VILLA 1 (UMM NAHAD)

(G+1+R)
EXCAVATION QTY
DEPTH TOTAL QTY
Sl. No. DESCRIPTION LENGTH (M) WIDTH (M)
(M) (M3)

1 EXCAVATION 42.00 16.50 1.50 1039.50

2 BACKFILLING 42.00 16.50 1.50 1143.45


VILLA 1 (UMM NAHAD)
(G+1+R)

FOOTING QTY
VOLUME OF AREA OF AREA OF POLYTHENE PCC FOOTING
TYPE OF LENGTH BREADTH DEPTH ANIT TERMITE
Sl. No. NOS CONCRETE SHUTTERING BITUMEN SHEET REQUIRED AREA
FOOTING
M M M M3 M2 M2 M2 M2 M3 M2

1 F1 36 1.80 1.80 0.50 58.32 129.6 246.24 116.64 116.64 14.4 3.24
NECK COLUMN

2 36 0.50 0.20 0.95 3.42 47.88 47.88

TOTAL 61.74 177.48 294.12 116.64 116.64 14.4 3.24


VILLA 1 (UMM NAHAD)
(G+1+R)

COLUMN QTY
VOLUME OF AREA OF
LENGTH BREADTH HEIGHT
Sl. No. TYPE OF COLUMN NOS CONCRETE SHUTTERING
M M M M3 M2

1 C1 36 0.30 0.30 4.20 13.61 181.44

TOTAL 13.61 181.44


VILLA 1 (UMM NAHAD)
(G+1+R)

SLAB QTY
CUMULATIVE VOLUME OF AREA OF
TYPE OF BREADTH DEPTH
Sl. No. AREA CONCRETE SHUTTERING
SLAB
M M M M3 M2

1 GRADE SLAB 688.00 1.00 0.20 137.60 275.6

2 FIRST FLOOR 953.00 1.00 0.25 238.25 477

TOTAL 376 752.60


VILLA 1 (UMM NAHAD)
(G+1+R)

TIE BEAM QTY


CUMULATIVE VOLUME OF AREA OF AREA OF
TYPE OF BREADTH DEPTH
Sl. No. LENGTH CONCRETE SHUTTERING BITUMEN
TIE BEAM
M M M M3 M2 M2

1 TB1 397.20 0.20 0.60 47.66 476.64 317.76

TOTAL 47.66 476.64 317.76


VILLA 1 (UMM NAHAD)
(G+1+R)

BEAM QTY
CUMULATIVE VOLUME OF AREA OF
BREADTH DEPTH
Sl. No. TYPE OF BEAM LENGTH CONCRETE SHUTTERING

M M M M3 M2

1 FF + RF BEAM 126.00 0.20 0.80 20.16 201.92

TOTAL 20 201.92
VILLA 1 (UMM NAHAD)
(G+1+R)

PARAPET WALL QTY


CUMULATIVE VOLUME OF AREA OF
BREADTH HEIGHT
Sl. No. TYPE OF BEAM LENGTH CONCRETE SHUTTERING

M M M M3 M2

1 RF FLOOR 126.00 0.15 1.60 30.24 403.2

TOTAL 30 403
VILLA 1 (UMM NAHAD)
(G+1+R)

SUMMARY
CONCRETE AREA OF AREA OF ANTI POLYTHENE PCC
SOIL QTY
Sl. No. DESCRIPTION QTY SHUTTERING BITUMEN TERMITE SHEET REQUIRED

M3 M3 M2 M2 M2 M2 M3

1 EXCAVATION 1040 693

2 BACKFILLING 1143

3 FOOTING (CONCRETE) 62 177 294 117 117 14.4

COLUMN
4 14 181
(CONCRETE)

5 SLAB CONCRETE 376 753

6 TIE BEAM CONCRETE 48 477 318

7 BEAM CONCRETE QTY 20 202

8 PARAPET CONCRETE 30 403

TOTAL 2183 549 2193 612 810 117 14

PREPARED BY : ENG.ALTHAF MOHAMED


JADDAF MOSQUE STEEL DETAILS

STEEL QTY FOR FOOTING


TOTAL QTY OF
X LENGTH Y LENGTH NOS OF ROD TOTAL IN
Sl. No. DESCRIPTION SPACE 10mm ROD IN d^2/162 TOTAL IN KG
IN METER IN METER ROD LENGTH TON
METER.

