Professional Documents
Culture Documents
Vet Hospital Structure Combined
Vet Hospital Structure Combined
HOSPITAL
A B C
4.50 4.00
2.10 2.10 A B
2.10 C
4.00
2.10
2.10
0.75
0.75
1 1 1.80
4.50
1.80 1.80
1.80
1.80
1.80
1 1
0.75 0.75 0.75 F1 F1 F1
4.52
4.52
2.10 2.10 2.10
5.11
5.11
2.10
2.10
0.75
0.75
2 2 1.80 1.80 1.80
1.80
1.80
1.80
2 2
F1 F1 F1
0.75 0.75 0.75
4.50
4.50
2.10 2.10 2.10
4.50
3.90
2.10
2.10
0.75
0.75
1.80
1.80
1.80
2.13
2.13
3 3
F1 F1 F1
2.13
2.13
2.10
0.75
0.75
2.10
4 4
1.80
1.80
1.80
4 4
F1 F1 F1
2.10 2.10 2.10
1.80 1.80 1.80
4.50 4.00
4.50 4.00
A B C A B C
TRENCH LAYOUT PLAN FOOTING LAYOUT PLAN
TIE BEAM SIZE: (250X300)mm
DESIGN BY:
OWNER PROJECT: CONSULTANT: REVISION:
TITLE: TRENCH LAYOUT PLAN AND
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL FOOTING LAYOUT PLAN Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-01
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
1800
1800
F1
S
F1
S
16mmØ @150mm c/c
FOOTING PLAN F1
Column Bar F1 1800 1800 450 2000 16Ø @150mm C/C 16Ø @150mm C/C
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: FOOTING SECTION AND FOOTING REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL SCHEDULE Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-02
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
A B C
4.00
4.50
1 1
C1 C1 C1
5.11
5.11
COLUMN DETAILS OF BUILDING
C2 C2 C2 CONCRETE GRADE: M20 STEEL GRADE: TMT Fe 500
2 2
IN (h+z) IN(H-2h)
3.90
350 350
Ø8@4"c/c Ø8@6"c/c
C1 1. C1 (350*350)mm +
350
350
C2 C2
3 3 8-20Ø 8-20Ø
2.13
2.13
350 350
C2 C2 C2 Ø8@4"c/c Ø8@6"c/c
2. C2 (350*350)mm +
350
350
4 4
4-20Ø 4-20Ø
4-16Ø 4-16Ø
4.50 4.00
A B C
COLUMN LAYOUT PLAN
COLUMN SIZE: (350X350)mm
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: COLUMN LAYOUT PLAN AND REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL COLUMN SCHEDULE Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-03
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
A B C
A B C
4.00
4.50
4.50 4.00
1 P.B P.B
1
M.B
M.B
5.11
P.B
P.B
P.B
M.B
S.B S.B S.B
VOID
4.52
5.11
M.B
M.B
S.B
2 P.B P.B
2
M.B M.B M.B
2 2
P.B
P.B
P.B
4.50
M.B
M.B
M.B
3.90
S.B S.B S.B
4.50
3.90
S.B
M.B
M.B
M.B
P.B P.B
3 3
M.B M.B M.B
3 3
2.13
2.13
P.B
P.B
P.B
2.13
2.13
P.B P.B
S.B
4 4
M.B M.B M.B
4 4
4.50 4.00
A B C 4.50 4.00
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: PLINTH BEAM LAYOUT PLAN AND REVISION:
Amar Singh Pashu Bigyan Campus BEAM LAYOUT PLAN Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Office Of The Rural Municipal Executive CREDATION GROUP NEPAL
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-04
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
A B C
4.50 4.00
B C
1 M.B M.B M.B
1
4.00
M.B
M.B
S.B S.B S.B
1 M.B
1
4.52
4.52
M.B
VOID
M.B
M.B
M.B
M.B
S.B
4.52
4.52
2 2
M.B
M.B
M.B
M.B
M.B
S.B S.B S.B
4.50
4.50
M.B
2 2
S.B
M.B
M.B
M.B
4.50 4.00 B C
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: BEAM LAYOUT PLAN REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-05
