Location: YEKA SUB CITY KOTEBE UNIVERSITY OF EDUCATION Client : KOTEBE UNIVERSITY OF EDUCATION Consultant: MAE Consult Contracter: BGM Construction T.G L*W*H Squ Unit Description 2.concrete work 2.1 lean concrete A. under footing pad 4 1.8 F-1 1.8 3 12.96 m 2.2 F-2 12 2.2 3 58.08 m 1.6 F-3 10 1.6 3 25.6 m 6 1.4 F-4 1.4 3 11.76 m 3 108.4 m Total 2.2 C-25 concret A.For footing pad 1.8 F-1 4 1.8 0.4 3 5.18 m 2.2 F-2 12 2.2 0.6 3 34.85 m 1.6 F-3 10 1.6 0.4 3 10.24 m 1.4 F-4 6 1.4 0.3 3.53 3 53.80 m Total T.G L*W*H Squ Unit Description B. For footing column 0.3 F2-C1 11 0.4 1.4 3 1.85 m 0.3 F4-C1 2 0.4 1.7 3 0.41 m 0.3 F1-C2 4 0.3 1.6 3 0.58 m 0.3 F3-C3 8 0.3 1.6 3 1.15 m 0.3 F4-C3 8 0.3 1.7 3 1.22 m 3 5.21 m Total 2.3 Basement beam concret work 34.8 BB1 4 0.25 0.4 3 13.92 m 17.4 BB2 9 0.25 0.4 3 15.66 m 3 29.58 m Total 2.4 Basement floor slab concret work Area for axis A-H/1-4 and the thickness 1 637.19 of the slab is 10cm 0.1 3 63.72 m Total 2.5 Retaining wall concret work 38.3 along axis A-H 1 6.4 0.25 3 61.28 m 18.25 along axis 1-4 2 6.4 0.25 3 58.4 m 3 119.68 m Total 2.6 Form work A.for footing pad 7.2 F-1 4 0.4 2 11.52 m 8.8 F-2 12 0.6 2 63.36 m 6.4 F-3 10 0.4 2 25.6 m 5.6 F-4 6 0.3 2 10.08 m 2 110.56 m Total B. For footing column 1.4 F2-C1 11 1.4 2 21.56 m 1.4 F4-C1 2 1.7 2 4.76 m 1.2 F1-C2 4 1.6 2 7.68 m F3-C3 1.2 8 1.6 2 15.36 m 1.2 F4-C3 8 1.7 2 16.32 m 2 65.68 m Total