Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

DTD3043 Systems Analysis & Design__

FACULTY OF COMPUTING AND META-TECHNOLOGY


UNIVERSITI PENDIDIKAN SULTAN IDRIS
DTD 3043: SYSTEMS ANALYSIS & DESIGN

GROUP PROJECT :
Group project carries 30% of the final grade. The project has to be proposed by each
group and approved by the lecturer. Each student based on group performance and
contribution, will receive a percentage of their final group project grade. Students are
encouraged to discuss the project details with the lecturer on a regular basis, during the
semester. Project will be evaluated as below:

Project report:
Proposal 10 marks
Requirement gathering 20 marks
Analysis 20 marks
Design 20 marks
Implementation 20 marks
Final report 10 marks

TOTAL 100 marks / 25%

Presentation:
Proposal presentation 10 marks
Final project presentation 10 marks

TOTAL 20 marks / 5%

____________________________________________@ harnani@meta.upsi.edu.my 1
DTD3043 Systems Analysis & Design__

A. Project Group
Each project must be done in groups of four (4) or five (5). Each member of a group will
be system analysts and one of them will serve as the group leader.

B. Project Proposal [10 marks]


A proposal of the project with title, background, problem statement, scope, objective,
and feasibility study should be submitted and presented in class. Proposed schedule is
compulsory (Gantt Chart).

C. Requirement Gathering and Analysis [20 marks]


A suitable fact finding method should be choose and apply in order to gather the
requirements of the proposed system.

D. Analysis Report [20 marks]


Analysis using selected methodologies, example: structured approach (Context
Diagram, DFD, Process Description). The report should have detailed discussions on
the analysis. Each diagram involve in analysis phase must be submitted.

E. Design Report [20 marks]


Suitable framework of the project should be proposed (Data, process and user
interface). A design report with user interface design, input, output and database design
are compulsory. The report should have detailed discussions on the design including
Database Management System. It also reports on the implementation plan and
approach with details on language features used.

F. Project Implementation [20 marks]


The proposed project must implemented using any suitable programming language.
Each project must be working / functioning as stated in the proposal.

G. Final Report [10 marks]


Each group should demonstrate submit a full report for the project. The report must
follow the given Table of Content. The report will be evaluated based on the clarity,
understanding, and readability. Your group can use your creativity to make the report
interesting and easy to read.

____________________________________________@ harnani@meta.upsi.edu.my 2
DTD3043 Systems Analysis & Design__

H. Project Presentation [20 marks]


There will be two types of presentation; proposal presentation and final project
presentation. Each group should demonstrate the project and perform the project
presentation. The mark for this will be based on the group's creativity to do the
presentation.

____________________________________________@ harnani@meta.upsi.edu.my 3
DTD3043 Systems Analysis & Design__

CONTENT OF THE PROJECT REPORT

TABLE OF CONTENT
1. Planning
 Introduction
 Problem statement
 Objectives
 Scope
 Feasibility study

2. Requirement analysis
 Analyze the results of your fact finding

3. Analysis
 Methodology
 Techniques
 Tools
 Context Diagram
 DFD 0, at least one DFD level 1
 Process Description Tools
 Object oriented modeling diagram (optional)*

4. Design
 Framework and architecture of the project
 User Interface design
 Input design
 Output design (Report design)
 Database design

5. Implementation
 Coding
 System testing

6. Conclusion
 Advantages and Limitation of the project
 Discussion and Recommendation

BIBLIOGRAPHY
APPENDIXES

____________________________________________@ harnani@meta.upsi.edu.my 4

You might also like