NAC Diesel Power Plant

Km. 10, Brgy. Quezon, Surigao City

NAC 11.22MW DIESEL POWER PLANT

Monthly Preventive Maintenance Servicing Checklist.


Unit: Electric Motor’s Auxiliary Equipment’s.

Date of PMS: ____________________ Date of Last PMS: _________________________

Check insulation resistance of the following electric motor’s.


ITEM Machine/ Electrical Equipment’s/Components G D R Insulation resistance
1 Motor 15kw Air Compressor Starter No.1
2 Motor 15kw Air Compressor Starter No.2
3 Motor 9 kw Pre Lube Oil Pump No. 1
4 Motor 9 kw Pre Lube Oil Pump No. 2
5 Motor kw Pre Lube Oil Pump No. 3
6 Motor 7.5kw Air Compressor 500T Blower No.1
7 Motor 7.5kw Air Compressor 500T Blower No.2
8 Motor 4.7kw Booster Pump “A”. F.O Booster Unit
For Engine No.1
9 Motor 4.7kw Booster Pump “A”. F.O Booster Unit
For Engine No.2
10 Motor 4.7kw Booster Pump “A”. F.O Booster Unit
For Engine No.3
11 Motor 5.5kw L.O Purifier No.1
12 Motor 5.5kw L.O Purifier No.2
13 Motor 5.5kw L.O Purifier No.3
14 Motor 1.8kw Sludge Pump L.O Purifier
15 Motor 0.44kw F.O Drain Tank
16 Motor 1.8kw L.O Purifier No.1
17 Motor 1.8kw L.O Purifier No.1
18 Motor 1.8kw L.O Purifier No.1
Remarks:

Legend:

G – Good D – Defective R – Replace

Performed By: _____________ Noted By: ________________ Check By: _______________


Electrician Electrical Supervisor O & M Engineer

Approved By: Martiniano M. Montemor


Resident Plant Manager