- --- --- --- ---
RB-30 (RB31-C43-RB31) (230 X 500)
Top Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Bottom Main Bar 12 mm 1 x 3 x 7.00 = --- --- 21.00 --- --- ---
Lap 12 mm 1 x 3 x 0.60 = --- --- 1.80 --- --- ---
Stirrup
10 mm 1 x 32 x 1.42 = --- 45.44 --- --- --- ---
8 mm 1 x 18 x 1.38 = 24.84 --- --- --- --- ---
RB-31 (230 X 500)=4 NOS
Top Main Bar 12 mm 4 x 3 x 3.55 = --- --- 42.60 --- --- ---
Bottom Main Bar 12 mm 4 x 3 x 3.55 = --- --- 42.60 --- --- ---
Stirrup
10 mm 4 x 16 x 1.42 = --- 90.88 --- --- --- ---
8 mm 4 x 6 x 1.38 = 33.12 --- --- --- --- ---
RB-12 (C42-C30-C18-C4 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 15.30 = --- --- --- 30.60 --- ---
Bottom Main Bar 16 mm 1 x 2 x 15.30 = --- --- --- 30.60 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Stirrup
(C42-C30) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
(C30-C18) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
(C18-C4) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 23 x 1.38 = 31.74 --- --- --- --- ---
RB-13 (C43-C31-C19-C5 ) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 15.30 = --- --- --- 30.60 --- ---
Bottom Main Bar 16 mm 1 x 2 x 15.30 = --- --- --- 30.60 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Extra top at C43 12 mm 1 x 1 x 2.70 = --- --- 2.70 --- --- ---
Extra top at C31& C19 20 mm 1 x 2 x 2.50 = --- --- --- --- 5.00 ---
Extra top at C5 12 mm 1 x 1 x 2.70 = --- --- 2.70 --- --- ---
B/F = 427.80 606.34 318.60 317.60 5.00 0.00
Page no- 27
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Page14-10
C/O = 427.80 606.34 318.60 317.60 5.00 0.00
Stirrup
(C43-C31) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
(C31-C19) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
(C19-C5) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 23 x 1.38 = 31.74 --- --- --- --- ---
RB-14 (C44-C32-C20-C6) (230 X 500)
Top Main Bar 16 mm 1 x 2 x 15.30 = --- --- --- 30.60 --- ---
Bottom Main Bar 16 mm 1 x 2 x 15.30 = --- --- --- 30.60 --- ---
Top Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Bottom Lap 16 mm 1 x 2 x 0.80 = --- --- --- 1.60 --- ---
Extra top at C32& C20 12 mm 1 x 2 x 2.50 = --- --- 5.00 --- --- ---
Stirrup
(C44-C32) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 21 x 1.38 = 28.98 --- --- --- --- ---
(C32-C20) 10 mm 1 x 18 x 1.42 = --- 25.56 --- --- --- ---
(C20-C6) 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 23 x 1.38 = 31.74 --- --- --- --- ---
Page no- 28
Date of Measurement:
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Steel (TMT Bars)
Particulars Dia No. Length
Page15-10
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
Measurement Of L/H Side Roof Slab Reinforcement
Long Direction
(C42-C44)to(C4-C6)
Bottom bar 10 mm 1 x 40 x 15.60 = --- 624.00 --- --- --- ---
Crank bar 10 mm 1 x 15 x 15.80 = --- 237.00 --- --- --- ---
Top bar 10 mm 1 x 27 x 15.60 = --- 421.20 --- --- --- ---
Extra top 10 mm 1 x 13 x 4.30 = --- 55.90 --- --- --- ---
At RB-6& RB-08 10 mm 1 x 13 x 4.00 = --- 52.00 --- --- --- ---
At RB-01& RB-32 10 mm 1 x 13 x 4.30 = --- 55.90 --- --- --- ---
Short direction
(C4-C42)to(C6-C44)
Bottom bar 10 mm 1 x 35 x 11.30 = --- 395.50 --- --- --- ---
10 mm 1 x 41 x 10.70 = --- 438.70 --- --- --- ---
Crank bar 10 mm 1 x 8 x 11.50 = --- 92.00 --- --- --- ---
Top bar 10 mm 1 x 24 x 11.30 = --- 271.20 --- --- --- ---
10 mm 1 x 36 x 10.70 = --- 385.20 --- --- --- ---
Extra top at RB-14 10 mm 1 x 5 x 2.00 = --- 10.00 --- --- --- ---
10 mm 1 x 5 x 1.40 = --- 7.00 --- --- --- ---
Extra top at RB-13 10 mm 1 x 5 x 2.52 = --- 12.60 --- --- --- ---
10 mm 1 x 5 x 2.52 = --- 12.60 --- --- --- ---
Extra top at RB-12 10 mm 1 x 5 x 1.90 = --- 9.50 --- --- --- ---
10 mm 1 x 5 x 1.90 = --- 9.50 --- --- --- ---
Front chajja
Top and bottom 10 mm 2 x 5 x 11.30 = --- 113.00 --- --- --- ---
L/H Side chajja
Top and bottom 10 mm 2 x 5 x 14.60 = --- 146.00 --- --- --- ---
Back Side chajja
Top and bottom 10 mm 2 x 5 x 10.50 = --- 105.00 --- --- --- ---
R/H Side chajja
Top and bottom 10 mm 2 x 5 x 6.60 = --- 66.00 --- --- --- ---
Lapping 10 mm 1 x 255 x 0.50 = --- 127.50 --- --- --- ---
Chair 10 mm 1 x 170 x 1.39 = --- 236.30 --- --- --- ---
False column vertical 12 mm 13 x 4 x 1.65 = --- --- 85.80 --- --- ---
False column ring 8 mm 13 x 2 x 0.52 = 13.52 --- --- --- --- ---
Total (In m) = 13.52 3883.60 85.80 0.00 0.00 0.00
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 5.34 2392.30 76.19 0.00 0.00 0.00
C/O TCMB / P - 2473.83 kg
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Measurement for Stirrup For Column and Beam Junction at Roof Slab of L/H side
C4 10 mm 1 x 4 x 1.78 = --- 7.12 --- --- --- ---
C5 10 mm 1 x 4 x 1.78 = --- 7.12 --- --- --- ---
C6 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C18 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C19 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C20 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C30 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C31 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C32 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C42 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C43 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
C44 10 mm 1 x 4 x 1.58 = --- 6.32 --- --- --- ---
Total (In m) = 0.00 77.44 0.00 0.00 0.00 0.00
0.395 0.616 0.888 1.579 2.467 3.850
Total Weight (In Kg) 0.00 47.70 0.00 0.00 0.00 0.00
C/O TCMB / P - 47.70 Kg
Item No:- 3.4 Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position
and binding all complete above plinth level.
