TO-00029 TO-00030

611-STO 625-STO
FECHA Tractor D8 - 1 Tractor D8 - 2
H. Inicial H. Final HM Ubicación H. Inicial H. Final
D 5/26/2023 7,960.90 7,970.30 9.40 CY 9,087.50 9,091.00
N 5/26/2023 7,970.30 7,980.50 10.20 CY 9,091.00 9,101.00
D 5/27/2023 7,980.50 7,988.40 7.90 CY 9,101.00 9,110.50
N 5/27/2023 7,988.40 7,988.40 0.00 Inop. 9,110.50 9,113.50
D 5/28/2023 7,988.40 7,990.50 2.10 CY 9,113.50 9,120.50
N 5/28/2023 7,990.50 7,990.50 0.00 Inop. 9,120.50 9,126.00
D 5/29/2023 7,990.50 7,996.30 5.80 CY 9,126.00 9,133.20
N 5/29/2023 7,996.30 8,001.70 5.40 CY 9,133.20 9,139.70
D 5/30/2023 8,001.70 8,011.50 9.80 CY 9,139.70 9,147.30
N 5/30/2023 8,011.50 8,013.00 1.50 Inop. 9,147.30 9,153.10
D 5/31/2023 8,013.00 8,015.40 2.40 CY 9,153.10 9,153.10
N 5/31/2023 8,015.40 8,025.10 9.70 CY 9,153.10 9,153.10
D 6/1/2023 8,025.10 8,033.00 7.90 CY 9,153.10 9,153.10
N 6/1/2023 8,033.00 8,043.90 10.90 CY 9,153.10 9,153.10
D 6/2/2023 8,043.90 8,053.00 9.10 CY 9,153.10 9,153.10
N 6/2/2023 8,053.00 8,062.80 9.80 CY 9,153.10 9,153.10
D 6/3/2023 8,062.80 8,072.00 9.20 CY 9,153.10 9,153.10
N 6/3/2023 8,072.00 8,081.90 9.90 CY 9,153.10 9,153.10
D 6/4/2023 8,081.90 8,090.00 8.10 CY 9,153.10 9,153.10
N 6/4/2023 8,090.00 8,100.30 10.30 CY 9,153.10 9,153.10
TO-P1001 TO-P1002
623-STO 640-STO
Tractor D6 - 1 Tractor D6 - 2
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
3.50 Road 2 8,816.50 8,816.50 0.00 Inop. 2,887.50
10.00 Road 2 8,816.50 8,816.50 0.00 Inop. 2,894.00
9.50 Road 2 8,816.50 8,816.50 0.00 Inop. 2,899.20
3.00 Road 2 8,816.50 8,816.50 0.00 Inop. 2,904.02
7.00 5a1 8,816.50 8,816.50 0.00 Inop. 2,907.90
5.50 5a1 8,816.50 8,816.50 0.00 Inop. 2,913.90
7.20 5a1 8,816.50 8,816.50 0.00 Inop. 2,917.90
6.50 5a1 8,816.50 8,816.50 0.00 Inop. 2,918.10
7.60 C5 8,816.50 8,816.50 0.00 Inop. 2,920.50
5.80 C5 8,816.50 8,816.50 0.00 Inop. 2,923.90
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,923.90
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,923.90
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,923.90
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,929.20
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,933.40
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,941.50
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,948.00
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,948.00
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,948.00
0.00 Inop. 8,816.50 8,816.50 0.00 Inop. 2,948.00
TO-P1003 2230.3
650-STO
Tractor D6 - 3
H. Final HM Ubicación H. Inicial H. Final HM Ubicación
2,894.00 6.50 E4 8,640.30 8,645.90 5.60 AC
2,899.20 5.20 E4 8,645.90 8,653.50 7.60 5a1
2,904.02 4.82 5a1 8,653.50 8,659.60 6.10 AC
2,907.90 3.88 E4 8,659.60 8,663.60 4.00 AC
2,913.90 6.00 E4 8,663.60 8,667.90 4.30 AC
2,917.90 4.00 E4 8,667.90 8,675.80 7.90 AC
2,918.10 0.20 E4 8,675.80 8,681.90 6.10 AC
2,920.50 2.40 E4 8,681.90 8,687.40 5.50 AC
2,923.90 3.40 5a1 8,687.40 8,694.00 6.60 AC
2,923.90 0.00 Inop. 8,694.00 8,702.20 8.20 AC
2,923.90 0.00 Inop. 8,702.20 8,708.70 6.50 AC
2,923.90 0.00 Inop. 8,708.70 8,717.30 8.60 AC
2,929.20 5.30 E4 8,717.30 8,723.00 5.70 AC
2,933.40 4.20 E4 8,723.00 8,730.60 7.60 AC
2,941.50 8.10 E4 8,730.60 8,739.60 9.00 AC
2,948.00 6.50 E4 8,739.60 8,743.00 3.40 AC
2,948.00 0.00 Inop. 8,743.00 8,752.40 9.40 AC
2,948.00 0.00 Inop. 8,752.40 8,761.20 8.80 AC
2,948.00 0.00 Inop. 8,761.20 8,767.20 6.00 AC
2,950.60 2.60 E4 8,767.20 8,774.90 7.70 AC
RO-00010 37.31 RO-00011 137.7
RT-P01 RT-P02
Rodillo de Tiro - 1 Rodillo de Tiro 2
H. Inicial H. Final HM H. Inicial H. Final HM
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 139.10 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 139.10 144.10 5.00 AC
6,839.71 6,839.71 0.00 Stand by 144.10 149.50 5.40 Stand by
6,839.71 6,839.71 0.00 Stand by 149.50 155.50 6.00 AC
6,839.71 6,839.71 0.00 Stand by 155.50 160.50 5.00 Stand by
6,839.71 6,839.71 0.00 Stand by 160.50 163.50 3.00 Stand by
6,839.71 6,839.71 0.00 Stand by 163.50 163.50 0.00 Stand by
6,839.71 6,839.71 0.00 Stand by 163.50 163.50 0.00 Stand by
RO-00013 53.3 RO-00006 1273.9
RT-P03 616-STO
Rodillo de Tiro 3 Rodillo autopropulsado - 1
H. Inicial H. Final HM H. Inicial H. Final HM Ubicación
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
81.30 81.30 0.00 Stand by 2,830.80 2,830.80 0.00 Inop.
RO-00012 979 EX-00048 3421.5
639-STO 612-STO
Rodillo autopropulsado - 2 Excavadora CAT
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
1,229.60 1,233.10 3.50 AC 6,041.00 6,041.70 0.70 Inop.
1,233.10 1,239.80 6.70 5a1 6,041.70 6,041.70 0.00 Inop.
1,239.80 1,241.70 1.90 AC 6,041.70 6,041.90 0.20 Inop.-Taller
1,241.70 1,246.70 5.00 5a1 6,041.90 6,041.90 0.00 Inop.-Taller
1,246.70 1,249.90 3.20 5a1 6,041.90 6,041.90 0.00 Inop.-Taller
1,249.90 1,256.00 6.10 5a1 6,041.90 6,051.50 9.60 C5
1,256.00 1,262.00 6.00 C5 6,051.50 6,055.00 3.50 Truck Shop
1,262.00 1,271.00 9.00 5a1 6,055.00 6,055.50 0.50 C5
1,271.00 1,277.50 6.50 AC 6,055.50 6,063.50 8.00 C5
1,277.50 1,283.40 5.90 AC 6,063.50 6,071.60 8.10 C5
1,283.40 1,284.30 0.90 AC 6,071.60 6,078.40 6.80 C5
1,284.30 1,291.50 7.20 AC 6,078.40 6,085.20 6.80 C5
1,291.50 1,295.50 4.00 AC 6,085.20 6,085.20 0.00 Inop.
1,295.50 1,300.50 5.00 Talud 3.5:1 6,085.20 6,086.00 0.80 Inop.
1,300.50 1,302.60 2.10 AC 6,086.00 6,086.50 0.50 Inop.
1,302.60 1,309.00 6.40 AC 6,086.50 6,088.70 2.20 C5
1,309.00 1,314.60 5.60 AC 6,088.70 6,094.10 5.40 Road 2
1,314.60 1,320.00 5.40 AC 6,094.10 6,101.10 7.00 C5
1,320.00 1,324.00 4.00 AC 6,101.10 6,107.00 5.90 Asenti
1,324.00 1,329.60 5.60 AC 6,107.00 6,115.00 8.00 Asenti
EX-P1001 3051.3 RE-P1001 2097.5
626-STO 614-STO
Excavadora Komatsu Retroexcavadora
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
3,736.20 3,745.10 8.90 T4 5,685.70 5,692.10 6.40 E4 - Stand by F
3,745.10 3,752.30 7.20 T4 5,692.10 5,697.70 5.60 E4
3,752.30 3,760.70 8.40 T4 5,697.70 5,701.90 4.20 5a1
3,760.70 3,768.00 7.30 T4 5,701.90 5,707.70 5.80 5a1
3,768.00 3,775.30 7.30 T4 5,707.70 5,710.80 3.10 E4
3,775.30 3,784.30 9.00 T4 5,710.80 5,711.70 0.90 E4
3,784.30 3,792.90 8.60 T4 5,711.70 5,716.20 4.50 5a1
3,792.90 3,802.00 9.10 T4 5,716.20 5,724.70 8.50 E4
3,802.00 3,810.00 8.00 T4 5,724.70 5,730.70 6.00 5a1
3,810.00 3,810.00 0.00 Stand by - FO 5,730.70 5,740.00 9.30 5a1
3,810.00 3,810.00 0.00 Stand by - FO 5,740.00 5,746.00 6.00 E4
3,810.00 3,813.20 3.20 T4 5,746.00 5,748.80 2.80 E4
3,813.20 3,821.50 8.30 T4 5,748.80 5,753.50 4.70 E4
3,821.50 3,826.50 5.00 T4 5,753.50 5,761.00 7.50 E4
3,826.50 3,835.00 8.50 T4 5,761.00 5,769.30 8.30 E4
3,835.00 3,844.60 9.60 T4 5,769.30 5,777.30 8.00 E4
3,844.60 3,854.00 9.40 T4 5,777.30 5,785.40 8.10 E4
3,854.00 3,862.60 8.60 T4 5,785.40 5,791.40 6.00 E4
3,862.60 3,868.00 5.40 T4 5,791.40 5,800.00 8.60 E4
3,868.00 3,877.20 9.20 T4 5,800.00 5,806.70 6.70 E4
CA-P1001 3175.89 CA-P1002 1780
615-STO 658-STO
Cisterna de Agua - 1 Cisterna de Agua - 2
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
5,647.09 5,655.17 8.08 CY 2,605.00 2,615.00 10.00 CY
5,655.17 5,661.33 6.16 E4 2,615.00 2,623.00 8.00 CY
5,661.33 5,671.57 10.24 CY 2,623.00 2,632.00 9.00 E4
5,671.57 5,674.57 3.00 E4 2,632.00 2,638.00 6.00 CY
5,674.57 5,683.48 8.91 E4 2,638.00 2,645.00 7.00 E4
5,683.48 5,689.22 5.74 E4 2,645.00 2,652.00 7.00 CY
5,689.22 5,696.45 7.23 CY 2,652.00 2,662.00 10.00 E4
5,696.45 5,702.57 6.12 E4 2,662.00 2,669.00 7.00 CY
5,702.57 5,712.49 9.92 E4 2,669.00 2,678.00 9.00 E4
5,712.49 5,712.49 0.00 Stand by - FO 2,678.00 2,686.00 8.00 CY
5,712.49 5,712.49 0.00 Inop. 2,686.00 2,694.00 8.00 E4
5,712.49 5,712.49 0.00 Inop. 2,694.00 2,704.00 10.00 E4
5,712.49 5,712.49 0.00 Inop. 2,704.00 2,712.00 8.00 E4
5,712.49 5,712.49 0.00 Inop. 2,712.00 2,722.00 10.00 E4
5,712.49 5,712.49 0.00 Inop. 2,722.00 2,728.00 6.00 E4
5,712.49 5,712.49 0.00 Inop. 2,728.00 2,738.00 10.00 E4
5,712.49 5,712.49 0.00 Inop. 2,738.00 2,748.00 10.00 E4
5,712.49 5,712.49 0.00 Inop. 2,748.00 2,758.00 10.00 5a1
5,712.49 5,712.49 0.00 Inop. 2,758.00 2,767.00 9.00 E4
5,712.49 5,712.49 0.00 Inop. 2,767.00 2,777.00 10.00 E4
CV-00391 1251.28 CV-00393 1040.83
617-STO 591-STO
Volquete - 1 Volquete - 2
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
13,105.44 13,116.08 10.64 CY-E4 13,535.45 13,546.14 10.69
13,116.08 13,126.16 10.08 CY-E4 13,546.14 13,556.18 10.04
13,126.16 13,130.37 4.21 CY-E4 13,556.18 13,566.46 10.28
13,130.37 13,136.11 5.74 CY-E4 13,566.46 13,571.55 5.09
13,136.11 13,144.38 8.27 CY-E4 13,571.55 13,580.01 8.46
13,144.38 13,154.45 10.07 CY-E4 13,580.01 13,590.05 10.04
13,154.45 13,164.38 9.93 CY-E4 13,590.05 13,597.48 7.43
13,164.38 13,174.34 9.96 CY-E4 13,597.48 13,607.30 9.82
13,174.34 13,181.07 6.73 CY-E4 13,607.30 13,616.43 9.13
13,181.07 13,184.24 3.17 CY-E4 13,616.43 13,626.51 10.08
13,184.24 13,190.31 6.07 CY-E4 13,626.51 13,632.52 6.01
13,190.31 13,200.46 10.15 CY-E4 13,632.52 13,642.53 10.01
13,200.46 13,200.46 0.00 Stand by - FO 13,642.53 13,642.53 0.00
13,200.46 13,211.03 10.57 CY-E4 13,642.53 13,652.47 9.94
13,211.03 13,220.21 9.18 CY-E4 13,652.47 13,661.26 8.79
13,220.21 13,230.02 9.81 E4-E4 13,661.26 13,671.34 10.08
13,230.02 13,240.50 10.48 CY-E4 13,671.34 13,681.42 10.08
13,240.50 13,250.52 10.02 CY-E4 13,681.42 13,691.50 10.08
13,250.52 13,259.20 8.68 CY-E4 13,691.50 13,701.48 9.98
13,259.20 13,269.39 10.19 CY-E4 13,701.48 13,711.57 10.09
CV-00413 1201.87 CV-00398
619-STO 620-STO
Volquete - 3 Volquete - 4
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
CY-E4 11,879.17 11,887.05 7.88 T10-5a1 13,691.22 13,701.06
CY-E4 11,887.05 11,892.28 5.23 Truck Shop - T1 13,701.06 13,711.33
CY-E4 11,892.28 11,894.51 2.23 T10-5a1 13,711.33 13,722.12
CY-E4 11,894.51 11,898.38 3.87 C5-5a1 13,722.12 13,727.29
CY-E4 11,898.38 11,905.00 6.62 Truck Shop - 5a 13,727.29 13,732.33
CY-E4 11,905.00 11,913.32 8.32 C5-5a1 13,732.33 13,742.32
CY-E4 11,913.32 11,920.34 7.02 C5-5a1 13,742.32 13,752.15
CY-E4 11,920.34 11,930.08 9.74 CY-E4 13,752.15 13,762.02
CY-E4 11,930.08 11,939.52 9.44 CY-E4 13,762.02 13,771.51
CY-E4 11,939.52 11,949.50 9.98 CY-E4 13,771.51 13,781.50
CY-E4 11,949.50 11,958.27 8.77 BAC3-E4 13,781.50 13,791.12
CY-E4 11,958.27 11,968.31 10.04 CY-E4 13,791.12 13,801.41
Stand by - FO 11,968.31 11,978.10 9.79 CY-E4 13,801.41 13,811.27
CY-E4 11,978.10 11,988.20 10.10 CY-E4 13,811.27 13,821.53
CY-E4 11,988.20 11,997.20 9.00 CY-E4 13,821.53 13,828.31
CY-E4 11,997.20 12,003.35 6.15 CY-E4 13,828.31 13,839.37
CY-E4 12,003.35 12,012.28 8.93 CY-E4 13,839.37 13,849.48
CY-E4 12,012.28 12,022.35 10.07 CY-E4 13,849.48 13,860.18
CY-E4 12,022.35 12,031.09 8.74 CY-E4 13,860.18 13,870.17
CY-E4 12,031.09 12,036.58 5.49 CY-E4 13,870.17 13,880.59
756.59 CV-P1001 1190.7 CV-P1002
627-STO 628-STO
Volquete - 5 Volquete - 6
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
9.84 CY-E4 3,614.20 3,624.35 10.15 CY-E4 3,577.50 3,587.23
10.27 CY-E4 3,624.35 3,634.10 9.75 CY-E4 3,587.23 3,598.13
10.79 CY-E4 3,634.10 3,640.59 6.49 CY-E4 3,598.13 3,608.38
5.17 CY-E4 3,640.59 3,640.59 0.00 Inop 3,608.38 3,613.59
5.04 CY-E4 3,640.59 3,645.80 5.21 CY-E4 3,613.59 3,621.51
9.99 CY-E4 3,645.80 3,651.31 5.51 CY-E4 3,621.51 3,629.57
9.83 CY-E4 3,651.31 3,660.38 9.07 CY-E4 3,629.57 3,637.00
9.87 CY-E4 3,660.38 3,670.16 9.78 CY-E4 3,637.00 3,645.46
9.49 CY-E4 3,670.16 3,679.58 9.42 CY-E4 3,645.46 3,655.90
9.99 CY-E4 3,679.58 3,689.46 9.88 CY-E4 3,655.90 3,665.28
9.62 CY-E4 3,689.46 3,698.38 8.92 CY-E4 3,665.28 3,673.01
10.29 CY-E4 3,698.38 3,709.20 10.82 CY-E4 3,673.01 3,682.31
9.86 CY-E4 3,709.20 3,718.43 9.23 CY-E4 3,682.31 3,692.20
10.26 CY-E4 3,718.43 3,728.55 10.12 CY-E4 3,692.20 3,702.11
6.78 CY-E4 3,728.55 3,737.50 8.95 CY-E4 3,702.11 3,711.17
11.06 CY-E4 3,737.50 3,747.50 10.00 CY-E4 3,711.17 3,721.30
10.11 CY-E4 3,747.50 3,756.58 9.08 CY-E4 3,721.30 3,731.00
10.70 CY-E4 3,756.58 3,767.40 10.82 CY-E4 3,731.00 3,741.13
9.99 CY-E4 3,767.40 3,774.19 6.79 CY-E4 3,741.13 3,751.34
10.42 CY-E4 3,774.19 3,784.10 9.91 CY-E4 3,751.34 3,761.54
1157.26 CV-P1003 1290.83 MO-P1001
629-STO 621-STO
Volquete - 7 Motoniveladora
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
9.73 CY-E4 3,761.16 3,771.34 10.18 CY-E4 8,161.50 8,164.00
10.90 CY-E4 3,771.34 3,782.08 10.74 CY-E4 8,164.00 8,174.50
10.25 CY-E4 3,782.08 3,793.01 10.93 CY-E4 8,174.50 8,177.50
5.21 CY-E4 3,793.01 3,798.40 5.39 CY-E4 8,177.50 8,183.50
