This checklist is to be completed for every activity and attached to each post check as an attachment.
Not uploaded to ISF or sharpoint but attached as a document.
Site ID 5CT0027A
EAMS Ticket ID 908488
ASP/SP Contact Gerrod Mcintosh
NIC that completed this checklist EUVLLAI
Activity Completed L19 radio swap + 2C
Issues found or general comments Please see coments on mail
Sign here Audits currently running to
Read each statement completely using your catch and track
signum Comments and Information
I have reviewed the state of each cell on all
technologies and verified the current state of
each cell is the correct state per the pre checks.
(ie. Locked/barred/reserved or
unlocked/unbarred/unreserved). If any state is
different from the pre checks, I have an e-mail
from the market allowing me to leave the cell in
an incorrect state.
I have logged into the ENM GUI and verified all cmedit get *5CT0027A* NetworkElement.managementState –table
nodes on my site are set to NORMAL under the Maintenance State Audit
managementState parameter.
Check the VSWR Settings tab if unsure how your ports should be set.
Command to check:
I have ran the hardware swap baseline, verified
the VSWR settings are correct based on the radio hget rfport vswrsupervision|vswrvalue RSSI & VSWR Audit
types installed and verified RSSI and VSWR values mfitr
are on range. invxrb
Command to check:
Baseline
I have checked correct Baseline has been loaded
Ask FE for GPS Cabling issue or check LKF for Feature availability and enable it to ensure GMSynch is in Enabled State
Grand Master Synch Status is enabled for Anchor
Sites or any site which has Anchor already
Integrated on it
Matrix to be provided by the Market IM/IC to keep in market specific exceptions database or in the eAMS tickets
Technology lock Matrix- For ex. If the the
technology being worked on is only
U19/GSM/L19. L21/L6/L7 should not be locked.
NOTE: By filling this out you confirm you have checked all parameters needed to call the site correct. These settings were completed and if needed, corrected while the FE was still on site.
This does not replace any other post check required by markets. This is in addition to all post checks completed per MOPs and Processes.