Cost Estimate
for
(FY 080/81)
Amount
S.N. Description Unit Quantity Rate Remarks
(NRs.)
A General
Insurance of works, equipment, Contractor's workmen
1 and employees and Third party Insurance against damage to other LS Err:509
persons and property.
2 Supply and place standard size sign board for contract information. Nos Err:509
B Civil Work
Roadway excavation in all types of soil material including disposal of
3 excavated material at approved environmentally safe tipping sites. In m3 Err:509
Hard Soil
C Stone solling work
Stone Soling Works in foundation including Material, labour,
4 transportation, as per specification etc all complete as directed by m3 Err:509
Engineer. [ C10 (6-5) ]
D Plane Concrete work for Structures
10 Supply and Laying of 4mm playwood for the expansion Joint per 4 meter Sq.m Err:509
Amount
S.N. Description Unit Quantity Rate Remarks
(NRs.)
A General
Insurance of works, equipment, Contractor's workmen
1 and employees and Third party Insurance against damage to other LS Err:509 Err:509 Err:509
persons and property.
Carry out additional tests for material and works as required and
2 instructed by the Engineer.
PS 1.00 Err:509 Err:509
3 Supply and place standard size sign board for contract information. Nos Err:509 Err:509 Err:509
B Civil Work
Roadway excavation in all types of soil material including disposal of
4 excavated material at approved environmentally safe tipping sites. In m3 Err:509 Err:509 Err:509
Hard Soil
C Stone solling work
Stone Soling Works in foundation including Material, labour,
5 transportation, as per specification etc all complete as directed by m3 Err:509 Err:509 Err:509
Engineer. [ C10 (6-5) ]
D Plane Concrete work for Structures
10 Reinforcement bar for RCC works including cutting, binding, kg Err:509 Err:509 Err:509
bending & placing as per drawing with 30m lead
I Plywood For Expansion Joint
11 Supply and Laying of 4mm playwood for the expansion Joint per 4 meter Sq.m Err:509 Err:509 Err:509
Boulder Soling and levelling works in foundation including 30m lead with all
3
complete.
Total 2285856.18
Contingencies @3% 68575.69
Grand total 2354431.87
User Bill
General works - -
E/W excavation in Soft Soil having silt and clay including 10m Cum 83.00 0.80 79.38 63.50 0.80 63.50
lead & 1.5m lift with all complete.
Boulder Soling and levelling works in foundation including 30m Cum 127.80 0.40 4,410.36 1,764.14 0.40 1,764.14
lead with all complete.
Err:509 Cum Err:509 1.80 Err:509 Err:509 1.80 Err:509
Err:509 0.00 - - - - -
Err:509 Cum Err:509 8.82 Err:509 Err:509 8.82 Err:509
Err:509 cum Err:509 4.41 Err:509 Err:509 4.41 Err:509
PCC Works in 1:2:4 including material collection & 30m lead cum 110.00 4.41 10,051.17 44,325.66 4.41 44,325.66
with all complete.
Sub Total Err:509 Sub Total Err:509
Name Of Project:कालिमाटी
1 1 User's Committee Sundar poudel Er.Ramji Tripathi
भित्रिबाटो सडक निर्माण।
Name Of Project:कालिमाटी भित्रिबाटो सडक निर्माण।
MEASUREMENT BOOK
Issued To:
Site Incharge: Sundar poudel
Issuing Officer :
Certified that this books contains 2 Page of pre - numbered measurement sheets.
Contract Bill
Name of Project :-
Location: Bill No:
Contract No: Previous Voucher No:
Agency Name: current of Payment:
Date of Agreement: Date of Payment:
Date of work order: Page no of Payment book:
Date of work to be Complete: M.B.Number:
Date of time extention: M.B.page No. from to
Date of work complete:
Date of measurement:
Total
kf]v/f dxfgu/kflnsf
gu/ sfo{kflnsfsf] sfof{no
Go'/f]8, kf]v/f
sfo{ ;DkGg k|ltj]bg
योजनाको नाम : कोलेफाँट भित्रि बन कु ना अधुरो बाटो ढलान प्रतिवेदनको मिति: १०/०३/२०८०
कामको नाम : Road PCC Works & Plum concrete काम सुरु भएको मिति : 17/2/2080
लागत अनुमानको कु ल रकम : Err:509 काम सम्पन्न गर्नु पर्ने मिति: 15/03/2080
खर्च भएको कु ल रकम : Err:509 सम्पन्न भएको मिति: 6/3/2080
सुरु लागत अनुमान भन्दा घटी बढीको प्रतिशित : Err:509
l;=g+=ljj/0f O{li6d]6 cg';f/ v'b nfu]sf] vr{ km/s kg{ cfPsf] s}lkmot
kl/df0f b/ /sd kl/df0f b/ /sd kl/df0f k|ltzt /sd
A General works
E/W excavation in Soft Soil having silt
1 and clay including 10m lead & 1.5m lift 83.00 79.38 6588.54 0.80 79.38 63.50 -82.200 -99.0 -6525.04
with all complete.
