Professional Documents
Culture Documents
G001 List of Finished Plans (Hull Part)
G001 List of Finished Plans (Hull Part)
G001 List of Finished Plans (Hull Part)
BIBLIOGRAPHY
(AS BUILT)
\~\SHED Pl4. .
~ MAR. -1. 2006 .;V
TSU SHIPYARD
APPROVED BY
CHECKED BY
List of Finished Plans
CHECKED BY (Hull Part)
DESIGNED BY
~px:~iID§~
Nov. 17,2005
(Hull Part)
@ Universal Shipbuilding Corporation .DWG. NO. 1001111
Tsu Shipyard MC-CODE
DATE OF ISSUE _ _ _ _ _ _ __
COOl
S.No.038/039/0601061 1001111 Page 1
A) General
- .... _- ....
G002 Finished Specifications 2 1
G004 1Q39001 Quick Report for Test & Inspection at Sea Trial 2 1
B2 Painting
C2 Hull Performance
D2 Hull Construction
Number of the drawing with ( ) means additional plans which are in the spare box.
S.No.038/0:39/0601061 1001111 Page 3
H022 2030110 Size of Fillet Weld (Fore and Mt Cargo Oil Tank) 2 1
E2 Hull Outfitting
Number of the drawing with ( ) means additional plans which are in the spare box.
S.N0.038/0g9/060/061 1001111 Page 6
F026 4014126 Detail of Distance Piece and Sea Chest Grating for 2 1
Hull Part
"'
F080 F712300 Fixed Fire Fighting system for Paint Locker 2 1
F084 F838102 Heating System for Cargo Oil Tanks and Slop Tank 2 1
F100 1245006 Level Switch for Bilge System (P. Room, Bosun & 2 1
E.F.P.Recess)
F2 Accommodation
L001 6009001 Test Results of Noise Level Measurement 2 1
18/19 for S.No.038