MUNICIPALIDAD PROVINCIAL DE ILO

CUADRO N°05 A
PLANILLA DE METRADOS EJECUTADOS
MES: OCTUBRE 2023

INSPECTOR/SUPERVISOR: ING. COSME DAMIAN ALARCON TAPIA


RESIDENTE: ING. ROYCY ANDRE BALDARRAGO ALCA
MODALIDAD DE EJECUCION: ADMINISTRACION PRESUPUESTARIA DIRECTA
FUENTE DE FINANCIAMIENTO: CANON Y SOBRECANON MINERO

# AREA / DIMENSIONES
ITEM DESCRIPCION UNIDAD CANT. DE PARCIAL TOTAL
VECES VOLUMEN LARGO ANCHO ALTO
PARTIDAS DEL EXPEDIENTE INICIAL
01 CONSTRUCCION DE CAMPO MENOR
01.01 OBRAS PROVISIONALES
01.01.02 INSTALACIONES PROVISIONALES
01.01.02.01 SUMINISTRO PROVISIONAL DE ENERGIA ELECTRICA mes 1.00
Thursday, October 12, 2023 1.00 1.00 1.00
01.01.02.02 SUMINISTRO PROVISIONAL DE AGUA POTABLE mes 1.00
Thursday, October 12, 2023 1.00 1.00 1.00
01.01.03 SEGURIDAD Y SALUD OCUPACIONAL
01.01.03.02 EQUIPOS DE PROTECCIÓN INDIVIDUAL und 5.00
Friday, October 27, 2023 5.00 1.00 5.00
01.01.03.09 DUCHA SIMPLE CON GRIFERIA mes 2.00
Wednesday, October 4, 2023 1.00 1.00 1.00
Friday, October 6, 2023 1.00 1.00 1.00
01.01.03.10 SERVICIOS HIGIENICOS EN OBRA mes 2.00
Friday, October 6, 2023 1.00 1.00 1.00
Wednesday, October 18, 2023 1.00 1.00 1.00
01.01.03.12 SEGURIDAD Y SALUD EN OBRAS CIVILES Y ESTRUCTURA METALICA mes 1.00
Friday, October 6, 2023 1.00 1.00 1.00
01.01.03.13 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS mes 2.00
Tuesday, October 10, 2023 1.00 1.00 1.00
Monday, October 23, 2023 1.00 1.00 1.00
01.01.04 IMPLEMENTACION DEL PLAN DE VIGILANCIA Y CONTROL FRENTE AL COVID-19 EN OBRA
01.01.04.04 EQUIPOS E INSUMOS DE LIMPIEZA Y DESINFECCION
01.01.04.04.02 PRODUCTOS DE DESINFECCION Y LIMPIEZA mes 2.00
Thursday, October 12, 2023 1.00 1.00 1.00
Tuesday, October 31, 2023 1.00 1.00 1.00
01.01.04.04.03 LAVAMANOS PROVISIONAL mes 2.00
Thursday, October 12, 2023 1.00 1.00 1.00
Tuesday, October 31, 2023 1.00 1.00 1.00
01.01.04.04.06 DESINFECCION DE AMBIENTES dia 25.00
Monday, October 2, 2023 1.00 1.00 1.00
Tuesday, October 3, 2023 1.00 1.00 1.00
Wednesday, October 4, 2023 1.00 1.00 1.00
Thursday, October 5, 2023 1.00 1.00 1.00
Friday, October 6, 2023 1.00 1.00 1.00
Saturday, October 7, 2023 1.00 1.00 1.00
Monday, October 9, 2023 1.00 1.00 1.00
Tuesday, October 10, 2023 1.00 1.00 1.00
Wednesday, October 11, 2023 1.00 1.00 1.00
Thursday, October 12, 2023 1.00 1.00 1.00
Friday, October 13, 2023 1.00 1.00 1.00
Saturday, October 14, 2023 1.00 1.00 1.00
Monday, October 16, 2023 1.00 1.00 1.00
Tuesday, October 17, 2023 1.00 1.00 1.00
Wednesday, October 18, 2023 1.00 1.00 1.00
Thursday, October 19, 2023 1.00 1.00 1.00
Friday, October 20, 2023 1.00 1.00 1.00
Saturday, October 21, 2023 1.00 1.00 1.00
Monday, October 23, 2023 1.00 1.00 1.00
Tuesday, October 24, 2023 1.00 1.00 1.00
Thursday, October 26, 2023 1.00 1.00 1.00
Friday, October 27, 2023 1.00 1.00 1.00
Saturday, October 28, 2023 1.00 1.00 1.00
Monday, October 30, 2023 1.00 1.00 1.00
Tuesday, October 31, 2023 1.00 1.00 1.00
01.02 CERCO PERIMETRICO
01.02.04 CONCRETO ARMADO
01.02.04.01 MURO DE CONTENCIÓN
01.02.04.01.01 MURO DE CONTENCIÓN - MUROS F'C = 175 KG/CM2 m3 3.35
TRAMO A-D
Monday, October 2, 2023 2.76 0.20 1.20 0.66
Tuesday, October 3, 2023 5.69 0.20 1.20 1.37
Wednesday, October 4, 2023 2.76 0.20 1.20 0.66
Friday, October 13, 2023 2.76 0.20 1.20 0.66
01.02.04.01.02 MURO DE CONTENCIÓN: ENCOFRADO Y DESENCOFRADO NORMAL DE MURO m2 35.68
TRAMO B-C
Monday, October 2, 2023 1.00 0.24 37.19 8.93
Tuesday, October 3, 2023 1.00 0.24 74.32 17.84
Friday, October 6, 2023 1.00 0.24 7.33 1.76
Wednesday, October 18, 2023 1.00 0.24 29.81 7.15
01.02.04.01.03 MURO DE CONTENCIÓN: ACERO CORRUGADO fy=4200 kg/cm2 GRADO 60 kg 147.96
Friday, October 6, 2023 32.20 1.00 32.20
Saturday, October 7, 2023 40.30 1.00 40.30
Monday, October 9, 2023 75.46 1.00 75.46
01.02.04.01.04 CURADO DEL CONCRETO CON ADITIVO m2 40.35
MUNICIPALIDAD PROVINCIAL DE ILO