Item No:- 3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
Front porch area beam and projected slab reinforcement
L/H side beam
Page16-10
Top and bottom 16 mm 2 x 3 x 4.90 = --- --- --- 29.40 --- ---
Extra top 12 mm 1 x 1 x 1.20 = --- --- 1.20 --- --- ---
Stirups 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
R/H side beam
Top and bottom 16 mm 2 x 3 x 4.90 = --- --- --- 29.40 --- ---
Extra top 20 mm 1 x 1 x 1.20 = --- --- --- --- 1.20 ---
Stirups 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 15 x 1.38 = 20.70 --- --- --- --- ---
Front beam
Top and bottom 16 mm 2 x 3 x 7.10 = --- --- --- 42.60 --- ---
Stirups 10 mm 1 x 20 x 1.42 = --- 28.40 --- --- --- ---
8 mm 1 x 22 x 1.38 = 30.36 --- --- --- --- ---
L/H side projected slab
Top and bottom main 10 mm 2 x 25 x 0.80 = --- 40.00 --- --- --- ---
Binder 10 mm 2 x 6 x 4.40 = --- 52.80 --- --- --- ---
R/H side projected slab
Top and bottom main 10 mm 2 x 30 x 0.80 = --- 48.00 --- --- --- ---
Binder 10 mm 2 x 6 x 5.00 = --- 60.00 --- --- --- ---
Front side projected slab
Top and bottom main 10 mm 2 x 52 x 0.80 = --- 83.20 --- --- --- ---
Binder 10 mm 2 x 6 x 7.50 = --- 90.00 --- --- --- ---
Slope vrtical reinforcement upto casting
L/H side 10 mm 1 x 25 x 0.35 = --- 8.75 --- --- --- ---
R/H side 10 mm 1 x 30 x 0.35 = --- 10.50 --- --- --- ---
Front 10 mm 1 x 52 x 0.35 = --- 18.20 --- --- --- ---
Lapping 10 mm 1 x 25 x 0.50 = --- 12.50 --- --- --- ---
16 mm 1 x 14 x 0.80 = --- --- --- 11.20 --- ---
Steel reinforcement for R.C.C work including straightening , cutting , bending placing in
3.4
position and binding all complete above plinth level
3.4.1 Thermo-Mechanically Treated bars of Grade Fe-500D or more
Reinforcement of Column R/H Side From 2nd Floor upto 3rd Floor
C-7 (350X600)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Page17-10
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-8 (350X600)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-9 (350X500)
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-10 (350X500)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Existing Bar 25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 2.60 = --- --- --- --- --- 2.60
25 mm 1 x 1 x 2.60 = --- --- --- --- --- 2.60
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-11 (350X500)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Existing Bar 25 mm 1 x 1 x 1.27 = --- --- --- --- --- 1.27
25 mm 1 x 1 x 1.75 = --- --- --- --- --- 1.75
25 mm 1 x 1 x 1.80 = --- --- --- --- --- 1.80
25 mm 1 x 1 x 1.45 = --- --- --- --- --- 1.45
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-12 (350X600)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-13 (350X600)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.74 = --- 41.76 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
B/F = 0.00 471.12 0.00 0.00 215.60 32.17
Page no- 31
Page no- 32
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 0.00 858.48 0.00 0.00 306.80 188.64
Existing Bar 25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.74 = --- --- --- --- --- 1.74
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
Page19-10
Links
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-34 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Existing Bar 25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-35 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Existing Bar 25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 2.10 = --- --- --- --- --- 2.10
25 mm 1 x 1 x 1.78 = --- --- --- --- --- 1.78
25 mm 1 x 1 x 2.35 = --- --- --- --- --- 2.35
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-36 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Existing Bar 25 mm 1 x 1 x 2.61 = --- --- --- --- --- 2.61
25 mm 1 x 1 x 1.67 = --- --- --- --- --- 1.67
25 mm 1 x 1 x 1.50 = --- --- --- --- --- 1.50
25 mm 1 x 1 x 2.10 = --- --- --- --- --- 2.10
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-37 (350X500)
Main Bar 25 mm 1 x 8 x 3.30 = --- --- --- --- --- 26.40
Lap 25 mm 1 x 8 x 1.25 = --- --- --- --- --- 10.00
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-38 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-45 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
B/F = 0.00 1245.84 0.00 0.00 363.60 336.89
Page no- 33
Steel (TMT Bars)
Particulars Dia No. Length
8 mm 10 mm 12 mm 16mm 20mm 25mm
C/O = 0.00 1245.84 0.00 0.00 363.60 336.89
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Existing Bar 25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 1.90 = --- --- --- --- --- 1.90
25 mm 1 x 1 x 2.50 = --- --- --- --- --- 2.50
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Page20-10
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-46 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Existing Bar 25 mm 1 x 1 x 2.10 = --- --- --- --- --- 2.10
25 mm 1 x 1 x 2.10 = --- --- --- --- --- 2.10
25 mm 1 x 1 x 2.10 = --- --- --- --- --- 2.10
25 mm 1 x 1 x 2.10 = --- --- --- --- --- 2.10
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-47 (350X500)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 8 x 1.00 = --- --- --- --- 8.00 ---
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-48 (350X500)
