Professional Documents
Culture Documents
Layout 2
Layout 2
1 1
F1 F1 F1
2340 2340
2 2
F1 F1 F1
3265 3265
3 3
F1 F2 F2
F1
FOOTING 2(F2)
FOOTING 1 (F1)
1500 X 1500
2000 X 2000
3375 3375
4 4
F1 F2 F2 F1
1825 1815 3340 1825 1815 3340
FOOTINGS
COLUMN LAYOUT TWO TYPES OF FOOTINGS ARE PROVIDED FOUNDATION LAYOUT F1= 2000X2000
F1- 2000 X 2000
F2 - 1500 X 1500 (UNDER COLUMN B3-B4,C3-C4) F2= 1500X1500
PARAPET
WALL 75MM 900 150.00
850.00
1700.00
127 SLAB BEAM
(300 X 420)
Inlet
D2 D2 W1 3200 to the
150.00 Secondary Outlet
Septic Primary inlet Chamber Chamber 850 from the
Tank 1700 x 1700 x 1700 Septic
127 MM BRICK WALL
Tank
125 MM RCC 1700.00
SLAB Exhuast
7150 Exhuast Pipes of
Pipes of 100 mm
450 MM RCC
CHAJJA 150.00 100 mm dia
dia
D2 D2 3200