CUADRO N°05 A
PLANILLA DE METRADOS EJECUTADOS
MES: OCTUBRE 2023

INSPECTOR/SUPERVISOR: ING. COSME DAMIAN ALARCON TAPIA


RESIDENTE: ING. ROYCY ANDRE BALDARRAGO ALCA
MODALIDAD DE EJECUCION: ADMINISTRACION PRESUPUESTARIA DIRECTA
FUENTE DE FINANCIAMIENTO: CANON Y SOBRECANON MINERO

# AREA / DIMENSIONES
ITEM DESCRIPCION UNIDAD CANT. DE PARCIAL TOTAL
VECES VOLUMEN LARGO ANCHO ALTO
Tuesday, October 3, 2023 1.00 6.73 1.20 8.07
Wednesday, October 4, 2023 1.00 13.45 1.20 16.14
Thursday, October 5, 2023 1.00 6.73 1.20 8.07
Friday, October 6, 2023 1.00 6.73 1.20 8.07
01.02.04.01.05 JUNTAS DE DILATACIÓN
01.02.04.01.05.01 JUNTA DE DILATACION C/TECKNOPORT E=1" H=6" m 5.72
Monday, October 2, 2023 1.00 1.00 1.15 1.15
Tuesday, October 3, 2023 1.00 1.00 2.30 2.30
Wednesday, October 4, 2023 1.00 1.00 1.12 1.12
Saturday, October 7, 2023 1.00 1.00 1.15 1.15
01.03 CONSTRUCCION DE SS.HH.
01.03.12 CARPINTERIA METALICA
01.03.12.01 VENTANA DE ACERO m2 2.16
Monday, October 16, 2023
SS.HH DAMAS Y VARONES
V-01 4.00 0.60 0.60 1.44
SS.HH DAMAS Y VARONES
V-01 2.00 0.60 0.60 0.72 0.72
01.03.14 VIDRIOS, CRISTALES Y SIMILARES
01.03.14.01 VIDRIO CRUDO INCOLORO LAMINADO DE 6mm m2 2.16
Monday, October 16, 2023
SS.HH DAMAS Y VARONES 4.00 0.60 0.60 1.44
V-01
SS.HH DAMAS Y VARONES 2.00 0.60 0.60 0.72
01.03.14.02 ESPEJO BISELADO DE 6mm m2 5.11
Monday, October 16, 2023 5.00 1.70 0.60 5.11
01.03.15 PINTURA
01.03.15.01 PINTURA LATEX EN MUROS INTERIORES, EXTERIORES Y CIELO RASO m2 65.63
EN BAÑOS SS.HH. DAMAS Y VARONES
Muros de albañilería interiores
Thursday, October 12, 2023 1.00 2.00 2.00 4.00
Friday, October 13, 2023 1.00 2.00 2.50 5.00
Monday, October 16, 2023 1.00 2.00 3.00 6.00
Tuesday, October 17, 2023 1.00 2.50 2.00 5.00
Wednesday, October 18, 2023 1.00 2.93 2.50 7.32
Thursday, October 19, 2023 1.00 4.00 2.50 10.00
Saturday, October 21, 2023 1.00 2.34 2.00 4.68
Monday, October 23, 2023 1.00 2.89 1.60 4.63
Tuesday, October 24, 2023 1.00 3.00 2.00 1.31