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
PLINTH BEAM SECOUNDARY BEAM GROUND,FIRST AND TOP FLOOR
150
150
150
300
300
350
350
3-12Ø (TH ) 3-12Ø (TH )
2-16Ø (TH ) 2-16Ø (TH )
250 250
SECTION AT 1-1 S1=8Ø(4L) @ 100mm c/c 250 250
S1=8Ø(4L) @ 100mm c/c
S2=8Ø(4L) @ 150mm c/c SECTION AT 2-2 SECTION AT 3-3
S2=8Ø(4L) @ 150mm c/c S1=8Ø(4L) @ 100mm c/c S2=8Ø(4L) @ 150mm c/c
A B C A B C
4.50 4.00 4.00
1.00 1.00 4.50
1.00 1.00
2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH)
2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH)
2 1-16Ø(EX) 3 1-16Ø(EX) 2 2 1-16Ø(EX) 3 1-16Ø(EX) 2
T.F T.F
2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2
2-16Ø (TH )
2-16Ø (TH )
2-16Ø(TH) 2-16Ø(TH)
2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH)
2 1-16Ø(EX) 3 1-16Ø(EX) 2 2 1-16Ø(EX) 3 1-16Ø(EX) 2 2 1-16Ø(EX) 3 1-16Ø(EX) 2 2 1-16Ø(EX) 3 1-16Ø(EX) 2
G.F G.F
2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2
2-16Ø (TH ) 2-16Ø (TH ) 2-16Ø (TH ) 2-16Ø (TH )
3-12Ø(TH) 3-12Ø(TH)
3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH)
1 1 1 1 1 1 1 3-12Ø(TH)
1 3-12Ø(TH)
1 1 3-12Ø(TH)
1 3-12Ø(TH)
1
P.L P.L
1 3-12Ø (TH ) 1 3-12Ø (TH ) 1 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1
3-12Ø (TH ) 3-12Ø (TH ) 3-12Ø (TH ) 3-12Ø (TH )
1.125 1.90 1.125 1.00 1.70 1.00 1.125 1.90 1.125 1.00 1.70 1.00
S1 S2 S1 S1 S2 S1
S1 S2 S1 S1 S2 S1
150
150
150
300
300
350
350
3-12Ø (TH ) 3-12Ø (TH )
2-16Ø (TH ) 2-16Ø (TH )
250 250
SECTION AT 1-1 S1=8Ø(4L) @ 100mm c/c 250 250
S1=8Ø(4L) @ 100mm c/c
S2=8Ø(4L) @ 150mm c/c SECTION AT 2-2 SECTION AT 3-3
S2=8Ø(4L) @ 150mm c/c S1=8Ø(4L) @ 100mm c/c S2=8Ø(4L) @ 150mm c/c
A B C
4.50 4.00
G.F
2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 3-12Ø(TH)
2-16Ø (TH ) 2-16Ø (TH ) 3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH)
1 1 1 1 1 1
P.L
3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH)
3-12Ø(TH)
3-12Ø(TH) 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1
1 1 1 1 1 1 3-12Ø (TH ) 3-12Ø (TH )
P.L 1.125
S1
1.90
S2
1.125
S1
1.00
S1
1.70
S2
1.00
S1
GRID 3-3
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: BEAM CROSS SECTION AND REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL BEAM LONGITUDINAL SECTION Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-07
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
PLINTH BEAM SECOUNDARY BEAM GROUND,FIRST AND TOP FLOOR
150
150
150
300
300
350
350
3-12Ø (TH ) 3-12Ø (TH )
2-16Ø (TH ) 2-16Ø (TH )
250 250
SECTION AT 1-1 S1=8Ø(4L) @ 100mm c/c 250 250
S1=8Ø(4L) @ 100mm c/c
S2=8Ø(4L) @ 150mm c/c SECTION AT 2-2 SECTION AT 3-3
S2=8Ø(4L) @ 150mm c/c S1=8Ø(4L) @ 100mm c/c S2=8Ø(4L) @ 150mm c/c
1 2 3 4
4.52 4.50 2.13
1 2 3 4 1.13 1.13
4.52 4.50 2.13
T.F
1.13 1.13 1.125 1.125 0.51 0.53
1.125 0.51 0.53
2-16Ø(TH)
2-16Ø(TH)
2-16Ø(TH) 2-16Ø(TH)
2-16Ø(TH)
2-16Ø(TH)
1.125
2 1-16Ø(EX) 3 1-16Ø(EX) 2 2 1-16Ø(EX) 3 1-16Ø(EX) 2
F.F 2
2-16Ø(TH)
1-16Ø(EX)
2-16Ø(TH)
3
2-16Ø(TH)
1-16Ø(EX) 2 2