Main Bar 20 mm 1 x 8 x 3.30 = --- --- --- --- 26.40 ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
Existing Bar 25 mm 1 x 1 x 1.45 = --- --- --- --- --- 1.45
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
25 mm 1 x 1 x 2.50 = --- --- --- --- --- 2.50
25 mm 1 x 1 x 1.75 = --- --- --- --- --- 1.75
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-49 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 20 mm 1 x 4 x 1.00 = --- --- --- --- 4.00 ---
25 mm 1 x 4 x 1.25 = --- --- --- --- --- 5.00
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
C-50 (350X500)
Main Bar 25 mm 1 x 4 x 3.30 = --- --- --- --- --- 13.20
Main Bar 20 mm 1 x 4 x 3.30 = --- --- --- --- 13.20 ---
Lap 20 mm 1 x 1 x 1.00 = --- --- --- --- 1.00 ---
25 mm 1 x 1 x 1.25 = --- --- --- --- --- 1.25
Stiruups (master ring) 10 mm 1 x 24 x 1.54 = --- 36.96 --- --- --- ---
Links 10 mm 1 x 24 x 0.45 = --- 10.80 --- --- --- ---
10 mm 1 x 24 x 0.70 = --- 16.80 --- --- --- ---
TOTAL = 0.00 1633.20 0.00 0.00 486.20 414.99
Provisional Weight considered for Measurements 0.395 0.616 0.888 1.579 2.467 3.850
Weight in Kg 0.00 1006.05 0.00 0.00 1199.46 1597.71
Total (in Kg) 3803.22
C/O TCMB / P -
Page no- 34
Page21-10
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforced cement concrete work, using coarse aggregate as well
as fine aggregate derived from natural sources and cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of
Agreement No. 3.6 :
centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete,
improve workability without impairing strength and durability as per direction of Engineer-in-
charge
3.6.2 : All works above plinth level upto floor V level
Particulars Nos x Nos x L x B x H = Quantity Unit
Asos mess building L/H Side Roof slab beam R.C.C
Linear Direction
R.B-01 (C4-C5) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
R.B-01 (C5-C6) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
RB-32 (C4-C18) to (C5-C19)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
RB-32 (C5-C19) to (C6-C20)
1 X 1 X 4.59 X 0.23 X 0.50 = 0.53 cum
RB-06 (C18-C19) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
RB-06 (C19-C20) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
RB-08 (C30-C31) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
RB-08 (C31-C32) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
RB-34 (C42-C30) to (C43-C31)
1 X 1 X 4.67 X 0.23 X 0.50 = 0.54 cum
RB-34 (C43-C31) to (C44-C32)
1 X 1 X 4.59 X 0.23 X 0.50 = 0.53 cum
RB-10 (C42-C43) 1 X 1 X 4.56 X 0.23 X 0.50 = 0.52 Cum
RB-10 (C43-C44) 1 X 1 X 4.46 X 0.23 X 0.50 = 0.51 Cum
RB-30 (Sub Beam)(C4- X X X X =
1 1 2.72 0.23 0.50 0.31 Cum
C5)
RB-30 (Sub Beam)(C5- X X X X =
1 1 2.89 0.23 0.50 0.33 Cum
C6)
RB-30 (Sub Beam)(C42- X X X X =
1 1 2.77 0.23 0.50 0.32 Cum
C43)
RB-30 (Sub Beam)(C43- X X X X =
1 1 2.81 0.23 0.50 0.32 Cum
C44)
Lateral Direction
RB-12 (C4-C18) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
RB-12 (C18-C30) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
RB-12 (C30-C42) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
RB-13 (C5-C19) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
RB-13 (C19-C31) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
RB-13 (C31-C43) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
RB-14 (C6-C20) 1 X 1 X 5.40 X 0.23 X 0.50 = 0.62 Cum
RB-14 (C20-C32) 1 X 1 X 1.77 X 0.23 X 0.50 = 0.20 Cum
RB-14 (C32-C44) 1 X 1 X 5.17 X 0.23 X 0.50 = 0.59 Cum
RB-31 (Sub Beam)
4 X 1 X 2.40 X 0.23 X 0.50 = 1.10 Cum
B/F = 12.87 Cum
Page no- 35
Particular Nos x Nos x L x B x H = Quantity Unit
C/O = 12.87 Cum
ASO'S MESS Building L/H Side roof slab
(RB12-RB31)(RB01- X X X X =
1 1 2.72 1.20 0.15 0.49 Cum
RB30)(C4-C5)
(RB12-RB31)(RB30- X X X X =
1 1 2.72 0.98 0.15 0.40 Cum
RB32)(C4-C5)
(RB31-RB13)(RB01- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
RB32)(C4-C5)
(RB12-RB13)(RB32- X X X X =
1 1 4.56 3.34 0.15 2.28 Cum
RB06)(C18-C19)
(RB1-RB32)(RB13- X X X X =
1 1 2.40 1.61 0.15 0.58 Cum
RB31)(C5-C6)
(RB31-RB14)(RB1 X X X X =
1 1 2.89 1.20 0.15 0.52 Cum
-RB30)(C5-C6)
(RB31-RB14)(RB30- X X X X =
1 1 2.89 0.98 0.15 0.42 Cum
RB32)(C5-C6)
(RB13-RB14)(RB32 X X X X =
1 1 4.74 3.34 0.15 2.37 Cum
-RB06)(C19-C20)
(C18-C19) to(C30-C31) 1 X 1 X 4.56 X 1.80 X 0.15 = 1.23 Cum
(C19-C20) to(C31-C32) 1 X 1 X 4.74 X 1.80 X 0.15 = 1.28 Cum
(RB12-RB13)(RB08- X X X X =
1 1 4.56 3.10 0.15 2.12 Cum
RB34)(C30-C31)
(RB34-RB10)(RB12- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
RB31)(C42-C43)
(RB31-RB13)(RB34- X X X X =
1 1 2.77 1.20 0.15 0.50 Cum
RB30)(C42-C43)
(RB31-RB13)(RB30- X X X X =
1 1 2.77 0.98 0.15 0.41 Cum
RB10)(C42-C43)
(RB13-RB14)(RB08- X X X X =
1 1 4.74 3.10 0.15 2.20 Cum
RB34)(C31-C32)
RB13-RB31)(RB34- X X X X =
1 1 2.81 1.20 0.15 0.51 Cum
RB30)(C43-C44)
(RB13-RB31)(RB30- X X X X =
1 1 2.81 0.98 0.15 0.41 Cum
RB10)(C43-C44)
(RB34-RB10)(RB31- X X X X =
1 1 2.40 1.62 0.15 0.58 Cum
RB14)(C43-C44)
Projected Slab
Front 1 X 1 X 11.30 X 0.60 X 0.10 = 0.68 Cum
L/H side 1 X 1 X 14.00 X 0.60 X 0.10 = 0.84 Cum
Back side 1 X 1 X 9.90 X 0.60 X 0.10 = 0.59 Cum
R/H side 1 X 1 X 6.00 X 0.60 X 0.10 = 0.36 Cum
Total Quantity (Cum) = 32.80 Cum
C/O TCMB / P -
Page no- 36
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and removal of form for