Tuesday, October 24, 2023 1.00 3.00 2.00 4.69
Wednesday, October 25, 2023 1.00 2.00 2.00 4.00
Thursday, October 26, 2023 1.00 1.60 2.50 4.00
Friday, October 27, 2023 1.00 2.00 2.50 5.00
01.03.15.03 PINTURA LATEX EN VIGAS Y COLUMNAS m2 28.68
EN BAÑOS SS.HH. DAMAS Y VARONES
Columnas interiores
Friday, October 13, 2023 8.00 0.20 2.50 4.00
Monday, October 16, 2023 4.00 0.50 1.50 3.00
Columnas exteriores
Tuesday, October 17, 2023 1.00 2.00 2.00 4.00
Monday, October 23, 2023 2.00 0.73 2.52 3.68
Tuesday, October 24, 2023 4.00 1.40 2.50 14.00
01.04 INSTALACIONES SANITARIAS
01.04.03 SISTEMA DE DRENAJE PLUVIAL
01.04.03.04 DREN DE GRAVA DE AGUAS PLUVIALES DE Ø 1.20m, H=1.0m
01.04.03.04.01 EXCAVACION MANUAL EN TERRENO m3 0.75
Monday, October 9, 2023 1.00 1.25 0.60 1.00 0.75
01.04.03.04.02 ACARREO DE MATERIAL EXCEDENTE D=30 m m3 0.75
Monday, October 9, 2023 1.00 1.25 0.60 1.00 0.75
01.04.03.04.03 ELIMINACION DE MATERIAL EXCEDENTE m3 0.75
Monday, October 9, 2023 1.00 1.25 0.60 1.00 0.75
01.04.03.04.04 RELLENO MANUAL CON AGREGADO FILTRANTE - GRAVA m3 0.75
Monday, October 9, 2023 1.00 1.25 0.60 1.00 0.75
01.05 LOSA DEPORTIVA Y PAVIMENTOS
01.05.01 OBRAS PRELIMINARES LOSA DEPORTIVA
01.05.01.03 PERFILADO, NIVELACION Y COMPACTACION DE TERRENO C/MAQUINARIA m2 7.00
Friday, October 13, 2023 1.00 1.00 3.50 2.00 7.00
01.05.10 IMPACTO AMBIENTAL
01.05.10.01 COMPACTACIÓN DE MATERIAL EXCEDENTE Y READECUACIÓN MORFOLÓGICA m3 297.12
Friday, October 13, 2023 1.00 1.00 297.12 297.12
01.06 CONSTRUCCION DE GRADERIA
01.06.01 OBRAS PRELIMINARES LOSA DEPORTIVA
01.06.01.02 TRAZO, NIVELES Y REPLANTEO DURANTE EL PROCESO CONSTRUCTIVO m2 81.88
MUNICIPALIDAD PROVINCIAL DE ILO

CUADRO N°05 A
PLANILLA DE METRADOS EJECUTADOS
MES: OCTUBRE 2023

INSPECTOR/SUPERVISOR: ING. COSME DAMIAN ALARCON TAPIA


RESIDENTE: ING. ROYCY ANDRE BALDARRAGO ALCA
MODALIDAD DE EJECUCION: ADMINISTRACION PRESUPUESTARIA DIRECTA
FUENTE DE FINANCIAMIENTO: CANON Y SOBRECANON MINERO

