TAKEOFF SHIT

Project: KOTEBE UNIVERSITY OF EDUCATION CLINIC


Location: YEKA SUB CITY KOTEBE UNIVERSITY OF EDUCATION
Client : KOTEBE UNIVERSITY OF EDUCATION
Consultant: MAE Consult
Contracter: BGM Construction
T.G L*W*H Squ Unit Description
2.concrete work
2.1 lean concrete
A. under footing pad
4 1.8 F-1
1.8
3
12.96 m
2.2 F-2
12 2.2
3
58.08 m
1.6 F-3
10 1.6
3
25.6 m
6 1.4 F-4
1.4
3
11.76 m
3
108.4 m Total
2.2 C-25 concret
A.For footing pad
1.8 F-1
4 1.8
0.4
3
5.18 m
2.2 F-2
12 2.2
0.6
3
34.85 m
1.6 F-3
10 1.6
0.4
3
10.24 m
1.4 F-4
6 1.4
0.3
3.53
3
53.80 m Total
T.G L*W*H Squ Unit Description
B. For footing column
0.3 F2-C1
11 0.4
1.4
3
1.85 m
0.3 F4-C1
2 0.4
1.7
3
0.41 m
0.3 F1-C2
4 0.3
1.6
3
0.58 m
0.3 F3-C3
8 0.3
1.6
3
1.15 m
0.3 F4-C3
8 0.3
1.7
3
1.22 m
3
5.21 m Total
2.3 Basement beam concret work
34.8 BB1
4 0.25
0.4
3
13.92 m
17.4 BB2
9 0.25
0.4
3
15.66 m
3
29.58 m Total
2.4 Basement floor slab concret work
Area for axis A-H/1-4 and the thickness
1 637.19 of the slab is 10cm
0.1
3
63.72 m Total
2.5 Retaining wall concret work
38.3 along axis A-H
1 6.4
0.25
3
61.28 m
18.25 along axis 1-4
2 6.4
0.25
3
58.4 m
3
119.68 m Total
2.6 Form work
A.for footing pad
7.2 F-1
4 0.4
2
11.52 m
8.8 F-2
12 0.6
2
63.36 m
6.4 F-3
10 0.4
2
25.6 m
5.6 F-4
6 0.3
2
10.08 m
2
110.56 m Total
B. For footing column
1.4 F2-C1
11 1.4
2
21.56 m
1.4 F4-C1
2 1.7
2
4.76 m
1.2 F1-C2
4 1.6
2
7.68 m
F3-C3
1.2
8 1.6
2
15.36 m
1.2 F4-C3
8 1.7
2
16.32 m
2
65.68 m Total