Julius Nyerere Hydropower Project - JNHPP


Originator Third
JV Review
party Review Date Reviewed by Date Reviewed by

00 2019-05-28 Issued for Approval M.


Rev. Date Details of revision Created Checked Approved

Scale NTS Size A4 Origin. No. xxxx-xxx-&xxxxxx-xxxxxx Rev. 00 Contract No. 7001

Originator Document Title

Power House - Precast Concrete Wall


Conceptual Structural Design
Rev.
Document No.

AAA-AAANNN-AAA-&AAANNN-NNNNNN 00
Page
Copyright © JV. of The Arab Contractors & Elsewedy Electric All rights reserved. The reproduction, disclosure or use of
this document or its contents is forbidden without express written authority from The Arab Contractors & Elsewedy Electric. 1/00
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

TABLE OF CONTENTS
1 Objective ............................................................................................................................. 3

2 Geometry ............................................................................................................................. 3

3 FEM Model........................................................................................................................... 4

4 Martial definition ................................................................................................................. 5


4.1 Concrete ............................................................................................................................... 5
4.2 Reinforcement ...................................................................................................................... 6

5 Loads ................................................................................................................................... 6
5.1 Self-Weight ........................................................................................................................... 6
5.2 Super Dead .......................................................................................................................... 6
5.3 Formwork Load ..................................................................................................................... 7
5.4 Live Load .............................................................................................................................. 7
5.5 Wind Load ............................................................................................................................ 8

6 Load Combination .............................................................................................................. 9

7 Analysis & Design Result ................................................................................................. 11


7.1 Bearing Stress .................................................................................................................... 11
7.2 Wall Reinforcement ............................................................................................................ 12
7.3 Anchor Bolt Design ............................................................................................................ 13
7.4 Mechanical Anchor Design ................................................................................................. 13

Page | 2
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

1 OBJECTIVE

The objective of report to present conceptual structure analysis and design of precast concrete wall for
power house faced

2 GEOMETRY

Page | 3
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

3 FEM MODEL

A 3D FEM Model have been carried out using Sap2000, the precast wall elements modeled as shell
elements with thickness as mention in drawings.

Lateral restraint
Lateral restraint
Point
Point

Wall Thickness 150mm

Vertical Spring

Page | 4
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

4 MARTIAL DEFINITION

4.1 CONCRETE

Allowable bearing Stress= 0.35.fc`=0.35x20=7 MPa=7000kN/m2

Assumed Spring Bearing Stiffness = 200000 kN/m/m2

Page | 5
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

4.2 REINFORCEMENT

Allowable Shear stress for Anchor Bolts =0.20. Fu=0.2x500=100MPa (ASD)

5 LOADS

5.1 SELF-WEIGHT
The Self weight of the wall will be calculated automatically by software

5.2 SUPER DEAD


Super dead presenting weight of the above
casted beam

SD=0.9mx25kN/m3=22.5 kN/m2 Acting


above precast wall

Page | 6
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

5.3 FORMWORK LOAD


The formwork weight is assumed 5kN/m acting form both wall side with eccentricity 1.00 from wall
centerline

Weightless Steel
members to simulate
formwork action on wall

Figure 2: Formwork load left side Figure 1:Formwork Load Right Side

5.4 LIVE LOAD


The live load action on working platform assumed 5kN/m acting form both wall side with eccentricity
1.00 from

Figure 3:Live Load Right Side


Figure 4:Live Load left Side

Page | 7
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

5.5 WIND LOAD


The resulting design wind pressure is 1.093 kN/m² as per “7000-SME410-UME-CDF010-111070-
Powerhouse Superstructure Blockwork Walls Design Report “