Boulder Soling and levelling works in
2 foundation including 30m lead with all 127.80 4410.36 563644.01 0.40 4410.36 1764.14 -127.400 -99.7 -561879.87
complete.
3 Err:509 Err:509 Err:509 Err:509 1.80 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
1 Err:509 Err:509 Err:509 Err:509 8.82 Err:509 Err:509 Err:509 Err:509 Err:509
2 Err:509 Err:509 Err:509 Err:509 4.41 Err:509 Err:509 Err:509 Err:509 Err:509
Av
S.N. Ch Length Breadth Quantity Unit Remarks
Breadth
1 0+000 0 5.00 -
2 0+010 10 5.00 5.00 50.00
3 0+020 10 5.00 5.00 50.00
4 0+030 10 4.95 4.98 49.80
5 0+040 10 5.00 4.98 49.80
6 0+050 10 5.00 5.00 50.00
7 0+060 10 5.50 5.25 52.50
8 0+070 10 5.10 5.30 53.00
9 0+080 10 6.00 5.55 55.50
10 0+090 10 6.20 6.10 61.00
11 0+100 10 6.10 6.15 61.50
12 0+110 10 6.20 6.15 61.50
13 0+120 10 6.10 6.15 61.50
14 0+130 10 6.00 6.05 60.50
15 0+0140 10 6.00 6.00 60.00
Total 140 776.60
5.5471429
Av
S.N. Ch Length Breadth Breadth Quantity Unit Remarks
1 0+000 0 5.80 -
2 0+010 10 5.60 5.70 57.00
3 0+020 10 5.40 5.50 55.00
4 0+030 10 5.40 5.40 54.00
5 0+040 10 5.20 5.30 53.00
6 0+045 5 5.20 5.20 26.00
Total 45 245.00
5.4444444
Pokhara Lekhanath Metropolitan city
Office of municipal executive
Newroad, Kaski
Detail Measurement
Name of Project :-
Location:
S.N. Description of works No. Length Breadth Height Quantity Unit Rate Amount Remarks
Total -
Rate
S.N. Norms no. Description unit Remarks
Dept.
1
Site cleareance (Grass Cutting, Weep out
A3 their root, removal of debris, Levelling and
lead of debris) SqM 19.07
2 Earthwork excavation in ………..including
10m lead & 1.5m lif
A B1-1 Soft Soil having silt and clay CuM 580.41
B B1-2 Boulder Mixed Soil CuM 663.32
C B1-2 Medium Rock CuM 2487.45
D Deep Foundation, Drain, Pipe line trench in B.M.S.
2(14) WS
including 10m lead & 1.5m lift CuM 1318.35
3 Boulder Soling & levelling works in
C10 (6-5)
foundation including 30m lead. CuM 3691.5
4
Plain cement concrete works in foundation including
material collection & 30m lead
A D1(7-2) ga In ( 1:3:6 ) CuM 11544.33
B D1(7-2) gha B. In ( 1:2:4 ) CuM 13305.57
5
Plain cement concrete works in superstructure, Slab &
Beams including material collection with 30m lead.
A D2(7-4)ka M15 (1:2:4) CuM 15490.57
B D2(7-4)kha M20 (1:1.5:3) CuM 16994.41
7
Brick masonry works including materials collection,
preparation of mortar with 30m transportation.
A C2(5-1)kha2 /
Chimney Bhatta Bricks in c/s mortar 1:4
5(2)ka CuM 16368.97
B C2(5-1)kha3 /
Chimney Bhatta Bricks in c/s mortar 1:6
5(2)ka CuM 15839.38
C C1(5-1)ka2 /
Machine Made(Chinese) Bricks in c/s mortar 1:4
5(2)ka CuM 16401.36
D C1(5-1)ka3 /
Machine Made(Chinaese) Bricks in c/s mortar 1:6
5(2)ka CuM 15896.88
Rate
S.N. Norms no. Description unit Remarks
Dept.
