By substituting wooden doors for cheaper WPC doors, using lower grade ceramic tiles, building a shared compound wall between clients instead of separate walls, opting for a prefabricated swimming pool instead of concrete, canceling the lift, car park tent and landscaping, the construction project could reduce its total budget by 482,000 AED according to the cost saving scenario.
By substituting wooden doors for cheaper WPC doors, using lower grade ceramic tiles, building a shared compound wall between clients instead of separate walls, opting for a prefabricated swimming pool instead of concrete, canceling the lift, car park tent and landscaping, the construction project could reduce its total budget by 482,000 AED according to the cost saving scenario.
By substituting wooden doors for cheaper WPC doors, using lower grade ceramic tiles, building a shared compound wall between clients instead of separate walls, opting for a prefabricated swimming pool instead of concrete, canceling the lift, car park tent and landscaping, the construction project could reduce its total budget by 482,000 AED according to the cost saving scenario.