3.2.5 : Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Particular x Nos x L x B x H = Quantity Unit
ASO'S MESS Building L/H Side Shuttering work for R.C.C roof slab beam
Linear Direction
RB-1 (C4-C5)
Outer Side 1 X 1 X 4.56 X 0.40 X - = 1.82 Sqm
Inner Side 1 X 1 X 4.56 X 0.35 X - = 1.60 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
RB-1 (C5-C6)
Outer Side 1 X 1 X 4.46 X 0.40 X - = 1.78 Sqm
Inner Side 1 X 1 X 4.46 X 0.35 X - = 1.56 Sqm
Bottom 1 X 1 X 4.46 X 0.23 X - = 1.03 Sqm
RB-32 (RB12-RB13)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
RB-32 (RB13-RB14)
Side 1 X 2 X 4.59 X 0.35 X - = 3.21 Sqm
Bottom 1 X 1 X 4.59 X 0.23 X - = 1.05 Sqm
RB-06 (C18-C19)
Side 1 X 2 X 4.56 X 0.35 X - = 3.19 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
RB-06 (C19-C20)
Side 1 X 2 X 4.46 X 0.35 X - = 3.12 Sqm
Bottom 1 X 1 X 4.46 X 0.23 X - = 1.03 Sqm
RB-08 (C30-C31)
Side 1 X 2 X 4.56 X 0.35 X - = 3.19 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
RB-08 (C31-C32)
Side 1 X 2 X 4.46 X 0.35 X - = 3.12 Sqm
Bottom 1 X 1 X 4.46 X 0.23 X - = 1.03 Sqm
RB-34 (RB12-RB13)
Side 1 X 2 X 4.67 X 0.35 X - = 3.27 Sqm
Bottom 1 X 1 X 4.67 X 0.23 X - = 1.07 Sqm
RB-34 (RB13-RB14)
Side 1 X 2 X 4.59 X 0.35 X - = 3.21 Sqm
Bottom 1 X 1 X 4.59 X 0.23 X - = 1.05 Sqm
RB-10 (C42-C43)
Outer Side 1 X 1 X 4.56 X 0.40 X - = 1.82 Sqm
Inner Side 1 X 1 X 4.56 X 0.35 X - = 1.60 Sqm
Bottom 1 X 1 X 4.56 X 0.23 X - = 1.05 Sqm
RB-10 (C43-C44)
Outer Side 1 X 1 X 4.460 X 0.400 X - = 1.78 Sqm
Inner Side 1 X 1 X 4.46 X 0.35 X - = 1.56 Sqm
Bottom 1 X 1 X 4.46 X 0.23 X - = 1.03 Sqm
RB-30 (Sub Beam)(C4-C5)
Side 1 X 2 X 2.72 X 0.35 X - = 1.90 Sqm
Bottom 1 X 1 X 2.72 X 0.23 X - = 0.63 Sqm
RB-30 (Sub Beam)(C5-C6)
Side 1 X 2 X 2.89 X 0.35 X - = 2.02 Sqm
Bottom 1 X 1 X 2.89 X 0.23 X - = 0.66 Sqm
RB-30 (Sub Beam)(C42-C43)
Side 1 X 2 X 2.77 X 0.35 X - = 1.94 Sqm
Bottom 1 X 1 X 2.77 X 0.23 X - = 0.64 Sqm
B/F = 59.45 Sqm
Page no- 37
Particular x Nos x L x B x H = Quantity Unit
C/O = 59.45 Sqm
RB-30 (Sub Beam)(C43-C44)
Side 1 X 2 X 2.81 X 0.35 X - = 1.97 Sqm
Bottom 1 X 1 X 2.81 X 0.23 X - = 0.65 Sqm
Lateral Direction
RB-12 (C4-C18)
Out side 1 X 1 X 5.40 X 0.40 X - = 2.16 Sqm
inside 1 X 1 X 5.40 X 0.35 X - = 1.89 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
RB-12 (C18-C30)
Side 1 X 1 X 1.77 X 0.40 X - = 0.71 Sqm
1 X 1 X 1.77 X 0.35 X - = 0.62 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
RB-12 (C30-C42)
1 X 1 X 5.17 X 0.40 X - = 2.07 Sqm
Side
1 X 1 X 5.17 X 0.35 X - = 1.81 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
RB-13 (C5-C19)
1 X 1 X 5.40 X 0.35 X - = 1.89 Sqm
Side
1 X 1 X 5.40 X 0.35 X - = 1.89 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
RB-13 (C19-C31)
Side 1 X 2 X 1.77 X 0.35 X - = 1.24 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
RB-13 (C31-C43)
1 X 1 X 5.17 X 0.35 X - = 1.81 Sqm
Side
1 X 1 X 5.17 X 0.35 X - = 1.81 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
RB-14 (C6-C20)
Inner Side 1 X 1 X 5.40 X 0.35 X - = 1.89 Sqm
Outer Side 1 X 1 X 5.40 X 0.50 X - = 2.70 Sqm
Bottom 1 X 1 X 5.40 X 0.23 X - = 1.24 Sqm
RB-14 (C20-C32)
Inner Side 1 X 1 X 1.77 X 0.35 X - = 0.62 Sqm
Outer Side 1 X 1 X 1.77 X 0.50 X - = 0.89 Sqm
Bottom 1 X 1 X 1.77 X 0.23 X - = 0.41 Sqm
RB-14 (C32-C44)
Inner Side 1 X 1 X 5.17 X 0.35 X - = 1.81 Sqm
Outer Side 1 X 1 X 5.17 X 0.40 X - = 2.07 Sqm
Bottom 1 X 1 X 5.17 X 0.23 X - = 1.19 Sqm
RB-31 (Sub Beam)
4 X 1 X 1.19 X 0.35 X - = 1.67 Sqm
Side 4 X 1 X 0.98 X 0.35 X - = 1.37 Sqm
4 X 1 X 2.40 X 0.35 X - = 3.36 Sqm
Bottom 4 X 1 X 2.40 X 0.23 X - = 2.21 Sqm
Total Quantity (Sq.m) = 107.08 Sqm
C/O TCMB / P -
Page no- 38
Date of Measurement
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and removal of form for
3.2.3 : suspended floor s, roof ,landings balconies and access platform
Particular x Nos x L x B x H = Quantity Unit
ASO'S MESS Building L/H Side Shuttering Work For R.C.C Roof slab
(RB12-RB31)(RB01- X X X X =
1 1 2.72 1.20 - 3.26 Sqm
RB30)(C4-C5)
(RB12-RB31)(RB30- X X X X =
1 1 2.72 0.98 - 2.67 Sqm
RB32)(C4-C5)
(RB31-RB13)(RB01- X X X X =
1 1 2.40 1.62 - 3.89 Sqm
RB32)(C4-C5)
(RB12-RB13)(RB32- X X X X =
1 1 4.56 3.34 - 15.23 Sqm
RB06)(C18-C19)
(RB1-RB32)(RB13- X X X X =
1 1 2.40 1.61 - 3.86 Sqm
RB31)(C5-C6)
(RB31-RB14)(RB1 X X X X =
1 1 2.89 1.20 - 3.47 Sqm
-RB30)(C5-C6)
(RB31-RB14)(RB30- X X X X =
1 1 2.89 0.98 - 2.83 Sqm
RB32)(C5-C6)
(RB13-RB14)(RB32 X X X X =
1 1 4.74 3.34 - 15.83 Sqm
-RB06)(C19-C20)
(C18-C19) to(C30-C31) 1 X 1 X 4.56 X 1.80 X - = 8.21 Sqm
(C19-C20) to(C31-C32) 1 X 1 X 4.74 X 1.80 X - = 8.53 Sqm
(RB12-RB13)(RB08- X X X X =
1 1 4.56 3.10 - 14.14 Sqm
RB34)(C30-C31)
(RB34-RB10)(RB12- X X X X =
1 1 2.40 1.62 - 3.89 Sqm
RB31)(C42-C43)
(RB31-RB13)(RB34- X X X X =
1 1 2.77 1.20 - 3.32 Sqm
RB30)(C42-C43)
(RB31-RB13)(RB30- X X X X =
1 1 2.77 0.98 - 2.71 Sqm
RB10)(C42-C43)
(RB13-RB14)(RB08- X X X X =
1 1 4.74 3.10 - 14.69 Sqm
RB34)(C31-C32)
RB13-RB31)(RB34- X X X X =
1 1 2.81 1.20 - 3.37 Sqm
RB30)(C43-C44)
(RB13-RB31)(RB30- X X X X =
1 1 2.81 0.98 - 2.75 Sqm
RB10)(C43-C44)
(RB34-RB10)(RB31- X X X X =
1 1 2.40 1.62 - 3.89 Sqm
RB14)(C43-C44)
Projected Slab
Front 1 X 1 X 11.30 X 0.60 X - = 6.78 Sqm
L/H side 1 X 1 X 14.00 X 0.60 X - = 8.40 Sqm