7.92 CY-E4 3,798.40 3,805.56 7.16 CY-E4 8,183.50 8,190.20
8.06 CY-E4 3,805.56 3,816.00 10.44 CY-E4 8,190.20 8,194.50
7.43 CY-E4 3,816.00 3,824.19 8.19 CY-E4 8,194.50 8,203.40
8.46 C5-E4 3,824.19 3,834.32 10.13 CY-E4 8,203.40 8,210.90
10.44 CY-E4 3,834.32 3,844.15 9.83 CY-E4 8,210.90 8,219.90
9.38 CY-E4 3,844.15 3,851.32 7.17 CY-E4 8,219.90 8,224.50
7.73 CY-E4 3,851.32 3,859.51 8.19 CY-E4 8,224.50 8,230.70
9.30 CY-E4 3,859.51 3,868.46 8.95 CY-E4 8,230.70 8,239.20
9.89 CY-E4 3,868.46 3,878.35 9.89 CY-E4 8,239.20 8,241.40
9.91 CY-E4 3,878.35 3,889.06 10.71 CY-E4 8,241.40 8,241.40
9.06 CY-E4 3,889.06 3,898.13 9.07 CY-E4 8,241.40 8,246.00
10.13 CY-E4 3,898.13 3,908.24 10.11 CY-E4 8,246.00 8,254.70
9.70 CY-E4 3,908.24 3,918.35 10.11 CY-E4 8,254.70 8,257.70
10.13 CY-E4 3,918.35 3,929.17 10.82 CY-E4 8,257.70 8,265.70
10.21 CY-E4 3,929.17 3,939.39 10.22 CY-E4 8,265.70 8,269.20
10.20 CY-E4 3,939.39 3,949.28 9.89 CY-E4 8,269.20 8,277.30
708.2 CF-P1001 1357 CT-P1001
622-STO 644-STO
Cargador frontal Camabaja
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
2.50 E4 8,470.00 8,480.00 10.00 CY 7,379.00 7,380.00
10.50 E4 8,480.00 8,489.00 9.00 CY 7,380.00 7,380.00
3.00 E4 8,489.00 8,500.00 11.00 CY 7,380.00 7,381.00
6.00 E4 8,500.00 8,508.00 8.00 CY 7,381.00 7,381.00
6.70 E4 8,508.00 8,517.00 9.00 CY 7,381.00 7,381.00
4.30 E4 8,517.00 8,525.00 8.00 CY 7,381.00 7,381.00
8.90 E4 8,525.00 8,536.00 11.00 CY 7,381.00 7,381.00
7.50 E4 8,536.00 8,543.00 7.00 CY 7,381.00 7,381.00
9.00 E4 8,543.00 8,554.00 11.00 CY 7,381.00 7,383.00
4.60 E4 8,554.00 8,565.00 11.00 CY 7,383.00 7,383.00
6.20 E4 8,565.00 8,573.00 8.00 CY 7,383.00 7,383.00
8.50 E4 8,573.00 8,583.00 10.00 CY 7,383.00 7,383.00
2.20 E4 8,583.00 8,593.00 10.00 CY 7,383.00 7,383.00
0.00 Stand by - FF 8,593.00 8,603.00 10.00 CY 7,383.00 7,383.00
4.60 E4 8,603.00 8,613.00 10.00 CY 7,383.00 7,390.00
8.70 E4 8,613.00 8,623.00 10.00 CY 7,390.00 7,390.00
3.00 E4 8,623.00 8,633.00 10.00 CY 7,390.00 7,390.00
8.00 E4 8,633.00 8,642.00 9.00 CY 7,390.00 7,390.00
3.50 E4 8,642.00 8,652.00 10.00 CY 7,390.00 7,393.00
8.10 E4 8,652.00 8,663.00 11.00 CY 7,393.00 7,393.00
63 TO-I1011 558.6 TO-P1004
656-STO 676-STO
Tractor D8 1a - 1 Tractor D8 1a - 2
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
1.00 Traslado 5,381.01 5,391.70 10.69 C5 3,009.50
0.00 Stand by - FF 5,391.70 5,401.50 9.80 C5 3,018.00
1.00 Traslado 5,401.50 5,410.00 8.50 C5 3,027.00
0.00 Stand by - FF 5,410.00 5,413.70 3.70 C5 3,030.00
0.00 Stand by - FF 5,413.70 5,422.10 8.40 C5 3,030.00
0.00 Stand by - FO 5,422.10 5,427.80 5.70 C5 3,036.20
0.00 Stand by - FF 5,427.80 5,436.20 8.40 C5 3,045.90
0.00 Stand by - FO 5,436.20 5,439.80 3.60 C5 3,052.60
2.00 Traslado 5,439.80 5,439.80 0.00 Stand by - FO 3,056.90
0.00 Stand by - FO 5,439.80 5,439.80 0.00 Stand by - FO 3,066.00
0.00 Stand by - FF 5,439.80 5,439.80 0.00 Inop. 3,072.60
0.00 Stand by - FO 5,439.80 5,439.80 0.00 Inop. 3,081.00
0.00 Stand by - FF 5,439.80 5,439.80 0.00 Inop. 3,091.00
0.00 Stand by - FO 5,439.80 5,439.80 0.00 Inop. 3,100.10
7.00 Traslado 5,439.80 5,441.00 1.20 C5 3,104.30
0.00 Stand by - FO 5,441.00 5,451.00 10.00 C5 3,111.70
0.00 Stand by - FF 5,451.00 5,455.70 4.70 C5 3,113.90
0.00 Stand by - FO 5,455.70 5,465.00 9.30 5a1 3,120.70
3.00 Traslado 5,465.00 5,474.00 9.00 5a1 3,130.50
0.00 Stand by - FO 5,474.00 5,483.00 9.00 Padock 3,138.40
296.2 TO-P1005 259.8 TO-00032
677-STO 580-STO
actor D8 1a - 2 Tractor D8 1a - 3 Tractor D-8
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
3,018.00 8.50 Truck Shop 2,727.60 2,737.70 10.10 E4 8,714.70
3,027.00 9.00 Truck Shop 2,737.70 2,747.60 9.90 E4 8,718.00
3,030.00 3.00 Truck Shop 2,747.60 2,757.10 9.50 E4 8,727.00
3,030.00 0.00 Inop. 2,757.10 2,760.90 3.80 E4 8,734.70
3,036.20 6.20 Truck Shop 2,760.90 2,765.20 4.30 E4 8,734.70
3,045.90 9.70 Truck Shop 2,765.20 2,774.10 8.90 E4 8,741.90
3,052.60 6.70 Truck Shop 2,774.10 2,783.30 9.20 E4 8,746.00
3,056.90 4.30 Truck Shop 2,783.30 2,793.20 9.90 E4 8,754.30
3,066.00 9.10 Truck Shop 2,793.20 2,802.20 9.00 E4 8,761.60
3,072.60 6.60 Truck Shop 2,802.20 2,813.00 10.80 E4 8,767.30
3,081.00 8.40 Truck Shop 2,813.00 2,823.00 10.00 E4 8,771.50
3,091.00 10.00 Truck Shop 2,823.00 2,833.00 10.00 E4 8,778.60
3,100.10 9.10 Truck Shop 2,833.00 2,842.10 9.10 E4 8,785.60
3,104.30 4.20 Truck Shop 2,842.10 2,852.20 10.10 E4 8,795.20
3,111.70 7.40 Truck Shop 2,852.20 2,861.10 8.90 E4 8,804.30
3,113.90 2.20 Road 2 2,861.10 2,867.50 6.40 E4 8,809.20
3,120.70 6.80 Road 2 2,867.50 2,878.10 10.60 E4 8,809.20
3,130.50 9.80 Road 2 2,878.10 2,887.60 9.50 E4 8,817.90
3,138.40 7.90 Road 2 2,887.60 2,895.50 7.90 E4 8,821.00
3,148.20 9.80 Road 2 2,895.50 2,905.20 9.70 E4 8,828.20
245.5 RO-00008 349.2 RO-P1001
665-STO 678-STO
Rodillo autopropulsado 1A -1 Rodillo autopropulsado 1A - 2
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
8,718.00 3.30 T4 5,556.30 5,565.20 8.90 E4 3,274.00
8,727.00 9.00 T4 5,565.20 5,576.00 10.80 5a1 3,282.50
8,734.70 7.70 T4 5,576.00 5,583.60 7.60 E4 3,293.70
8,734.70 0.00 Stand by - FO 5,583.60 5,589.20 5.60 5a1 3,301.70
8,741.90 7.20 T4 5,589.20 5,594.60 5.40 E4 3,304.50
8,746.00 4.10 T4 5,594.60 5,601.80 7.20 5a1 3,312.60
8,754.30 8.30 T4 5,601.80 5,608.30 6.50 E4 3,319.70
8,761.60 7.30 T4 5,608.30 5,617.10 8.80 E4 3,329.00
8,767.30 5.70 T4 5,617.10 5,620.50 3.40 E4 3,337.30
8,771.50 4.20 T4 5,620.50 5,628.20 7.70 E4 3,344.30
8,778.60 7.10 T4 5,628.20 5,636.30 8.10 E4 3,349.80
8,785.60 7.00 T4 5,636.30 5,636.70 0.40 Inop. 3,357.00
8,795.20 9.60 T4 5,636.70 5,639.90 3.20 E4 3,367.30
8,804.30 9.10 T4 5,639.90 5,646.50 6.60 E4 3,370.10
8,809.20 4.90 T4 5,646.50 5,650.40 3.90 E4 3,380.00
8,809.20 0.00 Stand by - FO 5,650.40 5,658.20 7.80 E4 3,387.70
8,817.90 8.70 T4 5,658.20 5,666.40 8.20 E4 3,396.70
8,821.00 3.10 T4 5,666.40 5,672.90 6.50 E4 3,406.10
8,828.20 7.20 T4 5,672.90 5,681.50 8.60 E4 3,413.40
8,830.30 2.10 T4 5,681.50 5,685.20 3.70 E4 3,424.29
373.1 EX-P1002 745.1 EX-P1003
657-STO 679-STO
dillo autopropulsado 1A - 2 Excavadora 336 Excavadora 336
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
3,282.50 8.50 E4 3,587.30 3,597.40 10.10 CY 6,047.90
3,293.70 11.20 E4 3,597.40 3,607.30 9.90 CY 6,056.70
3,301.70 8.00 E4 3,607.30 3,617.20 9.90 CY 6,066.50
3,304.50 2.80 E4 3,617.20 3,623.60 6.40 CY 6,075.80
3,312.60 8.10 E4 3,623.60 3,632.20 8.60 CY 6,080.60
3,319.70 7.10 E4 3,632.20 3,642.30 10.10 CY 6,084.10
3,329.00 9.30 E4 3,642.30 3,652.20 9.90 CY 6,096.00
3,337.30 8.30 E4 3,652.20 3,661.80 9.60 CY 6,107.60
3,344.30 7.00 E4 3,661.80 3,671.90 10.10 CY 6,118.50
3,349.80 5.50 E4 3,671.90 3,682.20 10.30 CY 6,126.50
3,357.00 7.20 E4 3,682.20 3,692.90 10.70 CY 6,136.20
3,367.30 10.30 E4 3,692.90 3,702.90 10.00 CY 6,140.20
3,370.10 2.80 E4 3,702.90 3,713.90 11.00 CY 6,145.40
3,380.00 9.90 E4 3,713.90 3,724.20 10.30 CY 6,154.10
3,387.70 7.70 E4 3,724.20 3,734.90 10.70 CY 6,163.80
3,396.70 9.00 E4 3,734.90 3,745.30 10.40 CY 6,171.30
3,406.10 9.40 E4 3,745.30 3,755.10 9.80 CY 6,178.30
3,413.40 7.30 E4 3,755.10 3,765.60 10.50 CY 6,185.00
3,424.29 10.89 E4 3,765.60 3,775.50 9.90 CY 6,195.10
3,435.30 11.01 E4 3,775.50 3,785.80 10.30 CY 6,204.70
411.7 EX-P1004 427.3 EX-P1005
674-STO 697-STO
cavadora 336 Excavadora 336 Excavadora 336
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
6,056.70 8.80 Road 2 3,858.00 3,866.00 8.00 AC 10,707.40
6,066.50 9.80 Road 2 3,866.00 3,876.00 10.00 AC 10,717.30
6,075.80 9.30 Road 2 3,876.00 3,883.60 7.60 AC 10,727.00
6,080.60 4.80 Road 2 3,883.60 3,888.40 4.80 AC 10,737.40
6,084.10 3.50 5a1 3,888.40 3,894.30 5.90 AC 10,742.70
6,096.00 11.90 5a1 3,894.30 3,905.00 10.70 AC 10,751.60
6,107.60 11.60 E4 3,905.00 3,912.00 7.00 AC 10,760.40
6,118.50 10.90 5a1 3,912.00 3,921.00 9.00 AC 10,769.10
6,126.50 8.00 E4 3,921.00 3,925.20 4.20 AC 10,778.80
6,136.20 9.70 E4 3,925.20 3,932.20 7.00 AC 10,788.50
6,140.20 4.00 E4 3,932.20 3,940.20 8.00 BAC3 10,798.40
6,145.40 5.20 E4 3,940.20 3,940.20 0.00 Stand by - FO 10,808.00
6,154.10 8.70 E4 3,940.20 3,947.50 7.30 Road 2 10,818.00
6,163.80 9.70 E4 3,947.50 3,947.50 0.00 Stand by - FO 10,829.00
6,171.30 7.50 CY 3,947.50 3,951.70 4.20 AC 10,839.20
6,178.30 7.00 CY 3,951.70 3,953.30 1.60 AC 10,848.80
6,185.00 6.70 CY 3,953.30 3,957.70 4.40 AC 10,858.60
6,195.10 10.10 CY 3,957.70 3,967.70 10.00 C5 10,867.00
6,204.70 9.60 CY 3,967.70 3,969.90 2.20 AC3 10,877.90
6,212.70 8.00 CY 3,969.90 3,970.10 0.20 Stand by - FO 10,885.00
RE-P1002 CA-P1003
698-STO 666-STO
cavadora 336 Retroexcavadora Cisterna de Agua -1
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
10,717.30 9.90 CY 4,590.00 4,593.80 3.80 E4 4,194.00
10,727.00 9.70 CY 4,593.80 4,603.70 9.90 E4 4,204.00
10,737.40 10.40 CY 4,603.70 4,611.50 7.80 E4 4,213.00
10,742.70 5.30 CY 4,611.50 4,615.40 3.90 5a1 4,223.00
10,751.60 8.90 CY 4,615.40 4,619.10 3.70 E4 4,225.00
10,760.40 8.80 CY 4,619.10 4,627.20 8.10 E4 4,234.00
10,769.10 8.70 CY 4,627.20 4,632.00 4.80 E4 4,239.00
10,778.80 9.70 CY 4,632.00 4,636.00 4.00 E4 4,249.00
10,788.50 9.70 CY 4,636.00 4,642.90 6.90 T10 4,256.00
10,798.40 9.90 CY 4,642.90 4,646.20 3.30 AC 4,263.00
10,808.00 9.60 CY 4,646.20 4,658.20 12.00 AC 4,268.00
10,818.00 10.00 CY 4,658.20 4,666.20 8.00 AC 4,277.00
10,829.00 11.00 CY 4,666.20 4,671.30 5.10 5a1 4,286.00
10,839.20 10.20 CY 4,671.30 4,678.70 7.40 5a1 4,292.00
10,848.80 9.60 CY 4,678.70 4,684.40 5.70 5a1 4,292.00
10,858.60 9.80 CY 4,684.40 4,688.40 4.00 5a1 4,292.00
10,867.00 8.40 CY 4,688.40 4,689.60 1.20 Road 2 4,292.00
10,877.90 10.90 CY 4,689.60 4,695.90 6.30 5a1 4,292.00
10,885.00 7.10 CY 4,689.60 4,699.80 10.20 5a1 4,292.00
10,885.10 0.10 Inop. 4,689.60 4,697.30 7.70 5a1 4,292.00
408 CA-P1004 0
701-STO
sterna de Agua -1 Cisterna de Agua -2
H. Final HM Ubicación H. Inicial H. Final HM
4,204.00 10.00 CY 6,747.80 6,747.80 0.00 Inop.
4,213.00 9.00 CY 6,747.80 6,747.80 0.00 Inop.
4,223.00 10.00 CY 6,747.80 6,747.80 0.00 Inop.
4,225.00 2.00 CY 6,747.80 6,747.80 0.00 Inop.
4,234.00 9.00 CY 6,747.80 6,747.80 0.00 Inop.
4,239.00 5.00 CY 6,747.80 6,747.80 0.00 Inop.
4,249.00 10.00 CY 6,747.80 6,747.80 0.00 Inop.
4,256.00 7.00 CY 6,747.80 6,747.80 0.00 Inop.
4,263.00 7.00 CY 6,747.80 6,747.80 0.00 Inop.
4,268.00 5.00 CY 6,747.80 6,747.80 0.00 Inop.
4,277.00 9.00 CY 6,747.80 6,747.80 0.00 Inop.
4,286.00 9.00 CY 6,747.80 6,747.80 0.00 Inop.
4,292.00 6.00 CY 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
4,292.00 0.00 Inop. 6,747.80 6,747.80 0.00 Inop.
CA-P1004 0 CV-00415 613.33
719-STO 653-STO
Cisterna de Agua -3 Volquete 1A - 1
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
1,326.00 1,335.00 9.00 CY 13,246.47 13,246.47 0.00 Inop.
1,335.00 1,344.00 9.00 CY 13,246.47 13,246.47 0.00 Inop.
1,344.00 1,354.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,354.00 1,359.00 5.00 CY 13,246.47 13,246.47 0.00 Inop.
1,359.00 1,368.00 9.00 CY 13,246.47 13,246.47 0.00 Inop.
1,368.00 1,375.00 7.00 CY 13,246.47 13,246.47 0.00 Inop.
1,375.00 1,385.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,385.00 1,392.00 7.00 CY 13,246.47 13,246.47 0.00 Inop.
1,392.00 1,402.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,402.00 1,409.00 7.00 CY 13,246.47 13,246.47 0.00 Inop.
1,409.00 1,416.00 7.00 CY 13,246.47 13,246.47 0.00 Inop.
1,416.00 1,425.00 9.00 CY 13,246.47 13,246.47 0.00 Inop.
1,425.00 1,434.00 9.00 CY 13,246.47 13,246.47 0.00 Inop.
1,434.00 1,444.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,444.00 1,454.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,454.00 1,464.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,464.00 1,474.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,474.00 1,484.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,484.00 1,494.00 10.00 CY 13,246.47 13,246.47 0.00 Inop.
1,494.00 1,502.00 8.00 CY 13,246.47 13,246.47 0.00 Inop.
CV-00406 566.27 CV-00414 47.79
651-STO 652-STO
Volquete 1A - 2 Volquete 1A - 3
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
13,367.39 13,377.25 9.86 C5-5a1 12,499.35 12,507.20 7.85 CY-E4
13,377.25 13,386.47 9.22 C5-5a1 12,507.20 12,516.29 9.09 CY-E4
13,386.47 13,394.22 7.75 C5-5a1 12,516.29 12,516.29 0.00 Inop.
13,394.22 13,398.35 4.13 C5-5a1 12,516.29 12,516.29 0.00 Inop.
13,398.35 13,405.11 6.76 C5-5a1 12,516.29 12,516.46 0.17 Inop.
