Method of Statement

INSTALLATION

1- Verify the masonry surfaces are visibly dry and free of excess mortar, sand and other
construction debris.
2- First layer of paint is finished and opening is ready to receive window typology.
3- Inspect all opening before beginning installation. Verify the masonry openings are
correct and the sill plates are level.
4- Fixing and leveling of the window shall always be the 1st step.
5- Fixing of the window shall start from the comer of the top hinge with the 1st fixing
point equally spaced on either side of the corner to avoid de-formation of the frame;
extra wedging points can be utilized.
6- Anchoring the fasteners into the wall.
7- Installing of panels.
8- Fixed glass to be installed at site.
9- Fixing gasket of fixed window glass.
10- Alignment and fixing the lock of each operable window to be closed properly.
11- Filling the backing rod and silicon at the gap between frames and walls all around.
12- Install of fly screen.
13- Visual inspection.
14- Handover.