# AREA / DIMENSIONES
ITEM DESCRIPCION UNIDAD CANT. DE PARCIAL TOTAL
VECES VOLUMEN LARGO ANCHO ALTO
Thursday, October 12, 2023 1.00 1.00 81.88 81.88
01.06.03 CONCRETO SIMPLE
01.06.03.01 GRADERIA
01.06.03.01.01 CONCRETO CICLOPEO 1:10 CEMENTO:HORMIGÓN + 30% PG 1:10 (MAX 10") m3 71.93
Friday, October 6, 2023 3.00 2.10 6.30
Tuesday, October 10, 2023 3.82 2.00 7.63
Thursday, October 12, 2023 3.53 2.00 7.05
Friday, October 13, 2023 3.48 2.00 6.97
Saturday, October 14, 2023 3.18 2.00 6.36
Monday, October 16, 2023 4.42 3.00 13.26
Tuesday, October 17, 2023 5.76 1.00 5.76
Wednesday, October 18, 2023 1.39 2.00 2.78
Thursday, October 19, 2023 3.40 1.00 3.40
Friday, October 20, 2023 4.17 1.00 4.17
Saturday, October 21, 2023 3.69 1.00 3.69
Monday, October 23, 2023 2.50 1.00 2.50
Tuesday, October 24, 2023 2.06 1.00 2.06
01.06.03.01.02 GRADAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 92.45
Tuesday, October 10, 2023 3.34 1.20 4.01
Wednesday, October 11, 2023 6.67 0.60 4.00
Thursday, October 12, 2023 10.00 0.40 4.00
Friday, October 13, 2023 15.13 1.00 15.13
Monday, October 16, 2023 11.55 1.20 13.86
Tuesday, October 17, 2023 7.00 1.20 8.40
Wednesday, October 18, 2023 10.98 1.00 10.98
Thursday, October 19, 2023 10.76 0.60 6.46
Saturday, October 21, 2023 18.82 0.40 7.53
Monday, October 23, 2023 7.44 1.00 7.44
MUNICIPALIDAD PROVINCIAL DE ILO

CUADRO N°05 A
PLANILLA DE METRADOS EJECUTADOS
MES: OCTUBRE 2023

INSPECTOR/SUPERVISOR: ING. COSME DAMIAN ALARCON TAPIA


RESIDENTE: ING. ROYCY ANDRE BALDARRAGO ALCA
MODALIDAD DE EJECUCION: ADMINISTRACION PRESUPUESTARIA DIRECTA
FUENTE DE FINANCIAMIENTO: CANON Y SOBRECANON MINERO