13,405.11 13,414.17 9.06 C5-5a1 12,516.46 12,525.10 8.64 CY-E4
13,414.17 13,421.37 7.20 CY-E4 12,525.10 12,534.14 9.04 CY-E4
13,421.37 13,431.08 9.71 CY.E4 12,534.14 12,542.45 8.31 CY-E4
13,431.08 13,439.58 8.50 CY-E4 12,542.45 12,551.02 8.57 CY-E4
13,439.58 13,450.08 10.50 CY-E4 12,551.02 12,560.58 9.56 CY-E4
13,450.08 13,459.46 9.38 CY-E4 12,560.58 12,565.19 4.61 CY-E4
13,459.46 13,469.27 9.81 CY-E4 12,565.19 12,573.33 8.14 CY-E4
13,469.27 13,478.28 9.01 CY-E4 12,573.33 12,582.07 8.74 CY-E4
13,478.28 13,489.51 11.23 CY-E4 12,582.07 12,592.07 10.00 CY-E4
13,489.51 13,496.46 6.95 CY-E4 12,592.07 12,601.00 8.93 CY-E4
13,496.46 13,507.06 10.60 CY-E4 12,601.00 12,611.10 10.10 CY-E4
13,507.06 13,515.19 8.13 CY-E4 12,611.10 12,621.23 10.13 CY-E4
13,515.19 13,526.35 11.16 CY-E4 12,621.23 12,631.00 9.77 CY-E4
13,526.35 13,536.31 9.96 CY-E4 12,631.00 12,641.59 10.59 CY-E4
13,536.31 13,546.20 9.89 CY-E4 12,641.59 12,652.32 10.73 CY-E4
CV-P1004 445 CV-P1005 478.1
668-STO 669-STO
Volquete 1A - 4 Volquete 1A - 5
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
2,910.20 2,919.55 9.35 T10-5a1 2,954.30 2,962.60 8.30
2,919.55 2,929.33 9.78 T10-5a1 2,962.60 2,972.48 9.88
2,929.33 2,938.52 9.19 T10-5a1 2,972.48 2,983.16 10.68
2,938.52 2,942.44 3.92 Truck Shop - 5a1 2,983.16 2,987.52 4.36
2,942.44 2,949.14 6.70 Truck Shop - 5a1 2,987.52 2,996.16 8.64
2,949.14 2,957.53 8.39 Truck Shop - 5a1 2,996.16 3,005.41 9.25
2,957.53 2,966.38 8.85 CY-E4 3,005.41 3,015.31 9.90
2,966.38 2,976.07 9.69 CY-E4 3,015.31 3,024.48 9.17
2,976.07 2,985.90 9.83 CY-E4 3,024.48 3,032.50 8.02
2,985.90 2,995.50 9.60 CY-E4 3,032.50 3,042.20 9.70
2,995.50 3,001.36 5.86 CY-E4 3,042.20 3,051.70 9.50
3,001.36 3,011.48 10.12 CY-E4 3,051.70 3,061.18 9.48
3,011.48 3,021.33 9.85 CY-E4 3,061.18 3,071.52 10.34
3,021.33 3,031.36 10.03 CY-E4 3,071.52 3,082.13 10.61
3,031.36 3,040.47 9.11 CY-E4 3,082.13 3,091.24 9.11
3,040.47 3,050.46 9.99 CY-E4 3,091.24 3,101.15 9.91
3,050.46 3,060.30 9.84 CY-E4 3,101.15 3,109.00 7.85
3,060.30 3,070.44 10.14 CY-E4 3,109.00 3,119.17 10.17
3,070.44 3,079.44 9.00 CY-E4 3,119.17 3,129.00 9.83
3,079.44 3,089.41 9.97 AC-Padock 3,129.00 3,139.60 10.60
CV-P1006 463.74 CV-P1007
670-STO 671-STO
Volquete 1A - 6 Volquete 1A - 7
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
CY-E4 5,813.41 5,817.36 3.95 T10-5a1 6,334.56 6,345.06
CY-E4 5,817.36 5,826.37 9.01 C5-5a1 6,345.06 6,355.10
CY-E4 5,826.37 5,835.05 8.68 C5-5a1 6,355.10 6,365.35
CY-E4 5,835.05 5,839.13 4.08 CY-E4 6,365.35 6,370.58
CY-E4 5,839.13 5,847.30 8.17 CY-E4 6,370.58 6,378.45
CY-E4 5,847.30 5,856.47 9.17 CY-E4 6,378.45 6,385.49
CY-E4 5,856.47 5,866.05 9.58 CY-E4 6,385.49 6,395.35
CY-E4 5,866.05 5,873.52 7.47 CY-E4 6,395.35 6,404.54
CY-E4 5,873.52 5,883.45 9.93 CY-E4 6,404.54 6,414.20
CY-E4 5,883.45 5,892.30 8.85 CY-E4 6,414.20 6,423.57
CY-E4 5,892.30 5,897.29 4.99 CY-E4 6,423.57 6,432.54
CY-E4 5,897.29 5,903.88 6.59 CY-E4 6,432.54 6,441.53
CY-E4 5,903.88 5,914.25 10.37 CY-E4 6,441.53 6,451.26
CY-E4 5,914.25 5,924.18 9.93 CY-E4 6,451.26 6,461.00
CY-E4 5,924.18 5,933.52 9.34 CY-E4 6,461.00 6,470.58
CY-E4 5,933.52 5,943.50 9.98 CY-E4 6,470.58 6,480.54
CY-E4 5,943.50 5,954.13 10.63 CY-E4 6,480.54 6,490.50
CY-E4 5,954.13 5,964.20 10.07 CY-E4 6,490.50 6,501.11
CY-E4 5,964.20 5,974.01 9.81 CY-E4 6,501.11 6,511.03
CY-E4 5,974.01 5,983.59 9.58 CY-E4 6,511.03 6,521.28
475.03 CV-P1008 467.44 CV-P1009
672-STO 673-STO
Volquete 1A - 8 Volquete 1A - 9
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
10.50 CY-E4 6,225.40 6,236.07 10.67 CY-E4 6,537.41 6,547.53
10.04 CY-E4 6,236.07 6,246.13 10.06 CY-E4 6,547.53 6,558.10
10.25 CY-E4 6,246.13 6,254.25 8.12 CY-E4 6,558.10 6,568.15
5.23 CY-E4 6,254.25 6,254.25 0.00 Stand by - FO 6,568.15 6,572.58
7.87 CY-E4 6,254.25 6,261.12 6.87 CY-E4 6,572.58 6,574.33
7.04 CY-E4 6,261.12 6,271.05 9.93 CY-E4 6,574.33 6,581.09
9.86 CY-E4 6,271.05 6,280.49 9.44 CY-E4 6,581.09 6,590.47
9.19 CY-E4 6,280.49 6,290.01 9.52 CY-E4 6,590.47 6,599.10
9.66 CY-E4 6,290.01 6,299.36 9.35 CY-E4 6,599.10 6,608.50
9.37 CY-E4 6,299.36 6,309.35 9.99 CY-E4 6,608.50 6,618.37
8.97 CY-E4 6,309.35 6,318.41 9.06 CY-E4 6,618.37 6,627.07
8.99 E4-E4 6,318.41 6,328.53 10.12 CY-E4 6,627.07 6,636.48
9.73 CY-E4 6,328.53 6,338.35 9.82 CY-E4 6,636.48 6,646.30
9.74 CY-E4 6,338.35 6,349.01 10.66 CY-E4 6,646.30 6,656.41
9.58 CY-E4 6,349.01 6,351.22 2.21 CY-E4 6,656.41 6,665.18
9.96 CY-E4 6,351.22 6,351.22 0.00 Inop. 6,665.18 6,675.18
9.96 CY-E4 6,351.22 6,353.28 2.06 Inop. 6,675.18 6,685.27
10.61 CY-E4 6,353.28 6,361.00 7.72 CY-E4 6,685.27 6,695.43
9.92 CY-E4 6,361.00 6,371.12 10.12 CY-E4 6,695.43 6,705.08
10.25 CY-E4 6,371.12 6,378.43 7.31 CY-E4 6,705.08 6,715.15
438.8 CV-P1011 323 CV-P1012
686-STO 687-STO
Volquete 1A - 10 Volquete 1A - 11
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
10.12 CY-E4 2,581.00 2,581.00 0.00 Inop-Moq 3,078.00 3,088.00
10.57 CY-E4 2,581.00 2,581.00 0.00 Inop-Moq 3,088.00 3,097.00
10.05 CY-E4 2,581.00 2,581.00 0.00 Inop-Moq 3,097.00 3,107.00
4.43 CY-E4 2,581.00 2,581.00 0.00 Inop-Moq 3,107.00 3,113.00
1.75 CY-E4 2,581.00 2,587.00 6.00 Traslado Moq. 3,113.00 3,119.00
6.76 AC-E4 2,587.00 2,594.00 7.00 C5-5a1 3,119.00 3,129.00
9.38 CY-E4 2,594.00 2,601.00 7.00 Truck Shop - 5a 3,129.00 3,139.00
8.63 AC-E4 2,601.00 2,611.00 10.00 CY-E4 3,139.00 3,148.00
9.40 CY-E4 2,611.00 2,621.00 10.00 CY-E4 3,148.00 3,154.00
9.87 CY-E4 2,621.00 2,630.00 9.00 CY-E4 3,154.00 3,162.00
8.70 CY-E4 2,630.00 2,636.00 6.00 CY-E4 3,162.00 3,169.00
9.41 CY-E4 2,636.00 2,645.00 9.00 CY-E4 3,169.00 3,179.00
9.82 CY-E4 2,645.00 2,645.00 0.00 Stand by - FO 3,179.00 3,188.00
10.11 CY-E4 2,645.00 2,654.00 9.00 CY-E4 3,188.00 3,198.00
8.77 CY-E4 2,654.00 2,664.00 10.00 CY-E4 3,198.00 3,207.00
10.00 CY-E4 2,664.00 2,672.00 8.00 CY-E4 3,207.00 3,215.00
10.09 CY-E4 2,672.00 2,682.00 10.00 CY-E4 3,215.00 3,224.00
10.16 CY-E4 2,682.00 2,686.00 4.00 CY-E4 3,224.00 3,235.00
9.65 CY-E4 2,686.00 2,686.00 0.00 Inop. 3,235.00 3,245.00
10.07 CY-E4 2,686.00 2,686.00 0.00 Inop. 3,245.00 3,254.00
302 CV-P1010 81 CV-P1013
685-STO 693-STO
Volquete 1A - 12 Volquete 1A - 13
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
10.00 CY-E4 8,076.00 8,079.00 3.00 T4 10,219.00 10,229.00
9.00 CY-E4 8,079.00 8,084.00 5.00 T4 10,229.00 10,238.00
10.00 CY-E4 8,084.00 8,086.00 2.00 T4 10,238.00 10,247.00
6.00 CY-E4 8,086.00 8,088.00 2.00 T4 10,247.00 10,250.00
6.00 CY-E4 8,088.00 8,094.00 6.00 T4 10,250.00 10,256.00
10.00 CY-E4 8,094.00 8,099.00 5.00 T4 10,256.00 10,265.00
10.00 CY-E4 8,099.00 8,102.00 3.00 T4 10,265.00 10,265.00
9.00 CY-E4 8,102.00 8,107.00 5.00 T4 10,265.00 10,270.00
6.00 CY-E4 8,107.00 8,107.00 0.00 Stand by - FF 10,270.00 10,276.00
8.00 CY-E4 8,107.00 8,111.00 4.00 T4 10,276.00 10,284.00
7.00 CY-E4 8,111.00 8,111.00 0.00 Stand by - FO 10,284.00 10,290.00
10.00 CY-E4 8,111.00 8,111.00 0.00 Stand by - FO 10,290.00 10,299.00
9.00 CY-E4 8,111.00 8,111.00 0.00 Stand by - FO 10,299.00 10,299.00
10.00 CY-E4 8,111.00 8,111.00 0.00 Stand by - FO 10,299.00 10,308.00
9.00 CY-E4 8,111.00 8,113.00 2.00 Stand by - FF 10,308.00 10,308.00
8.00 CY-E4 8,113.00 8,113.00 0.00 Stand by - FO 10,308.00 10,308.00
9.00 CY-E4 8,113.00 8,121.00 8.00 AC-AC 10,308.00 10,308.00
11.00 CY-E4 8,121.00 8,132.00 11.00 AC-AC 10,308.00 10,308.00
10.00 CY-E4 8,132.00 8,139.00 7.00 C5-5a1 10,308.00 10,308.00
9.00 CY-E4 8,139.00 8,147.00 8.00 C5-5a1 10,308.00 10,308.00
0 CV-P1014 0 CV-P1015
694-STO 695-STO
Volquete 1A - 14 Volquete 1A - 15
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
10.00 T10-5a1 11,725.00 11,734.00 9.00 T10-5a1 9,287.56
9.00 T10-5a1 11,734.00 11,734.00 0.00 Stand by - FO 9,287.56
9.00 T10-5a1 11,734.00 11,744.00 10.00 T10-5a1 9,287.56
3.00 C5-5a1 11,744.00 11,744.00 0.00 Stand by - FO 9,287.56
6.00 T10-5a1 11,744.00 11,744.00 0.00 Inop. 9,287.56
9.00 C5-5a1 11,744.00 11,744.00 0.00 Inop. 9,287.56
0.00 Inop. 11,744.00 11,749.00 5.00 Traslado 9,287.56
5.00 AC-5a1 11,749.00 11,752.00 3.00 T10-5a1 9,287.56
6.00 Truck Shop-5a1 11,752.00 11,758.00 6.00 CY-E4 9,287.56
8.00 Truck Shop-5a1 11,758.00 11,758.00 0.00 Stand by - FO 9,287.56
6.00 Road 2 - 5a1 11,758.00 11,758.00 0.00 Stand by - FO 9,287.56
9.00 Truck Shop-5a1 11,758.00 11,768.00 10.00 CY-E4 9,287.56
0.00 Stand by - FO 11,768.00 11,768.00 0.00 Stand by - FO 9,287.56
9.00 Truck Shop-5a1 11,768.00 11,778.00 10.00 CY-E4 9,287.56
0.00 Inop. 11,778.00 11,780.00 2.00 CY-E4 9,287.56
0.00 Inop. 11,780.00 11,790.00 10.00 CY-E4 9,287.56
0.00 Inop. 11,790.00 11,790.00 0.00 Stand by - FO 9,287.56
0.00 Inop. 11,790.00 11,801.00 11.00 CY-E4 9,287.56
0.00 Inop. 11,801.00 11,801.00 0.00 Stand by - FO 9,287.56
0.00 Inop. 11,801.00 11,811.00 10.00 CY-E4 9,287.56
0 CV-P1016 1122.91
696-STO
lquete 1A - 15 Volquete 1A - 16
H. Final HM Ubicación H. Inicial H. Final HM Ubicación
9,287.56 0.00 Inop. 7,181.56 7,192.36 10.80 T10-5a1
9,287.56 0.00 Inop. 7,192.36 7,203.24 10.88 T10-5a1
9,287.56 0.00 Inop. 7,203.24 7,213.15 9.91 CY-E4
9,287.56 0.00 Inop. 7,213.15 7,217.02 3.87 C5-5a1
9,287.56 0.00 Inop. 7,217.02 7,223.43 6.41 Truck Shop - 5a1
9,287.56 0.00 Inop. 7,223.43 7,232.54 9.11 Truck Shop - 5a1
9,287.56 0.00 Inop. 7,232.54 7,240.25 7.71 C5-5a1
9,287.56 0.00 Inop. 7,240.25 7,245.40 5.15 C5-5a1
9,287.56 0.00 Inop. 7,245.40 7,247.46 2.06 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,247.46 0.00 Inop.
9,287.56 0.00 Inop. 7,247.46 7,255.31 7.85 Traslado
9,287.56 0.00 Inop. 7,255.31 7,262.31 7.00 Traslado
9,287.56 0.00 Stand by - FF 7,262.31 7,262.31 0.00 Inop.
9,287.56 0.00 Stand by - FF 7,262.31 7,269.21 6.90 C5-5a1
MO-P1002 100.2 EX-P1006
675-STO 712-STO
Motoniveladora Excavadora 679
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
3,190.40 3,194.80 4.40 CY 8,170.00 8,180.00 10.00 T10
3,194.80 3,194.80 0.00 Inop. 8,180.00 8,190.00 10.00 T10
3,194.80 3,198.80 4.00 5a1 8,190.00 8,198.00 8.00 T10
3,198.80 3,203.40 4.60 E4 8,198.00 8,206.00 8.00 T10
3,203.40 3,207.00 3.60 E4 8,206.00 8,215.00 9.00 T10
3,207.00 3,212.90 5.90 E4 8,215.00 8,225.00 10.00 T10
3,212.90 3,214.50 1.60 E4 8,225.00 8,225.00 0.00 Inop.
3,214.50 3,222.50 8.00 E4 8,225.00 8,235.00 10.00 T10
3,222.50 3,227.20 4.70 C5 8,235.00 8,243.00 8.00 T10
3,227.20 3,232.00 4.80 E4 8,243.00 8,243.00 0.00 Inop.
3,232.00 3,236.50 4.50 5a1 8,243.00 8,243.80 0.80 Inop.
3,236.50 3,238.50 2.00 Inop. 8,243.80 8,243.80 0.00 Inop.
3,238.50 3,241.10 2.60 E4 8,243.80 8,245.70 1.90 AC
3,241.10 3,248.10 7.00 E4 8,245.70 8,255.00 9.30 T10
3,248.10 3,253.20 5.10 E4 8,255.00 8,260.00 5.00 T10
3,253.20 3,261.50 8.30 5a1 8,260.00 8,270.00 10.00 T10
3,261.50 3,263.40 1.90 5a1 8,270.00 8,279.40 9.40 T10
3,263.40 3,268.40 5.00 5a1 8,279.40 8,288.00 8.60 T10
3,268.40 3,273.40 5.00 5a1 8,288.00 8,297.00 9.00 T10
3,273.40 3,281.00 7.60 AC 8,297.00 8,307.00 10.00 T10
EX-P1007
713-STO 722-STO
Excavadora 679 Retroexcavadora
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
8,159.00 8,169.00 10.00 CY 5,405.40 5,410.70 5.30 T4
8,169.00 8,179.20 10.20 CY 5,410.70 5,415.90 5.20 T4
8,179.20 8,183.20 4.00 CY 5,415.90 5,419.70 3.80 T4
8,183.20 8,183.20 0.00 Inop. 5,419.70 5,421.00 1.30 T4
8,183.20 8,183.20 0.00 Inop. 5,421.00 5,427.10 6.10 T4
8,183.20 8,183.20 0.00 Inop. 5,427.10 5,432.40 5.30 T4
8,183.20 8,183.20 0.00 Inop. 5,432.40 5,437.10 4.70 T4
8,183.20 8,183.20 0.00 Inop. 5,437.10 5,442.80 5.70 T4
8,183.20 8,183.20 0.00 Inop. 5,442.80 5,442.80 0.00 Inop.