Back side 1 X 1 X 9.90 X 0.60 X - = 5.94 Sqm
R/H side 1 X 1 X 6.00 X 0.60 X - = 3.60 Sqm
Total = 141.26 Sqm
C/O TCMB -
Agreement No. 3.2.8 : Edges of slabs and breaks in floors and wallsfor
3.2.8.1 : Under 20 cm wide
Particular Nos x L x B x H = Quantity Unit
Slab edge shuttering
Projected Slab side shuttering of L/H side Roof slab
Front 1 X 11.30 X - - = 11.30 mtr
L/H side 1 X 14.60 X - - = 14.60 mtr
Back side 1 X 10.50 X - - = 10.50 mtr
R/H side 1 X 6.60 X - - = 6.60 mtr
Total Quantity = 43.00 mtr
C/O TCMB -
Page no- 39
Date of Measurement
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and Removal of form for
3.2.6 : Column, Pillars, piers, Abustments, posts and struts
Particular Nos x Nos x L x B x H = Quantity Unit
ASOS Mess R/H Side Column Shuttering From 3rd floor slab upto 2.40mt
C7 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm
C8 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm
C9 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C10 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C11 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C12 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm
C13 1 x 2 x( 0.35 + 0.60 )x 2.40 = 4.56 sqm
C21 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C22 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C23 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C24 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C25 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C26 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C33 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C34 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C35 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C36 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C37 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C38 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C45 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C46 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C47 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C48 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C49 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
C50 1 x 2 x( 0.35 + 0.50 )x 2.40 = 4.08 sqm
Page no- 40
Date of Measurement
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforcd cement concrete work , using coarse aggregate as well
as fine aggregate derived from natural source and cement cocrete as per approved design
Agreement No. 3.6 : mix , including pimping of con crete to site laying but excluding the cost of centering ,
shuttering,finishing and reinforecd , including admixture in recommended proportion as per
IS: 9103 to accelerated, retard setting of concrete , improve workability without impairing
strength and durability as per direction of Engineer-in-Charge.
C/O TCMB -
Page no- 41
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and removal of form for
3.2.5 : Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Particular x Nos x L x B x H = Quantity Unit
ASOS Mess front porch beam Shuttering
L/H side beam
Outer Side 1 X 1 X 4.31 X - X 0.40 = 1.72 Sqm
Inner Side 1 X 1 X 4.31 X - X 0.50 = 2.16 Sqm
Bottom 1 X 1 X 4.56 X - X 0.23 = 1.05 Sqm
R/H side beam
Outer Side 1 X 1 X 4.31 X - X 0.40 = 1.72 Sqm
Inner Side 1 X 1 X 4.31 X - X 0.50 = 2.16 Sqm
Bottom 1 X 1 X 4.56 X - X 0.23 = 1.05 Sqm
Front
Outer Side 1 X 1 X 5.90 X - X 0.40 = 2.36 Sqm
Inner Side 1 X 1 X 5.90 X - X 0.50 = 2.95 Sqm
Bottom 1 X 1 X 5.90 X - X 0.23 = 1.36 Sqm
Total Quantity = 16.53 Sqm
C/O TCMB -
Agreement No. 3.2 : Centering and shuttering including strutting, propping etc. and removal of form for
3.2.3 : suspended floor s, roof ,landings balconies and access platform
Particular x Nos x L x B x H = Quantity Unit
ASOS Mess front porch projected slab shuttering
L/H side 1 X 1 X 4.40 X 0.60 X - = 2.64 Sqm
R/H side 1 X 1 X 6.90 X 0.60 X - = 4.14 Sqm
Front side 1 X 1 X 4.40 X 0.60 X - = 2.64 Sqm
Total Quantity = 9.42 Sqm
C/O TCMB -
Agreement No. 3.2.8 : Edges of slabs and breaks in floors and walls for
3.2.8.1 : Under 20 cm wide
Particular Nos x L x B x H = Quantity Unit
Slab edge shuttering
ASOS Mess front porch projected slab side shuttering
L/H side 1 X 4.40 X - - = 4.40 mtr
Front side 1 X 7.50 X - - = 7.50 mtr
R/H side 1 X 5.00 X - - = 5.00 mtr
Total Quantity = 16.90 mtr
C/O TCMB -
Page no- 42
ABSTRACT OF COST 6th R.A. Bill
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn,
1 Name of work : ITBP at Karchia Sonapur (Assam) including water supply, sanitary
installation & internal electrical installation.
2 Agreement No- : 04/CE/EE/PD/2020-21
3 Agency - : M/s Khatri Enterprises
4 Date of Start : 10.08.2020
5 Date of Complittion : 09.08.2021
6 Time Allowed : 12 (Twelve) months
7 Date of completion (Actual) : Work in Progress
8 Date of Abstract : 6/26/2023
9 Sl.No Of Bill : 6th R.A bill
Rate
Item
Description B/F Page No. Quantity Unit : Amount
No. Agmnt in this bill
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers
1.5.1 not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up
to 50m and lift upto 1.5m.
c/O = 433765.06
Supplying and filling in plinth with sand under floors, including watering, ramming,
1.7
consolidation and dressing complete.
