JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
TABLE OF CONTENTS
1 Objective ............................................................................................................................. 3
2 Geometry ............................................................................................................................. 3
3 FEM Model........................................................................................................................... 4
5 Loads ................................................................................................................................... 6
5.1 Self-Weight ........................................................................................................................... 6
5.2 Super Dead .......................................................................................................................... 6
5.3 Formwork Load ..................................................................................................................... 7
5.4 Live Load .............................................................................................................................. 7
5.5 Wind Load ............................................................................................................................ 8
Page | 2
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
1 OBJECTIVE
The objective of report to present conceptual structure analysis and design of precast concrete wall for
power house faced
2 GEOMETRY
Page | 3
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
3 FEM MODEL
A 3D FEM Model have been carried out using Sap2000, the precast wall elements modeled as shell
elements with thickness as mention in drawings.
Lateral restraint
Lateral restraint
Point
Point
Vertical Spring
Page | 4
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
4 MARTIAL DEFINITION
4.1 CONCRETE
Page | 5
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
4.2 REINFORCEMENT
5 LOADS
5.1 SELF-WEIGHT
The Self weight of the wall will be calculated automatically by software
Page | 6
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
Weightless Steel
members to simulate
formwork action on wall
Figure 2: Formwork load left side Figure 1:Formwork Load Right Side
Page | 7
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
Page | 8
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
6 LOAD COMBINATION
TABLE: Combination Definition
ScaleFac
ComboName ComboType CaseType CaseName Notes
tor
Text Text Text Text Unitless Text
Linear Static DEAD 1.2
Linear Static Wind 1
Linear Static DEAD 1.4
Construction Stage 1 Linear Add Dead Only; Strength
Linear Static Super Dead 1.4
Linear Static Formwork L 1.4
Linear Static Formwork R 1.4
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2
Construction Stage 2 Linear Add Dead + Live; Strength
Linear Static Formwork R 1.2
Linear Static Live Load L 1.6
Linear Static Live Load R 1.6
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2
Dead + Live+wind;
Construction Stage 3 Linear Add Linear Static Formwork R 1.2
Strength
Linear Static Live Load L 1
Linear Static Live Load R 1
Linear Static Wind 1
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2
Dead + Live-wind;
Construction Stage 4 Linear Add Linear Static Formwork R 1.2
Strength
Linear Static Live Load L 1
Linear Static Live Load R 1
Linear Static Wind -1
Linear Static DEAD 0.9
Linear Static Super Dead 0.9
Dead (min) + Wind;
Construction Stage 5 Linear Add Linear Static Formwork L 0.9
Strength
Linear Static Formwork R 0.9
Linear Static Wind 1
Linear Static DEAD 0.9
Linear Static Super Dead 0.9
Dead (min) - Wind;
Construction Stage 6 Linear Add Linear Static Formwork L 0.9
Strength
Linear Static Formwork R 0.9
Linear Static Wind -1
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Construction Stage 7 Linear Add Dead + Live; Strength
Linear Static Formwork L 1.2
Linear Static Live Load L 1.6
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2 Dead + Live(one
Construction Stage 8 Linear Add
Linear Static Formwork R 1.2 side)+wind; Strength
Linear Static Live Load L 1
Linear Static Wind 1
Page | 9
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
Page | 10
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
The Minimum Bearing Stress 21kN/m2 No tension -full contact between concrete faces
Page | 11
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
Page | 12
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project
Page | 13