Professional Documents
Culture Documents
H 25 Houkokusyo 2
H 25 Houkokusyo 2
H 25 Houkokusyo 2
13 September, 2013
4 th Ocean Energy Workshop, Kona
Place: Kumejima
2
A1-1
添付資料①
Okinawa Prefectural Deep Sea Water Research Center and Business Park
2.035
4
Billion yen is roughly equivalent to 21 Million US
Dollars @ 97.78 rate 出典: 久⽶島海洋深層⽔複合利⽤基本調査 報告書
A1-2
添付資料①
Kumejima: Temperature
Difference between SSW and
DSW(1000m) : 20.5℃
Kumejima Electricity
Population: approx. 8.500
Power Plant: Kumejima Power Plant
久⽶島
Capacity 18,500kW
Diesel Engine Generator (HFO)
100
200
2.5km for 600m depth
300
5km for 800m depth
400
Depth [m]
500
600
700
800
900
1000
February August Average 6
A1-3
添付資料①
Location
General Arrangement
A1-4
添付資料①
Evaporator A Monitoring
and Control
Condenser A
Space
Evaporator B Condenser B
DEEP WATER
DEEP • Flow Rate: Max.
WATER 13,000 t/d (540t/h)
by the existing SW
intake pipe and pump
• Intake Depth: 612m
by the existing SW
intake pipe
• Temperature:
annual ave. 9oC
A1-5
添付資料①
LL HL Switch
Switch
L L
UP‐DOWN Repeated
Rooftop Tank
Use in Research
Institute
Use in Private
Companies
SW
From Intake Pipe Intake Pump Discharge
Level Sensor
L L L
UP‐DOWN Repeated
Flow Control Valve
Controlled at Constant
OTEC Level
Rooftop Tank
Use in Research
Institute
M
Unit‐A Unit‐B
Flow Mode: (1) Cascade (A‐> B), (2) Cascade (B > A), (3) Parallel, (4) A only (B bypass),
(5) B only (A bypass)
Turbine
Mist Separator
Condenser
Evaporator
Working Fluid
Pump
A1-7
添付資料①
To p i c : W o r k i n g F l u i d
The facility was designed and manufactured for both HFC134a
and Ammonia.
The current working fluid: HFC134a
Japanese deregulation for small binary power generation
facility in April, 2012
For facilities fulfilling the all Deregulation about the below
conditions below: requirements:
Heat source: hot water or steam in • Submission of various documents
atmospheric pressure • Inspection by certified authority
Working Fluid: Inert gas regarding both equipment and whole
Structure preventing people from facility
anoxia in case of leakage • Distance from public street/road or
Design temperature < 250 deg‐C building outside
Design pressure < 2MPa • Stationed personnel with national
Power output < 300kW certification about boiler and turbine
Turbine and Generator are in a body
Shelter or equivalent against turbine Next Step (1MW):
accident
Ammonia will be used
Heat Exchanger
Cross Flow Plate Heat Exchanger
Working Fluid
Tu r b i n e G e n e ra t o r a n d W F P u m p
Turbine
Radial, 33000 rpm, without reduction
WF Pump
gear
Commercialized canned type
Generator
(manufacturer: Nikkiso)
50kW 400V, 550Hz (33000rpm) with
frequency conditioner
A1-9
添付資料①
History
Mile Stones
Jan. 2013 Feb. 2013 Mar. 2013 Apr. 2013 May. 2013 Jun. 2013
15 Apr. 16 Jun.
28 Jan. Official Opening Ceremony
Construction Operation
Started at Site Starts
30 Mar. / 1st Power Generation Test Succeeded
Surface Water: 23.5 oC, 330t/h
Deep Water: 9.3 oC, 250t/h
Power Output: 3.1kW (for Test)
History
A1-10
添付資料①
History
History
History
History
History
History
History
Operation
500
400
300
200
100
0
April May Jun July August
Continuous Data Gathering
per 1 Second as CSV form
A1-14
添付資料①
Operation
Over 100 Students and Children Have Visited the Facility in this 4
months.
System Configuration of OTEC Is Similar to Conventional Steam Turbine
Power Plant such as Coal Fired Thermal or Nuclear…Basic Concept of
Power Generation Can Be Learned.
A1-16
添付資料①
Peopleʼs Awareness