Professional Documents
Culture Documents
Unjuran PT Kja 2020
Unjuran PT Kja 2020
ELEK ELEK
CREDITE NOTE NEO
2 ZB 9627 12.7 MM 1. POWER DRIVE CONTROL UNIT(PDCU) 1. RM 32,000.00 MPL :-
SATU WAJA
3 DIV:-
ELEK ELEK
3 ZB 9636 12.7 MM 1. POWER DRIVE CONTROL UNIT(PDCU) 1. RM 32,000.00 CREDIT NOTE MRA
ELEK ELEK
4 ZB 9682 25 MM 1. THERMAL SIGHT UNIT (TSU) 1. RM 38,000.00 CREDIT NOTE MRA
ELEK ELEK
5 ZC 2034 25 MM 1. ELEKTRONIK CONTROL UNIT 1. RM 35,000.00 CREDITE NOTE MEJOR TRAX
JUMLAH RM198,000.00
ELEK ELEK
1. LASER WARNING CONTROL BOX (LWCB) 1. RM 32,000.00
2. PERISCOPE M 27 2. RM 20,000.00
6 ZB 9701 AAV 3. PERISCOPE M 17 3. RM 28,000.00
ELEK ELEK
1. ELECTRONIC CONTROL UNIT(ECU) 1. RM 33,000.00
2.WIRING HARNESS W 10 2. RM 8,000.00
3.WIRING HARNESS W 02 3. RM 6,000.00
4. WIRING HARNESS W 05 4. RM 3,000.00
DUA 5. WIRING HARNESS W 16 5. RM 5,000.00 MPL :-
7 ZC 2039 25 MM 3 DIV:-
PERSENJATAAN PERSENJATAAN
1. TRAVERS GEAR BOX 1. RM 13,000
ELEK ELEK
1. PERISCOPE M 27 1. RM 28,000.00
8 ZC 2017 AAV 2. PERISCOPE M 17 2. RM 20,000.00
JUMLAH RM191,000.00
AUTO AUTO
1.AIRCOND 1.RM 8,500.00
ELEK ELEK
1. TURRET CONTROL HANDLE 1. RM 15,000.00
2. BASIC DAY NIGHT GUNNERY SIGHT(BDNGS) 2. RM 35,000.00
9 ZB 9642 12.7 MM 3. POWER DRIVE CONTROL UNIT(PDCU) 3, RM 30,000.00
4. FUME EXTRACTOR 4. RM 28,000.00
KETIGA MPL :-
3 DIV:-
AUTO AUTO
1. PANEL BOX AIRCOND 1. RM 20,000.00
2. AICOND 2. RM 8,500.00
10 ZC 2025 AVF
JUMLAH RM145,000.00
AUTO
1. RM 8,500.00
AUTO
1. AIRCOND ELEK
1. RM 9,000.00
ELEK 2. RM 28,000.00
1.TURRET CONTROL HANDLE 3. RM 35,000.00
2. ELECTRICAL DISTRIBUTION BOX (EDB) 4. RM 5,000.00
11 ZB 9655 12.7 MM
3. LASER WARNING CONTROL BOX (LWCB) 5. RM 30,000.00
4. PERISCOPE MK 35 MPL :-
KEEMPAT 5. POWER DRIVE CONTROL UNIT(PDCU) PERSENJATAAN 3 DIV:-
1. RM 9,000.00
PERSENJATAAN
1. COCKING MECHANISEM
AUTO AUTO
12 ZC 2036 25 MM 1. FINAL DRIVE 1.RM 22,000.00
JUMLAH RM146,500.00