Agrt. Qnty -103.00 cum
Qty. B/F CMB No COM/ITBP/PD-
II/860 vide Page No. 71.62 cum
Total 71.62 cum 1265.05 1265.05 cum : 90602.88
Providing and laying in position cement concrete of specified grade excluding the cost of
2.1
centering and shuttering - All work upto plinth level:
1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural sources : 10 graded stone
2.1.2
aggregate 40 mm nominal size derived from natural sources )
Agrt. Qnty - 142.97 Cum
Qty. B/F CMB No COM/ITBP/PD-
86.86
II/860 vide Page No. cum
Total 86.86 cum 5524.40 5524.40 cum : 479849.38
3.2 Centering and shuttering including strutting, propping etc. and removal of form for
3.2.1 Foundations, footings, bases of columns, etc. for mass concrete
Agrt. Qnty - 413.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-
386.26
II/860 vide Page No. sqm
Total 386.26 sqm 234.05 234.05 Sqm : 90404.15
3.2.2 Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Agrt. Qnty - 367.24 Sqm
Qty. B/F CMB No COM/ITBP/PD-
145.72 sqm
II/860 vide Page No.
Total 145.72 sqm 500.05 500.05 Sqm : 72867.29
3.2.3 suspended floor s, roof ,landings balconies and access platform
Agrt. Qnty - 2273.75 Sqm
Qty. B/F CMB No COM/ITBP/PD-
1178.66 sqm
II/860 vide Page No.
Qty B/F TCMB 307.55 sqm
Qty B/F TCMB 141.26 sqm
Qty B/F TCMB 9.42 sqm
Total 1636.89 sqm 546.55 546.55 Sqm : 894642.23
3.2.5 Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Agrt. Qnty - 2964.90 Sqm
Qty. B/F CMB No COM/ITBP/PD-
1435.19 sqm
II/860 vide Page No.
Qty B/F TCMB 255.93 sqm
Qty B/F TCMB 107.08 sqm
Qty B/F TCMB 16.53 sqm
Total 1814.73 sqm 432.70 432.70 Sqm : 785233.67
3.2.6 Columns, Pillars, Piers, Abutments, Posts and Struts
Agrt. Qnty - 998.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-
760.35 sqm
II/860 vide Page No.
Qty B/F TCMB 33.88 sqm
Qty B/F TCMB 48.96 sqm
Qty B/F TCMB 35.10 sqm
Qty B/F TCMB 103.92 sqm
Total 982.21 sqm 579.15 579.15 Sqm : 568846.92
3.2.7 Stairs,(excluding landings) except spiral-staircases
Agrt. Qnty - 159.00 Sqm
Qty. B/F CMB No COM/ITBP/PD-
84.76 sqm
II/860 vide Page No.
Qty B/F TCMB 17.53 sqm
Total 102.29 sqm 579.15 579.15 Sqm : 59241.25
B/F = 3475452.83
Page no- 44
C/O = 3475452.83
Providing and laying in position machine batched and machine mixed design mix M-25
grade cement concrete for reinforced cement concrete work, using coarse aggregate as well
as fine aggregate derived from natural sources and cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of
3.6
centering, shuttering, finishing and reinforcement, including admixtures in
recommended proportions as per IS: 9103 to accelerate, retard setting of concrete,
improve workability without impairing strength and durability as per direction of Engineer-in-
charge
3.6.1 All works upto plinth level.
Agrt. Qnty - 265.00 cum
Qty. B/F CMB No COM/ITBP/PD- Cu
263.19
II/860 vide Page No. m
Total 263.19 cum 8084.30 8084.30 cum : 2127706.92
B/F = 13261840.89
Page no- 45
C/O = 13261840.89
3.6.2 All works above plinth level upto floor V level
Agrt. Qnty - 560.00 cum
Qty. B/F CMB No COM/ITBP/PD-
366.35 Cum
II/860 vide Page No.
Qty B/F TCMB 4.28 Cum
Qty B/F TCMB 76.20 Cum
Qty B/F TCMB 5.04 Cum
Qty B/F TCMB 2.14 Cum
Qty B/F TCMB 32.80 Cum
Qty B/F TCMB 10.82 Cum
Qty B/F TCMB 2.61 Cum
Total 500.24 cum
Total (A) 32.80 cum 9098.00 6823.50 cum 223810.80
Total (B) 467.44 cum 9098.00 9098.00 cum 4252769.12
Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and
4.1
plinth in :
4.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand)
Agrt. Qnty - 88.00cum
Qty. B/F CMB No COM/ITBP/PD-
II/860 vide Page No. 48.03
Total 48.03 cum 7879.85 7879.85 cum : 378469.20
10.1 12 mm Cement Plaster of Mix :
10.1.1 1:4 (1 Cement : 4 coarse sand)
Agrt. Qnty - 3220.00 sqm
Qty. B/F CMB No COM/ITBP/PD-
II/860 vide Page No. 262.00 sqm
Extra for additional height in centering, shuttering where ever required with adequate bracing, propping etc.,
including cost of de-shuttering and decentering at all levels, over a height of 3.5 m, for every additional
E/S-3 height of 1 metre or part thereof (Suspended floors, roofs, landing, beams and balconies (Plan area to be
measured)
Qty B/F TCMB 178.52 sqm
Total 178.52 sqm 262.95 239.85 sqm : 42818.02
Certify that:-
1. The work has been done as per CPWD specification and agreement
2. No Govt. T&P has been issued to the contractor
3. No Labour complaint has been received so far.
4. Water has been arranged by the contractor at his own source.
5. Contractor has engaged technical staff.
6. F.N.Labour report has been submitted by the contractor
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
6th R.A. Bill
RECOVERIES:
1 Security Deposit @ 2.5% on "Gross value " : 83542.00
Already recovered in pervious bill :
Now to be recovered : 83542.00
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia Sonapur
1 Name of Work:-
(Assam) including water supply, sanitary installation & internal electrical installation.
5 Date of Entry
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and
3.4
binding all complete above plinth level.
3.4.1 Thermo-Mechanically Treated bars of grade Fe-500D or more.
REINFORCEMENT (TMT BAR)
Item Page Total in
Reference MB No.
