Volume of planned

No. Bridge Position Operation


works total
1 M1 BRIDGE km 45+208 Precast girders 144
2 M1 BRIDGE km 45+208 Foundations 12
3 M1 BRIDGE km 45+208 Piers 12
4 M1 BRIDGE km 45+208 Abutment piers 8
5 M1 BRIDGE km 45+208 Bearing beams 12
6 M1 BRIDGE km 45+208 Deck slab 4
7 M3 BRIDGE km 48+951 Bearing beams 4
8 M3 BRIDGE km 48+951 Abutments 4
9 M3 BRIDGE km 48+951 Precast girders 60
10 M4 BRIDGE km 50+816 Foundations 4
11 M4 BRIDGE km 50+816 Abutments 4
12 M5 OVERPASS km 51+438 Bearing beams 4
13 M5 OVERPASS km 51+438 Precast girders 21
14 M7 OVERPASS km 56+354 Piers 4
15 M7 OVERPASS km 56+354 Bearing beams 4
16 M7 OVERPASS km 56+354 Precast girders 18
17 M8 BRIDGE km 56+773 Abutments 4
18 M8 BRIDGE km 56+773 Deck slab 2
19 M9 OVERPASS km 58+170 Abutments 2
20 M9 OVERPASS km 58+170 Precast girders 24
21 M12 BRIDGE km 61+300 Pedestrian walkways 4
22 M13 BRIDGE km 62+350 Pedestrian walkways 4
Volume of planned works in Volume of executed production in
November November
40 35
1 1
1 1
1 1
3 3
1 0.5
4 0
2 1
40 17
2 2
4 0.5
4 2
7 0
1 1
2 0
12 0
2 1
1 0
1 0
8 8
4 0
4 0
Volume of executed production from 14th to Description of executed production from 14th to
20th of November 20th of November
12 Concreted 12 girders.
0
0
0
1 Concreted 1 bearing beam.
0.5 Concreted 1/2 deck slab.
0
1 Concreted 1 abutment.
13 Concreted 13 girders.
1 Concreted 1 foundation.
0.5 Concrete 1/2 pier S1R.
0
0
0.5 concreted 1/2 pier s3
0
0
0
0
0
3 Concreted 3 precast girders.
0
0