# AREA / DIMENSIONES
ITEM DESCRIPCION UNIDAD CANT. DE PARCIAL TOTAL
VECES VOLUMEN LARGO ANCHO ALTO
Tuesday, October 24, 2023 4.70 0.60 2.82
Friday, October 27, 2023 6.53 1.20 7.83
01.06.03.01.03 CURADO DEL CONCRETO CON ADITIVO m2 174.65
Tuesday, October 10, 2023 2.33 5.15 12.00
Wednesday, October 11, 2023 2.26 5.15 11.64
Thursday, October 12, 2023 4.85 5.15 25.00
Friday, October 13, 2023 4.85 5.15 25.00
Monday, October 16, 2023 13.26 2.00 26.51
Tuesday, October 17, 2023 4.14 4.00 16.54
Wednesday, October 18, 2023 6.38 4.00 25.51
Thursday, October 19, 2023 4.00 2.00 8.00
Friday, October 20, 2023 2.00 2.00 4.00
Saturday, October 21, 2023 3.05 2.00 6.09
Monday, October 23, 2023 4.00 2.00 8.00
Tuesday, October 24, 2023 2.59 2.00 5.17
Thursday, October 26, 2023 1.20 1.00 1.20
01.06.04 CONCRETO ARMADO
01.06.04.01 PELDAÑOS
01.06.04.01.01 GRADAS: CONCRETO F'C=140 kg/cm2 ACABADO PULIDO m3 5.63
Friday, October 13, 2023 6.00 0.90 0.38 0.20 0.41
Saturday, October 21, 2023 3.00 0.90 0.38 0.20 0.20
Tuesday, October 24, 2023 3.00 0.90 0.38 0.20 0.20
Thursday, October 26, 2023 4.00 4.00 0.30 0.50 2.39
Friday, October 27, 2023 4.00 4.05 0.30 0.50 2.43
01.06.04.01.02 GRADAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 314.39
Friday, October 13, 2023 314.39 1.00 314.39
01.06.04.01.03 GRADAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 36.07
Monday, October 16, 2023 1.00 5.64 0.50 2.82
Tuesday, October 17, 2023 1.00 13.45 0.20 2.69
Wednesday, October 18, 2023 1.00 5.40 0.50 2.70
Thursday, October 19, 2023 1.00 5.64 0.50 2.82
Friday, October 20, 2023 1.00 10.72 0.50 5.36
Saturday, October 21, 2023 1.00 3.04 0.50 1.52
Tuesday, October 24, 2023 1.00 10.72 0.50 5.36
Thursday, October 26, 2023 1.00 11.52 0.50 5.76
Friday, October 27, 2023 1.00 3.36 0.50 1.68
Saturday, October 28, 2023 1.00 10.72 0.50 5.36
01.06.04.01.04 CURADO DEL CONCRETO CON ADITIVO m2 49.70
Monday, October 16, 2023 1.00 3.64 2.00 7.28
Tuesday, October 17, 2023 1.00 2.42 3.00 7.26
Wednesday, October 18, 2023 1.00 1.00 3.63 3.63
Thursday, October 19, 2023 1.00 1.00 3.63 3.63
Friday, October 20, 2023 1.00 1.00 6.70 6.70
Saturday, October 21, 2023 1.00 1.00 8.00 8.00
Tuesday, October 24, 2023 1.00 3.00 2.00 6.00
Thursday, October 26, 2023 1.00 3.00 2.00 6.00
Friday, October 27, 2023 1.00 1.20 1.00 1.20
01.06.05 REVOQUES ENLUCIDOS Y MOLDURAS
01.06.05.01 GRADAS - SOLAQUEADO m2 224.35
Friday, October 20, 2023 15.91 5.16 82.10
Saturday, October 21, 2023 16.20 5.16 83.59
Monday, October 23, 2023 4.00 2.24 8.96
Tuesday, October 24, 2023 4.00 3.00 0.57 0.90 6.16
Thursday, October 26, 2023 24.00 0.08 1.80
Friday, October 27, 2023 1.30 15.91 20.68
Saturday, October 28, 2023 1.30 16.20 21.06
01.07 COBERTURA EN LOSA DEPORTIVA
01.07.02 MOVIMIENTO DE TIERRAS
01.07.02.01 EXCAVACIÓN EN TERRENO DURO ROCOSO C/MAQUINARIA m3 2.64
Monday, October 2, 2023 1.00 1.00 3.50 2.00 0.38 2.64
01.07.02.03 RELLENO Y COMPACTACION DE MATERIAL GRANULAR m3 69.18
Tuesday, October 10, 2023 1.00 10.64 2.00 1.20 25.53
Saturday, October 14, 2023 1.00 18.19 2.00 1.20 43.65
01.07.02.05 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ. 15m3 D=5km m3 30.00
Saturday, October 14, 2023 1.00 1.00 30.00
01.07.03 CONCRETO SIMPLE
01.07.03.01 SOLADO DE CONCRETO E=2", C:H-1:10 m2 7.00
Monday, October 2, 2023 3.50 2.00 7.00
01.07.04 CONCRETO ARMADO
01.07.04.01 ZAPATAS
01.07.04.01.01 ZAPATAS: CONCRETO f'c=210 kg/cm2 PREPARADO EN OBRA m3 7.00
Monday, October 2, 2023 1.00 3.50 2.00 0.50 3.50
Tuesday, October 3, 2023 1.00 3.50 2.00 0.50 3.50
01.07.04.01.02 ENCOFRADO Y DESENCOFRADO NORMAL m2 11.00
Monday, October 2, 2023 2.00 1.00 2.75 5.50
Tuesday, October 3, 2023 2.00 1.00 2.75 5.50
01.07.04.01.03 ZAPATAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 127.87
MUNICIPALIDAD PROVINCIAL DE ILO

CUADRO N°05 A
PLANILLA DE METRADOS EJECUTADOS
MES: OCTUBRE 2023

INSPECTOR/SUPERVISOR: ING. COSME DAMIAN ALARCON TAPIA


RESIDENTE: ING. ROYCY ANDRE BALDARRAGO ALCA
MODALIDAD DE EJECUCION: ADMINISTRACION PRESUPUESTARIA DIRECTA
FUENTE DE FINANCIAMIENTO: CANON Y SOBRECANON MINERO