No. No. 8mm 10 mm 12 mm 16 mm 20mm 25 mm ( Kg )
2.1.2 1:5:10 (1 cement : 5 coarse sand (Zone-III) derived from natural sources : 10
graded stone aggregate 40 mm nominal size derived from natural sources )
3.6 Providing and laying in position machine batched and machine mixed design
mix M-25 grade cement concrete for reinforced cement concrete work, using
coarse aggregate as well as fine aggregate derived from natural sources
and cement content as per approved design mix, including pumping of concrete
to site of laying but excluding the cost of centering, shuttering, finishing and
reinforcement, including admixtures in recommended proportions as per IS: 9103
to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge
E/S-2 Add for using extra cement in the items of design mix over and above the
specified cement content therein
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
Based On DSR 2021 Item No 5.35
EIS-II Add for using extra cement in the items of design mix over and
Code above the specified cement content
Description Unit therein
Quantity Rate Amount
Details of cost for 1 Quintal.
MATERIAL:
0367 Portland Cement tonne 0.100 7343.80 734.38
2209 Carriage of Cement tonne 0.100 0.00 0.00
TOTAL 734.38
Add for water charge @ 1 % 7.34
Total 741.72
Add for 12% GST applicable on work contract
by reversible method (multiplying fqactor 104.21
0.1405)
Total 845.94
Add for contractor’s profit and over-heads @ 15% 126.89
Total 972.83
Cost of 1 Quintal 972.83
Say 972.85
04/CE/EE/PD/2020-21
5,90,40,588.00
5,68,85,607.00
12 (Twelve) months
Work in progress
No any
Assistant Engineer
SPSD-II, Project Division
CPWD, (Assam)
5th R/A Bill C.P.W.A.-26 (Revised)
RUNNING ACCOUNT BILL
(Referred to in Paragraph 10-2-10 and 10-2-12)
(Final Payment must invariably the made on forms Printed on Yellow paper which should not be used for intermediate payment)
(For Contractor : This form provides for (1) advance payment (2) Payment for Measured Works. The form of Account Secured Advance which
has been printed separately should be attached, where necessary).
1. The work has been done as per CPWD specification as per direction of Engineer in charge
4. Water and electricity has been arranged by the contractor at his own source.
N.B.-- When there are two or more entries in column 6 relating to each Sub-head of estimate they should in case of work the accounts
of which are kept by sub-heads be totalled and the recorded in column 7 for posting the work abstract.
II. Certificate & Signature
1. The measurement on which are based the entires in column 1 to 6 of account I were verified by JE, SPSD-II on ____________ and
are recorded at Computer Measurement Book No.
2. Certified that in addition to and quite a part from the quantities of work actually executed as shown in column 4 of the account I some
work has actually been done in connection with several items and the value of such work after deducting there from proportionate
amount of required advance if any ultimately recoverable on account of the materials used therein) is in no case less than the advance
payment as per item 2 of the memorandum if payments made or proposed to be made for the convenience of the contractor in
anticipation of and subject to the result of detailed measurements which will be made as such as possible.
*This figure should be tested to see that it agree with the total of item 7 & 8.
If the net amount be paid is less than Rs.10 and it cannot be included in cheque the payment should be made in cash this entry being
alteered suitable and the alteration attested by dated initials.
Remarks
This space is reserved for any remarks which the Disbursing Officer of the Divisional Officer may wish to recorded in respect of
the execution of the work check of measurements or the state of contractor's amount.
Checked
3341664.35
GROSS TOTAL VALUE OF WORK DONE
1. Security Deposit 2.5% on Gross/Tendered Amount Rs.________ 0.00 i.e. Rs. 83542.00
5. Labour welfare cess 1% on Gross value Rs.________ 0.00 i.e. Rs. 0.00
6. GST 2%
(a) CGST 1% Rs.________ 0.00 i.e. Rs. 33417.00
(b) SGST 1% Rs.________ 0.00 i.e. Rs. 33417.00
7 Forest Royalty (As per Statement) Rs.________ 0.00 i.e. Rs. 0.00
Total recovery Rs. 250626.00
Assistant Engineer
SPSD II,PD
Assam,Guwahati
6th R.A Bill
Curing on Progress.
28 Days Test Report
3.6.2 All works upto plinth level. 32.80 9098.00 6823.50 Cum Awaited
3.6.1 All works upto plinth level. 263.19 Cum 4.076 (Qtl/cum) 1,072.76 Qntal
3.6.2 All works above plinth level upto floor V level 500.24
In 3rd R/A bill 34.76 Cum 4.076 (Qtl/cum) 141.68 Qntal
In 3rd R/A bill 141.17 Quantity Excuted By R.M.C
In 4th R/A bill 14.09 Cum 4.076 (Qtl/cum) 57.43 Qntal
In 4th R/A bill 77.49 Quantity Excuted By R.M.C
In 5th R/A bill 10.45 Cum 4.076 (Qtl/cum) 42.59 Qntal
In 5th R/A bill 88.39 Quantity Excuted By R.M.C
In this bill 48.37 Cum 4.076 (Qtl/cum) 197.16 Qntal
In this bill 85.52 Quantity Excuted By R.M.C
4.1.2 Cement mortar 1:6 (1 cement : 6 coarse sand) 48.03 cum 0.625 (Qtl/cum) 30.02 Qntal
10.1 12 mm Cement Plaster of Mix :
10.1.1 1:4 (1 Cement : 4 coarse sand) 262.00 sqm 0.055 (Qtl/Sqm) 14.33 Qntal
1,668.89
Variation (+2%) 33.38 Qtl
1,702.27 Qtl
3,405.00 Bags
Variation (-2%) 33.38 Qtl
3,371.62 Bags
Qty brought at site = 2895.00 Bags
Actual Consumption = 2865.00 Bags
Balance = 30.00 Bags
upto 5TH R.A Bill 1007.31 4096.32 4178.86 11489.85 899.94 2013.17 23685.45
Total (A) = 1007.31 4096.32 4178.86 11489.85 899.94 2013.17 23685.45 Kgs
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete
3.4 above plinth level.
