MATERIAL APPROVAL SHEET

Proj.Ref.: Project: GPU-MAN HOLE Contractor: VOLTAS OMAN SPC Date :24/08/2023
COVER PLATE Contractor:
Sub Contractor: ADVANCED
ENGINEERING SOLUTIONS LLC
MaterialDescription: MAS Number : 01 Drg. Ref:
ALUMINIUM CHEQURED PLATE AES/DWG/VOLTA S/188/23/01
THICKNESS: 7.8MM THICK BOQ Ref.:
MATERIAL GRADE:A1100 (MTC /DATA SHEET ATTACHED) ,STD Spec. Ref. :23-UAE-SR04 (A)
ASTM B209 REPORT:GY30327

Location to be used : GPU AREA-GPU MANHOLE Enclosure


Drawing : 
” We confirm that the material hereby submitted is suitable for the conditions and confirms with
The contract specifications and all applicable codes, standards and statutory requirements. We Sample :
confirm that no variation in the contract sum is implied or claimed by this submittal. Acceptance
of this material submittal does not alter in any way whatsoever our contractual or common Literature: MATERIAL MTC
obligations and responsibilities. Where the submittal is in anyway at variation with the
specifications, such variations will be identified and brought to the attention of the contract Other :
Administratorin this form.
SPECIFIED PROPOSED
MAKE/ MODEL UAE MAKE/ MODEL UAE
CAPACITY / SIZE 7.8MM THICK CAPACITY / SIZE 7.8MM THICK
MANUFACTURER GUANGDONG GUANGYUN NEW MANUFACTURER GUANGDONG GUANGYUN NEW
MATERIAL CO.LTD(SUPPLY OF MATERIAL CO.LTD(SUPPLY OF
SHEET) VIA AL DANUBE STEEL SHEET) VIA AL DANUBE STEEL
ProductDetails

ADVANCED ENGINEERING ADVANCED ENGINEERING


SOLUTIONS LLC (MACHINING) SOLUTIONS LLC (MACHINING)
LOCAL AGENT AL DANUBE STEEL (SOURCED LOCAL AGENT AL DANUBE STEEL (SOURCED FROM
FROM UAE) UAE)
PLACE OF ORIGIN UAE PLACE OF ORIGIN UAE
NOTICE OF COST VARIATON : REASON FOR ALTERNATIVES :

Client/Consultants Name Date Received Status Date Signature

1
2
3
4
5
Royal CourtAffairs
COMMENTS

Name: Sign: Date: A Approved

B Approved with Comments Not

C Approved
The approval of MAS does not the contractor of his responsibility for errors and such errors should be corrected by the contractor
without any implications