# AREA / DIMENSIONES
ITEM DESCRIPCION UNIDAD CANT. DE PARCIAL TOTAL
VECES VOLUMEN LARGO ANCHO ALTO
Monday, October 2, 2023 63.96 1.00 63.96
Tuesday, October 3, 2023 63.91 1.00 63.91
01.07.04.01.04 CURADO DEL CONCRETO CON ADITIVO m2 24.40
Tuesday, October 3, 2023 2.00 1.00 6.10 - 1.00 12.20
Wednesday, October 4, 2023 1.00 1.00 AREA: 12.20 - 12.20
01.07.04.02 VIGAS DE CIMENTACION
01.07.04.02.01 VIGAS DE CIMENTACION: CONCRETO f'c=210 kg/cm2 PREPARADO EN OBRA m3 2.19
Monday, October 2, 2023 1.00 8.88 0.25 0.50 1.11
Tuesday, October 3, 2023 1.00 4.32 0.25 0.50 0.54
Saturday, October 14, 2023 1.00 4.32 0.25 0.50 0.54
01.07.04.02.02 VIGAS DE CIMENTACION: ENCOFRADO Y DESENCOFRADO NORMAL m2 6.87
Tuesday, October 3, 2023 1.00 0.13 18.48 2.31
Thursday, October 12, 2023 1.00 0.13 36.48 4.56
01.07.04.02.03 VIGAS DE CIMENTACION: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 140.07
Monday, October 2, 2023 46.69 1.00 - 46.69
Tuesday, October 3, 2023 46.69 1.00 - 46.69
Thursday, October 5, 2023 20.69 1.00 - 20.69
Saturday, October 14, 2023 26.00 1.00 - 26.00
01.07.04.02.04 CURADO DEL CONCRETO CON ADITIVO m2 18.40
Tuesday, October 3, 2023 2.00 0.13 18.40 4.60
Wednesday, October 4, 2023 2.00 0.13 18.40 4.60
Thursday, October 12, 2023 2.00 0.13 36.80 9.20
01.07.04.03 COLUMNAS
01.07.04.03.01 COLUMNAS: CONCRETO f'c=210 kg/cm2 PREPARADO EN OBRA m3 5.76
Monday, October 2, 2023 1.00 1.00 0.75 0.40 2.40 0.72
Tuesday, October 3, 2023 1.00 2.00 0.75 0.40 2.40 1.44
Saturday, October 7, 2023 1.00 1.14 0.75 0.40 2.40 0.82
Saturday, October 14, 2023 1.00 3.86 0.75 0.40 2.40 2.78
01.07.04.03.02 COLUMNAS: ENCOFRADO Y DESENCOFRADO NORMAL m2 34.32
Monday, October 2, 2023 1.00 1.62 2.40 3.88
Tuesday, October 3, 2023 1.00 1.18 2.40 2.84
Saturday, October 7, 2023 1.00 1.04 2.40 2.50
Friday, October 13, 2023 1.00 2.08 2.40 5.00
Saturday, October 14, 2023 1.00 2.50 2.40 6.00
Tuesday, October 17, 2023 1.00 5.88 2.40 14.10
01.07.04.03.03 COLUMNAS: ACERO CORRUGADO FY= 4200 kg/cm2 GRADO 60 kg 704.78
