Cost Estimate, Revised
Cost Estimate, Revised
"Detail Project Report and Geotechnical Investigation of Phocho das School, Dewanjung-6
Amount
S. N. Particulars Rate (Rs) No. Remarks
Manday Amount (Rs)
1 Desk Study
1.1 Team Leader 3,106.15 1.00 2.00 6,212.31
1.2 Structure Engineer 2,768.46 1.00 2.00 5,536.92
1.3 Geotechnical Engineer 2,768.46 1.00 2.00 5,536.92
1.4 Architect 2,768.46 1.00 2.00 5,536.92
1.5 Civil Engineer 2,768.46 1.00 2.00 5,536.92
1.6 Draftman 1,988.46 1.00 2.00 3,976.92
1.7 Surveyor 1,988.46 1.00 2.00 3,976.92
1.8 Helper 749.23 1.00 2.00 1,498.46
Sub-Total 37,812.31
2 Field Works (Survey Works)
1.1 Team Leader 3,106.15 1.00 3.00 9,318.46
1.2 Structure Engineer 2,768.46 1.00 3.00 8,305.38
1.3 Geotechnical Engineer 2,768.46 1.00 3.00 8,305.38
1.4 Architect 2,768.46 1.00 3.00 8,305.38
1.5 Civil Engineer 2,768.46 1.00 3.00 8,305.38
1.6 Draftman 1,988.46 1.00 3.00 5,965.38
1.7 Surveyor 1,988.46 1.00 3.00 5,965.38
1.8 Helper 749.23 3.00 3.00 6,743.08
Sub-Total 61,213.85
3 Office Work (Design, Report Preparation)
1.1 Team Leader 3,106.15 1.00 28.00 86,972.31
1.2 Structure Engineer 2,768.46 1.00 14.00 38,758.46
1.4 Architect 2,768.46 1.00 24.00 66,443.08
1.5 Civil Engineer 2,768.46 1.00 15.00 41,526.92
1.6 Draftman 1,988.46 2.00 12.00 47,723.08
1.7 Surveyor 1,988.46 1.00 14.00 27,838.46
1.8 Helper 749.23 1.00 28.00 20,978.46
Sub-Total 330,240.77
Total of Manpower 429,266.92
Detail Project Report and Geotechnical Investigation of Phocho das School, Dewanjung-6
"Detail Project Report and Geotechnical Investigation of Phocho das School, Dewanjung-6"
Page 3 of 6
, Dewanjung-6"
Remarks
Page 4 of 6
Drilling of boreholes and carryout specified Field and Laboratory tests as per the TOR
ITEM Percussion drilling in soil /sand and take continuous soil /sand core to a depth below ground level with Percussion drill bits
including Sample Collector all complete as directed
ITEM
Sieve Analysis, Hydrometer Analysis, Atterberg's limit, Specific Gravity, Natural Moisture Content, Direct Shear Test
Conducting SPT at 1.5m interval using autotrip hammer system including collection of samples, sealing etc. Retreiving
undisturbed Samples for consolidation and shear strength tests per BH
Unit LS
Rate per set 9000.00
Dewangunj Rural Municipality
Office of the Rural Municipal Executive
Sunsari
Province No 1,Nepal
Bill 0f Quantities
S.N. Description Quantity Unit Rate Total Amount Remarks
Project:Janta Ma. Vi. Soil test , Dewanjung-1
1 60 m 6680.95 400,857.00
Total 400,857.00
Discount
Vat @ 13% 52,111.41
Grand Total 452,968.41
In Words