8 12.5mm th. Cement plaster works in…………
A I1(12-1)ga Wall & floor in 1:3 C/S motar SqM 417.78
B I1(12-1)ga Wall & floor in 1:4 C/S motar SqM 405.82
C I1(12-1)gha Wall & floor in 1:6 C/S motar SqM 379.01
D I7(12-1)kha Ceiling in 1:4 C/S motar SqM 472.52
9 1/8" thick Flush pointing works in…..
A I8(14-1)ka Brick wall in 1:1 C/S motar SqM 282.88
B I8(14-1)kha Brick wall in 1:2 C/S mortar SqM 264.53
C I9(14-2)ka Boulder stone wall in 1:1 C/S motar SqM 354.71
D I9(14-2)kha Boulder stone wall in 1:2 C/S motar SqM 319.54
10 14/6, 123 3mm thick cement punning works (1:1) SqM 265.08
11 Form Works including selection of materials, centering &
shuttering as per drawing with 30m lead.
A E1(8-3)Ka Form works on Column by using local wood SqM 1238.07
B Form works on beam having beam height upto 0.3m by
E3(8-4)Ka 1297.48
using local wood SqM
C Form works on beam having beam height 0.3m to 0.8 m
E4(8-4)Kha 983.53
by using local wood SqM
D Form works by using iron props and 18mm thick Water
E6(8-4)Ka 875.58
proof Ply wood SqM
E Form works by using iron props and 10mm thick Water
DOR 18.2 a i 681.42
proof Ply wood SqM
Reinforcement bar for RCC works including
12 D9(7-5) cutting, binding, bending & placing as per Kg 122.33
drawing with 30m lead
13
C.G.I sheet roofing works including material collection.
A F1(9-1) 24 gauge SqM 1099.21
B F1(9-1) 24 gauge Colour SqM 1265.15
C F1(9-1) 26 gauge SqM 910.11
D F1(9-1) 26 gauge Colour SqM 1049.04
E F1(9-1) 28 gauge SqM 771.19
F 9/1, 69 Ridge Plain sheet Roofing Works works including material
28 gauge Colour SqM 898.54
14 collection.
A F4(9-2) 24 Gauge Plain Sheet RM 1151.28
B F4(9-2) 26 Gauge Plain Sheet RM 1038.08
C F4(9-2) 28 Gauge Plain Sheet RM 849.43
Rate
S.N. Norms no. Description unit Remarks
Dept.
15 C.G.I Gutter Works including material collection.
A 150 mm -450mm wide Colour G.I. Plain sheet Rain
F7
Gutter works including iron bracket, Notbolt, Washer . RM 1264.03
B 150 mm -450mm wide plain G.I. Plain sheet Rain Gutter
F7
works including iron bracket, Notbolt, Washer . RM 1051.79
1.2 mm thick heavy Corrugated Fiber sheet
16 F14 Roofing works including material collection all SqM 3879.90
complete works .
17 1.2mm thick heavy Ridge Fiber plain sheet
F15 Roofing works including material collection all
complete works . RM 2616.63
18 Slate Roofing works including material
F9(9-5)
collection with all complete works. SqM 2104.50
19 UPVC Roofing works including material collection with all
complete
A F22 2mm thick UPVC Roofing Works SqM 2068.67
B F23 3mm thick UPVC Roofing Works SqM 2811.11
20 3mm thick UPVC Ridge covering works including
F15
material collection all complete works . RM 1720.40
21 Wood Works
A G1(10-1) Salwood frame with wood size 100*75mm CuM 278151.89
B G1(10-1) Local wood frame with wood size 100*75mm CuM 95016.58
C G2(10-2) 38mm th.sal wood in panneled door & window shutter. SqM 14653.91
D G2(10-2) 38mm th.local wood in panneled door & window shutter. SqM 8038.55
E 4mm th. glazed window shutter with 38*75mm sal wood
G3(10-4)
frame. SqM 10365.39
F 4mm th. glazed window shutter with 38*75mm local
G3(10-4)
wood frame. SqM 6707.16
G Flush door with 38mm th. Sal wood frame & 4mm
G4(10-7)
commercial plywood shutter. SqM 8590.82
H Flush door with 38mm th.local wood frame & 4mm
G4(10-7)
commercial plywood on both side SqM 6024.92
I Door shutter with 38mm th.local wood frame & fixing of 26
G4(10-9)
gauge plain sheet in both side. SqM 6452.74
J G4(10-10)
Mosquito proof door & window shutter with 38mm th.sal wood
frame & 24 gauge G.I wire. SqM 5853.61
K Mosquito proof door & window shutter with 38mm
G4(10-10)
th.Shisham wood frame & 24 gauge G.I wire. SqM 4884.43
Rate
S.N. Norms no. Description unit Remarks
Dept.