8,183.20 8,183.20 0.00 Inop. 5,442.80 5,444.00 1.20 T4
8,183.20 8,183.20 0.00 Inop. 5,444.00 5,449.00 5.00 T4
8,183.20 8,183.20 0.00 Inop. 5,449.00 5,449.70 0.70 T4
8,183.20 8,183.20 0.00 Inop. 5,449.70 5,453.70 4.00 T4
8,183.20 8,187.00 3.80 CY 5,453.70 5,454.10 0.40 Stand by - FO
8,187.00 8,195.00 8.00 CY 5,454.10 5,457.30 3.20 T4
8,195.00 8,204.00 9.00 CY 5,457.30 5,460.30 3.00 T4
8,204.00 8,213.90 9.90 CY 5,460.30 5,460.30 0.00 Stand by - FO
8,213.90 8,225.00 11.10 CY 5,460.30 5,468.90 8.60 T4
8,225.00 8,234.50 9.50 CY 5,468.90 5,471.30 2.40 T4
8,234.50 8,245.00 10.50 CY 5,471.30 5,471.90 0.60 Traslado
731-STO 729-STO
Motoniveladora Rodillo autopropulsado
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
1,058.70 1,060.00 1.30 T4 2,094.30 2,102.80 8.50 E4
1,060.00 1,060.00 0.00 Stand by - FF 2,102.80 2,111.10 8.30 E4
1,060.00 1,060.00 0.00 Stand by - FF 2,111.10 2,121.30 10.20 E4
1,060.00 1,060.00 0.00 Stand by - FF 2,121.30 2,126.80 5.50 E4
1,060.00 1,060.00 0.00 Stand by - FF 2,126.80 2,134.30 7.50 E4
1,060.00 1,060.00 0.00 Stand by - FF 2,134.30 2,141.10 6.80 E4
1,060.00 1,061.00 1.00 T4 2,141.10 2,149.80 8.70 E4
1,061.00 1,062.90 1.90 T4 2,149.80 2,158.00 8.20 E4
1,062.90 1,062.90 0.00 Stand by - FF 2,158.00 2,164.10 6.10 E4
1,062.90 1,063.20 0.30 T4 2,164.10 2,174.10 10.00 E4
1,063.20 1,063.20 0.00 Stand by - FO 2,174.10 2,182.10 8.00 E4
1,063.20 1,063.20 0.00 Stand by - FO 2,182.10 2,191.70 9.60 E4
1,063.20 1,066.00 2.80 T4 2,191.70 2,195.60 3.90 E4
1,066.00 1,068.50 2.50 T4 2,195.60 2,205.60 10.00 E4
1,068.50 1,074.60 6.10 T4 2,205.60 2,212.80 7.20 E4
1,074.60 1,077.20 2.60 T4 2,212.80 2,220.80 8.00 E4
1,077.20 1,084.70 7.50 T4 2,220.80 2,227.60 6.80 E4
1,084.70 1,085.80 1.10 T4 2,227.60 2,233.60 6.00 E4
1,085.80 1,092.60 6.80 T4 2,233.60 2,241.50 7.90 E4
1,092.60 1,095.90 3.30 T4 2,241.50 2,246.00 4.50 E4
732-STO 738-STO
Cisterna de Agua Rodillo autopropulsado
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
1,206.00 1,212.00 6.00 5a1 969.50 972.60 3.10 T4
1,212.00 1,219.00 7.00 5a1 972.60 977.50 4.90 T4
1,219.00 1,222.00 3.00 5a1 977.50 978.70 1.20 T4
1,222.00 1,225.00 3.00 5a1 978.70 981.00 2.30 T4
1,225.00 1,230.00 5.00 5a1 981.00 983.50 2.50 T4
1,230.00 1,238.00 8.00 5a1 983.50 985.00 1.50 T4
1,238.00 1,244.00 6.00 5a1 985.00 986.50 1.50 T4
1,244.00 1,254.00 10.00 5a1 986.50 990.00 3.50 T4
1,254.00 1,258.00 4.00 5a1 990.00 990.00 0.00 Stand by - FO
1,258.00 1,267.00 9.00 5a1 990.00 993.50 3.50 T4
1,267.00 1,276.00 9.00 5a1 993.50 993.50 0.00 Stand by - FO
1,276.00 1,281.00 5.00 5a1 993.50 994.50 1.00 T4
1,281.00 1,290.00 9.00 5a1 994.50 997.80 3.30 T4
1,290.00 1,297.00 7.00 5a1 997.80 1,000.80 3.00 T4
1,297.00 1,306.00 9.00 5a1 1,000.80 1,007.50 6.70 T4
1,306.00 1,314.00 8.00 C5 1,007.50 1,011.50 4.00 T4
1,314.00 1,314.00 0.00 Inop. 1,011.50 1,019.50 8.00 T4
1,314.00 1,319.00 5.00 5a1 1,019.50 1,024.00 4.50 T4
1,319.00 1,329.00 10.00 5a1 1,024.00 1,031.00 7.00 T4
1,329.00 1,337.00 8.00 5a1 1,031.00 1,034.00 3.00 T4
721-STO 734-STO
Tractor D8 Tractor D8
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
1,083.30 1,093.30 10.00 CY 1,512.80 1,521.20 8.40 Road 2
1,093.30 1,102.90 9.60 CY 1,521.20 1,530.90 9.70 AC
1,102.90 1,113.10 10.20 CY 1,530.90 1,537.90 7.00 AC
1,113.10 1,118.20 5.10 CY 1,537.90 1,540.90 3.00 AC
1,118.20 1,126.80 8.60 CY 1,540.90 1,543.80 2.90 AC
1,126.80 1,136.00 9.20 CY 1,543.80 1,551.40 7.60 5a1
1,136.00 1,145.70 9.70 CY 1,551.40 1,560.10 8.70 5a1
1,145.70 1,154.00 8.30 CY 1,560.10 1,565.40 5.30 5a1
1,154.00 1,163.80 9.80 CY 1,565.40 1,573.60 8.20 5a1
1,163.80 1,171.50 7.70 CY 1,573.60 1,582.90 9.30 5a1
1,171.50 1,180.30 8.80 CY 1,582.90 1,590.00 7.10 5a1
1,180.30 1,180.30 0.00 Inop. 1,590.00 1,600.30 10.30 5a1
1,180.30 1,180.30 0.00 Inop. 1,600.30 1,607.50 7.20 5a1
1,180.30 1,180.30 0.00 Inop. 1,607.50 1,617.80 10.30 5a1
1,180.30 1,182.30 2.00 Inop. 1,617.80 1,626.30 8.50 5a1
1,182.30 1,185.10 2.80 CY 1,626.30 1,636.70 10.40 5a1
1,185.10 1,194.10 9.00 CY 1,636.70 1,644.70 8.00 5a1
1,194.10 1,204.20 10.10 CY 1,644.70 1,650.80 6.10 5a1
1,204.20 1,211.50 7.30 CY 1,650.80 1,662.00 11.20 5a1
1,211.50 1,220.80 9.30 CY 1,662.00 1,672.00 10.00 AC
730-STO 724-STO
Tractor D6 Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
3,074.70 3,079.60 4.90 T4 9,729.43 9,733.53 4.10 T4
3,079.60 3,080.20 0.60 T4 9,733.53 9,737.49 3.96 T4
3,080.20 3,082.00 1.80 T4 9,737.49 9,739.53 2.04 T4
3,082.00 3,088.90 6.90 T4 9,739.53 9,743.32 3.79 T4
3,088.90 3,095.20 6.30 T4 9,743.32 9,750.03 6.71 CY-E4
3,095.20 3,099.60 4.40 T4 9,750.03 9,754.22 4.19 T4
3,099.60 3,101.50 1.90 T4 9,754.22 9,757.32 3.10 T4
3,101.50 3,105.50 4.00 T4 9,757.32 9,762.24 4.92 T4
3,105.50 3,109.00 3.50 T4 9,762.24 9,762.24 0.00 Stand by - FF
3,109.00 3,110.70 1.70 T4 9,762.24 9,764.34 2.10 T4
3,110.70 3,110.70 0.00 Stand by - FF 9,764.34 9,764.34 0.00 Stand by - FO
3,110.70 3,110.70 0.00 Stand by - FF 9,764.34 9,764.34 0.00 Stand by - FO
3,110.70 3,111.80 1.10 T4 9,764.34 9,764.34 0.00 Stand by - FO
3,111.80 3,111.80 0.00 Stand by - FO 9,764.34 9,764.34 0.00 Stand by - FO
3,111.80 3,114.80 3.00 T4 9,764.34 9,768.45 4.11 T4
3,114.80 3,114.80 0.00 Stand by - FO 9,768.45 9,776.57 8.12 T4
3,114.80 3,120.80 6.00 T4 9,776.57 9,784.20 7.63 T4
3,120.80 3,120.80 0.00 Stand by - FO 9,784.20 9,792.04 7.84 T4
3,120.80 3,124.10 3.30 T4 9,792.04 9,797.45 5.41 T4
3,124.10 3,124.10 0.00 Stand by - FO 9,797.45 9,804.58 7.13 T4
726-STO 727-STO
Volquete Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
9,808.06 9,814.04 5.98 T4 9,532.51 9,536.56 4.05 T4
9,814.04 9,818.00 3.96 T4 9,536.56 9,542.03 5.47 T4
9,818.00 9,825.50 7.50 CY-E4 9,542.03 9,544.23 2.20 T4
9,825.50 9,831.15 5.65 T4 9,544.23 9,547.55 3.32 T4
9,831.15 9,837.17 6.02 CY-E4 9,547.55 9,554.43 6.88 T4
9,837.17 9,842.34 5.17 T4 9,554.43 9,560.34 5.91 T4
9,842.34 9,848.42 6.08 CY-E4 9,560.34 9,566.23 5.89 CY-E4
9,848.42 9,852.08 3.66 T4 9,566.23 9,570.46 4.23 T4
9,852.08 9,852.08 0.00 Stand by - FO 9,570.46 9,570.46 0.00 Stand by - FF
9,852.08 9,858.02 5.94 T4 9,570.46 9,576.00 5.54 T4
9,858.02 9,858.02 0.00 Stand by - FO 9,576.00 9,576.00 0.00 Stand by - FO
9,858.02 9,862.17 4.15 T4 9,576.00 9,576.00 0.00 Stand by - FO
9,862.17 9,862.17 0.00 Stand by - FO 9,576.00 9,576.00 0.00 Stand by - FO
9,862.17 9,868.48 6.31 T4 9,576.00 9,576.00 0.00 Stand by - FO
9,868.48 9,870.20 1.72 T10 - Sentina 9,576.00 9,577.51 1.51 T10 - Sentina
9,870.20 9,875.00 4.80 T10 - Sentina 9,577.51 9,582.44 4.93 T10 - Sentina
9,875.00 9,881.03 6.03 T4 9,582.44 9,589.48 7.04 T10 - Sentina
9,881.03 9,881.03 0.00 Stand by - FO 9,589.48 9,595.10 5.62 T10 - Sentina
9,881.03 9,886.23 5.20 T4 9,595.10 9,599.34 4.24 T4
9,886.23 9,886.23 0.00 Stand by - FO 9,599.34 9,599.34 0.00 Stand by - FF
737-STO 748-STO
Cargador Frontal Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
6,304.00 6,310.00 6.00 T10 8,144.11 8,152.37 8.26 CY-E4
6,310.00 6,319.00 9.00 T10 8,152.37 8,155.22 2.85 CY-E4
6,319.00 6,328.00 9.00 T10 8,155.22 8,165.31 10.09 CY-E4
6,328.00 6,334.00 6.00 T10 8,165.31 8,168.25 2.94 CY-E4
6,334.00 6,341.00 7.00 T10 8,168.25 8,172.37 4.12 CY-E4
6,341.00 6,350.00 9.00 T10 8,172.37 8,182.40 10.03 CY-E4
6,350.00 6,355.00 5.00 T10 8,182.40 8,193.06 10.66 CY-E4
6,355.00 6,361.00 6.00 T10 8,193.06 8,202.02 8.96 CY-E4
6,361.00 6,365.00 4.00 C5 8,202.02 8,211.24 9.22 CY-E4
6,365.00 6,374.00 9.00 T10 8,211.24 8,221.16 9.92 CY-E4
6,374.00 6,380.00 6.00 T10 8,221.16 8,228.35 7.19 CY-E4
6,380.00 6,389.00 9.00 T10 8,228.35 8,238.41 10.06 CY-E4
6,389.00 6,392.00 3.00 T10 8,238.41 8,248.55 10.14 CY-E4
6,392.00 6,398.00 6.00 T10 8,248.55 8,259.30 10.75 CY-E4
6,398.00 6,399.00 1.00 Inop. 8,259.30 8,263.24 3.94 CY-E4
6,399.00 6,403.00 4.00 T10 8,263.24 8,271.27 8.03 CY-E4
6,403.00 6,407.00 4.00 T10 8,271.27 8,280.35 9.08 CY-E4
6,407.00 6,413.00 6.00 T10 8,280.35 8,290.53 10.18 CY-E4
6,413.00 6,416.00 3.00 Asenti 8,290.53 8,300.19 9.66 CY-E4
6,416.00 6,422.00 6.00 Asenti 8,300.19 8,310.34 10.15 CY-E4
751-STO 752-STO
Volquete Tractor D8
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
7,690.19 7,701.14 10.95 C5-5a1 1,075.30 1,083.50 8.20 CY
7,701.14 7,710.49 9.35 C5-5a1 1,083.50 1,093.10 9.60 CY
7,710.49 7,719.02 8.53 C5-5a1 1,093.10 1,103.40 10.30 CY
7,719.02 7,723.15 4.13 C5-5a1 1,103.40 1,108.50 5.10 CY
7,723.15 7,729.39 6.24 C5-5a1 1,108.50 1,116.60 8.10 CY
7,729.39 7,729.39 0.00 Inop. 1,116.60 1,126.40 9.80 CY
7,729.39 7,729.39 0.00 Inop. 1,126.40 1,132.20 5.80 CY
7,729.39 7,729.39 0.00 Inop. 1,132.20 1,142.00 9.80 CY
7,729.39 7,729.39 0.00 Inop. 1,142.00 1,151.90 9.90 CY
7,729.39 7,729.39 0.00 Inop. 1,151.90 1,161.80 9.90 CY
7,729.39 7,729.39 0.00 Inop. 1,161.80 1,172.10 10.30 CY
7,729.39 7,729.39 0.00 Inop. 1,172.10 1,181.60 9.50 CY
7,729.39 7,729.39 0.00 Inop. 1,181.60 1,192.00 10.40 CY
7,729.39 7,729.39 0.00 Inop. 1,192.00 1,202.00 10.00 CY
7,729.39 7,729.39 0.00 Inop. 1,202.00 1,212.20 10.20 CY
7,729.39 7,729.39 0.00 Inop. 1,212.20 1,222.00 9.80 CY
7,729.39 7,729.39 0.00 Inop. 1,222.00 1,231.60 9.60 CY
7,729.39 7,729.39 0.00 Inop. 1,231.60 1,241.40 9.80 CY
7,729.39 7,729.39 0.00 Inop. 1,241.40 1,250.50 9.10 CY
7,729.39 7,729.39 0.00 Inop. 1,250.50 1,260.40 9.90 CY
749-STO 750-STO
Volquete Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
10,143.33 10,151.15 7.82 C5-5a1 8,857.26 8,863.15 5.89
10,151.15 10,161.16 10.01 C5-5a1 8,863.15 8,865.03 1.88
10,161.16 10,169.58 8.42 C5-5a1 8,865.03 8,872.37 7.34
10,169.58 10,174.09 4.51 C5-5a1 8,872.37 8,877.51 5.14
10,174.09 10,181.29 7.20 C5-5a1 8,877.51 8,884.58 7.07
10,181.29 10,190.58 9.29 C5-5a1 8,884.58 8,890.45 5.87
10,190.58 10,200.51 9.93 C5-5a1 8,890.45 8,891.22 0.77
10,200.51 10,206.00 5.49 C5-5a1 8,891.22 8,894.34 3.12
10,206.00 10,211.27 5.27 C5-5a1 8,894.34 8,897.11 2.77
10,211.27 10,220.02 8.75 C5-5a1 8,897.11 8,899.00 1.89
10,220.02 10,229.04 9.02 Truck Shop-5a1 8,899.00 8,899.00 0.00
10,229.04 10,239.02 9.98 C5-5a1 8,899.00 8,904.04 5.04
10,239.02 10,239.02 0.00 Stand by - FO 8,904.04 8,906.41 2.37
10,239.02 10,249.44 10.42 Road 2 - 5a1 8,906.41 8,913.02 6.61
10,249.44 10,259.20 9.76 Truck Shop-5a1 8,913.02 8,920.30 7.28
10,259.20 10,269.28 10.08 C5-5a1 8,920.30 8,929.08 8.78
10,269.28 10,278.03 8.75 Road 2 - 5a1 8,929.08 8,936.28 7.20
10,278.03 10,287.38 9.35 Road 2 - 5a1 8,936.28 8,944.25 7.97
10,287.38 10,295.43 8.05 Truck Shop-5a1 8,944.25 8,950.13 5.88
10,295.43 10,304.54 9.11 T10-5a1 8,950.13 8,957.10 6.97
746-STO 720-STO
Excavadora 336 Perforadora
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
T4 5,273.00 5,284.00 11.00 5a1 1,133.20 1,138.40
T4 5,284.00 5,295.00 11.00 5a1 1,138.40 1,148.90
CY-E4 5,295.00 5,300.90 5.90 5a1 1,148.90 1,152.90
T4 5,300.90 5,306.50 5.60 5a1 1,152.90 1,160.90
T4 5,306.50 5,307.40 0.90 Inop. 1,160.90 1,162.90
T4 5,307.40 5,312.90 5.50 5a1 - S+tand by FF 1,162.90 1,163.20
Inop. 5,312.90 5,320.30 7.40 5a1 1,163.20 1,170.20
T4 5,320.30 5,328.50 8.20 5a1 - Stand by FF 1,170.20 1,177.80
T4 5,328.50 5,336.90 8.40 5a1 1,177.80 1,182.70
T4 5,336.90 5,344.20 7.30 5a1 1,182.70 1,192.60
Stand by - FF 5,344.20 5,344.20 0.00 Stand by - FO 1,192.60 1,196.40
T4 5,344.20 5,351.60 7.40 AC 1,196.40 1,196.40
T4 5,351.60 5,358.90 7.30 AC 1,196.40 1,197.00
T4 5,358.90 5,368.00 9.10 AC 1,197.00 1,197.40
T4 5,368.00 5,375.80 7.80 AC 1,197.40 1,206.80
T4 5,375.80 5,386.00 10.20 AC 1,206.80 1,206.80
T4 5,386.00 5,395.70 9.70 AC 1,206.80 1,207.20
T4 5,395.70 5,406.80 11.10 AC 1,207.20 1,217.00
T4 5,406.80 5,412.10 5.30 AC 1,217.00 1,219.00
T4 5,412.10 5,422.30 10.20 AC 1,219.00 1,219.00
