This contingency plan outlines potential issues and control measures for a Doritos production. Locations include The Ark in Poole Park, a college greenscreen room, and the college library. Possible problems include disruptions from vehicles/weather at the park, technical difficulties with equipment or clothing colors affecting greenscreen effects, and other students entering the frame in the library. Control measures involve checking weather conditions, choosing clothing that won't impact effects, informing library staff, and being mindful of others.
This contingency plan outlines potential issues and control measures for a Doritos production. Locations include The Ark in Poole Park, a college greenscreen room, and the college library. Possible problems include disruptions from vehicles/weather at the park, technical difficulties with equipment or clothing colors affecting greenscreen effects, and other students entering the frame in the library. Control measures involve checking weather conditions, choosing clothing that won't impact effects, informing library staff, and being mindful of others.
This contingency plan outlines potential issues and control measures for a Doritos production. Locations include The Ark in Poole Park, a college greenscreen room, and the college library. Possible problems include disruptions from vehicles/weather at the park, technical difficulties with equipment or clothing colors affecting greenscreen effects, and other students entering the frame in the library. Control measures involve checking weather conditions, choosing clothing that won't impact effects, informing library staff, and being mindful of others.
Name of Production: Doritos Producers Name: Micky Hyde, Krissy Bond, Jack Byatt Contact Number: 07450254090
Location / Potential problem Effect on production Control Measure Existing measures
scene The Ark (Poole The public/ Vehicles and It could be disrupted in a Checking the weather and being Checking the weather and being Park) weather. minor or major way mindful of Vehicles and people. mindful of Vehicles and people. (depending) College Technical difficulties/ If there’s a technical issue Wear clothing with less risk to Informing and reminding my peers Greenscreen the clothes we wear. then that slows it down, changing when the green screen about this fact. room. also if we wear colours effect is added. like yellow, green or teal If there's a technical issue then it etc. Then the effect will be will have to be sorted accordingly. obvious to notice. College Library. The fact that my group We will need a bit to Be informative about this fact and Be informative about this fact and might not be the only make sure that students inform the library staff about this. inform the library staff about this. ones within the library. that who are not part of this are not in frame. (Privacy issues)