Page | 8
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

6 LOAD COMBINATION
TABLE: Combination Definition
ScaleFac
ComboName ComboType CaseType CaseName Notes
tor
Text Text Text Text Unitless Text
Linear Static DEAD 1.2
Linear Static Wind 1
Linear Static DEAD 1.4
Construction Stage 1 Linear Add Dead Only; Strength
Linear Static Super Dead 1.4
Linear Static Formwork L 1.4
Linear Static Formwork R 1.4
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2
Construction Stage 2 Linear Add Dead + Live; Strength
Linear Static Formwork R 1.2
Linear Static Live Load L 1.6
Linear Static Live Load R 1.6
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2
Dead + Live+wind;
Construction Stage 3 Linear Add Linear Static Formwork R 1.2
Strength
Linear Static Live Load L 1
Linear Static Live Load R 1
Linear Static Wind 1
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2
Dead + Live-wind;
Construction Stage 4 Linear Add Linear Static Formwork R 1.2
Strength
Linear Static Live Load L 1
Linear Static Live Load R 1
Linear Static Wind -1
Linear Static DEAD 0.9
Linear Static Super Dead 0.9
Dead (min) + Wind;
Construction Stage 5 Linear Add Linear Static Formwork L 0.9
Strength
Linear Static Formwork R 0.9
Linear Static Wind 1
Linear Static DEAD 0.9
Linear Static Super Dead 0.9
Dead (min) - Wind;
Construction Stage 6 Linear Add Linear Static Formwork L 0.9
Strength
Linear Static Formwork R 0.9
Linear Static Wind -1
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Construction Stage 7 Linear Add Dead + Live; Strength
Linear Static Formwork L 1.2
Linear Static Live Load L 1.6
Linear Static DEAD 1.2
Linear Static Super Dead 1.2
Linear Static Formwork L 1.2 Dead + Live(one
Construction Stage 8 Linear Add
Linear Static Formwork R 1.2 side)+wind; Strength
Linear Static Live Load L 1
Linear Static Wind 1

Page | 9
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

Linear Static DEAD 1.2


Linear Static Super Dead 1.2
Dead + Live(one
Linear Static Formwork L 1.2
Construction Stage 9 Linear Add side)+wind;
Linear Static Formwork R 1.2
Strength
Linear Static Live Load R 1
Linear Static Wind -1
Linear Static DEAD 1.2 Dead +wind;
Service Stage Linear Add Strength (Case of
Linear Static Wind 1
operating)
Response Combo Construction Stage 1 1
Response Combo Construction Stage 2 1
Response Combo Construction Stage 3 1
Response Combo Construction Stage 4 1
Response Combo Construction Stage 5 1
Envelope Envelope
Response Combo Construction Stage 6 1
Response Combo Construction Stage 7 1
Response Combo Construction Stage 8 1
Response Combo Construction Stage 9 1
Response Combo Service Stage 1
Linear Static Formwork L 1 Case to get
Max. Shear Force on Linear Static Live Load L 1 Maximum shear
Linear Add
Anchor (ASD) force on Anchor
Linear Static Wind 1
bolts

Page | 10
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

7 ANALYSIS & DESIGN RESULT

7.1 BEARING STRESS

The Maximum Bearing Stress 140kN/m2 <<<<< 7000 kN/m2

The Minimum Bearing Stress 21kN/m2  No tension -full contact between concrete faces

Page | 11
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

7.2 WALL REINFORCEMENT

Maximum required area


steel =254mm2 /m

Applied reinforcement 510/m = 392.2mm2/m.

Page | 12
JV. of The Arab Contractors and Elsewedy Electric Julius Nyerere Hydropower Project

7.3 ANCHOR BOLT DESIGN

 Maximum shear force per one bolt = 15.736/2=7.87kN.


 Area of the bolt = 7.87x1000/100=78.7mm2
 Required Diameter of the bolt =78.7x4/3.14=10.10mm
 Used bolt diameter is 16mm.

7.4 MECHANICAL ANCHOR DESIGN

 Maximum shear force per one anchor = 18.96/2=9.48kN.


 Consider 10% for accidental force =10.43 kN