PROCEDURE
FOR
TO CONSUMERS
AT
1|Page
LOAD PERFOMA
Load Demand:
Present Load
Signature of Applicant
2|Page
PUNJAB INDUSTRIAL ESTATES (PIEDMC)
APPLICATION AND AGREEMENT FORM FOR POWER SUPPLY AT
QUAID-E-AZAM BUSINESS PARK
---------------------------------------------------------------------------------------------------------------------
LOAD REQUIRED.
- Will use the equipment mentioned above for taking power supply.
- Will abide by rules of PIEDMC and pay the power charges as per bill rendered by PIEDMC including
any change in Power Tariff from time to time.
- I have read, understood and agree to the contract conditions provided by PIEDMC.
- “For any dispute between PIEDMC and Consumer regarding electricity connection, billing, etc., the
case will be referred to Dispute Resolution Committee (DRC) - PIEDMC for resolution and I will not
go to any court of law in this regard prior to the decision of the Dispute Resolution Committee -
PIEDMC”.
-----------------------------
Signature of Applicant
---------------------------
Witness Signature
National ID card:
- -
3|Page
ABRIDGED CONDITIONS OF SUPPLY
4|Page
ABRIDGED CONDITIONS OF SUPPLY
subject to the availability of load under prevailing rules, Applicant can demand
electric supply for a specific time period not exceeding three months, which may
2. An applicant may apply for temporary connection for the following purposes:
b. Construction of buildings
Documents Required:
Conditions:
The applicant shall be served with Demand Notice for the cost relating to the
electric connection and security which will be deposited with the PIEDMC Head
office.
PIEDMC, after deposit the demand note payment, shall provide the electric
power connection within 07 working days as per priority maintained for temporary
connection.
Signature of Applicant
5|Page
PIEDMC shall provide temporary electric connection to the applicant on his
demand for a specified period and disconnect the same after the expiry of this
period unless extended further on the request of the consumer and confirmation
by the PIEDMC electrical department that the purpose for which temporary
The consumer shall apply for extension in the sanctioned period at least one
week before the expiry of the sanctioned period. The consumer shall pay in
PIEDMC shall discontinue service without notice whenever it is not renewed for
further, given connection to his neighbor, nonpayment for one month or it is used
After the expiry of the approved period or after the period when connection is no more
required and is disconnected, the material installed for temporary connection shall be
The security charges are refundable and calculate with the following formula: -
SERVICESCHARGES: 16,800/-
Signature of Applicant
6|Page