2-16Ø(TH)
1-16Ø(EX)
2-16Ø(TH)
3
2-16Ø(TH)
1-16Ø(EX) 2
2 2-16Ø (TH ) 3
2-16Ø (TH )
2-16Ø (TH ) 2 2 2-16Ø (TH ) 3
2-16Ø (TH )
2-16Ø (TH ) 2 F.F
2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2
2-16Ø (TH ) 2-16Ø (TH )
2-16Ø(TH) 2-16Ø(TH)
2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH)
2 1-16Ø(EX) 3 1-16Ø(EX) 2 2 1-16Ø(EX) 3 1-16Ø(EX) 2 2-16Ø(TH) 2-16Ø(TH) 2-16Ø(TH)
G.F 2
2-16Ø(TH)
1-16Ø(EX) 3
2-16Ø(TH)
1-16Ø(EX) 2 2
2-16Ø(TH)
1-16Ø(EX) 3
2-16Ø(TH)
1-16Ø(EX) 2
2-16Ø(TH) 2-16Ø(TH)
1-16Ø(EX)
2 3
1-16Ø(EX)
2
2 2-16Ø (TH ) 3
2-16Ø (TH )
2-16Ø (TH ) 2 2 2-16Ø (TH ) 3
2-16Ø (TH )
2-16Ø (TH ) 2 G.F
2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 2 2-16Ø (TH ) 3 2-16Ø (TH ) 2 3 2
2-16Ø (TH ) 2-16Ø (TH ) 2 2-16Ø (TH ) 2-16Ø (TH )
2-16Ø (TH )
3-12Ø(TH) 3-12Ø(TH)
3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH) 3-12Ø(TH)
1 1 1 1 1 1
P.L 1 3-12Ø(TH)
3-12Ø(TH)
1 3-12Ø(TH)
1 1 3-12Ø(TH)
1 3-12Ø(TH)
1 1
3-12Ø(TH) 3-12Ø(TH)
1 1
1 3-12Ø (TH ) 1
3-12Ø (TH )
3-12Ø (TH ) 1 1 3-12Ø (TH ) 1
3-12Ø (TH )
3-12Ø (TH ) 1 P.L
1.13 1.89 1.13 1.125 1.90 1.125 0.53 0.76 0.53 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1 1 3-12Ø (TH ) 1 3-12Ø (TH ) 1 1 1 13-12Ø (TH )
S1 S2 S1 S1 3-12Ø (TH ) 3-12Ø (TH ) 3-12Ø (TH ) 3-12Ø (TH )
S2 S1
1.13 1.89 1.13 1.125 1.90 1.125 0.53 0.76 0.53
GRID A-A S1 S2 S1 S1 S2 S1
GRID B-B
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: BEAM CROSS SECTION AND REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL BEAM LONGITUDINAL SECTION Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-08
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
PLINTH BEAM SECOUNDARY BEAM GROUND,FIRST AND TOP FLOOR
150
150
150
300
300
350
350
3-12Ø (TH ) 3-12Ø (TH )
2-16Ø (TH ) 2-16Ø (TH )
250 250
SECTION AT 1-1 S1=8Ø(4L) @ 100mm c/c 250 250
S1=8Ø(4L) @ 100mm c/c
S2=8Ø(4L) @ 150mm c/c SECTION AT 2-2 SECTION AT 3-3
S2=8Ø(4L) @ 150mm c/c S1=8Ø(4L) @ 100mm c/c S2=8Ø(4L) @ 150mm c/c
1 2 3 4
4.52 4.50 2.13
1.13 1.13
2-16Ø(TH)
2-16Ø(TH) 2-16Ø(TH)
2 1-16Ø(EX) 3 1-16Ø(EX) 2
T.F
2 2-16Ø (TH ) 3 2-16Ø (TH ) 2
2-16Ø (TH )
GRID C-C
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: BEAM CROSS SECTION AND REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL BEAM LONGITUDINAL SECTION Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-09
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
A B C
A B C
4.50 4.00
2.25 2.25 4.00
4.50 4.00
2.25 2.25 4.00
1 1
1 1
0.33
0.33
2.26
2.26
0.67 0.67 0.67 1.20
2.26
2.26
0.33
VOID
4.52
0.67
0.67
5.11
VOID
4.52
5.11
0.67
0.67
2.26
2.26
0.67 0.67 0.67 1.20
2.26
2.26
0.33
0.67
0.67
2 2 2 2
0.67
0.67
0.67
8mmØbars @ 150 mm c/c bothways
2.25
2.25
0.67 0.67 0.67 1.20
2.25
2.25
0.33 0.60
0.67
0.67
0.67
4.50
4.50
3.90
3.90
0.67
0.67
0.67
0.67 0.67 0.67 1.20
2.25
2.25
2.25
2.25
0.33 0.60
0.67
0.67
0.67
3 3 3 3
0.63
0.63
0.63
8mmØbars @ 150 mm c/c bothways
2.13
2.12
2.13
2.13
0.67 0.67 0.67 1.20
2.13
2.12
2.13
2.13
0.33 0.60
0.31
0.31
0.31
4 4 4