11.80 0.20 60 12.00 720


1 F1 0.617 454.07 0.454
1.56 0.20 8 2.00 15.6
21.92 0.20 110 12.00 1315.2
2 GENTS PRAYER HALL 0.617 1271.85 1.272
12.42 0.20 62 12.00 745.2
21.92 0.20 110 12.00 1315.2
3 AWKAT 0.617 960.00 0.960
5.76 0.20 30 8.00 240
21.92 0.20 110 12.00 1315.2
4 ENTRANCE HALL 0.617 979.01 0.979
6.77 0.20 34 8.00 270.8
2.74 0.20 14 4.00 54.8
5 STORE ROOM 0.617 66.54 0.067
2.65 0.20 13 4.00 53
3.84 0.20 20 4.00 80
6 STORE ROOM 0.617 155.56 0.156
4.30 0.20 21 8.00 172
4.20 0.20 21 6.00 126
7 ABLUTION 0.617 324.69 0.325
8.00 0.20 40 10.00 400
3.80 0.20 20 6.00 120
8 LOBBY 0.617 150.00 0.150
4.10 0.20 20 6.00 123
3.25 0.20 16 6.00 97.5
9 DSABLED TOILET 0.617 72.53 0.073
1.80 0.20 10 2.00 20
4.10 0.20 20 6.00 123
10 LOBBY 0.617 261.11 0.261
7.50 0.20 38 8.00 300
0.80 0.20 4 2.00 8
11 STAIR 0.617 190.12 0.190
7.50 0.20 38 8.00 300
3.84 0.20 20 6.00 120
12 MAID 0.617 185.19 0.185
5.82 0.20 30 6.00 180
4.20 0.20 21 6.00 126
13 PUMP ROOM 0.617 103.95 0.104
2.12 0.20 11 4.00 42.4
3.80 0.20 20 6.00 120
14 WASH 0.617 106.17 0.106
2.60 0.20 13 4.00 52
3.80 0.20 20 6.00 120
15 WATCHMAN 0.617 111.36 0.111
3.02 0.20 15 4.00 60.4
3.25 0.20 16 6.00 97.5
16 TOILETS 0.617 150.93 0.151
4.90 0.20 25 6.00 147
3.25 0.20 16 6.00 97.5
17 ELECTRICAL RM 0.617 106.79 0.107
3.02 0.20 15 5.00 75.5
2.15 0.20 11 4.00 43
18 MINARET 0.617 53.09 0.053
2.15 0.20 11 4.00 43
9152.8 5649.88 5.650
BOQ FOR UNIVERSITY NEW BUILDING MIDDLE PAR
PROJECT : G + 1 VILLA (V1)

