The document is an inspection checklist for the installation of plumbing pumps at Sidra Medical & Research Centre. It lists 14 attributes to inspect, including confirming the pumps are approved and installed properly, the cabling and piping are correctly installed and supported, and the pumps can rotate freely. Inspectors are to check each item, indicate if it is accepted or rejected, and provide any remarks before sign-off.
The document is an inspection checklist for the installation of plumbing pumps at Sidra Medical & Research Centre. It lists 14 attributes to inspect, including confirming the pumps are approved and installed properly, the cabling and piping are correctly installed and supported, and the pumps can rotate freely. Inspectors are to check each item, indicate if it is accepted or rejected, and provide any remarks before sign-off.
The document is an inspection checklist for the installation of plumbing pumps at Sidra Medical & Research Centre. It lists 14 attributes to inspect, including confirming the pumps are approved and installed properly, the cabling and piping are correctly installed and supported, and the pumps can rotate freely. Inspectors are to check each item, indicate if it is accepted or rejected, and provide any remarks before sign-off.
FOR INSTALLATION OF PLUMBING PUMPS Description of Work: Tag No. : Drawing Ref. No.: Location: System No.: Inspection Request No. : Contract No.: Project No: 625 INSPECTION ATTRIBUTES Item Description Accept Reject NA A) Installation 1. Pumps are approved as per material submittal Pumps are installed as per manufacturer’s instruction 2. manual /shop drawings Confirm name plate corresponds to the order and pump 3. data. Check that sediment chamber, oil interceptor and sump 4. chamber are clean and free from waste. Check pump cabling and termination are per applicable 5. codes / manufacturer’s recommendation 6. Check pump cabling and termination using megger Check pedestal foundation bolts are tightened and pump 7. is sitting properly. Discharge main is connected and all valves on the line are 8. open. 9. Check discharge piping properly supported & installed. Check all valves and pipes to make sure that it is not 10. block by construction material or other debris. 11. Cables are fixed properly without tangling. Check that the chain is securely attached to pump and 12. hook 13. Check pumps are free to rotate with hand 14. Others