Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 6

NOM Building Element 1.

Qlassic (CIS: 7) Side Condetion Remarks


Comments
FLOOR
1. I. Finishing Compliance

Finishing

 No stain Mark In compliance

Stain Mark
 Consistent Compliance
Colour tone

Consistent
colour tone
II. Alignment and Compliance
Evenness
 Evenness of
surface

Evenness of
surface
 Falls in wet Compliance
areas should be
in right direction

Falls in wet
areas
III. Cracks and Damages In compliance
 No visible
damages/defect
s

damages
IV. Hollowness/ In compliance
Delamination
 No hollow sound
when tapped

Hollow
 No sign of In compliance
delamination

delamination
V. Jointing compliance
 Consistent
skirting
thickness and
no visible

 Edge to be compliance
straight and
aligned
NOM Building Element 1. Qlassic (CIS: 7) Side Condetion Remarks
Comments

DOOR
1. I. Joints and gaps Compliance

 Consistent gap
between bottom
of door leaf and
finished floor

 No visible gaps Compliance


between door
frame and wall

 Neat joints In compliance

untidy
 Consistent gap compliance
between door
leaf and frame

ii. Alignment and Evenness compliance


 Aligned and
level with walls

 Door leaf and compliance


frame cornes
maintained at
right angles
 No ratting sound In compliance
when the door is
closed

Ratting sound
iii. Materials and Damages In compliance
 No stain mark
and any visible
damages

Stain mark
 No sags, warps compliance
on door leaf

 Door joints and compliance


nail holes filled
up

 No sign of In compliance
corrosion

corrosion
 Good painwork compliance
(including top
and bottom of
door left)
iv. functionality In compliance
 Ease in
opening, closing
and locking

The lock not


function
v. Accessories Defects compliance
 For timber
frame, no
additional timbe
strip added for
site adjustment
should be
detected

You might also like