4
2.25 2.25
2.25 2.25 4.50 4.00
4.50 4.00
A B C
A B C
GROUND FLOOR SLAB REINFORCEMENT
GROUND FLOOR SLAB REINFORCEMENT TOP BAR LAYOUT PLAN
BOTTOM BAR LAYOUT PLAN SLAB THICKNESS :125mm
SLAB THICKNESS :125mm 8mmØ BAR@150mm c/c
8mmØ BAR@150mm c/c
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: SLAB REINFORCEMENT LAYOUT REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL PLAN Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-10
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
A B C
A B C
4.50 4.00
4.50 4.00
1 1 1 1
0.33
0.33
2.26
2.26
0.67 0.67 0.67 1.20
0.33
0.67
0.67
VOID
4.52
4.52
4.52
VOID
5.11
0.67
0.67
0.67 0.67 0.67 1.20
0.33
2.26
2.26
0.67
0.67
2 2 2 2
0.67
0.67
0.67
8mmØbars @ 150 mm c/c bothways 0.60
0.67 0.67 0.67 1.20
0.33
2.25
2.25
0.67
0.67
0.67
8mmØbars @ 150 mm c/c bothways
4.50
4.50
4.50
0.67
0.67
0.67
3.90
0.67 0.67 0.67 1.20 0.60
0.33
8mmØbars @ 150 mm c/c bothways
2.25
2.25
8mmØbars @ 150 mm c/c bothways
0.31
0.31
0.31
3 3
3 3
4.50 4.00
4.50 4.00
A B C
A B C
FIRST FLOOR SLAB REINFORCEMENT
FIRST FLOOR SLAB REINFORCEMENT TOP BAR LAYOUT PLAN
SLAB THICKNESS :125mm
BOTTOM BAR LAYOUT PLAN 8mmØ BAR@150mm c/c
SLAB THICKNESS :125mm
8mmØ BAR@150mm c/c
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: SLAB REINFORCEMENT LAYOUT REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL PLAN Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-11
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
B C B C
4.00
4.00
1 1 1 1
0.33
8mmØbars @ 150 mm c/c bothways
0.60
2.26
2.26
2.26
2.26
0.33
0.67
8mmØbars @ 150 mm c/c bothways
4.52
4.52
4.52
4.52
0.67
0.33 0.60
2.26
2.26
2.26
2.26
8mmØbars @ 150 mm c/c bothways
0.31
2 2 2 2
4.00
4.00
B C
B C
ROOF FLOOR SLAB REINFORCEMENT
ROOF FLOOR SLAB REINFORCEMENT TOP BAR LAYOUT PLAN
SLAB THICKNESS :125mm
BOTTOM BAR LAYOUT PLAN
SLAB THICKNESS :125mm 8mmØ BAR@150mm c/c
8mmØ BAR@150mm c/c
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: SLAB REINFORCEMENT LAYOUT REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL PLAN Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-12
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By:
A 4.50
B 4.00
C
8mmØbars@150mm c/c 8mmØbars@150mm c/c 8mmØbars@150mm c/c 8mmØbars@150mm c/c
1 2.13
2 4.50
3 4
4.52
8mmØbars@150mm c/c 8mmØbars@150mm c/c 8mmØbars@150mm c/c 8mmØbars@150mm c/c 8mmØbars@150mm c/c 8mmØbars@150mm c/c
4.00
12mm Ø @ 100mm c/c
1.30
WAIST SLAB: 200mm
4.52
1.71
8mm Ø @ 150 c/c
12mm Ø @ 100mm c/c
12mm Ø @ 100mm c/c
1.31
12mm Ø @ 100mm c/c
B C
8mm Ø @ 150 c/c
8mm Ø @ Nosing Bar
DESIGN BY:
OWNER PROJECT: CONSULTANT: TITLE: STAIR CASE SECTION REVISION:
Office Of The Rural Municipal Executive Amar Singh Pashu Bigyan Campus CREDATION GROUP NEPAL Drawn By: AR.AMRIT KARKI AND SITAL SAUD
Dewangunj Rural Municipality
Dewangunj,Sunsari
Tatha Aaspatal ko Bhawan, Dewangunj, PVT. LTD.
Sunsari Kathmandu Nepal
ST-14
Checked By:
Koshi Province, Nepal STRUCTURE DRAWING
DATE:
Approved By: