PART 1 - GENERAL
½
__ ________ _
¾ DATE: ________ E. Section 01352 LEED Requirements
PROJECT
ENGINEER
F. Section 01524 Construction Waste Management
____________
DATE
CONSTRUCTION
AGENCY
B. Section 03200 Concrete Reinforcement
________________
DATE: C. Section 04100 Mortar and Masonry Grout.
OPERATIONS
______________ D. Section 07920 Sealant and Caulking
DATE:_________
1.04 REFERENCES
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
structures,
Appendix-A.
SECTION 04340
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
CERT
ENG’G
SAUDI ARAMCO OIL COMPANY
½
__ ________ _
¾ DATE: ________ A307 Carbon Steel Externally Threaded Standard
PROJECT Fasteners
ENGINEER
____________
DATE A616 Rail Steel Deformed and Plain Bars for Concrete
CERTIFIED Reinforcement
CONSTRUCTION
AGENCY
C90 Hollow Load-Bearing Concrete Masonry Units
________________
DATE: C140 Standard Methods of Sampling and Testing
OPERATIONS Concrete Masonry Units
______________
DATE:_________
F. International Masonry Industry All-Weather Council (IMIAC)
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
Masonry Construction.
Date:
By:
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
J. Green Seal Standard GS-11 – for Commercial Flat and Non-flat Paints
Architectural Coatings
1.05 SUBMITTALS
B. Product Data: Provide data for masonry units and other manufactured
DATE JOB/EWO
products.
½
__ ________ _
¾ DATE: ________ F. A tabulation of each material used on the project that is being tracked for
PROJECT recycled content. The tabulation must include the following:
ENGINEER
1. Description of the material,
____________
DATE 2. Material manufacturer
CERTIFIED 3. Product cost
4. Pre-consumer and/or post-consumer recycled content percentage,
_ __________ 5. Source of the recycled content data.
DATE: ________
CONSTRUCTION
AGENCY
G. A tabulation of each material used on the project that is being tracked for
________________
regional content. The following information to be included:
DATE: 1. Product name for each tracked material;
OPERATIONS 2. Material manufacturer;
______________ 3. Total product cost for each tracked material;
DATE:_________
4. Percentage of product, by weight, that meets both the extraction
and manufacture criteria;
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
site;
6. Distance between the project site and the final manufacturing
Date:
By:
location.
OF THIS DRAWING IS COVERED, FOR ALL
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
J. Provide a listing of each indoor paint and coating used on the project.
Include the following information:
1. Manufacturer’s name,
2. Product name,
3. Specific VOC data (in g/L, less water) for each product,
4. Corresponding allowable VOC from the referenced standard.
DATE JOB/EWO
CONSTRUCTION
AGENCY
A. Provide mockup of composite masonry under provisions of Section
________________
01400.
DATE:
OPERATIONS B. Construct a mockup of masonry into panel size of 3.0 meters long by
______________ 3.0 meters high by full thickness, including mortar accessories and
DATE:_________
suitable footing to support the wall. Masonry construction shall not
proceed until the sample panel is accepted by SAUDI ARAMCO
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
been selected and approved to show color range and maximum texture
range. The mockup shall demonstrate bond, mortar, tooling of joints
Date:
By:
work.
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
1.10 COORDINATION
ENG’G
PART 2 - PRODUCTS
DESCRIPTION
2.01 MANUFACTURERS
A. Hollow Load Bearing Block Units (CMU): ASTM C90, Type II, Grade-N
in accordance with 09-SAMSS-016.
REV.
NO.
B. Size and Shape: Refer to Contract Drawings for size. Provide special
DISCIPLINE
ENGINEER units for 90 degree corners, bond beams, and lintels.
½
__ ________ _
¾ DATE: ________ 2.03 REINFORCEMENT AND ANCHORAGE
PROJECT
ENGINEER
A. Reinforcing Bars: Epoxy Coated - ASTM A616, 420 MPa yield grade.
____________
DATE Use deformed bars, unless otherwise indicated on the Contract
CERTIFIED Drawings. Reinforcing bar shall conform to Section 03200.
