Project Name : Talimarjan Thermal Power Plant Extension Project

Date/Revision Page

STRUCTURAL Risk Assessment


Work Activity Rev. No. 0
STEEL

Risk Assessment
Work Activity Break Down Risk Facts Risk Occurrence Occurrence Assess. Registry
Frequency Severity Grade

Falling of beams, column to personnel during transportation due to unsafe practices, improper
body injury
Transportation of steel structure at site lashing and strapping
Personnel hit by steel structures while loading and unloading hit by
Toppling of crane due to unsafe crane positioning and exceeding crane safe working load (SWL)
Toppling
limit.
Personnel hit by steel structures during erection due to non provision of tag line. hit by
Installation / erection of steel structures Collision of crane booms while performing tandem lift due to non availability of qualified and
collision
certified rigger.

Fall of structures from height due to unsafe rigging practices and poor quality and condition of
fall from height
lifting tools and tackles
Damaged power tools and cables insulation causing electric shock to workers. electric shock
Structural alignment and bolt tightening Hands caught in between beams or columns, man basket and structure while tightening the bolts. caught in betweeen
Personnel hit by falling bolts, washers and loose hand tools while doing bolts tightening works. fall from height

Grade(Dangerous degree):A(9),B(6),C(4),D(3),E(2),F(1)
Project Name : Talimarjan Thermal Power Plant Extension Project

Date Page
Risk Assessment Registry
Work Activity STRUCTURAL STEEL Rev. No. 0

Risk Assessment
Assessment
Work Activity Break Down Risk Facts Control Measures
Grade Occurrence Occurrence Assessment
Frequency Severity Grade
Always follow safe lifting procedure
Provide tagline during lifting of steel structure
Transportation of steel
Personnel hit by steel structures while loading and unloading Install barricade on the area where lifting activities shall be conducted
structure at site
Qualified, certified and trained riggershall be assign to give signals on lifting
operation

Qualified, certified and trained riggershall be assign to give signals on lifting


operation
Installation / erection of steel Collision of crane booms while performing tandem lift due to non
Provide refresher training on all operator and rigger
structures availability of qualified rigger
Conduct daily inspection on all equipment and maintain crane checklist
Always follow safe lifting procedure

Inspection and color coding of all electrical and power tools shall be conducted
daily before starting any job.

Damaged power tools and cables insulation causing electric shock to Provide competent and trained electrician for all electricla connection works
workers
Cables with damaged insulation and unsafe tools shall be removed at site
Structural alignment and bolt immediately
tightening
Provide proper earthing and grounding system on all equipment
Secure the area by close barricade
Personnel hit by falling bolts, washers and loose hand tools while
doing bolt tightening works. Do not allow personnel to pass / work under the structure where lifting / bolting
works is on progress