Monday, October 2, 2023 352.40 1.00 352.40
Tuesday, October 3, 2023 352.38 1.00 352.38
01.07.04.03.04 CURADO DEL CONCRETO CON ADITIVO m2 56.79
Monday, October 2, 2023 1.00 1.00 2.38 - 2.40 5.70
Tuesday, October 3, 2023 1.00 1.00 2.38 2.40 5.70
Wednesday, October 4, 2023 1.00 1.00 4.73 - 2.40 11.34
Friday, October 13, 2023 1.00 1.00 4.58 2.40 11.00
Saturday, October 14, 2023 1.00 1.00 4.58 2.40 11.00
Tuesday, October 17, 2023 1.00 1.00 5.02 - 2.40 12.05
02 CONSTRUCCION DE VEREDA
02.08 CARPINTERIA DE MADERA
02.08.01 CONFECCIÓN Y COLOCACIÓN DE ASIENTOS DE MADERA TIPO 01 ser 13.00
Monday, October 16, 2023 13.00 1.00 13.00
02.08.02 CONFECCIÓN Y COLOCACIÓN DE ASIENTOS DE MADERA TIPO 02 ser 9.00
Tuesday, October 17, 2023 9.00 1.00 9.00
02.09 PINTURA
02.09.01 PINTURA LATEX EN MURETES m2 14.34
Monday, October 2, 2023 1.00 1.00 4.10 3.50 14.34
02.11 IMPACTO AMBIENTAL
02.11.01 COMPACTACIÓN DE MATERIAL EXCEDENTE Y READECUACIÓN MORFOLÓGICA m3 4.52
Saturday, October 14, 2023 1.00 1.00 4.52
02.12 CONSTRUCCION DE SARDINEL DE C°A°
02.12.05 JUNTAS DE DILATACIÓN
02.12.05.02 JUNTA DE DILATACION C/MICROPOROSO E=1" H=2.5" m 20.00
Monday, October 30, 2023 1.00 1.00 20.00 20.00
02.12.06 PINTURA
02.12.06.01 PINTURA ESMALTE SINTETICO PARA SARDINEL m2 12.00
Monday, October 30, 2023 1.00 1.00 12.00 1.00 12.00
03 IMPLEMENTACION DE AREA VERDE
03.02 MOVIMIENTO DE TIERRAS
03.02.03 ACARREO Y ELIMINACIÓN
03.02.03.02 ELIMINACION DE MATERIAL EXCEDENTE C/VOLQ. 15m3 D=5km m3 17.33
Monday, October 30, 2023 1.00 1.00 17.33 17.33
03.05 IMPACTO AMBIENTAL
03.05.01 COMPACTACIÓN DE MATERIAL EXCEDENTE Y READECUACIÓN MORFOLÓGICA m3 17.33
Monday, October 30, 2023 1.00 1.00 17.33 17.33
04 IMPLEMENTACION DE SUMINISTRO DE ENERGIA ELECTRICA
04.02 ILUMINACIÓN ESPECIAL
04.02.01 SUMINISTRO DE MATERIALES Y EQUIPOS ELECTROMECÁNICOS
04.02.01.01 ESTRUCTURAS und
04.02.01.01.01 POSTE METÁLICO ORNAMENTAL, INCLUYE BASE DE ANCLAJE 12.00
MUNICIPALIDAD PROVINCIAL DE ILO