_ __________ B. Embedded bolts ASTM - A307, or ASTM A325 galvanized per ASTM
DATE: ________
A153.
CONSTRUCTION
AGENCY
________________
C. Door jamb and Head Accessories: See Section 08112.
DATE:
2.05 FLASHING
OF THIS DRAWING IS COVERED, FOR ALL
SECTION 04340
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
PART 3 - EXECUTION
DESCRIPTION
3.01 EXAMINATION
A. Verify that field conditions are acceptable and are ready to receive
work.
B. Verify items provided by other sections of work are properly sized and
located.
DATE JOB/EWO
C. Verify that built-in items are in proper location, and ready for roughing
into masonry work.
3.02 PREPARATION
REV.
NO.
½
__ ________ _
¾ DATE: ________ B. Provide temporary bracing during installation of masonry work.
PROJECT Maintain in place until building structure provides permanent bracing.
ENGINEER
____________
DATE 3.03 COURSING
CERTIFIED
A. Establish lines, levels, and coursing indicated. Protect from displacement.
_ __________
DATE: ________ B. Maintain masonry courses to uniform dimension. Form vertical and horizontal
CONSTRUCTION joints of uniform thickness.
AGENCY
________________
DATE:
C. Concrete Masonry Units:
OPERATIONS
1. Bond : Running
______________
DATE:_________
2. Coursing : One unit and one mortar joint to equal 200mm or
or 250 mm per Contract Drawings.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
modified by SAES-M-100.
SECTION 04340
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
B. Lay hollow masonry units with face shell bedding on head and bed
joints.
CERT
permitted.
E. Erect adjoining walls simultaneously. Do not erect walls more than five
DESCRIPTION
feet above adjoining walls. Cover and protect the tops of unfinished
walls.
F. Do not shift or tap masonry units after mortar has achieved initial set.
Where adjustment must be made, remove mortar and replace.
G. Perform job site cutting of masonry units with proper tools to provide
straight, clean, unchipped edges. Prevent broken masonry unit corners
DATE JOB/EWO
or edges.
H. Generally, mortar joints shall be concave. Cut mortar joints flush where
wall tile is scheduled and cement purging is required.
REV.
NO.
I. Care shall be taken to prevent grout and mortar stains. Keep wall
DISCIPLINE
ENGINEER continually clean, if grout does not run over, clean immediately.
½
__ ________ _
¾ DATE: ________ 3.05 REINFORCEMENT AND ANCHORAGE
PROJECT
ENGINEER
A. Install horizontal and vertical reinforcement as specified on Contract
____________
DATE Drawing in accordance with UBC Section 2107.2.2 except as modified
CERTIFIED by SAES-M-100.
steel reinforcing dowels, projecting from the foundation. Fill cells with
EDSD
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
horizontal joints of masonry walls. Fill cell below and above anchor with
mortar. Horizontally space anchors in first and last masonry coarse and
40 cm. (16 in.) o.c. in between.
DESCRIPTION
3.07 LINTELS
½
__ ________ _
¾ DATE: ________ E. Allow masonry lintels to attain specified strength before removing
PROJECT temporary supports.
ENGINEER
____________
DATE 3.08 ENGINEERED MASONRY
CERTIFIED
A. Mortar joint shall be approximately 10 mm thick for concrete masonry
_ __________ units.
DATE: ________
CONSTRUCTION
AGENCY
B. Reinforce masonry unit cores with reinforcement bars and grout as
________________
indicated.
DATE: C. Retain vertical reinforcement in position at top and bottom of cells and
OPERATIONS at intervals not exceeding 200 bar diameters.
