COST OVERRUNS

TASK COST VARIANCE RESOURCE COST VARIANCE


Cost variance for all the work resources.
Cost variance for all top-level tasks in the project.
14000000 1800000
1600000
12000000 1400000
1200000
1000000
10000000 800000
600000
8000000 400000
200000
6000000 0

Dia 8mm deformed…

Eucalyptus wood…
loder
Nails

Washer
white marble thread

Gang chief

wire
Welder

Asst.plumber

saw
vibrator

stucco

Kitchen Sink

Conduit 32mm
Electrician
mould oil
sockets outlet
Daily labor

20 cm. Thick HCB

marble tile

7*5 cm wooden purlin


ceramic tile

pvc tile 2mm thick


Basaltic stone
4000000

2000000

0
RESIDENTIAL BUILDING

Cost Variance Cost Variance

Name % Complete Cost Baseline Cost Name Cost Baseline Cost Cost Variance
Cost Variance
Daily labor 1,611,120.00 Br 0.00 Br 1,611,120.00
RESIDENTIAL 0% 11,728,252. 0.00 Br 11,728,252. Br
BUILDING 34 Br 34 Br
Carpenter 468,400.00 Br 0.00 Br 468,400.00 Br
Vibrator Operator 5,040.00 Br 0.00 Br 5,040.00 Br
Mixer Operator 7,000.00 Br 0.00 Br 7,000.00 Br
mixer 10,000.00 Br 0.00 Br 10,000.00 Br
vibrator 6,720.00 Br 0.00 Br 6,720.00 Br
Bar bender 242,792.00 Br 0.00 Br 242,792.00 Br
Bar bender II 0.00 Br 0.00 Br 0.00 Br
Plasterer 197,120.00 Br 0.00 Br 197,120.00 Br
painter 251,040.00 Br 0.00 Br 251,040.00 Br
Welder 1,920.00 Br 0.00 Br 1,920.00 Br