Sr # Detail Pricing
COVERED AREA
Construction Work:
All kind of constructions work including:
Sand Loading/Offloading, Chisel work, Praanch fixing/disassembling, Marble/Tile
chiseling, fixing and polishing.
1 650/Sq.ft
Plumbing Work:
All kind of plumbing work, Pipe fixing, Leakage, waste disposal, Sewage system etc.
Color Work:
All kind of color work under the covered area.
NOT INCLUDED WORKS
Below mentioned works will not be included.
* Electric Work.
2 * Wood works.
* Wooden Polish works.
* Carpenter works
ROOF AREA
Below mentioned work will be included.
* Roof floor chiseling.
3 * New flooring installation. 325/Sq.ft
* Roof wall construction.
* Roof wall pluster.