L F21 Making & fixing of salwood truss CuM 265277.83
M F21 Making & fixing of local wood truss CuM 90466.85
N F20(10-19) Making & fixing of 25mm sal wood eaves board. SqM 6043.12
O F20(10-19) Making & fixing of 25mm local wood eaves board. SqM 1464.74
P 4mm Commercial plywood ceilling with 50*75mm salwood size
N7(10-16)ka
& 600*900mm frame size. SqM 3768.48
Q Commercial plywood ceilling with 50*75mm local wood size &
N7(10-16)ka
600*900mm frame size. SqM 1661.70
22 Flooring Works
A H1(11-1)kha
38mm thick 1:2:4 Cement Concrete floor Carting including
finishing by rubbing Cement. SqM 669.42
B H1(11-1)ga
50mm thick 1:2:4 Cement Concrete floor Carting including
finishing by rubbing Cement. SqM 818.34
C H1(11-1)gha
75mm thick 1:2:4 Cement Concrete floor Carting including
finishing by rubbing Cement. SqM 1101.47
D 25 mm th.mosaic flooring with 12.5mm th cement plaster (1:2)
H4(11-4) base course & 6 mm th marble chips with white cement (1:1)
surface course including rubbing & polishing SqM 4026.80
E H6(11-7) Procelain glazed flooring tile in (1:4) Cement Sand mortar SqM 2895.83
F 15 mm th. marble with cement sand (1:2) surface course
H34 including rubbing & polishing SqM 4930.38
G H26(11-6)
16mm Granaite with 20mm thick cement sand (1:2) surface
course including rubbing & polishing SqM 7380.43
H H19(11-9) 37.5 mm th Flagstone paving in 1:4 cement sand mortar SqM 2091.28
I H19(11-20) Brick ballast filling works. CuM 4818.50
23 Painting works
A J4(13-4)kha 2 coat waterproof cement paint works. SqM 137.35
B J1(13-1)kha 2 coat white washing in new surface in wall SqM 32.84
C J1(13-1)kha 2 coat white washing in new surface in ceiling SqM 39.37
D J2(13-2) White washing in old surface SqM 17.90
E
J3(13-3)ka and ga
Two coat distemper painting over one coat primer . SqM 118.22
F J5(13-5)ka and
kha One coat Emulsion paint over one coat primer . SqM 213.34
G
J5(13-5)ka and ga
Two coat Emulsion paint over one coat primer . SqM 323.74
H J18(13-5)kha One Coat Weather Coat(apex) Excluding primer . SqM 156.40
I J18(13-5)kha Two Coat Weather Coat(apex) Excluding primer . SqM 290.95
J
J5(13-5)ka and ga
2 coat Weather coat (apex) over one coat primer. SqM 378.94
Rate
S.N. Norms no. Description unit Remarks
Dept.