in 3rd R.A Bill 1874.10 11739.04 1518.52 7459.19 1742.71 1986.37 26319.93
in 4TH R.A Bill 550.60 6335.48 1101.15 3422.03 1438.34 2059.75 14907.35
in 5TH R.A Bill 457.88 8054.41 1138.35 3400.89 865.30 1613.92 15530.75
Total (B) = 3593.83 37353.00 4773.94 17838.64 5962.04 7538.03 77059.48 Kgs
TOTAL (A+B) 4601.14 41449.32 8952.80 29328.49 6861.98 9551.20 100744.93 Kgs
Add 3% Wastage 138.03 1243.48 268.58 879.85 205.86 286.54 3022.34 Kgs
GRAND TOTAL 4739.17 42692.80 9221.38 30208.34 7067.84 9837.74 103767.27 Kgs
TOTAL (In M.T) 4.74 42.69 9.22 30.21 7.07 9.84 103.77 M.T
Brought at site (In M.T) 5.57 44.65 9.66 33.37 9.47 10.56 113.28 M.T
Balance at Site 0.83 1.96 0.44 3.16 2.40 0.72 9.51 M.T
0.00
Say 0.00
* Total amount outstanding as per this account © Rs. 0.00
Deduct :- amount outstanding as per entry (C) of Annexure to previous bil Rs. 0.00
Net Amount since Previous bill (in words) 0.00
(-) (E) Rs. 0.00
* Entries relating to each description of materials should be posted thus in column 3 first enter the difference between quantities in column 1 and 2 then show below this entry, the
quantities of any brought to site against which a f
** Entries in column 8 show the money values of the total quantities outstanding as per column 3.
*** Certified (1) that the plus quantities of materials shown in the column 3 of the account have actually been brought by the Contractor at site of the work and the Contractor has not
previously received any advance on these quantities.
(2) that these materials are of an imperishable nature and all required by the contractor for use on the work in connection with the items for which rates for finished work have been
agreed upon .
(3) that a formal agreement in form 31 signed and executed by the Contractor in accordance with the pragraphs 10.2.24 (a) of the CPWD Account Code is recorded in the Divisional
Office
(4) The quality of materilas is as per the specifications.
Dated Signature of Officer preparing the bill (Rank) Dated Signature of Officer authorising payment (Rank)
Assistant Engineer(Civil) Executive Engineer
Sonapur Project Sub Division-II Project Division-II
CPWD, Guwahati-15 CPWD, Guwahati-15.
*** These Certificate must be signed by the Sub-Divisional or Divisional Officer.
# This signature is necessary only when officer who prepares the bill is not the Officeer who authorises the payment.
In such case the two signatures are essential.
0 7/1/2023 TO 7/15/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.
TOTAL : ₹ 133,300.00
Signature of Contractor
Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 7/16/2023 TO 7/31/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.
TOTAL : ₹ 144,950.00
Signature of Contractor
Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 8/1/2023 TO 8/15/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.
TOTAL : ₹ 194,700.00
Signature of Contractor
Date :
FORTNIGHTLY LABOUR REPORT FOR THE PERIOD FROM 8/16/2023 TO 8/25/2023
1. Name of Agency: M/s Khatri Enterprises
Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP
2. Name of work : at Karchia Sonapur (Assam) including water supply, sanitary installation &
internal electrical installation.
TOTAL : ₹ 135,900.00
Signature of Contractor
Date :
TEST CHECK STATEMENT
1 Name of Work :- Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at
Karchia Sonapur (Assam) including water supply, sanitary installation & internal
electrical installation.
Ref. of Amount of
SL
No.
Description of Items MB & Quantity Amount of AE Test Check EE Test
page Check
50.61
Assistant Engineer
SPSD-II, Project Division
CPWD, Assam
r 33rd bn, ITBP at
stallation & internal
Remarks
Engineer
ect Division
Assam
MANDATORY TEST
6th R.A Bill
1 Name of Work: Construction of 45 Nos. SO's suites (ASI Accomodation ) for 33rd bn, ITBP at Karchia
Sonapur (Assam) including water supply, sanitary installation & internal electrical
installation.
Remarks/
Frequency as per No. of tests No of tests
Sl. No. Description of item Qty Upto date Qty Reasons for
specification required. actually done
shortfall, if any.
5 nos Report
Awaited ( Work
suspended
1 Water Test 22 Months 3 Months 8 Nos 8 Nos 8 Nos 14/7/21-7/3/22
17/3/22-5/10/22
12/10/22-
14/3/23)
2 Steel Test
8mm dia 5.57 tonne 25 tonnes 1 No. 1 No. 4 No. Satisfactory
10mm dia 44.65 tonne 35 tonnes 2 No. 2 No. 5 No. Satisfactory
12 mm dia 9.66 tonne 35 tonnes 2 No. 2 No. 4 No. Satisfactory
16mm dia 33.37 tonne 35 tonnes 2 No. 2 No. 5 No. Satisfactory
20mm dia 9.47 tonne 35 tonnes 2 No. 2 No. 4 No. Satisfactory
25mm dia 10.56 tonne 45 tonnes 1 Nos. 1 Nos. 3 No. Satisfactory
1Nos test Report
3 Cement Test 2895.00 Bags 1000 Bags 3 Nos. 3 Nos. 6 Nos. Awaited
1Nos lab test
4 Cube Test of RCC M-25 763.43 Cum 50 Cum 14 Nos. 14 Nos. 31 Nos. Report Awaited
1Nos test Report
5 Slump Test M-25 763.43 Cum 50 Cum 14 Nos. 14 Nos. 54 Nos. Awaited
8 Brick test 24000.00 Nos. 50000 Nos. 1 Nos. 1 Nos. 1 Nos. Satisfactory
6 Coarse Sand
i) Bulking Test 358.11 Cum 20 Cum 18 Nos. 14 Nos. 17 Nos. Satisfactory
ii) Silt Content Test. 358.11 Cum 20 Cum 18 Nos. 14 Nos. 17 Nos. Satisfactory
iii) Particle Size Distribution. 358.11 Cum 40 Cum 9 Nos. 7 Nos. 8 Nos. Satisfactory
7 Stone Aggregate
(i) 40 mm stone aggregate 56.46 Cum
(a) Particle Size Distribution 56.46 Cum 40 cum 2 Nos. 2 Nos. 3 Nos. Satisfactory
(b) Deleterious Material 56.46 Cum 40 cum 2 Nos. 2 Nos, 3 Nos. Satisfactory
(ii) 20 mm stone aggregate 379.69 Cum
(a) Particle Size Distribution 379.69 Cum 40 cum 10 Nos. 10 Nos. 12 Nos. Satisfactory
(b) Deleterious Material 379.69 Cum 40 cum 10 Nos. 10 Nos, 12 Nos. Satisfactory
(iii) 10 mm stone aggregate 176.67 Cum
(a) Particle Size Distribution 176.67 Cum 40 cum 5 Nos. 5 Nos. 7 Nos. Satisfactory
(b) Deleterious Material 176.67 Cum 40 cum 5 Nos. 5 Nos, 7 Nos. Satisfactory
09.08.2021
7 Date of Completion(Stp.):
450.00 21614.00