725-STO 733-STO
Volquete Tractor D8
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
5.20 T4 6,966.33 6,976.55 10.22 C5-5a1 667.50
10.50 T4 6,976.55 6,986.01 9.46 C5-5a1 677.50
4.00 T4 6,986.01 6,994.30 8.29 C5-5a1 687.70
8.00 T4 6,994.30 6,998.58 4.28 C5-5a1 697.80
2.00 T4 6,998.58 7,006.04 7.46 C5-5a1 703.01
0.30 Stand by - FF 7,006.04 7,013.04 7.00 C5-5a1 711.60
7.00 T4 7,013.04 7,024.18 11.14 CY-E4 721.60
7.60 T4 7,024.18 7,033.50 9.32 CY-E4 731.90
4.90 T4 7,033.50 7,043.10 9.60 CY-E4 741.70
9.90 T4 7,043.10 7,053.10 10.00 CY-E4 750.60
3.80 T4 7,053.10 7,062.52 9.42 BAC3-E4 759.80
0.00 Stand by - FF 7,062.52 7,072.40 9.88 CY-E4 764.00
0.60 Stand by - FF 7,072.40 7,081.34 8.94 CY-E4 772.00
0.40 Stand by - FF 7,081.34 7,091.20 9.86 CY-E4 779.80
9.40 T4 7,091.20 7,101.19 9.99 CY-E4 786.60
0.00 Stand by - FF 7,101.19 7,111.10 9.91 CY-E4 796.70
0.40 Stand by - FF 7,111.10 7,121.30 10.20 CY-E4 806.20
9.80 T4 7,121.30 7,131.01 9.71 CY-E4 815.80
2.00 T4 7,131.01 7,141.34 10.33 CY-E4 826.10
0.00 Inop. 7,141.34 7,151.10 9.76 CY-E4 835.40
759-STO
Volquete
H. Final HM Ubicación H. Inicial H. Final HM Ubicación
677.50 10.00 CY 9,259.52 9,270.26 10.74 C5-5a1
687.70 10.20 CY 9,270.26 9,280.10 9.84 C5-5a1
697.80 10.10 CY 9,280.10 9,288.00 7.90 C5-5a1
703.01 5.21 CY 9,288.00 9,293.48 5.48 C5-5a1
711.60 8.59 CY 9,293.48 9,300.36 6.88 C5-5a1
721.60 10.00 CY 9,300.36 9,310.15 9.79 C5-5a1
731.90 10.30 CY 9,310.15 9,320.31 10.16 C5-5a1
741.70 9.80 CY 9,320.31 9,326.10 5.79 C5-5a1
750.60 8.90 CY 9,326.10 9,333.19 7.09 C5-5a1
759.80 9.20 CY 9,333.19 9,342.59 9.40 Road 2 - 5a1
764.00 4.20 CY 9,342.59 9,350.80 8.21 Road 2 - 5a1
772.00 8.00 CY 9,350.80 9,359.53 8.73 C5-5a1
779.80 7.80 CY 9,359.53 9,363.03 3.50 Truck Shop-5a1
786.60 6.80 CY 9,363.03 9,373.55 10.52 AC - Talud
796.70 10.10 CY 9,373.55 9,383.03 9.48 Truck Shop-5a1
806.20 9.50 CY 9,383.03 9,393.10 10.07 C5-5a1
815.80 9.60 CY 9,393.10 9,397.43 4.33 Truck Shop-5a1
826.10 10.30 CY 9,397.43 9,404.23 6.80 Road 2 - 5a1
835.40 9.30 CY 9,404.23 9,412.13 7.90 Truck Shop-5a1
845.30 9.90 CY 9,412.13 9,422.29 10.16 C5-5a1
760-STO 761-STO
Volquete Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
9,950.00 9,950.00 0.00 Inop. 8,275.20 8,286.08 10.88 C5-5a1
9,950.00 9,950.00 0.00 Inop. 8,286.08 8,295.36 9.28 C5-5a1
9,950.00 9,950.00 0.00 Inop. 8,295.36 8,303.54 8.18 C5-5a1
9,950.00 9,950.00 0.00 Inop. 8,303.54 8,308.39 4.85 C5-5a1
9,950.00 9,950.00 0.00 Inop. 8,308.39 8,310.51 2.12 C5-5a1
9,950.00 9,950.00 0.00 Inop. 8,310.51 8,318.42 7.91 C5-5a1
9,950.00 9,954.10 4.10 C5-5a1 8,318.42 8,327.03 8.61 C5-5a1
9,954.10 9,958.52 4.42 C5-5a1 8,327.03 8,336.12 9.09 CY-E4
9,958.52 9,963.49 4.97 AC-AC 8,336.12 8,345.19 9.07 CY-E4
9,963.49 9,973.38 9.89 Road 2 - 5a1 8,345.19 8,355.36 10.17 CY-E4
9,973.38 9,973.38 0.00 Stand by - FO 8,355.36 8,365.00 9.64 CY-E4
9,973.38 9,983.54 10.16 C5-5a1 8,365.00 8,374.56 9.56 CY-E4
9,983.54 9,986.43 2.89 Road 2 - 5a1 8,374.56 8,384.56 10.00 CY-E4
9,986.43 9,996.58 10.15 Road 2 - 5a1 8,384.56 8,394.37 9.81 CY-E4
9,996.58 10,006.10 9.52 Road 2 - 5a1 8,394.37 8,404.28 9.91 CY-E4
10,006.10 10,016.12 10.02 C5-5a1 8,404.28 8,413.55 9.27 CY-E4
10,016.12 10,024.45 8.33 Road 2 - 5a1 8,413.55 8,424.13 10.58 CY-E4
10,024.45 10,033.07 8.62 C5-5a1 8,424.13 8,433.50 9.37 CY-E4
10,033.07 10,042.02 8.95 C5-5a1 8,433.50 8,438.25 4.75 CY-E4
10,042.02 10,051.55 9.53 T10-5a1 8,438.25 8,448.18 9.93 CY-E4
TD12 103.30 764-STO 76.12
Perforadora Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
2,742.30 2,749.30 7.00 C5 9,959.56 9,969.36 9.80
2,749.30 2,750.36 1.06 C5 9,969.36 9,979.57 10.21
2,750.36 2,751.54 1.18 C5 9,979.57 9,990.30 10.73
2,751.54 2,757.60 6.06 Road 2 9,990.30 9,996.30 6.00
2,757.60 2,763.12 5.52 Road 2 9,996.30 10,002.30 6.00
2,763.12 2,773.00 9.88 Road 2 10,002.30 10,012.36 10.06
2,773.00 2,781.42 8.42 Road 2 10,012.36 10,023.12 10.76
2,781.42 2,790.24 8.82 C5 10,023.12 10,026.09 2.97
2,790.24 2,797.48 7.24 C5 10,026.09 10,026.09 0.00
2,797.48 2,805.12 7.64 C5 10,026.09 10,026.09 0.00
2,805.12 2,805.42 0.30 Inop. 10,026.09 10,026.09 0.00
2,805.42 2,805.42 0.00 Inop. 10,026.09 10,026.09 0.00
2,805.42 2,809.12 3.70 C5 10,026.09 10,026.09 0.00
2,809.12 2,819.12 10.00 C5 10,026.09 10,026.09 0.00
2,819.12 2,827.18 8.06 C5 10,026.09 10,034.12 8.03
2,827.18 2,836.42 9.24 C5 10,034.12 10,044.28 10.16
2,836.42 2,843.18 6.76 C5 10,044.28 10,053.24 8.96
2,843.18 2,853.30 10.12 Truck Shop 10,053.24 10,063.34 10.10
2,853.30 2,862.54 9.24 10,063.34 10,072.20 8.86
2,862.54 2,867.24 4.70 Truck Shop 10,072.20 10,083.28 11.08
780-STO 55.00 781-STO
Excavadora KOMATSU Excavadora KOMATSU
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
CY-E4 998.08 1,007.60 9.52 E4 984.10 984.30
CY-E4 1,007.60 1,018.30 10.70 E4 984.30 987.10
CY-E4 1,018.30 1,027.30 9.00 E4 987.10 994.30
CY-E4 1,027.30 1,033.50 6.20 E4 994.30 997.30
CY-E4 1,033.50 1,040.10 6.60 E4 997.30 1,003.80
CY-E4 1,040.10 1,050.80 10.70 E4 1,003.80 1,013.50
Truck Shop 1,050.80 1,059.30 8.50 E4 1,013.50 1,020.00
C5-5a1 1,059.30 1,069.50 10.20 E4 1,020.00 1,029.30
Inop. 1,069.50 1,078.50 9.00 E4 1,029.30 1,036.60
Inop. 1,078.50 1,086.50 8.00 E4 1,036.60 1,044.60
Inop. 1,086.50 1,093.20 6.70 E4 1,044.60 1,053.10
Inop. 1,093.20 1,102.40 9.20 E4 1,053.10 1,063.10
Inop. 1,102.40 1,110.70 8.30 E4 1,063.10 1,064.80
Inop. 1,110.70 1,117.00 6.30 Road 2 1,064.80 1,071.90
C5-5a1 1,117.00 1,126.20 9.20 Road 2 1,071.90 1,080.30
Road 2 - 5a1 1,126.20 1,134.00 7.80 Road 2 1,080.30 1,091.00
C5-5a1 1,134.00 1,142.60 8.60 Road 2 1,091.00 1,099.70
Truck Shop-5a1 1,142.60 1,144.20 1.60 Road 2 1,099.70 1,108.50
C5-5a1 1,144.20 1,152.70 8.50 C5 1,108.50 1,116.00
C5-5a1 1,152.70 1,163.20 10.50 C5 1,116.00 1,123.50
74.70 784-STO 18.00 785-STO
Tractor D8T Rodillo Bomag
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
0.20 Inop. 465.00 470.00 5.00 C5 4,230.20 4,236.10
2.80 Traslado 470.00 481.00 11.00 C5 4,236.10 4,247.10
7.20 5a1 481.00 484.00 3.00 C5 4,247.10 4,254.50
3.00 AC 484.00 485.00 1.00 C5 4,254.50 4,261.10
6.50 AC 485.00 491.00 6.00 C5 4,261.10 4,263.80
9.70 AC 491.00 501.00 10.00 C5 4,263.80 4,270.40
6.50 AC 501.00 511.00 10.00 C5 4,270.40 4,277.60
9.30 AC 511.00 511.00 0.00 Stand by - FO 4,277.60 4,285.00
7.30 AC 511.00 511.00 0.00 Stand by - FO 4,285.00 4,289.40
8.00 BAC3 511.00 511.00 0.00 Stand by - FO 4,289.40 4,298.30
8.50 Road 2 511.00 518.00 7.00 C5 4,298.30 4,303.90
10.00 Road 2 518.00 527.00 9.00 C5 4,303.90 4,311.00
1.70 E4 527.00 536.00 9.00 C5 4,311.00 4,314.00
7.10 E4 536.00 536.00 0.00 Stand by - FO 4,314.00 4,321.00
8.40 E4 536.00 539.00 3.00 C5 4,321.00 4,325.20
10.70 E4 539.00 539.00 0.00 Stand by - FO 4,325.20 4,335.00
8.70 E4 539.00 539.00 0.00 Stand by - FO 4,335.00 4,341.60
8.80 E4 539.00 539.00 0.00 Stand by - FO 4,341.60 4,348.70
7.50 E4 539.00 539.00 0.00 Stand by - FO 4,348.70 4,352.10
7.50 E4 539.00 539.00 0.00 Stand by - FO 4,352.10 4,360.70
58.90 735-STO 68.00 768-STO
Cisterna de Agua Cisterna de Agua
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
5.90 5a1 2,505.00 2,514.00 9.00 C5 10,238.20 10,246.55
11.00 5a1 2,514.00 2,524.00 10.00 C5 10,246.55 10,256.20
7.40 5a1 2,524.00 2,534.00 10.00 C5 10,256.20 10,266.35
6.60 E4 2,534.00 2,534.00 0.00 Inop. 10,266.35 10,273.00
2.70 5a1 2,534.00 2,537.00 3.00 Stand by - FO 10,273.00 10,279.13
6.60 5a1 2,537.00 2,547.00 10.00 C5 10,279.13 10,282.40
7.20 5a1 2,547.00 2,547.00 0.00 Stand by - FO 10,282.40 10,282.40
7.40 E4 2,547.00 2,555.00 8.00 C5 10,282.40 10,282.40
4.40 5a1 2,555.00 2,555.00 0.00 Stand by - FO 10,282.40 10,282.40
8.90 5a1 2,555.00 2,563.00 8.00 C5 10,282.40 10,282.40
5.60 5a1 2,563.00 2,563.00 0.00 Stand by - FO 10,282.40 10,282.40
7.10 5a1 2,563.00 2,563.00 0.00 Stand by - FO 10,282.40 10,282.40
3.00 5a1 2,563.00 2,563.00 0.00 Stand by - FO 10,282.40 10,282.40
7.00 5a1 2,563.00 2,563.00 0.00 Stand by - FO 10,282.40 10,282.40
4.20 5a1 2,563.00 2,572.00 9.00 Road 2 10,282.40 10,282.40
9.80 5a1 2,572.00 2,572.00 0.00 Stand by - FO 10,282.40 10,282.40
6.60 5a1 2,572.00 2,581.00 9.00 C5 10,282.40 10,282.40
7.10 5a1 2,581.00 2,582.00 1.00 Stand by - FO 10,282.40 10,282.40
3.40 5a1 2,582.00 2,591.00 9.00 Road 2 10,282.40 10,282.40
8.60 E4 2,591.00 2,591.00 0.00 Stand by - FO 10,282.40 10,282.40
3.67 788-STO 56.00 723-STO
Volquete Camión Grúa
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
8.35 C5 3,970.00 3,979.00 9.00 T10-5a1 563.00
9.65 C5 3,979.00 3,989.00 10.00 T10-5a1 567.00
10.15 C5 3,989.00 3,998.00 9.00 T10-5a1 567.00
6.65 C5 3,998.00 4,002.00 4.00 T10-5a1 575.00
6.13 C5 4,002.00 4,009.00 7.00 T10-5a1 575.00
3.27 C5 4,009.00 4,018.00 9.00 Truck Shop-5a1 583.00
0.00 Inop. 4,018.00 4,028.00 10.00 Truck Shop-5a1 583.00
0.00 Inop. 4,028.00 4,035.00 7.00 Truck Shop-5a1 592.00
0.00 Inop. 4,035.00 4,042.00 7.00 Truck Shop-5a1 592.00
0.00 Inop. 4,042.00 4,051.00 9.00 Truck Shop-5a1 599.00
0.00 Inop. 4,051.00 4,059.00 8.00 Truck Shop-5a1 599.00
0.00 Inop. 4,059.00 4,069.00 10.00 Truck Shop-5a1 604.00
0.00 Inop. 4,069.00 4,077.00 8.00 Road 2 - 5a1 604.00
0.00 Inop. 4,077.00 4,086.00 9.00 Truck Shop-5a1 611.00
0.00 Inop. 4,086.00 4,095.00 9.00 Road 2 - 5a1 611.00
0.00 Inop. 4,095.00 4,105.00 10.00 Road 2 - 5a1 619.00
0.00 Inop. 4,105.00 4,113.00 8.00 Road 2 - 5a1 619.00
0.00 Inop. 4,113.00 4,124.00 11.00 Truck Shop-5a1 627.00
0.00 Inop. 4,124.00 4,130.00 6.00 Truck Shop-5a1 627.00
0.00 Inop. 4,130.00 4,130.00 0.00 Stand by - FF 636.00
58.00 783-STO 16.00 767-STO
Tractor D8 Volquete
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
567.00 4.00 Traslado 608.00 618.00 10.00 5a1 5,333.35
567.00 0.00 Stand by - FO 618.00 627.00 9.00 5a1 5,343.53
575.00 8.00 Traslado 627.00 635.00 8.00 5a1 5,353.29
575.00 0.00 Stand by - FO 635.00 640.00 5.00 5a1 5,364.20
583.00 8.00 Traslado 640.00 640.00 0.00 Inop. 5,370.09
583.00 0.00 Stand by - FO 640.00 640.00 0.00 Stand by - FO 5,378.51
592.00 9.00 Traslado 640.00 640.00 0.00 Stand by - FO 5,388.19
592.00 0.00 Stand by - FO 640.00 640.00 0.00 Stand by - FO 5,397.55
599.00 7.00 Traslado 640.00 640.00 0.00 Stand by - FO 5,407.06
599.00 0.00 Stand by - FO 640.00 640.00 0.00 Stand by - FO 5,416.50
604.00 5.00 Traslado 640.00 640.00 0.00 Stand by - FO 5,426.46
604.00 0.00 Stand by - FO 640.00 640.00 0.00 Stand by - FO 5,435.40
611.00 7.00 Traslado 640.00 640.00 0.00 Stand by - FO 5,445.40
611.00 0.00 Stand by - FO 640.00 640.00 0.00 Stand by - FO 5,455.06
619.00 8.00 Traslado 640.00 646.00 6.00 C5 5,465.30
619.00 0.00 Stand by - FO 646.00 646.00 0.00 Stand by - FO 5,475.00
627.00 8.00 Traslado 646.00 653.00 7.00 AC 5,485.10
627.00 0.00 Stand by - FO 653.00 653.00 0.00 Stand by - FO 5,495.20
636.00 9.00 Traslado 653.00 658.00 5.00 Padock 5,504.45
636.00 0.00 Stand by - FO 658.00 658.00 0.00 Stand by - FO 5,511.22
27.00 792-STO 0.00 766-STO
Volquete Volquete
H. Final HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
5,343.53 10.18 CY-E4 9,857.53 9,868.01 10.48 CY-E4 9,699.00
5,353.29 9.76 CY-E4 9,868.01 9,878.02 10.01 CY-E4 9,709.46
5,364.20 10.91 CY-E4 9,878.02 9,888.38 10.36 CY-E4 9,719.47
5,370.09 5.89 CY-E4 9,888.38 9,894.00 5.62 CY-E4 9,730.00
5,378.51 8.42 CY-E4 9,894.00 9,900.07 6.07 CY-E4 9,735.13
5,388.19 9.68 CY-E4 9,900.07 9,910.03 9.96 CY-E4 9,743.38
5,397.55 9.36 CY-E4 9,910.03 9,919.54 9.51 C5-5a1 9,753.30
5,407.06 9.51 CY-E4 9,919.54 9,925.23 5.69 C5-5a1 9,763.38
5,416.50 9.44 CY-E4 9,925.23 9,931.55 6.32 C5-5a1 9,770.20
5,426.46 9.96 CY-E4 9,931.55 9,938.14 6.59 C5-5a1 9,777.29
5,435.40 8.94 CY-E4 9,938.14 9,947.17 9.03 T10-5a1 9,786.55