K
J5(13-5)ka and ga
2 coat readymade Enamelpaint over one coat primer. SqM 314.54
L 2 coat readymade Aluminium paint over one coat
J6(13-6)
primer. SqM 314.02
M J11(12-4)ga One Coat Red oxide paint SqM 98.79
N J11(12-4)gha Two Coat Red oxide paint SqM 174.40
24 Irons works
A Making & fixing 3*20 mm iron gril including one coat Red
M1(24-1)ka
oxide paint after rubbing with sand paper. SqM 2821.27
B
M2(24-1)kha Making & fixing 4.5*20 mm iron gril including one coat
Red oxide paint after rubbing with sand paper. SqM 3758.20
C Making & fixing of rolling shutter including one coat red
M6(24-2) oxide paint after rubbing with sand paper with all
complete . SqM 2214.95
D M9(24-6) Barbed wire fencing work RM 76.38
25 DoR SNo-24.2, Supply and Laying
Box size 1.5x1x1m usingof Gabion
heavy box including
zinc coated Hexagonal Stone filling
A Ref. to ss mesh type 100x120mm , mesh wire 3mm, selvage wire
2402(A),Sno 24.3
DoR SNo-24.2, 3.9mm
Box sizelacing wireusing
2x1x1m 2.4mmheavy zinc coated Hexagonal Per box 8098.30
B and SNo24.4
Ref. to ss mesh type 100x120mm , mesh wire 3mm, selvage wire
2402(A),Sno 24.3
DoR SNo-24.2, 3.9mm
Box sizelacing wireusing
3x1x1m 2.4mmheavy zinc coated Hexagonal Per box 10433.95
C and SNo24.4
Ref. to ss mesh type 100x120mm , mesh wire 3mm, selvage wire
2402(A),Sno 24.3 3.9mm lacing wire 2.4mm Per box 14361.20
26 and SNo24.4 Hollow Concrete block works
A 5/1(b)3, 31 4" thick in 1:4 C /S motar CuM 8665.25
B 5/1(b)3, 31 6" thick in 1:4 C /S motar CuM 7976.98
Rate
S.N. Norms no. Description unit Remarks
Dept.
E Dismantalling Cement Plaster with deposition up to 10
L5
mtr. Lead works CuM 86.94
F Cutting and Remove Reinforcement using on RCC or
L20
RBC with deposition up to 10 mtr. Lead works SqM 920.00
G Dismantalling of Gabion box with deposition up to 10
L21
mtr. Lead works SqM 920.00
H Dismantalling of CGI Roofing with deposition up to 10
L22
mtr. Lead works SqM 63.25
29 Miscellaneous Works
A
Plum Cement Concrete work. It includes all labour and
material required for mixing, placing in position, vibrating,
compaction, finishing, curing and all other incidentals
41 (a) spec.cl.No11 required to produce concrete of specified strength as per
the specification. Rate includes athe work of making,
fixing and removing of all centres and forms required for
the work. (Concrete M15 grade + 40% Boulder in
foundation) CuM 9825.03
B Putting works on wall and ceiling over Plastered surface
H24
including all complete works. SqM 293.39
C Supplying and fitting of Gypsum board Suspended False
H24
Ceiling with all complete works SqM 1299.27
Providing and Applying prime coat with Hot Bitumen Ltr. 193.93
DoR-SN13.1, SS- (including Cutter) on Prepared surface of granular
8
1302B base including cleaning of road surface and spraying
at specified rate by manual means.
Providing and Applying tack coat with Hot Bitumen at Ltr. 143.52
DoR-SN13.2, SS-
9 specified rate on the prepared surface including
1302B
cleaning by Manual Means.
Providing and laying open-graded premix carpet of Sq.m. 238.28 11024.30
DoR-SN13.3, SS- 20 mm thickness composed of 13.2 mm to 5.6 mm Per cuM
10
1307 aggregates as wearing course on a previously
prepared base
Filling Pot-holes and Patch Repairs with open
11
Graded Premix surfacing , 20mm
Sq.m. 273.44
Providing required material and repair the potholes
including removal of failed material, trimming and
DoR-SN29.11, SS-
A finishing the surface applying tack coat on the side
2903A
sand base of excavation, backfilling with hot
bituminous Material and compaction
DoR-SN13.11, SS- Providing and Laying of Seal coat sealing the voids Sq.m. 71.24
12
1310 in a Bitumenous surface.
Solid block Edging Works including soil filling & RM 370.30
13 15(25)c 143
compaction.
RM 354.20
Brick Edging Works including soil filling &
14 15(25)b 143 compaction by bricks laying with edge
standing(250mm ht.)
