Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

PROFESSIONAL PRACTICE

10. HLURB
1. The Intellectual Property Code of the Philippines.
a. Housing and Land Use Regulatory Board
a. PD 8293
b. Housing and Land Use Rules Board
b. RA 8293
c. Housing and Land Use Regulating Board
c. RA 2893
d. Housing and Land Use Ruling Board
d. PD 2893
11. All on-site work done in the site preparation,
2. The Fire Code of the Philippines of 2008
excavation, foundation, assembly of all the
a. RA 9514
components and installation of utilities, machineries
b. PD 9514
and equipment of buildings/structures.
c. PD 9541
a. Conversion
d. RA 9541
b. Addition
3. Code on the Sanitation of the Philippines
c. Construction
a. PD 856
d. Alteration
b. RA 856
12. Works in buildings/structures involving changes
c. RA 857
in the materials used, partitioning, location/size of
d. RA 858
openings, structural parts, existing utilities and
4. The Subdivision and Condominium Buyers’
equipment but does not increase the building height
Protective Decree
and/or floor area.
a. PD 954
a. Conversion
b. PD 956
b. Addition
c. PD 957
c. Construction
d. PD 958
d. Alteration
5. The Law to enhance mobility of disabled persons
13. An exterior passage for walking along, especially
a. BP 220
one connecting adjoining building and related
b. PD 220
structures.
c. BP 344
a. Walkway
d. PD 344
b. Passageway
6. National Building Code of the Philippines
c. Vestibule
a. PD 8293
d. Sidewalk
b. PD 957
14. A small entrance way or transitional space from
c. PD 9266
the exterior to the interior of a building and opens
d. PD 1096
into a larger space.
7. The Architecture Act of 2004
a. Walkway
a. PD 8293
b. Passageway
b. PD 8981
c. Vestibule
c. PD 9266
d. Sidewalk
d. PD 1096
15. A space connecting one area or room of a
8. The PRC Modernization Act of 2000
building with another.
a. RA 8293
a. Walkway
b. RA 8981
b. Passageway
c. RA 9266
c. Vestibule
d. RA 1096
d. Sidewalk
9. The practice of adopting measures that promote
16. Refers to features that enable disabled persons
resource management efficiency and site
to make use of the primary functions for which a
sustainability while minimizing the negative impact
structure is built.
of buildings on human health and the environment.
a. Accessible
a. Green Architecture
b. Accommodation
b. Green Building
c. Mobility
c. Green Construction
d. Enable
d. Green Development

1|P ROF ESSI ON AL PRAC TICE


17. An exit, or a means of going out. 25. A slopped surface connecting two or more planes
a. Exit at different levels.
b. Egress a. Corridor
c. Entrance b. Passage
d. Elevator c. Ramp
18. Point of entry into a building: an exterior door, a d. Sidewalk
vestibule, or a lobby. 26. May I always Build: “I will open my hands to ___,
a. Exit that I may skillfully turn point, line and plane to the
b. Egress support and protection of man’s body, to the
c. Entrance nourishment of his hope, to the preservation of his
d. Elevator culture.
19. Ramps shall have a minimum clear width of ? a. Arts
a. 0.80 M b. Architecture
b. 0.90 M c. Architect
c. 1.00 M d. Artistry
d. 1.20 M 27. In regular practice, normally acts as his/her
20. Manual switches shall be positioned within ___ client’s or the owner’s adviser. He/she translate the
to 1.30 above the floor. owner’s needs and requirements to spaces and
a. 0.80 M forms in the best manner of professional service
b. 0.90 M he/she can render.
c. 1.00 M a. Architect
d. 1.20 M b. Broker
21. BP 220: Economic and socialized housing refers c. Contractor
to housing units which are within the affordability d. Developer
level of the average and low-income earners which is 28. A person who is responsible for advocating the
___ of the gross family income as determined by the fair and sustainable development, welfare and
NEDA form time to time. cultural expression of society’s habitat in terms of
a. 20 % space, forms and historical context:
b. 30 % a. Architect
c. 33 % b. Broker
d. 38 % c. Contractor
22. Any person who, for commission or other d. Developer
compensation, undertakes to sell or negotiate the 29. An Act providing for a more responsive and
sale of a real estate belonging to other. comprehensive regulation for the registration,
a. Agent licensing and practice of Architecture.
b. Broker a. PD 856
c. Dealer b. PD 9266
d. Developer c. PD 957
23. Any person directly engaged as principal in the d. PD 1096
business of buying, selling or exchanging real estate 30. A document issued by the Building Official (BO)
whether on a full-time or part-time basis. to an owner/applicant to proceed with the
a. Agent construction, installation, addition, alteration,
b. Broker renovation, conversion, repair, moving, demolition or
c. Dealer other work activity of a specific
d. Developer project/building/structure or portions thereof after
24. A long interior passageway providing access to the accompanying principal plans, specifications and
several rooms. other pertinent documents with the duly notarized
a. Corridor application are found satisfactory and substantially
b. Passage conforming with the NBCP…
c. Ramp a. Architectural Working Drawings
d. Sidewalk b. Building Permit
c. Structural Detailing
d. Transfer Certificate of Title

2|P ROF ESSI ON AL PRAC TICE

You might also like