5,445.40 10.00 CY-E4 9,947.17 9,957.05 9.88 C5-5a1 9,795.35
5,455.06 9.66 CY-E4 9,957.05 9,957.05 0.00 Stand by - FO 9,805.42
5,465.30 10.24 CY-E4 9,957.05 9,968.05 11.00 Road 2 - 5a1 9,813.27
5,475.00 9.70 CY-E4 9,968.05 9,977.29 9.24 Road 2 - 5a1 9,823.00
5,485.10 10.10 CY-E4 9,977.29 9,988.46 11.17 C5-5a1 9,832.49
5,495.20 10.10 CY-E4 9,988.46 9,997.40 8.94 Road 2 - 5a1 9,842.58
5,504.45 9.25 CY-E4 9,997.40 10,007.20 9.80 C5-5a1 9,851.59
5,511.22 6.77 CY-E4 10,007.20 10,017.30 10.10 Road 2 - 5a1 9,861.28
5,521.40 10.18 CY-E4 10,017.30 10,028.04 10.74 C5-5a1 9,870.44
0.00 791-STO 0.00
Volquete
H. Final HM Ubicación H. Inicial H. Final HM Ubicación
9,709.46 10.46 CY-E4 9,989.45 9,996.42 6.97 T10 - 5a1
9,719.47 10.01 CY-E4 9,996.42 10,007.28 10.86 T10 - 5a1
9,730.00 10.53 CY-E4 10,007.28 10,016.29 9.01 T10 - 5a1
9,735.13 5.13 CY-E4 10,016.29 10,021.27 4.98 Truck Shop - 5a1
9,743.38 8.25 CY-E4 10,021.27 10,027.42 6.15 Truck Shop - 5a1
9,753.30 9.92 CY-E4 10,027.42 10,037.00 9.58 C5-5a1
9,763.38 10.08 C5-5a1 10,037.00 10,046.35 9.35 C5-5a1
9,770.20 6.82 AC - Road 2 10,046.35 10,051.49 5.14 C5-5a1
9,777.29 7.09 Road 2 - 5a1 10,051.49 10,058.47 6.98 C5-5a1
9,786.55 9.26 Road 2 - 5a1 10,058.47 10,067.40 8.93 C5-5a1
9,795.35 8.80 Road 2 - 5a1 10,067.40 10,073.30 5.90 T10-5a1
9,805.42 10.07 C5-5a1 10,073.30 10,082.52 9.22 C5-5a1
9,813.27 7.85 Road 2 - 5a1 10,082.52 10,090.30 7.78 Road 2 - 5a1
9,823.00 9.73 C5-5a1 10,090.30 10,100.16 9.86 Road 2 - 5a1
9,832.49 9.49 Road 2 - 5a1 10,100.16 10,109.36 9.20 Road 2 - 5a1
9,842.58 10.09 C5-5a1 10,109.36 10,119.45 10.09 C5-5a1
9,851.59 9.01 Road 2 - 5a1 10,119.45 10,129.13 9.68 Padock-AC
9,861.28 9.69 C5-5a1 10,129.13 10,138.46 9.33 C5-5a1
9,870.44 9.16 T10-Sentina 10,138.46 10,146.15 7.69 T10-Sentina
9,880.11 9.67 T10-Sentina 10,146.15 10,156.14 9.99 T10 - 5a1
765-STO 45.13 798-STO 0.00
Volquete Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
5,143.50 5,146.34 2.84 Traslado 9,892.30 9,902.12 9.82
5,146.34 5,146.34 0.00 Inop. 9,902.12 9,912.16 10.04
5,146.34 5,146.34 0.00 Inop. 9,912.16 9,919.30 7.14
5,146.34 5,146.34 0.00 Inop. 9,919.30 9,921.20 1.90
5,146.34 5,148.12 1.78 Traslado Moq. 9,921.20 9,929.38 8.18
5,148.12 5,148.12 0.00 Inop. 9,929.38 9,939.42 10.04
5,148.12 5,148.12 0.00 Inop. 9,939.42 9,947.04 7.62
5,148.12 5,148.12 0.00 Inop. 9,947.04 9,953.20 6.16
5,148.12 5,150.15 2.03 Inop. 9,953.20 9,959.05 5.85
5,150.15 5,160.12 9.97 CY-E4 9,959.05 9,968.35 9.30
5,160.12 5,163.46 3.34 CY-E4 9,968.35 9,976.36 8.01
5,163.46 5,172.55 9.09 CY-E4 9,976.36 9,986.12 9.76
5,172.55 5,174.13 1.58 CY-E4 9,986.12 9,994.07 7.95
5,174.13 5,183.54 9.41 CY-E4 9,994.07 10,003.40 9.33
5,183.54 5,192.05 8.51 CY-E4 10,003.40 10,012.26 8.86
5,192.05 5,201.42 9.37 CY-E4 10,012.26 10,022.22 9.96
5,201.42 5,211.03 9.61 CY-E4 10,022.22 10,031.14 8.92
5,211.03 5,220.45 9.42 CY-E4 10,031.14 10,040.02 8.88
5,220.45 5,230.06 9.61 CY-E4 10,040.02 10,049.48 9.46
5,230.06 5,239.58 9.52 CY-E4 10,049.48 10,058.58 9.10
799-STO 0.00 800-STO
Volquete Volquete
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
CY-E4 9,876.45 9,887.48 11.03 C5-5a1 9,963.03 9,972.30
CY-E4 9,887.48 9,896.42 8.94 C5-5a1 9,972.30 9,983.04
CY-E4 9,896.42 9,905.30 8.88 C5-5a1 9,983.04 9,993.33
CY-E4 9,905.30 9,909.44 4.14 AC - 5a1 9,993.33 9,998.41
CY-E4 9,909.44 9,916.56 7.12 C5-5a1 9,998.41 10,007.30
CY-E4 9,916.56 9,926.28 9.72 C5-5a1 10,007.30 10,017.46
C5-5a1 9,926.28 9,931.14 4.86 C5-5a1 10,017.46 10,025.40
C5-5a1 9,931.14 9,937.00 5.86 C5-5a1 10,025.40 10,030.26
AC3-AC 9,937.00 9,943.51 6.51 C5-5a1 10,030.26 10,035.30
Road 2 - 5a1 9,943.51 9,953.29 9.78 Road 2 - 5a1 10,035.30 10,044.51
Road 2 - 5a1 9,953.29 9,959.31 6.02 Truck Shop-5a1 10,044.51 10,054.05
C5-5a1 9,959.31 9,968.58 9.27 C5-5a1 10,054.05 10,063.55
Road 2 - 5a1 9,968.58 9,976.05 7.47 Padock- Padock 10,063.55 10,071.59
Road 2 - 5a1 9,976.05 9,986.46 10.41 Road 2 - 5a1 10,071.59 10,081.40
Road 2 - 5a1 9,986.46 9,995.30 8.84 C5-Padock 10,081.40 10,091.09
C5-5a1 9,995.30 10,005.34 10.04 C5-5a1 10,091.09 10,100.54
C5-5a1 10,005.34 10,013.37 8.03 Truck Shop-5a1 10,100.54 10,109.44
C5-5a1 10,013.37 10,023.14 9.77 Road 2 - 5a1 10,109.44 10,118.11
C5-5a1 10,023.14 10,031.54 8.40 Truck Shop-5a1 10,118.11 10,122.46
T10-5a1 10,031.54 10,041.30 9.76 T10-5a1 10,122.46 10,133.12
0.00 789-STO 0.00 790-STO
Volquete Volquete
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
9.27 CY-E4 6,441.18 6,451.29 10.11 CY-E4 9,923.10 9,934.01
10.74 CY-E4 6,451.29 6,461.44 10.15 CY-E4 9,934.01 9,943.20
10.29 CY-E4 6,461.44 6,472.27 10.83 CY-E4 9,943.20 9,948.35
5.08 CY-E4 6,472.27 6,477.58 5.31 CY-E4 9,948.35 9,948.35
8.89 CY-E4 6,477.58 6,486.21 8.63 CY-E4 9,948.35 9,948.35
10.16 CY-E4 6,486.21 6,496.35 10.14 CY-E4 9,948.35 9,960.00
7.94 C5-5a1 6,496.35 6,506.31 9.96 CY-E4 9,960.00 9,960.00
4.86 C5-5a1 6,506.31 6,516.37 10.06 CY-E4 9,960.00 9,970.10
5.04 C5-5a1 6,516.37 6,525.56 9.19 CY-E4 9,970.10 9,970.10
9.21 Road 2 - 5a1 6,525.56 6,535.36 9.80 CY-E4 9,970.10 9,970.10
9.54 T10-5a1 6,535.36 6,545.24 9.88 CY-E4 9,970.10 9,970.10
9.50 C5-5a1 6,545.24 6,555.45 10.21 CY-E4 9,970.10 9,970.10
8.04 Road 2 - 5a1 6,555.45 6,565.43 9.98 CY-E4 9,970.10 9,970.10
9.81 Road 2 - AC 6,565.43 6,576.07 10.64 CY-E4 9,970.10 9,970.10
9.69 C5-5a1 6,576.07 6,585.00 8.93 Stand by - FO 9,970.10 9,970.10
9.45 C5-5a1 6,585.00 6,595.00 10.00 CY-E4 9,970.10 9,970.10
8.90 C5-5a1 6,595.00 6,604.33 9.33 CY-E4 9,970.10 9,970.10
8.67 C5-5a1 6,604.33 6,614.03 9.70 CY-E4 9,970.10 9,970.10
4.35 C5-5a1 6,614.03 6,624.07 10.04 CY-E4 9,970.10 9,970.10
10.66 C5-5a1 6,624.07 6,634.29 10.22 CY-E4 9,970.10 9,970.10
0.00 797-STO 0.00 802-STO
Volquete Cisterna de Agua
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
10.91 C5-5a1 9,806.00 9,814.53 8.53 C5-5a1 1,416.80 1,427.00
9.19 C5-5a1 9,814.53 9,824.00 9.47 C5-5a1 1,427.00 1,436.10
5.15 C5-5a1 9,824.00 9,832.25 8.25 C5-5a1 1,436.10 1,446.50
0.00 Inop. 9,832.25 9,837.00 4.75 C5-5a1 1,446.50 1,451.90
0.00 Inop. 9,837.00 9,844.03 7.03 C5-5a1 1,451.90 1,460.90
11.65 Inop. 9,844.03 9,853.00 8.97 C5-5a1 1,460.90 1,464.90
0.00 Traslado 9,853.00 9,860.28 7.28 C5-5a1 1,464.90 1,475.40
10.10 C5-5a1 9,860.28 9,866.00 5.72 C5-5a1 1,475.40 1,480.20
0.00 Stand by - FO 9,866.00 9,873.07 7.07 Road 2 - 5a1 1,480.20 1,490.30
0.00 Stand by - FO 9,873.07 9,880.32 7.25 C5-5a1 1,490.30 1,498.70
0.00 Stand by - FO 9,880.32 9,888.02 7.70 Road 2 - 5a1 1,498.70 1,507.10
0.00 Inop. 9,888.02 9,897.45 9.43 C5-5a1 1,507.10 1,517.00
0.00 Inop. 9,897.45 9,904.50 7.05 Road 2 - 5a1 1,517.00 1,526.50
0.00 Inop. 9,904.50 9,915.18 10.68 Road 2 - 5a1 1,526.50 1,537.00
0.00 Inop. 9,915.18 9,924.24 9.06 C5-5a1 1,537.00 1,546.60
0.00 Inop. 9,924.24 9,935.37 11.13 C5-5a1 1,546.60 1,556.50
0.00 Inop. 9,935.37 9,943.32 7.95 C5-5a1 1,556.50 1,566.50
0.00 Inop. 9,943.32 9,954.33 11.01 C5-5a1 1,566.50 1,576.50
0.00 Inop. 9,954.33 9,962.57 8.24 C5-5a1 1,576.50 1,586.40
0.00 Inop. 9,962.57 9,972.40 9.83 C5-5a1 1,586.40 1,596.40
0.00 755-STO 0.00 786-STO
Excavadora Rodillo
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
10.20 CY 7,004.00 7,004.00 0.00 Inop. 3,327.00 3,327.00
9.10 CY 7,004.00 7,004.00 0.00 Inop. 3,327.00 3,327.00
10.40 CY 7,004.00 7,004.00 0.00 Inop. 3,327.00 3,327.00
5.40 CY 7,004.00 7,004.00 0.00 Inop. 3,327.00 3,327.00
9.00 CY 7,004.00 7,004.00 0.00 Inop. 3,327.00 3,327.00
4.00 CY 7,004.00 7,004.00 0.00 Inop. 3,327.00 3,327.00
10.50 CY 7,004.00 7,007.00 3.00 5a1 3,327.00 3,327.00
4.80 CY 7,007.00 7,007.00 0.00 Stand by - FO 3,327.00 3,327.00
10.10 CY 7,007.00 7,015.00 8.00 5a1 3,327.00 3,328.10
8.40 CY 7,015.00 7,023.00 8.00 5a1 3,328.10 3,332.10
8.40 CY 7,023.00 7,030.00 7.00 5a1 3,332.10 3,335.10
9.90 CY 7,030.00 7,035.00 5.00 5a1 3,335.10 3,341.90
9.50 CY 7,035.00 7,044.00 9.00 5a1 3,341.90 3,347.20
10.50 CY 7,044.00 7,053.00 9.00 5a1 3,347.20 3,354.20
9.60 CY 7,053.00 7,064.00 11.00 5a1 3,354.20 3,355.70
9.90 CY 7,064.00 7,074.00 10.00 5a1 3,355.70 3,355.70
10.00 CY 7,074.00 7,082.00 8.00 5a1 3,355.70 3,355.70
10.00 CY 7,082.00 7,092.00 10.00 5a1 3,355.70 3,355.70
9.90 CY 7,092.00 7,103.00 11.00 5a1 3,355.70 3,355.70
10.00 CY 7,103.00 7,114.00 11.00 5a1 3,355.70 3,355.70
0.00 770-STO 0.00 782-STO
Tractor Oruga Tractor Komatsu
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
0.00 Inop. 1,420.10 1,421.90 1.80 T10 410.00 417.00
0.00 Inop. 1,421.90 1,429.20 7.30 T10 417.00 417.00
0.00 Inop. 1,429.20 1,438.50 9.30 T10 417.00 422.00
0.00 Inop. 1,438.50 1,438.50 0.00 Inop. 422.00 427.00
0.00 Inop. 1,438.50 1,443.50 5.00 T10 427.00 434.00
0.00 Inop. 1,443.50 1,452.80 9.30 T10 434.00 434.00
0.00 Inop. 1,452.80 1,460.50 7.70 T10 434.00 434.00
0.00 Inop. 1,460.50 1,467.80 7.30 T10 434.00 440.00
1.10 Inop. 1,467.80 1,477.40 9.60 T10 440.00 448.00
4.00 5a1 1,477.40 1,486.70 9.30 T10 448.00 458.00
3.00 5a1 1,486.70 1,493.50 6.80 T10 458.00 466.00
6.80 5a1 1,493.50 1,501.10 7.60 AC 466.00 466.00
5.30 5a1 1,501.10 1,508.40 7.30 AC 466.00 475.00
7.00 5a1 1,508.40 1,516.60 8.20 AC 475.00 475.00
1.50 5a1 1,516.60 1,526.00 9.40 AC 475.00 485.00
0.00 Inop. 1,526.00 1,530.90 4.90 AC 485.00 485.00
0.00 Inop. 1,530.90 1,539.30 8.40 AC 485.00 485.00
0.00 Inop. 1,539.30 1,549.50 10.20 AC 485.00 485.00
0.00 Inop. 1,549.50 1,559.30 9.80 Truck Shop 485.00 495.00
0.00 Inop. 1,559.30 1,559.50 0.20 Inop. 495.00 495.00
0.00 771-STO 0.00 793-STO
Cisterna de Agua Volquete
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
7.00 T10 6,730.00 6,730.00 0.00 Inop. 457.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 467.00
5.00 T10 6,730.00 6,730.00 0.00 Inop. 477.00
5.00 T10 6,730.00 6,730.00 0.00 Inop. 486.00
7.00 T10 6,730.00 6,730.00 0.00 Inop. 489.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 495.00
0.00 Stand by - FF 6,730.00 6,730.00 0.00 Inop. 504.00
6.00 CY 6,730.00 6,730.00 0.00 Inop. 513.00
8.00 CY 6,730.00 6,730.00 0.00 Inop. 519.00
10.00 CY 6,730.00 6,730.00 0.00 Inop. 523.00
8.00 CY 6,730.00 6,730.00 0.00 Inop. 529.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 535.00
9.00 CY 6,730.00 6,730.00 0.00 Inop. 545.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 549.00
10.00 CY 6,730.00 6,730.00 0.00 Inop. 549.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 550.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 558.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 558.00
10.00 CY 6,730.00 6,730.00 0.00 Inop. 558.00
0.00 Stand by - FO 6,730.00 6,730.00 0.00 Inop. 558.00
0.00 813-STO 0.00
Volquete
H. Final HM Ubicación H. Inicial H. Final HM Ubicación
467.00 10.00 T10-5a1 7,546.00 7,555.00 9.00 T10-5a1
477.00 10.00 T10-5a1 7,555.00 7,565.00 10.00 T10-5a1
486.00 9.00 T10-5a1 7,565.00 7,574.00 9.00 T10-5a1
489.00 3.00 Truck Shop - 5a1 7,574.00 7,577.00 3.00 Truck Shop - 5a1
495.00 6.00 Truck Shop - 5a1 7,577.00 7,577.00 0.00 Inop.
504.00 9.00 Truck Shop - 5a1 7,577.00 7,577.00 0.00 Inop.
513.00 9.00 Truck Shop - 5a1 7,577.00 7,580.00 3.00 Traslado
519.00 6.00 Truck Shop - 5a1 7,580.00 7,585.00 5.00 C5-5a1
523.00 4.00 C5-5a1 7,585.00 7,585.00 0.00 Stand by - FO
529.00 6.00 AC-AC 7,585.00 7,585.00 0.00 Stand by - FO
535.00 6.00 Truck Shop-5a1 7,585.00 7,585.00 0.00 Stand by - FO
545.00 10.00 Truck Shop-5a1 7,585.00 7,585.00 0.00 Stand by - FO
549.00 4.00 Truck Shop-5a1 7,585.00 7,585.00 0.00 Inop.
549.00 0.00 Inop. 7,585.00 7,585.00 0.00 Inop.
550.00 1.00 Inop. 7,585.00 7,585.00 0.00 Inop.
558.00 8.00 Road 2 - 5a1 7,585.00 7,585.00 0.00 Inop.
558.00 0.00 Stand by - FO 7,585.00 7,585.00 0.00 Inop.
558.00 0.00 Stand by - FO 7,585.00 7,585.00 0.00 Inop.