CUADRO N°05 A
PLANILLA DE METRADOS EJECUTADOS
MES: OCTUBRE 2023

INSPECTOR/SUPERVISOR: ING. COSME DAMIAN ALARCON TAPIA


RESIDENTE: ING. ROYCY ANDRE BALDARRAGO ALCA
MODALIDAD DE EJECUCION: ADMINISTRACION PRESUPUESTARIA DIRECTA
FUENTE DE FINANCIAMIENTO: CANON Y SOBRECANON MINERO

# AREA / DIMENSIONES
ITEM DESCRIPCION UNIDAD CANT. DE PARCIAL TOTAL
VECES VOLUMEN LARGO ANCHO ALTO
Friday, October 13, 2023 4.00 1.00 4.00
Saturday, October 14, 2023 4.00 1.00 4.00
Monday, October 16, 2023 4.00 1.00 4.00
04.02.01.02 ELECTRODUCTOS
04.02.01.02.01 TUBERIA PVC SAP ELÉCTRICA DE Ø 25 mm (1") m 36.00
Wednesday, October 4, 2023 1.00 1.00 16.00 16.00
Thursday, October 5, 2023 1.00 1.00 12.00 12.00
Saturday, October 7, 2023 1.00 1.00 8.00 8.00
04.02.01.02.02 TUBERIA PVC SAP ELÉCTRICA DE Ø 20 mm (3/4") m 114.00
Wednesday, October 4, 2023 1.00 1.00 60.00 60.00
Thursday, October 5, 2023 1.00 1.00 24.00 24.00
Saturday, October 7, 2023 1.00 1.00 30.00 30.00
04.02.01.02.03 CURVA PVC SAP ELÉCTRICA DE Ø 25 mm (1") x 90° pza 4.00
Wednesday, October 4, 2023 4.00 1.00 4.00
04.02.01.02.04 CURVA PVC SAP ELÉCTRICA DE Ø 20 mm (3/4") x 90° pza 7.00
Wednesday, October 4, 2023 7.00 1.00 7.00
04.02.01.02.05 CONECTOR A CAJA PVC SAP DE Ø 25 mm (1") pza 24.00
Wednesday, October 4, 2023 18.00 1.00 18.00
Saturday, October 7, 2023 6.00 1.00 6.00
04.02.01.02.06 CONECTOR A CAJA PVC SAP DE Ø 20 mm (3/4") pza 67.00
Wednesday, October 4, 2023 40.00 1.00 40.00
Thursday, October 5, 2023 27.00 1.00 27.00
04.02.01.03 CONDUCTORES ELECTRICOS
04.02.01.03.03 CONDUCTOR DE COBRE RECOCIDO, FLEXIBLE, CLASE 5, TIPO RV-K TRIPOLAR DE m 64.00
Friday, October 13, 2023 1.00 1.00 24.00 24.00
Monday, October 23, 2023 1.00 1.00 40.00 40.00
04.02.01.03.04 CONDUCTOR DE COBRE RECOCIDO, FLEXIBLE, CLASE 5, TIPO RV-K TRIPOLAR DE m
Friday, October 13, 2023 1.00 1.00 80.00 80.00 413.00
Monday, October 23, 2023 1.00 1.00 230.00 230.00
Friday, October 27, 2023 1.00 1.00 103.00 103.00
04.02.01.04 LUMINARIAS Y ARTEFACTOS
04.02.01.04.02 LUMINARIA TIPO LED ORNAMENTAL DE 60 W und 11.00
Friday, October 13, 2023 4.00 1.00 4.00
Saturday, October 14, 2023 4.00 1.00 4.00
Monday, October 16, 2023 3.00 1.00 3.00
04.02.01.05 FERRETERIA Y ACCESORIOS ELÉCTRICOS
04.02.01.05.03 CINTA SEÑALIZADORA ROJA DE POLIETILENO rll 2.00
Friday, October 13, 2023 1.00 2.00 2.00
04.02.02 MONTAJE ELECTROMECANICO
04.02.02.01 PRELIMINARES
04.02.02.01.01 REPLANTEO, TRAZO Y UBICACIÓN DE ESTRUCTURAS pto 12.00
Friday, October 13, 2023 12.00 1.00 12.00
04.02.02.01.02 MOVILIZACIÓN Y DESMOVILIZACIÓN DE EQUIPOS Y HERRAMIENTAS glb 1.00
Friday, October 13, 2023 1.00 1.00 1.00
04.02.02.02 MOVIMIENTO DE TIERRAS
04.02.02.02.01 EXCAVACION MANUAL DE ZANJAS DE 0,40 m X h=0,40 m EN TERRENO NORMAL m 160.00
Wednesday, October 4, 2023 1.00 1.00 100.00 100.00
Friday, October 6, 2023 1.00 1.00 60.00 60.00
04.02.02.02.03 RELLENO Y COMPACTACION DE ARENA FINA m 160.00
Wednesday, October 4, 2023 1.00 1.00 100.00 100.00
Friday, October 6, 2023 1.00 1.00 60.00 60.00
04.02.02.02.04 RELLENO Y COMPACTACION DE MATERIAL GRANULAR m3 160.00
Friday, October 6, 2023 1.00 1.00 111.11 0.60 0.60 40.00
Saturday, October 7, 2023 1.00 1.00 77.78 0.60 0.60 28.00
Monday, October 9, 2023 1.00 1.00 111.11 0.60 0.60 40.00
Wednesday, October 11, 2023 1.00 1.00 66.67 0.60 0.60 24.00
Thursday, October 12, 2023 1.00 1.00 33.33 0.60 0.60 12.00
Saturday, October 14, 2023 1.00 1.00 44.44 0.60 0.60 16.00
04.02.02.02.05 RELLENO Y COMPACTACION DE MATERIAL PROPIO SELECCIONADO m3 0.00 160.00
Friday, October 6, 2023 1.00 1.00 222.22 0.60 0.60 80.00
Monday, October 9, 2023 1.00 1.00 166.67 0.60 0.60 60.00
Wednesday, October 11, 2023 1.00 55.56 0.60 0.60 20.00
04.02.02.02.06 ACARREO DE MATERIAL EXCEDENTE D=30 m m3 24.00
Monday, October 9, 2023 1.00 1.00 24.00 24.00
04.02.02.02.07 ELIMINACION DE MATERIAL EXCEDENTE D=6 km m3 13.50
Monday, October 9, 2023 1.00 1.00 13.50 13.50