C Medium Rock
Norms No. B1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 3.00 700.00 2100.00
Sub-Total 2100.00
Tools & Plants @ 3% 63.00
Sub Total 2163.00
Contractor Overhead@15% 324.45
Total (Dept. Rate) 2487.45
3 Item : Boulder Soling & levelling works in foundation including 30m lead.
Norms No. C10 (6-5)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md
Unskilled Md 1.50 700.00 1050.00
Material Boulder Stone Cu.M 1.20 1800.00 2160.00
Sub Total 3210.00
Contractor Overhead@15% 481.50
Total (Dept. Rate) 3691.50
4 Item : Plain cement concrete works in foundation including material collection & 30m lead
A In (1:3:6)
Norms No. D1(7-2) ga
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1000.00 1000.00
Unskilled Md 4.0 700.00 2800.00
Material Cement(N.S. marks) M.T 0.22 16500.00 3630.00
Agg. 40 mm Cu.M 0.65 1850.00 1202.50
Agg. 20 mm Cu.M 0.24 1850.00 444.00
Course Sand Cu.M 0.47 2000.00 940.00
Water Litre 120 0.18 21.60
Sub Total 10038.10
Contractor Overhead@15% 1505.72
Total (Dept. Rate) 11543.82
B In ( 1:2:4 )
Norms No. D1(7-2) gha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.0 1000.00 1000.00
Unskilled Md 4.0 700.00 2800.00
Material Cement(OPC) M.T 0.32 16500.00 5280.00
Agg. 40 mm Cu.M 0.52 1850.00 962.00
Agg. 20 mm Cu.M 0.22 1850.00 407.00
Agg. 10 mm Cu.M 0.11 1850.00 203.50
Sand(crusher screen) Cu.M 0.445 2000.00 890.00
Water Litre 150 0.18 27.00
Sub Total 11569.50
Contractor Overhead@15% 1735.43
Total (Dept. Rate) 13304.93
Plain cement concrete works in superstructure, Slab & Beams including material
5 Item :
collection with 30m lead.
A M15 (1:2:4)
Norms No. D2(7-4)ka
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1000.00 800.00
Unskilled Md 7.0 700.00 4900.00
Material Cement (OPC) M.T 0.32 16500.00 5280.00
Agg. 40 mm(Crusher) Cu.M 0.52 1850.00 962.00
Agg. 20 mm(Crusher) Cu.M 0.22 1850.00 407.00
Agg. 10 mm(Crusher) Cu.M 0.11 1850.00 203.50
Sand(Crusher Screen) Cu.M 0.445 2000.00 890.00
Water Litre 150 0.18 27.00
Sub Total 13469.50
Contractor Overhead@15% 2020.43
Total (Dept. Rate) 15489.93
B M20 (1:1.5:3)
Norms No. D2(7-4)kha
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.8 1000.00 800.00
Unskilled Md 7.0 700.00 4900.00
Material Cement (OPC) M.T 0.4 16500.00 6600.00
Agg. 20 mm(Crusher) Cu.M 0.57 1850.00 1054.50
Agg. 10 mm(Crusher) Cu.M 0.29 1850.00 536.50
Sand(Crusher screen) Cu.M 0.425 2000.00 850.00
Water Litre 200 0.18 36.00
Sub Total 14777.00
Contractor Overhead@15% 2216.55
Total (Dept. Rate) 16993.55
Stone masonry works including material collection, preparation of motar with 5m lift
6 Item :
& 10m lead
A Random Rubble in 1:4 c/s mortar
Norms No. C6(6ka) 1-2
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 1.5 1000.00 1500.00
Unskilled Md 5.0 700.00 3500.00
Material Cement(N.S. marks) M.T 0.159 16500.00 2623.50
Block stone Cu.M 1.00 1800.00 1800.00
Bond stone Cu.M 0.10 1800.00 180.00
Sand(Crusher Screen) Cu.M 0.45 2000.00 900.00
Water Litre 100 0.18 18.00
Sub Total 10521.50
Contractor Overhead@15% 1578.23
Total (Dept. Rate) 12099.73
Form Works including selection of materials, centering & shuttering as per drawing
11 Item :
with 30m lead.
D Form works by using iron props and 10mm thick Water proof Ply wood
Norms No. DOR 18.2 a i
Unit 10 Sq.M.