558.00 0.00 Inop. 7,585.00 7,589.00 4.00 Truck Shop - 5a1
558.00 0.00 Inop. 7,589.00 7,599.00 10.00 C5-5a1
756-STO 0.00 815-STO 0.00
Excavadora Volquete
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
7,251.30 7,260.10 8.80 T4 7,627.00 7,627.00 0.00
7,260.10 7,269.80 9.70 T4 7,627.00 7,627.00 0.00
7,269.80 7,279.80 10.00 T4 7,627.00 7,627.00 0.00
7,279.80 7,285.50 5.70 T4 7,627.00 7,627.00 0.00
7,285.50 7,292.80 7.30 T4 7,627.00 7,627.00 0.00
7,292.80 7,302.50 9.70 T4 7,627.00 7,627.00 0.00
7,302.50 7,307.80 5.30 T4 7,627.00 7,634.00 7.00
7,307.80 7,317.40 9.60 T4 7,634.00 7,639.00 5.00
7,317.40 7,324.30 6.90 T4 7,639.00 7,646.00 7.00
7,324.30 7,333.30 9.00 T4 7,646.00 7,655.00 9.00
7,333.30 7,339.50 6.20 T4 7,655.00 7,662.00 7.00
7,339.50 7,339.50 0.00 Stand by - FO 7,662.00 7,673.00 11.00
7,339.50 7,347.40 7.90 T4 7,673.00 7,678.00 5.00
7,347.40 7,352.20 4.80 T4 7,678.00 7,682.00 4.00
7,352.20 7,359.70 7.50 T4 7,682.00 7,689.00 7.00
7,359.70 7,367.20 7.50 T4 7,689.00 7,699.00 10.00
7,367.20 7,376.20 9.00 T4 7,699.00 7,707.00 8.00
7,376.20 7,379.00 2.80 T4 7,707.00 7,716.00 9.00
7,379.00 7,387.10 8.10 T4 7,716.00 7,716.00 0.00
7,387.10 7,395.60 8.50 T4 7,716.00 7,721.00 5.00
803-STO 0.00 762-STO
Cisterna de Agua Perforadora
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
Inop. 8,067.50 8,067.50 0.00 Inop. 3,697.50 3,701.60
Inop. 8,067.50 8,067.50 0.00 Inop. 3,701.60 3,701.60
Inop. 8,067.50 8,067.50 0.00 Inop. 3,701.60 3,702.10
Inop. 8,067.50 8,067.50 0.00 Inop. 3,702.10 3,702.10
Inop. 8,067.50 8,067.50 0.00 Inop. 3,702.10 3,704.10
Inop. 8,067.50 8,067.50 0.00 Inop. 3,704.10 3,704.10
Truck Shop - 5a1 8,067.50 8,067.50 0.00 Inop. 3,704.10 3,710.80
Truck Shop - 5a1 8,067.50 8,067.50 0.00 Inop. 3,710.80 3,710.80
AC3-AC 8,067.50 8,067.50 0.00 Inop. 3,710.80 3,716.00
Road 2 - 5a1 8,067.50 8,067.50 0.00 Inop. 3,716.00 3,716.00
Truck Shop-5a1 8,067.50 8,067.50 0.00 Inop. 3,716.00 3,716.00
Truck Shop-5a1 8,067.50 8,067.50 0.00 Inop. 3,716.00 3,716.00
Truck Shop-5a1 8,067.50 8,067.50 0.00 Inop. 3,716.00 3,716.50
Truck Shop-5a1 8,067.50 8,067.50 0.00 Inop. 3,716.50 3,716.50
C5 - 5a1 8,067.50 8,067.50 0.00 Inop. 3,716.50 3,716.80
Road 2 - 5a1 8,067.50 8,067.50 0.00 Inop. 3,716.80 3,716.80
C5 - 5a1 8,067.50 8,067.50 0.00 Inop. 3,716.80 3,716.80
T10-Sentina 8,067.50 8,067.50 0.00 Inop. 3,716.80 3,726.50
Stand by-FO 8,067.50 8,067.50 0.00 Inop. 3,726.50 3,730.40
T10-Sentina 8,067.50 8,067.50 0.00 Inop. 3,730.40 3,730.40
36.10 811-STO 563.00 794-STO
Volquete Volquete
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
4.10 T4 8,994.00 9,003.00 9.00 T10-5a1 10,301.00 10,310.00
0.00 Stand by - FO 9,003.00 9,012.00 9.00 T10-5a1 10,310.00 10,310.00
0.50 Stand by - FF 9,012.00 9,022.00 10.00 T10-5a1 10,310.00 10,319.00
0.00 Stand by - FO 9,022.00 9,026.00 4.00 5a1 - paddock 10,319.00 10,320.00
2.00 T4 9,026.00 9,032.00 6.00 T10-5a1 10,320.00 10,323.00
0.00 Stand by - FO 9,032.00 9,032.00 0.00 Inop. 10,323.00 10,323.00
6.70 T4 9,032.00 9,032.00 0.00 Inop. 10,323.00 10,325.00
0.00 Stand by - FO 9,032.00 9,034.00 2.00 Truck Shop - 5a1 10,325.00 10,325.00
5.20 T4 9,034.00 9,036.00 2.00 Inop. 10,325.00 10,330.00
0.00 Stand by - FO 9,036.00 9,036.00 0.00 Inop. 10,330.00 10,330.00
0.00 Stand by - FO 9,036.00 9,036.00 0.00 Inop. 10,330.00 10,330.00
0.00 Stand by - FF 9,036.00 9,036.00 0.00 Inop. 10,330.00 10,340.00
0.50 Stand by - FF 9,036.00 9,036.00 0.00 Inop. 10,340.00 10,340.00
0.00 Stand by - FO 9,036.00 9,036.00 0.00 Inop. 10,340.00 10,351.00
0.30 Stand by - FF 9,036.00 9,036.00 0.00 Inop. 10,351.00 10,351.00
0.00 Stand by - FO 9,036.00 9,036.00 0.00 Inop. 10,351.00 10,361.00
0.00 Stand by - FF 9,036.00 9,036.00 0.00 Inop. 10,361.00 10,361.00
9.70 T4 9,036.00 9,040.00 4.00 Inop. 10,361.00 10,371.00
3.90 T4 9,040.00 9,047.00 7.00 Truck Shop - 5a1 10,371.00 10,376.00
0.00 Stand by - FF 9,047.00 9,056.00 9.00 C5-5a1 10,376.00 10,384.00
415.00 812-STO 243.00 769-STO
Volquete Rodillo
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
9.00 T10-5a1 7,461.00 7,461.00 0.00 Inop. 1,445.30 1,452.50
0.00 Stand by - FO 7,461.00 7,461.00 0.00 Inop. 1,452.50 1,459.00
9.00 T10 - 5a1 7,461.00 7,461.00 0.00 Inop. 1,459.00 1,465.00
1.00 T10 - 5a1 7,461.00 7,461.00 0.00 Inop. 1,465.00 1,470.10
3.00 Traslado Moq. 7,461.00 7,461.00 0.00 Inop. 1,470.10 1,475.10
0.00 Inop. 7,461.00 7,461.00 0.00 Inop. 1,475.10 1,478.30
2.00 Traslado Moq. 7,461.00 7,461.00 0.00 Inop. 1,478.30 1,483.00
0.00 Inop. 7,461.00 7,461.00 0.00 Inop. 1,483.00 1,488.00
5.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,488.00 1,493.00
0.00 Stand by - FO 7,461.00 7,461.00 0.00 Inop. 1,493.00 1,496.10
0.00 Stand by - FO 7,461.00 7,461.00 0.00 Inop. 1,496.10 1,499.50
10.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,499.50 1,505.50
0.00 Stand by - FO 7,461.00 7,461.00 0.00 Inop. 1,505.50 1,509.60
11.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,509.60 1,515.90
0.00 Stand by - FO 7,461.00 7,461.00 0.00 Inop. 1,515.90 1,520.70
10.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,520.70 1,529.20
0.00 Stand by - FO 7,461.00 7,461.00 0.00 Inop. 1,529.20 1,533.20
10.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,533.20 1,541.90
5.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,541.90 1,546.90
8.00 CY-E4 7,461.00 7,461.00 0.00 Inop. 1,546.90 1,555.60
291.10 822-STO 471.00 814-STO
Volquete Volquete
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
7.20 CY 7,881.00 7,887.00 6.00 T10-5a1 8,073.00 8,073.00
6.50 CY 7,887.00 7,897.00 10.00 Road 2 - T10 8,073.00 8,083.00
6.00 CY 7,897.00 7,902.00 5.00 Truck Shop - 5a1 8,083.00 8,086.00
5.10 CY 7,902.00 7,906.00 4.00 AC-AC 8,086.00 8,086.00
5.00 CY 7,906.00 7,912.00 6.00 Truck Shop - 5a1 8,086.00 8,086.00
3.20 CY 7,912.00 7,920.00 8.00 Truck Shop - 5a1 8,086.00 8,086.00
4.70 CY 7,920.00 7,928.00 8.00 Truck Shop - 5a1 8,086.00 8,086.00
5.00 CY 7,928.00 7,933.00 5.00 Truck Shop - 5a1 8,086.00 8,086.00
5.00 CY 7,933.00 7,937.00 4.00 Truck Shop-5a1 8,086.00 8,086.00
3.10 CY 7,937.00 7,947.00 10.00 Road 2 - 5a1 8,086.00 8,086.00
3.40 CY 7,947.00 7,947.00 0.00 Stand by - FO 8,086.00 8,086.00
6.00 CY 7,947.00 7,956.00 9.00 Truck Shop-5a1 8,086.00 8,086.00
4.10 CY 7,956.00 7,965.00 9.00 Truck Shop-5a1 8,086.00 8,086.00
6.30 CY 7,965.00 7,974.00 9.00 Truck Shop-5a1 8,086.00 8,086.00
4.80 CY 7,974.00 7,983.00 9.00 Truck Shop-5a1 8,086.00 8,086.00
8.50 CY 7,983.00 7,993.00 10.00 Road 2 - 5a1 8,086.00 8,086.00
4.00 CY 7,993.00 8,002.00 9.00 Truck Shop-5a1 8,086.00 8,086.00
8.70 CY 8,002.00 8,005.00 3.00 Road 2-5a1 8,086.00 8,086.00
5.00 CY 8,005.00 8,005.00 0.00 Inop. 8,086.00 8,086.00
8.70 CY 8,005.00 8,005.00 0.00 Inop. 8,086.00 8,086.00
145.00 823-STO 213.00 804-STO
Volquete Volquete
HM Ubicación H. Inicial H. Final HM Ubicación H. Inicial
0.00 Inop. 8,067.00 8,067.00 0.00 Inop. 7,252.06
10.00 Inop. 8,067.00 8,086.00 19.00 Inop. 7,261.11
3.00 Truck Shop - 5a1 8,086.00 8,088.00 2.00 Traslado 7,271.01
0.00 Inop. 8,088.00 8,088.00 0.00 Inop. 7,278.49
0.00 Inop. 8,088.00 8,092.00 4.00 CY-E4 7,282.56
0.00 Inop. 8,092.00 8,102.00 10.00 CY-E4 7,288.32
0.00 Inop. 8,102.00 8,112.00 10.00 CY-E4 7,298.02
0.00 Inop. 8,112.00 8,112.00 0.00 Stand by - FO 7,307.00
0.00 Inop. 8,112.00 8,114.00 2.00 Truck Shop-5a1 7,311.21
0.00 Inop. 8,114.00 8,123.00 9.00 C5-5a1 7,316.23
0.00 Inop. 8,123.00 8,129.00 6.00 C5-5a1 7,325.56
0.00 Inop. 8,129.00 8,136.00 7.00 Truck Shop-5a1 7,328.00
0.00 Inop. 8,136.00 8,136.00 0.00 Stand by - FO 7,328.00
0.00 Inop. 8,136.00 8,143.00 7.00 Truck Shop-5a1 7,328.00
0.00 Inop. 8,143.00 8,150.00 7.00 Truck Shop-5a1 7,328.00
0.00 Inop. 8,150.00 8,160.00 10.00 Road 2 - 5a1 7,328.15
0.00 Inop. 8,160.00 8,169.00 9.00 C5-5a1 7,337.22
0.00 Inop. 8,169.00 8,177.00 8.00 Truck Shop-5a1 7,345.50
0.00 Inop. 8,177.00 8,177.00 0.00 Stand by - FO 7,354.45
0.00 Inop. 8,177.00 8,186.00 9.00 C5-5a1 7,363.40
421.51 763-STO 275.73
Volquete
H. Final HM Ubicación H. Inicial H. Final HM Ubicación
7,261.11 9.05 T10-5a1 4,134.00 4,134.00 0.00 Inop.
7,271.01 9.90 Road 2 -5a1 4,134.00 4,134.00 0.00 Inop.
7,278.49 7.48 Road 2 -5a1 4,134.00 4,134.00 0.00 Inop.
7,282.56 4.07 Road 2 -5a1 4,134.00 4,134.00 0.00 Inop.
7,288.32 5.76 Truck Shop - 5a1 4,134.00 4,134.00 0.00 Inop.
7,298.02 9.70 C5-5a1 4,134.00 4,134.00 0.00 Inop.
7,307.00 8.98 Truck Shop - 5a1 4,134.00 4,134.00 0.00 Inop.
7,311.21 4.21 C5-5a1 4,134.00 4,134.00 0.00 Inop.
7,316.23 5.02 5a1-5a1 4,134.00 4,134.00 0.00 Inop.
7,325.56 9.33 Road 2 - 5a1 4,134.00 4,134.00 0.00 Inop.
7,328.00 2.44 T10-5a1 4,134.00 4,134.00 0.00 Inop.
7,328.00 0.00 Inop. 4,134.00 4,134.00 0.00 Inop.
7,328.00 0.00 Inop. 4,134.00 4,134.00 0.00 Inop.
7,328.00 0.00 Inop. 4,134.00 4,134.00 0.00 Inop.
7,328.15 0.15 Inop. 4,134.00 4,134.00 0.00 Inop.
7,337.22 9.07 Road 2 - 5a1 4,134.00 4,134.00 0.00 Inop.
7,345.50 8.28 Road 2 - 5a1 4,134.00 4,134.00 0.00 Inop.
7,354.45 8.95 Road 2 - 5a1 4,134.00 4,153.40 19.40 Inop.
7,363.40 8.95 Road 2 - 5a1 4,153.40 4,155.22 1.82 Traslado
7,370.02 6.62 C5-5a1 4,155.22 4,164.00 8.78 C5-5a1
824-STO 443.40 825-STO 403.20
Excavadora KOMATSU Excavadora KOMATSU
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
278.30 286.00 7.70 Truck Shop 2,477.00 2,486.50 9.50 T4
286.00 297.40 11.40 Truck Shop 2,486.50 2,497.00 10.50 T4
297.40 305.90 8.50 Truck Shop 2,497.00 2,506.30 9.30 T4
305.90 312.70 6.80 Truck Shop 2,506.30 2,514.30 8.00 T4
312.70 319.50 6.80 Truck Shop 2,514.30 2,521.40 7.10 T4
319.50 329.80 10.30 Truck Shop 2,521.40 2,531.50 10.10 T4
329.80 334.60 4.80 Truck Shop 2,531.50 2,540.90 9.40 T4
334.60 343.20 8.60 Truck Shop 2,540.90 2,551.00 10.10 T4
343.20 351.10 7.90 Truck Shop 2,551.00 2,559.60 8.60 T4
351.10 360.10 9.00 Truck Shop 2,559.60 2,569.00 9.40 T4
360.10 368.40 8.30 Truck Shop 2,569.00 2,575.60 6.60 T4
368.40 379.10 10.70 Truck Shop 2,575.60 2,581.00 5.40 T4
379.10 388.20 9.10 Truck Shop 2,581.00 2,591.50 10.50 T4
388.20 398.80 10.60 Truck Shop 2,591.50 2,600.30 8.80 T4
398.80 406.80 8.00 Truck Shop 2,600.30 2,609.50 9.20 T4
406.80 416.10 9.30 Truck Shop 2,609.50 2,619.30 9.80 T4
416.10 426.80 10.70 Truck Shop 2,619.30 2,628.90 9.60 T4
426.80 437.50 10.70 Truck Shop 2,628.90 2,637.90 9.00 T4
437.50 447.50 10.00 Truck Shop 2,637.90 2,647.10 9.20 T4
447.50 458.20 10.70 Truck Shop 2,647.10 2,655.10 8.00 T4
840-STO 429.90 TD11 224.00
Excavadora KOMATSU Perforadora
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
1,561.60 1,572.40 10.80 C5 3,160.24 3,162.24 2.00 T4
1,572.40 1,582.80 10.40 C5 3,162.24 3,172.24 10.00 T4
1,582.80 1,590.00 7.20 C5 3,172.24 3,182.00 9.76 T4
1,590.00 1,595.90 5.90 C5 3,182.00 3,189.48 7.48 T4
1,595.90 1,604.20 8.30 C5 3,189.48 3,191.18 1.70 T4
1,604.20 1,614.40 10.20 C5 3,191.18 3,196.24 5.06 T4
1,614.40 1,625.00 10.60 C5 3,196.24 3,202.36 6.12 T4
1,625.00 1,632.60 7.60 C5 3,202.36 3,211.30 8.94 T4
1,632.60 1,641.00 8.40 C5 3,211.30 3,214.48 3.18 T4
1,641.00 1,650.80 9.80 C5 3,214.48 3,219.00 4.52 T4
1,650.80 1,657.80 7.00 C5 3,219.00 3,222.24 3.24 T4
1,657.80 1,666.90 9.10 Stand by - FO 3,222.24 3,231.54 9.30 T4
1,666.90 1,675.90 9.00 C5 3,231.54 3,232.24 0.70 Stand by - FF
1,675.90 1,685.50 9.60 C5 3,232.24 3,233.00 0.76 Stand by - FF
1,685.50 1,692.30 6.80 C5 3,233.00 3,233.18 0.18 Stand by - FF
1,692.30 1,700.20 7.90 Asenti 3,233.18 3,233.54 0.36 Stand by - FF
1,700.20 1,708.70 8.50 Asenti 3,233.54 3,234.06 0.52 Stand by - FF
1,708.70 1,718.40 9.70 Asenti 3,234.06 3,234.06 0.00 Stand by - FO
1,718.40 1,728.20 9.80 Asenti 3,234.06 3,235.24 1.18 Truck Shop
1,728.20 1,736.90 8.70 Asenti 3,235.24 3,242.00 6.76 Truck Shop
838-STO 040-STO 330.40 839-STO 046-STO 333.80
Excavadora 390F Excavadora 390F
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
14,763.00 14,773.00 10.00 C5 8,882.10 8,892.40 10.30 T10
14,773.00 14,783.80 10.80 C5 8,892.40 8,902.40 10.00 T10
14,783.80 14,788.00 4.20 C5 8,902.40 8,912.60 10.20 T10
14,788.00 14,798.10 10.10 C5 8,912.60 8,918.50 5.90 T10
14,798.10 14,798.60 0.50 Inop. 8,918.50 8,927.10 8.60 T10
14,798.60 14,802.80 4.20 C5 8,927.10 8,934.10 7.00 T10
14,802.80 14,810.40 7.60 C5 8,934.10 8,942.00 7.90 5a1 - Truck Sho
14,810.40 14,818.10 7.70 C5 8,942.00 8,950.50 8.50 Truck Shop
14,818.10 14,821.20 3.10 C5 8,950.50 8,959.40 8.90 Truck Shop
14,821.20 14,826.50 5.30 Road 2 8,959.40 8,968.00 8.60 Truck Shop
14,826.50 14,830.50 4.00 Road 2 8,968.00 8,976.60 8.60 Truck Shop
14,830.50 14,842.10 11.60 Road 2 8,976.60 8,986.80 10.20 Truck Shop
14,842.10 14,846.30 4.20 Road 2 8,986.80 8,991.70 4.90 Truck Shop
14,846.30 14,856.70 10.40 Road 2 8,991.70 9,001.40 9.70 Truck Shop
14,856.70 14,868.40 11.70 Road 2 9,001.40 9,001.40 0.00 Stand by - FO
14,868.40 14,880.40 12.00 Road 2 9,001.40 9,011.10 9.70 Road 2
14,880.40 14,888.80 8.40 Road 2 9,011.10 9,020.80 9.70 Road 2
14,888.80 14,899.00 10.20 C5 9,020.80 9,030.10 9.30 Road 2
14,899.00 14,908.00 9.00 C5 9,030.10 9,038.00 7.90 Road 2
14,908.00 14,913.00 5.00 C5 9,038.00 9,046.60 8.60 Road 2
817-STO 392.00 826-STO 248.70
Cisterna de Agua Motoniveladora
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
462.00 471.00 9.00 CY 1,647.90 1,656.00 8.10 E4
471.00 480.00 9.00 CY 1,656.00 1,663.50 7.50 5a1
480.00 488.00 8.00 CY 1,663.50 1,669.70 6.20 5a1
488.00 496.00 8.00 CY 1,669.70 1,673.30 3.60 C5
496.00 504.00 8.00 CY 1,673.30 1,676.20 2.90 5a1
504.00 511.00 7.00 CY 1,676.20 1,683.80 7.60 5a1
511.00 521.00 10.00 CY 1,683.80 1,687.70 3.90 5a1
521.00 526.00 5.00 CY 1,687.70 1,694.80 7.10 5a1
526.00 536.00 10.00 CY 1,694.80 1,696.00 1.20 Inop.