Location: JUMEIRAH UNVIERSITY

Client: Mr.AHAMED KHALIFA DHEAN

Consultant: EMIRATES SAS ENGINEERING CONSULTANT

Contractor : BIN DHAEN CONTRACTING

UNIVERSITY NEW BUILDING -PROPOSED


SL.NO. DESCRIPTION UNIT

PRELIMINERIES & MOBILIZATION

1 Prelimineries & Mobilization L.S

Total Amount of PRELIMINERIES&MOBILIZATION

EARTHWORK

2 Excavation L.S

3 Back filling L.S

4 Anti Termite Treatment L.S

Total Amount of EARTHWORK

SUB STRUCTURE

5 PCC M3

6 RCC - FOOTING M3

7 Neck Column M3

8 Tie Beam M3

9 8" solid block M2

10 Bitumin L.S

11 Polythene Sheet 1000G L.S

12 Grade Slab - Ground Floor M3

Total Amount of SUB STRUCTURE


SUPER STRUCTURE

13 Ground Floor Column M3

14 First Floor Beam / Slab M3

15 First Floor Column M3

16 Roof Floor Beam/ Slab M3

17 Parapet M3

18 Lintel, Door & Jammer M3

19 Internal Staircase M3

20 Foundation for AC Machine M3

Total Amount of SUPER STRUCTURE

BLOCK WORK

21 8" THERMAL Block M2

22 8" Hollow Block M2

23 4" Hollow Block M2

Total Amount of BLOCK WORK

MAIN VILLA
SL.NO. DESCRIPTION UNIT

PLASTERING

24 Internal Wall Plaster M2

25 Ceiling Plaster M2

26 External Wall Plaster M2

Total Amount of PLASTERING

PAINTING WORK

27 Internal Painting (National) M2

28 Ceiling Painting M2
29 External Wall Painting (Texture - National) M2

Total Amount of PAINTING

TILE & MARBLE WORK

30 Ceramic Tile Including bathroom 60x60- PC RATE 25 Dhs M2

31 Ceramic Tile Bathroom - PC RATE 25 Dhs M2

32 Ceramic Tile Wall-- PC RATE 25 Dhs M2

33 Ceramic Skirting - PC RATE 10 Dhs RM

34 Granite Floor - PC RATE 120 Dhs M2

35 Granite Skirting- PC RATE 30 Dhs RM

36 Marble Threshold - PC RATE 50 Dhs RM

37 Staircase Marble - PC RATE 120 Dhs RM

Total Amount of TILES WORK

WATERPROOFING

38 Roof Combo System water proofing M2

39 First Floor Bathroom Water Proofing M2

Total Amount of WATERPROOFING

METAL WORKS

40 Alumnium Door m2

41 Aluminium Handrail - Staircase RM

42 Aluminium Handrail - Balcony RM

Total Amount of METAL WORK

WOODEN WORK

43 Main Doors NOS

44 Internal Doors NOS

Total Amount of WOODEN WORK

KITCHEN CABINET

45 Kitchen Cabinet RM

46 Cupboards RM

47 Granite Counter NOS


Total Amount of KITCHEN CABINET

MAIN VILLA

SL.NO. DESCRIPTION UNIT

PROVISONAL SUM ITEMS


PLUMBING WORK

48 Plumbing & Water Connection P.S

49 Solar Water Heater P.S

50 Water Tank P.S

51 Septic Tank P.S

52 Sanitary Wares P.S

53 Manhole - Civil Work P.S

Total Amount of PLUMBING WORK

ELECTRICAL WORK

54 Electrical Connection & Wiring Works P.S

55 Light Fittings P.S

Total Amount of ELECTRICAL WORK

EXTERNAL WORK

56 Interlock M2

57 Kerbstone RM

58 Main Gate L.S

59 Cat Ladder Spiral L.S

Total Amount of EXTERNAL WORK

EXTERNAL COMPOUND WALL


60 Compound Wall RM

Total Amount of EXTERNAL COMPOUND WALL

TOTAL AMOUNT
NG MIDDLE PART -PROPOSED
.

DING -PROPOSED
QTY RATE AMOUNT

1.00 -

ZATION -

1.00 10,000.00 10,000.00

1.00 7,000.00 7,000.00

1.00 3,000.00 3,000.00

20,000.00

15.00 280.00 4,200.00

65.00 880.00 57,200.00

5.00 830.00 4,150.00

48.00 880.00 42,240.00

90.00 -

1.00 2,000.00 2,000.00

1.00 2,000.00 2,000.00


1794
138.00 480.00 66,240.00

E 178,030.00
15.00 680.00 10,200.00

240.00 680.00 163,200.00

0.00 680.00 -

0.00 680.00 -
32
30.00 680.00 20,400.00

480.00 -

4.00 630.00 2,520.00

3.00 300.00 900.00

RE 197,220.00

70.00 -

60.00 -

60.00 -

LA
QTY RATE AMOUNT

30.00 -

40.00 -

15.00 -

-
20.00 -

55.00 -

55.00 -

18.00 -

170.00 -

45.00 -

90.00 -

120.00 -

90.00 -

30.00 -

G -

380.00 -

500.00 -

500.00 -

3,500.00 -

900.00 -

650.00 -

650.00 -

1,000.00 -
T -

LA

QTY RATE AMOUNT

M ITEMS

30,000.00 -

9,500.00 -

4,800.00 -

9,500.00 -

1,800.00 -

10,000.00 -

K -

35,000.00 -

13,000.00 -

K -

55.00 -

40.00 -

8,000.00 -

3,000.00 -

K -
600.00 -

WALL -

395,250.00
VILLA 1
(G+1+R)

FOOTING QTY
VOLUME OF AREA OF AREA OF POLYTHENE PCC FOOTING
TYPE OF LENGTH BREADTH DEPTH ANIT TERMITE
Sl. No. REFERENCE DWG NOS CONCRETE SHUTTERING BITUMEN SHEET REQUIRED AREA
FOOTING
M M M M3 M2 M2 M2 M2 M2 M2

1 F1 7 1.40 1.40 0.50 0.98 19.6 33.32 13.72 13.72 0.256 1.96

2 F2 5 1.80 1.80 0.50 1.62 18 34.2 16.2 16.2 4 3.24

3 F3 4 2.20 2.20 0.60 2.90 21.12 40.48 19.36 19.36 5.76 4.84

4 F4 3 2.60 2.60 0.70 4.73 21.84 42.12 20.28 20.28 7.84 6.76

TOTAL 10.24 80.56 150.12 69.56 69.56 17.856 16.8

DEDUCTION OF FOOTING AREA FROM TOP OF PCC 16.8


ACTUAL BITUMEN AREA 133.32
ACTUAL POLYTHENE AREA 1329.56