A B C

7.15 A B C
3.00 4.15 3.00 7.15

1.02
4.15 3.00

WF WF ROOF LINE ROOF LINE

WF WF
TRUSS 1

1 1 RB1 RB1
F1 C1 GB1 F1 C1 GB1 F1 C1

ROOF LINE

ROOF LINE
2.20
GB1

GB1

RB1
3.00
GB1

RB1

RB1
3.00

WF WF
2.60

WF

6.00
2
6.00

0.45
RB1
0.45

F1 C1 TRUSS 1
GB1

3 F1 C1 GB1 F1 C1 3 RB1

S1

RB1
GB1

2.55

RB1

RB1
2.55

GB1

GB1

ROOF LINE

ROOF LINE
TRUSS 1
WF
4 4 RB1 RB1
F1 C1 GB1 F1 C1 GB1 F1 C1

RB2

RB2
1.40
1.40

GB2

GB2
RB2
5 5 TRUSS 2
ROOF LINE

F2 C2 GB2 F2 C2

ROOF LINE

1 FOUNDATION PLAN 2 ROOF FRAMING PLAN


S 2 SCALE 1:100 M S 2 SCALE 1:100 M

SHORT DIR #16@300 C/C #16@300 C/C

LD
C21:Fy415

COLUMN LINKS
#16@300 C/C (B)
LONG DIR #16@300 C/C #16@300 C/C

D,d 250 250


#16@300 C/C (B)
SIZE 1000 x 1000 800 x 800
LENGTH

#16@300 C/C (B)


COLUMNS
F1 F2
MARKED DEPTH

3 FOOTING SCHEDULE #16@300 C/C (B)


S 2 SCALE NTS WIDTH

WIDTH

STRUCTURAL/ CIVIL ENGINEER PROJECT TITLE APPROVED BY: DRAFTED BY: RSA SHEET CONTENTS SET NO. SHEET NO.

PLOTTED BY: RSA FOUNDATION PLAN

RSA REEJOY S. ANDRIN,ce CONSTRUCTION OF ONE - STOREY


ROOF FRAMING PLAN
5 11
Design and Build CIVIL ENGINEER MR. JESSIE JAY ANO-OS DATE: 11/25/2023 FOOTING SCHEDULE AND DETAILS
S2 S4
RESIDENTAL BUILDING OWNER CHECKED BY: -
PRC: 0146128 PTR: 7464130
FINAL CON. DOC.
DATE: 12/12/2023 DATE: 01/06/2022
ADDRESS: SANGI, BRGY. LILOAN, ORMOC CITY ADDRESS: SANGI, BRGY. LILOAN, ORMOC CITY CLIENT: - STRUCTURAL DATE : 11/25/2023