536.00 546.00 10.00 CY 1,696.00 1,704.90 8.90 5a1
546.00 554.00 8.00 C5 1,704.90 1,709.20 4.30 5a1
554.00 564.00 10.00 CY 1,709.20 1,717.40 8.20 5a1
564.00 574.00 10.00 CY 1,717.40 1,725.20 7.80 5a1
574.00 583.00 9.00 CY 1,725.20 1,733.50 8.30 5a1
583.00 594.00 11.00 CY 1,733.50 1,735.50 2.00 5a1
594.00 603.00 9.00 CY 1,735.50 1,744.50 9.00 5a1
603.00 613.00 10.00 CY 1,744.50 1,750.50 6.00 5a1
613.00 623.00 10.00 CY 1,750.50 1,757.00 6.50 5a1
623.00 634.00 11.00 CY 1,757.00 1,762.61 5.61 5a1
634.00 644.00 10.00 CY 1,762.61 1,768.20 5.59 5a1
801-STO 201.75 810-STO 213.30
Cisterna de Agua Cisterna de Agua
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
277.25 283.53 6.28 T4 5,095.00 5,104.00 9.00 T10
283.53 290.24 6.71 T4 5,104.00 5,114.00 10.00 T10
290.24 298.12 7.88 T4 5,114.00 5,124.00 10.00 T10
298.12 302.32 4.20 T4 5,124.00 5,128.40 4.40 C5
302.32 304.59 2.27 T4 5,128.40 5,135.30 6.90 T10
304.59 306.16 1.57 T4 5,135.30 5,144.70 9.40 T10
306.16 306.16 0.00 Stand by - FO 5,144.70 5,152.40 7.70 T10
306.16 309.15 2.99 T4 5,152.40 5,156.00 3.60 T10
309.15 309.15 0.00 Stand by - FO 5,156.00 5,164.10 8.10 T10
309.15 311.90 2.75 T4 5,164.10 5,172.90 8.80 Truck Shop
311.90 314.58 2.68 T4 5,172.90 5,181.40 8.50 Truck Shop
314.58 318.37 3.79 T4 5,181.40 5,181.40 0.00 Stand by - FO
318.37 318.56 0.19 T4 5,181.40 5,183.60 2.20 Truck Shop
318.56 322.49 3.93 T4 5,183.60 5,183.60 0.00 Inop.
322.49 329.33 6.84 T4 5,183.60 5,192.90 9.30 Truck Shop
329.33 334.34 5.01 T4 5,192.90 5,195.40 2.50 T10
334.34 342.30 7.96 T4 5,195.40 5,202.40 7.00 Truck Shop
342.30 347.56 5.26 T4 5,202.40 5,208.90 6.50 Road 2
347.56 354.44 6.88 T4 5,208.90 5,215.00 6.10 Truck Shop
354.44 360.25 5.81 T4 5,215.00 5,219.00 4.00 Truck Shop
809-STO 266.01 827-STO 126.00
Cisterna de Agua Tractor D8
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM Ubicación
6,932.54 6,941.31 8.77 T10 4,273.00 4,280.00 7.00 CY
6,941.31 6,949.01 7.70 T10 4,280.00 4,282.00 2.00 CY
6,949.01 6,959.19 10.18 T10 4,282.00 4,282.00 0.00 Inop.
6,959.19 6,963.00 3.81 C5 4,282.00 4,282.00 0.00 Inop.
6,963.00 6,970.30 7.30 T10 4,282.00 4,282.00 0.00 Inop.
6,970.30 6,977.00 6.70 Truck Shop 4,282.00 4,282.00 0.00 Inop.
6,977.00 6,986.38 9.38 C5 4,282.00 4,282.00 0.00 Inop.
6,986.38 6,991.00 4.62 5a1 4,282.00 4,282.00 0.00 Inop.
6,991.00 6,999.37 8.37 Road 2 4,282.00 4,282.00 0.00 Inop.
6,999.37 7,007.00 7.63 Road 2 4,282.00 4,282.00 0.00 Inop.
7,007.00 7,015.26 8.26 Truck Shop 4,282.00 4,282.00 0.00 Inop.
7,015.26 7,024.42 9.16 C5 4,282.00 4,282.00 0.00 Inop.
7,024.42 7,033.19 8.77 Road 2 4,282.00 4,282.00 0.00 Inop.
7,033.19 7,041.50 8.31 Road 2 4,282.00 4,282.00 0.00 Inop.
7,041.50 7,050.57 9.07 C5 4,282.00 4,282.00 0.00 Inop.
7,050.57 7,060.56 9.99 Road 2 4,282.00 4,282.00 0.00 Inop.
7,060.56 7,069.56 9.00 C5 4,282.00 4,282.00 0.00 Inop.
7,069.56 7,079.17 9.61 C5 4,282.00 4,282.00 0.00 Inop.
7,079.17 7,088.07 8.90 Truck Shop 4,282.00 4,282.00 0.00 Inop.
7,088.07 7,098.11 10.04 C5 4,282.00 4,282.00 0.00 Inop.
795-STO 123.00 828-STO 243.00
Volquete Tractor komatsu
H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
7,583.00 7,584.00 1.00 T10 3,167.00 3,176.00 9.00
7,584.00 7,594.00 10.00 Road 2 - 5a1 3,176.00 3,181.00 5.00
7,594.00 7,599.00 5.00 Truck Shop - 5a1 3,181.00 3,189.00 8.00
7,599.00 7,602.00 3.00 Truck Shop - 5a1 3,189.00 3,196.00 7.00
7,602.00 7,605.00 3.00 Truck Shop - 5a1 3,196.00 3,202.00 6.00
7,605.00 7,613.00 8.00 Truck Shop - 5a1 3,202.00 3,210.00 8.00
7,613.00 7,619.00 6.00 Truck Shop - 5a1 3,210.00 3,217.00 7.00
7,619.00 7,622.00 3.00 C5-5a1 3,217.00 3,217.00 0.00
7,622.00 7,629.00 7.00 Road 2 - 5a1 3,217.00 3,218.00 1.00
7,629.00 7,637.00 8.00 Truck Shop-5a1 3,218.00 3,227.00 9.00
7,637.00 7,645.00 8.00 T10-5a1 3,227.00 3,227.00 0.00
7,645.00 7,651.00 6.00 Truck Shop-5a1 3,227.00 3,227.00 0.00
7,651.00 7,659.00 8.00 Road 2 - 5a1 3,227.00 3,233.00 6.00
7,659.00 7,669.00 10.00 Truck Shop-5a1 3,233.00 3,233.00 0.00
7,669.00 7,676.00 7.00 Road 2 - 5a1 3,233.00 3,239.00 6.00
7,676.00 7,685.00 9.00 Road 2 - 5a1 3,239.00 3,245.00 6.00
7,685.00 7,686.00 1.00 Truck Shop-5a1 3,245.00 3,248.00 3.00
7,686.00 7,689.00 3.00 Traslado 3,248.00 3,254.00 6.00
7,689.00 7,692.00 3.00 Traslado 3,254.00 3,257.00 3.00
7,692.00 7,700.00 8.00 C5-5a1 3,257.00 3,264.00 7.00
796-STO 67.33 847-STO 166.60
Volquete Rodillo CAT
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
T4 9,215.26 9,225.31 10.05 CY-E4 4,404.00 4,411.20 7.20
T4 9,225.31 9,226.46 1.15 CY-E4 4,411.20 4,421.60 10.40
T4 9,226.46 9,227.34 0.88 Inop 4,421.60 4,427.60 6.00
T4 9,227.34 9,227.34 0.00 Inop. 4,427.60 4,433.50 5.90
T4 9,227.34 9,227.34 0.00 Inop. 4,433.50 4,435.60 2.10
T4 9,227.34 9,227.34 0.00 Inop. 4,435.60 4,443.30 7.70
T4 9,227.34 9,227.34 0.00 Inop. 4,443.30 4,449.80 6.50
Inop. 9,227.34 9,227.34 0.00 Inop. 4,449.80 4,456.50 6.70
Inop. 9,227.34 9,227.34 0.00 Inop. 4,456.50 4,457.10 0.60
T4 9,227.34 9,227.34 0.00 Inop. 4,457.10 4,464.00 6.90
Stand by - FO 9,227.34 9,227.34 0.00 Inop. 4,464.00 4,470.80 6.80
Stand by - FO 9,227.34 9,227.34 0.00 Inop. 4,470.80 4,476.80 6.00
T4 9,227.34 9,227.34 0.00 Inop. 4,476.80 4,480.90 4.10
Stand by - FO 9,227.34 9,227.34 0.00 Inop. 4,480.90 4,487.00 6.10
T4 9,227.34 9,227.34 0.00 Inop. 4,487.00 4,492.00 5.00
T4 9,227.34 9,227.34 0.00 Inop. 4,492.00 4,500.60 8.60
T4 9,227.34 9,227.34 0.00 Inop. 4,500.60 4,507.40 6.80
T4 9,227.34 9,227.34 0.00 Inop. 4,507.40 4,517.00 9.60
T4 9,227.34 9,227.34 0.00 Inop. 4,517.00 4,517.00 0.00
T4 9,227.34 9,227.34 0.00 Inop. 4,517.00 4,524.40 7.40
857-STO 92.00 873-STO 124.00
Tractor D8 Cisterna de agua
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final HM
5a1 17.00 26.00 9.00 T10 150.00 150.00 0.00
5a1 26.00 35.00 9.00 T10 150.00 150.00 0.00
5a1 35.00 40.00 5.00 C5 150.00 150.00 0.00
5a1 40.00 40.00 0.00 Inop. 150.00 150.00 0.00
5a1 40.00 45.00 5.00 C5 150.00 150.00 0.00
5a1 45.00 45.00 0.00 Inop. 150.00 150.00 0.00
5a1 45.00 54.00 9.00 C5 150.00 160.00 10.00
5a1 54.00 54.00 0.00 Inop. 160.00 165.00 5.00
Inop. 54.00 54.00 0.00 Inop. 165.00 175.00 10.00
5a1 54.00 62.00 8.00 Road 2 175.00 181.00 6.00
5a1 62.00 70.00 8.00 Road 2 181.00 188.00 7.00
5a1 70.00 81.00 11.00 Road 2 188.00 197.00 9.00
5a1 81.00 81.00 0.00 Stand by -FO 197.00 206.00 9.00
5a1 81.00 81.00 0.00 Stand by -FO 206.00 216.00 10.00
5a1 81.00 82.00 1.00 Stand by -FO 216.00 225.00 9.00
5a1 82.00 82.00 0.00 Stand by -FO 225.00 235.00 10.00
5a1 82.00 82.00 0.00 Stand by -FO 235.00 244.00 9.00
5a1 82.00 82.00 0.00 Stand by -FO 244.00 254.00 10.00
Srand by 82.00 91.00 9.00 C5 254.00 264.00 10.00
5a1 91.00 101.00 10.00 C5 264.00 274.00 10.00
858-STO 11.00 834-STO 24.02
Volquete Volquete
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final HM

CY
CY
CY
CY
CY
CY
CY
CY
CY 8,820.00 8,826.00 6.00 C5 - 5a1
CY 8,826.00 8,831.00 5.00 Road 2 - 5a1
CY 8,831.00 8,831.00 0.00 Inop. 13,276.31 13,276.31 0.00
CY 8,831.00 8,831.00 0.00 Inop. 13,276.31 13,286.00 9.69
CY 8,831.00 8,831.00 0.00 Inop. 13,286.00 13,289.54 3.54
CY 8,831.00 8,831.00 0.00 Inop. 13,289.54 13,300.33 10.79
833-STO 26.11 638-STO
Volquete Cisterna de Combustible
Ubicación H. Inicial H. Final HM Ubicación H. Inicial H. Final
2,497.50 2,507.50
2,507.50 2,507.50
2,507.50 2,514.00
2,514.00 2,524.00
2,524.00 2,534.00

2,525.90 2,530.80
2,530.80 2,536.60
2,536.60 2,542.10
2,542.10 2,549.60
2,549.60 2,553.50
2,553.50
0.00
Taller 13,273.00 13,273.00 0.00 Taller 0.00
Road 2 - 5a1 13,273.00 13,279.26 6.26 Road 2 - 5a1 0.00
5a1-5a1 13,279.26 13,288.25 8.99 C5-5a1 0.00 2,591.40
C5-5a1 13,288.25 13,299.11 10.86 C5-5a1 2,591.40 2,598.50
2,577.20 680-STO 573.00 736-STO 768.00 747-STO
Cisterna de Combustible Cisterna de Combustible Cisterna de Combustible
HM H. Inicial H. Final HM H. Inicial H. Final HM H. Inicial
10.00 2,189.00 2,195.00 6.00 696.00 704.00 8.00 911.00
0.00 2,195.00 2,204.00 9.00 704.00 714.00 10.00 919.00
6.50 2,204.00 2,213.00 9.00 714.00 722.00 8.00 928.00
10.00 2,213.00 2,220.00 7.00 722.00 729.00 7.00 934.00
10.00 2,220.00 2,225.00 5.00 729.00 736.00 7.00 940.00
736.00 745.00 9.00 947.00
745.00 755.00 10.00 956.00
755.00 764.00 9.00 964.00
764.00 772.00 8.00 973.00
4.90 772.00 781.00 9.00 981.00
5.80 781.00 789.00 8.00 990.00
5.50 789.00 797.00 8.00 996.00
7.50 797.00 804.00 7.00 1,006.00
3.90 804.00 812.00 8.00 1,012.00
-2,553.50 812.00 821.00 9.00 1,021.00
0.00 2,225.00 821.00 828.00 7.00 0.00
0.00 2,225.00 2,225.00 Inop. 828.00 837.00 9.00 1,037.00
0.00 837.00 846.00 9.00 1,046.00
2,591.40 846.00 855.00 9.00 1,053.00
7.10 855.00 863.00 8.00 1,062.00
930.00 GE-P001
Cisterna de Combustible Grupo Electrógeno
H. Final HM H. Inicial H. Final HM
919.00 8.00 9,700.18 9,713.69 13.51 963.59
928.00 9.00 9,713.69 9,727.20 13.51 1,010.21
934.00 6.00 9,727.20 9,740.71 13.51 897.35
940.00 6.00 9,740.71 9,754.22 13.51 496.94
947.00 7.00 9,754.22 9,767.73 13.51 688.12
956.00 9.00 9,767.73 9,781.24 13.51 846.34
964.00 8.00 9,781.24 9,794.75 13.51 852.15
973.00 9.00 9,794.75 9,808.26 13.51 788.79
981.00 8.00 9,808.26 9,821.77 13.51 759.84
990.00 9.00 9,821.77 9,835.28 13.51 839.21
996.00 6.00 9,835.28 9,848.79 13.51 674.04
1,006.00 10.00 9,848.79 9,862.30 13.51 809.46
1,012.00 6.00 9,862.30 9,875.81 13.51 659.20
1,021.00 9.00 9,875.81 9,889.32 13.51 828.26
9,889.32 9,902.83 13.51 828.40
1,037.00 9,902.83 9,916.34 13.51 886.42
1,046.00 9.00 9,916.34 9,929.85 13.51 857.95
1,053.00 7.00 9,929.85 9,943.36 13.51 948.05
1,062.00 9.00 9,943.36 9,956.87 13.51 851.85
1,071.00 9.00 9,956.87 9,970.38 13.51 886.08
Ciste. Combus Total

32.00 995.59
28.00 1,038.21
29.50 926.85
30.00 526.94
29.00 717.12
18.00 864.34
18.00 870.15
18.00 806.79
16.00 775.84
22.90 862.11
19.80 693.84
23.50 832.96
20.50 679.70
20.90 849.16
-2,544.50 -1,716.10
7.00 893.42
#VALUE! #VALUE!
16.00 964.05
2,609.40 3,461.25
24.10 910.18
UTILIZACION DE EQUIPOS

MES: Dec-22 2.MAY.3090


Inicio: 26-Nov SERVICIO DE MOVIMIENTO DE TIERRAS PARA LA OPERACIÓN DE LA PRESA
Fecha de reporte: 29-Dec DE RELAVES
CORTE MES: 25-Dec CONTROL DE DISPONIBILIDAD MECÁNICA Y HORAS MÍNIMAS DEL MES
Días del Mes 30
Fecha de Inicio Horas no Días No Disponibilidad
Código Equipo Descripción Dias Disponibles Utilización
Mes Disponibles Disponibles Física
611-STO Tractor D8 - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
625-STO Tactor D8 - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
623-STO Tactor D6 - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
640-STO Tactor D6 - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
650-STO Tactor D6 - 3 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
656-STO Tractor D8 1a - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
676-STO Tractor D8 1a - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
677-STO Tractor D8 1a - 3 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
RT-P01 Rodillo de Tiro - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
RT-P02 Rodillo de Tiro 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
RT-P03 Rodillo de Tiro 3 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
616-STO Rodillo autopropulsado - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
639-STO Rodillo autopropulsado - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
665-STO Rodillo autopropulsado 1A -1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
678-STO Rodillo autopropulsado 1A - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
612-STO Excavadora CAT 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
626-STO Excavadora Komatsu 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
657-STO Excavadora 336 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
679-STO Excavadora 336 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
674-STO Excavadora 336 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
614-STO Retroexcavadora 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
615-STO Cisterna de Agua - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
658-STO Cisterna de Agua - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
666-STO Cisterna de Agua 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
617-STO Volquete - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
591-STO Volquete - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
619-STO Volquete - 3 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
620-STO Volquete - 4 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
627-STO Volquete - 5 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
628-STO Volquete - 6 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
UTILIZACION DE EQUIPOS

MES: Dec-22 2.MAY.3090


Inicio: 26-Nov SERVICIO DE MOVIMIENTO DE TIERRAS PARA LA OPERACIÓN DE LA PRESA
Fecha de reporte: 29-Dec DE RELAVES
CORTE MES: 25-Dec CONTROL DE DISPONIBILIDAD MECÁNICA Y HORAS MÍNIMAS DEL MES
Días del Mes 30
Fecha de Inicio Horas no Días No Disponibilidad
Código Equipo Descripción Dias Disponibles Utilización
Mes Disponibles Disponibles Física
629-STO Volquete - 7 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
653-STO Volquete 1A - 1 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
651-STO Volquete 1A - 2 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
652-STO Volquete 1A - 3 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
668-STO Volquete 1A - 4 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
669-STO Volquete 1A - 5 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
670-STO Volquete 1A - 6 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
671-STO Volquete 1A - 7 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
672-STO Volquete 1A - 8 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
673-STO Volquete 1A - 9 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
686-STO Volquete 1A - 10 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
687-STO Volquete 1A - 11 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
685-STO Volquete 1A - 12 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
621-STO Motoniveladora 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
675-STO Motoniveladora 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
622-STO Cargador frontal 12/23/2022 7.00 Err:504 Err:504 Err:504 0%
644-STO Camabaja 12/23/2022 7.00 Err:504 Err:504 Err:504 0%