1. Inspection
2. Predictive maintenance
3. Cleaning
4. Tightening
5. Operate
6. Adjustment
Common associated tasks
7. Take readings
1. Operation Condition
8. Lubrication
2. Adequate Maintenance
9. Schedule replacement PM System Maintainability Improvement
3. With Better Protection
10. Interview Operators
11. Analysis
1. Extend the life of an asset
1. Utilization
Series of tasks for 2. Detect that an asset has had critical
2. Wealth cycle
1. Through the PM efforts and other approach PM Strategy for 3 Equip Life Cycle
3. Breakdown cycle
2. fail because any tasks force trying to change from a fire-fighting operation
4. Tightening
1. Can work alone Common Tasks
5. Operate
2. Interested new advance technology
6. Adjustment
3. Know how to review unit history
7. Take Readings
4. Proactive in style if mechanic is reactive Six attributes of great PM inspector
5. Must be highly trained
1. Detect the location of critical wear point/potential failure
6. Full time and separated from maintenance crew
Purpose of PM 2. Defer critical wear or potential failure
3. The PM attitude needs the support of management in form of listening to the Strategies to get PM done 2. String Based PM
inspector and solving PM Task Lists 3. Future benefit PM
4. Condition Based PM
1. Political Problem
3. Jika jam actual lebih kecil dari yang diminta maka ada yang harus 1. PM Maintenance hours/materials
dinegosiasikan Next Follow Up
2. Corrective Maintenance hours/materials
4. Cari usaha untuk mengatasi kendala yang ada agar kegiatan maintenance
efektif dan efisien 3. User Maintenance hours/materials
1. Membuat daftar asset yang akan dimaintenance Permintaan Kegiatan Maintenance 5. Replacement Maintenance hours/materials
2. Tambahkan area plant dan site yang akan di maintenance 6. Social Demand
6. Tambahkan satu garis global untuk social, expansions, dan catasthrope Mengelompokkan permintaan pekerjaan maintenance berdasarkan unsur
pokoknya seperti menurut asset/lokasinya
demands How to start How to start zero based budget
7. Buat file backup dan update secara rutin
9. Review perkiraan biaya dan hours dari CM, PM, UM, RM dan SM
Maintenance Budgeting 1. Maintenance cost per foot building or facilities (MB/ft2)
6. Catasthrope Demand
1. Cost of production downtime
2. Maintenance Scheduling 1. Documentation (Store Requisition, Inventory Record, Physical Inventory etc.)
3. Quantity Purcashing 2. Decision Making (what to stock, order points, order quantity etc)
Principles of Maintenance Store Control
4. Equipments, parts, and materials standarization 3. Inventory Level (min-max)
1. Major Spare (Spare Parts) Disadvantages 2. Stores inventory control redirected by production and may closely fit to
maintenance needs
2. Normal Maintenance Stock