______________
DATE:_________
D. Do not wet masonry unit surfaces in contact with grout prior to grout
placement.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
E. Grout spaces less than 50 mm in width with Fine grout using low lift
grouting techniques. Grout spaces 50 mm or greater in width with
Date:
By:
F. When grouting is stopped for more than one hour, terminate grout 38
mm below top of upper masonry unit to form a positive key for
REVISION CERTIFICATION
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
G. Low Lift Grouting: Place first lift of grout to a height of 400 mm and rod
for grout consolidation. Place subsequent lifts in 200 mm increments
CERT
2. Clean out masonry cells with high pressure water spray. Permit
complete water drainage.
units.
½
__ ________ _
¾ DATE: ________ I. Cure walls by damping for two days by Fog Spray. For high-lift grouted
PROJECT construction, masonry walls shall cure at least three days before
ENGINEER
pouring grout per SAES-M-100.
____________
DATE
_ __________ A. As work progresses, install built-in metal door and frames, window
DATE: ________
frames, wood nailing strips, anchor bolts, plates, and other items to be
CONSTRUCTION
AGENCY
built in the work and furnished by other sections.
________________
DATE: B. Install built in items plumb and level.
OPERATIONS
______________ C. Do not build-in organic materials subject to deterioration.
DATE:_________
3.10 TOLERANCES
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
m; 13 mm in 9 m.
ENG’G
A. Cut and fit for chases, pipes, conduit, sleeves, and grounds.
Coordinate with other sections of work to provide correct size, shape,
and location.
3.12 CLEANING
DATE JOB/EWO
PROJECT E. Surfaces shall be free of all foreign matter which would inhibit bonding
ENGINEER
of cement plaster covered under Section 09220 and paint per 09900.
____________
DATE
CONSTRUCTION
AGENCY
B. Without damaging completed work, provide protective boards at
________________
exposed external corners that may be damaged by construction
DATE: activities.
OPERATIONS
______________ C. Protect all sills, ledges and offsets for mortar dropping or other damage
DATE:_________
during construction.
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
Section 01400.
OF THIS DRAWING IS COVERED, FOR ALL
SECTION 04340
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
A. Use materials with recycled content such that the sum of post-consumer
recycled content plus one-half of the pre-consumer content constitutes a
ENG’G
total of at least 20%, based on cost, of the total value of the materials in
the project.
½
__ ________ _
¾ DATE: ________ All adhesives and sealants used on the interior of the building (defined as inside
PROJECT of the weatherproofing system and applied on-site) shall comply with the
ENGINEER
requirements of the following reference standards:
____________
DATE
CERTIFIED A. South Coast Air Quality Management District Rule 1168, 2005 –
Adhesives, Sealants and Sealants Primes VOC limits.
_ __________
DATE: ________
B. Green Seal Standard for Commercial Adhesives (GS-36), 2000 – Aerosol
CONSTRUCTION
AGENCY
Adhesives VOC limits.
________________
DATE: 3.19 PAINTS & COATINGS
OPERATIONS
______________ Paints and coatings used on the interior of the building (defined as inside of the
DATE:_________
weatherproofing system and applied on-site) shall comply with the following
criteria:
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
PMT
SAUDI ARAMCO OIL COMPANY
C. Clear wood finishes, floor coatings, stains, sealers, and shellacs applied
ENG’G
– Sealers: waterproofing sealers 250 g/L; sanding sealers 275 g/L; all
other sealers 200 g/L
– Shellac: clear 730 g/L; pigmented 550 g/L
– Stains: 250 g/L
DISCIPLINE
ENGINEER
½
__ ________ _
¾ DATE: ________
PROJECT
ENGINEER
____________
DATE
CERTIFIED
_ __________
DATE: ________
CONSTRUCTION
AGENCY
________________
DATE:
OPERATIONS
______________
DATE:_________
APPROVAL/CERTIFICATION REQUIREMENTS,, CONTROL NUMBER
VERIFICATION
EDSD
Date:
By:
OF THIS DRAWING IS COVERED, FOR ALL
SECTION 04340
CONSTRUCTION SPECIFICATIONS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT. NO. REV. NO.