SIDRA MEDICAL & RESEARCH CENTRE

INSPECTION CHECK LIST


FOR
INSTALLATION OF PLUMBING PUMPS
Description of Work: Tag No. :
Drawing Ref. No.: Location:
System No.: Inspection Request No. :
Contract No.: Project No: 625
INSPECTION ATTRIBUTES
Item Description Accept Reject NA
A) Installation
1. Pumps are approved as per material submittal
Pumps are installed as per manufacturer’s instruction
2.
manual /shop drawings
Confirm name plate corresponds to the order and pump
3.
data.
Check that sediment chamber, oil interceptor and sump
4.
chamber are clean and free from waste.
Check pump cabling and termination are per applicable
5.
codes / manufacturer’s recommendation
6. Check pump cabling and termination using megger
Check pedestal foundation bolts are tightened and pump
7.
is sitting properly.
Discharge main is connected and all valves on the line are
8.
open.
9. Check discharge piping properly supported & installed.
Check all valves and pipes to make sure that it is not
10.
block by construction material or other debris.
11. Cables are fixed properly without tangling.
Check that the chain is securely attached to pump and
12.
hook
13. Check pumps are free to rotate with hand
14. Others

Remarks

ACCEPTED BY QK/QC MC/JV QC KEO/QP/QF QC