AV-SWP-10 Maintenance and Statutory Testing Iss 1
AV-SWP-10 Maintenance and Statutory Testing Iss 1
All downloaded and printed copies of this document are considered as Uncontrolled
Page 1 of 4
AVANTIS
1
Receive new equipment
3
2
Enter into service, schedule
Statutory check No
periodic maintenance checks as
required?
per manufacturer s instructions
Yes
4
Enter details onto statutory
checklist. Where applicable,
allocate unique reference
number and/ location
5
Determine the level of
statutory testing. Where in
house checks are required,
produce procedure/ checklist
6
On due date conduct
statutory check a
per checklist
8
Remove faulty equipment and
7 repair to bring back to service.
Is equipment No Note: all equipment which is
fit for purpose? considered to be unsafe must be
removed from use and identified
to prevent inadvertent use
Yes
9
Use schedules and file
relevant certification
10
Return equipment for use
All downloaded and printed copies of this document are considered as Uncontrolled
Page 2 of 4
AVANTIS
Additional Notes
All downloaded and printed copies of this document are considered as Uncontrolled
Page 3 of 4
AVANTIS
All downloaded and printed copies of this document are considered as Uncontrolled
Page 4 of 4