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 2.200 1,000.00 2200.00
Unskilled Md 2.200 700.00 1540.00
Material Ply Wood 10mm Sqm 11.000 53.80 591.80 8 times Used
Strut Lallies etc Sq.m 0.400 3,383.88 1353.55 12times Used
Nails Kg 2.500 96.00 240.00
Sub-Total 5925.35 Per sq.m
Contractor Overhead@15% 888.80
Total (Dept. Rate) 6814.15 681.42
Plum Cement Concrete work. It includes all labour and material required for mixing, placing in
position, vibrating, compaction, finishing, curing and all other incidentals required to produce
concrete of specified strength as per the specification. Rate includes athe work of making, fixing
and removing of all centres and forms required for the work. (Concrete M15 grade + 40%
A Boulder in foundation)
Norms No. 41 (a) spec.cl.No11 (60% Concrete & 40% Boulder stone)
Unit Cu.M
Particular Description Unit Quantity Rate Amount Remarks
Labour Skilled Md 0.3 1000.00 300.00
Unskilled Md 4.0 700.00 2800.00
Material Cement(N.S. marks) M.T 0.192 16500.00 3168.00
Boulder stone 225 mm Cu.M 0.44 1800.00 792.00
Aggregate all Type Cu.M 0.51 1850.00 943.50
Sand (Crusher screen) Cu.M 0.27 2000.00 540.00
Sub-Total 8543.50
Contractor Overhead@15% 1281.53
Total (Dept. Rate) 9825.03
B Roadway Excavation in All types of Soil including removal of stumps and other
deleterious matter, with all lifts and lead (Mechanical Means)
Norms No: DoR-SN9.1, SS-905, I, B
Unit : 360 Cum
Particular Description Unit Quantity Rate Amount Remarks
Labour Skill Md 1.0 1,000.00 1,000.00
Unskill Md 3.0 700.0 2,100.00
Equipment Excavator Hr 6.0 1,200.00 7,200.00
Sub Total 10,300.00
Overhead @15% 1,545.00 Per CuM Rate
Total 11,845.00 32.90
6 Item : Providing and laying granular sub-base on prepared surface, mixing at OMC,
and compacting to achieve the desired density, complete (Manual Means)
Norms No: DoR-SN12.1, SS-1201B
Unit : 200 CuM
Particular Description Unit Quantity Rate Amount Remarks
Labour Skill Md 2.00 1,000.00 2,000.00
Unskill Md 60.00 700.00 42,000.00
Material Sub-Base Material CuM 256.00 1,100.00 281,600.00 S1or S2
Cost of Water KL 23.00 183.75 4,226.25
Equipment Vibratory Roller Hr 6.00 500.00 3,000.00
Sub Total 332,826.25
Overhead @15% 49,923.94 Per CuM Rate
Total 382,750.19 1,913.75
7 Item : Providing and laying Crusher Run Material on a prepared surface, spreading and
mixing , watering and compacting to form a layer of Base course
Providing and laying Crusher Run Material on a prepared surface, spreading and mixing
A
, watering and compacting to form a layer of Base course (For 53mm Maximum size)
Norms No: DoR-SN12.7, SS-1204A
Unit : 360 CuM
Particular Description Unit Quantity Rate Amount Remarks
Labour Skill Md 3.00 1,000.00 3,000.00
Unskill Md 14.00 700.00 9,800.00
Material Crusher run Material Base Material
63 to 45 mm CuM 157.46 1,850.00 291,301.00
22.5 to 5.6 mm CuM 151.06 1,750.00 264,355.00
Below 5.6mm CuM 166.68 1,750.00 291,690.00
Cost of Water KL 36.00 183.75 6,615.00
Equipment Vibratory Roller Hr 6.00 500.00 3,000.00
Motor Grader Hr 6.00 1,200.00 7,200.00
Sub Total 876,961.00
Overhead @15% 131,544.15 Per CuM Rate
Total 1,008,505.15 2,801.40
Providing and Applying prime coat with Hot Bitumen (including Cutter) on
8 Item : Prepared surface of granular base including cleaning of road surface and
spraying at specified rate by manual means.
Norms No: DoR-SN13.1, SS-1302B
Unit : 1000 Lit
Particular Description Unit Quantity Rate Amount Remarks
Labour Skill Md 3.00 1,000.00 3,000.00
Unskill Md 100.00 700.00 70,000.00
Bitumen (cutback) with
Material MC 70 Tonne 1.10 70,000.00 77,000.00
Cost of Water KL 10.00 183.75 1,837.50
Equipment Tractor Hr 6.00 300.00 1,800.00
Bitumen Sprayer Hr 6.00 1,300.00 7,800.00
Boiler Hr 8.00 750.00 6,000.00
Generator Hr 8.00 150.00 1,200.00
Sub Total 168,637.50
Cost Estimate
for
(FY 075/76)
Name of Project :-
Chitepani Raikar, Krishi Campus machhapuchhere
Gaunpalika Sadak ,PMC-19