PM-Conduct of Works
PM-Conduct of Works
2 Conduct of work
3- Stop project
If the landlord/actress arrested project converts through formal
request approved by the owner or his representative to the
The receipt of the request for formal
Project Manager project manager who then turn the dial to the project 1
amendment
coordinator who shall review it and then convert it to the
implementation Manager
Implementation Manager in coordination with project
Director of
coordinator to study the cost of damage caused by the Study on the cost of the damage 2
implementation
disruption of the project, which will be charged to the owner
The Director of the transfer request to the Technical Director
Abstract Preparation of the extract of the work
Artistic Director for the infectious extracts prepared extract of the work carried 3
Qf-75-02-17 carried out
out which did not enter in the previous abstract
Director of The Director for the implementation of the transfer request to Distribution and keeping of demand 4
implementation the quality officer who saved and distributed copies of it to the
Director-General and his Deputy and the Chief Financial
Officer and Director of human resources, legal Director
Request the The manager shall prepare a request stop project and
Project
cessation of project converts it to the Director for approval to the project manager Prepare a request stop 5
Coordinator
Qf-75-02-21 to stop work on the project
4- The primary delivery site
After the completion of the project planned by the detailed
programme, the project manager informing the project
coordinator who then notifies the Department of quality control
Quality officer Project work 1
for previewing work that was
Preview and testing process will be in accordance with the
procedure of quality control in enterprisesQOP82-01
After all, quality Officer reviews project manager prepare a
By the end of the letter terminating the project works and converts it to the
Preparation and distribution of the letter of
project Project Manager project coordinator for information and documentation officer 2
termination of work
Qf-75-02-22 who shall seal and transferred to the consultant after sending
a copy of the letter to the Director of implementation
After receiving the reply and scheduling the primary business
receipt (each section is delivered with a separate date) Project
Project Manager Receiving primary delivery schedule 3
Manager software distribution to various departments to get
ready and prepare
Project Manager, Director or a representative to meet with the
consultant on schedule to deliver the work of the primary
Project Manager Primary receipt section 4
section, where the consultant examined the business and
ensure compliance
Project Manager In the event of a substantial block delivery notes, received a Closing remarks 5
letter from the advisory notes and decided to postpone the
delivery of sufficient duration and work to close these
observations
In the case of reviews does not impede project delivery or the
lack of reviews, the consultant receiving primary site from the
Minutes of the
project manager and the record is set up to receive primary,
receipt of the Preparation of minutes of receipt of primary
Project Manager indicating all the observations and determine the duration of 6
primary
the closure (if any) and adoption of the consultant and the
Qf-75-02-23
contractor and the owner's representative, as well as the
warranty period and date of final receipt of project
The consultant receiving comments in accordance with the
Delivery model
delivery model reviews the project manager prepared
reviews Project Manager Closing and delivery notes 7
The consultant after receiving notes the adoption form and
Qf-75-02-24
convert it to an owner's representative for approval
After the adoption of the project completion of primary
deliverables, the project coordinator convert a copy of the
Abstract Project
minutes of the receipt of technical director which notice Preparation of final extract 8
Qf-75-02-17 Coordinator
prepared extracts for the preparation of the final project
abstract
The Technical Director shall, in coordination with Department
Artistic Director managers involved in preparing the Guide to maintenance and Operation and maintenance manual site 9
operation of the site
Project Manager deliver the final abstract and formal advisory
Abstract
Project Manager guide to maintenance and operation of the site and final plans Delivery of the final project documents 1
Qf-75-02-17
as after adoption and stamped by the documentation officer
The recipient of If you receive a communication problem is properly manipulate Receive notification of a problem 1
it as a customer complaint according to a customer
the complaint
satisfactionQOP 72-02
5- Final receipt
After the warranty period, the project manager prepared a
By the end of the letter of completion of the warranty and converts it to the
Preparation and distribution of a finished
guarantee Project Manager project coordinator for information and documentation officer 1
work to ensure
Qf-75-02-25 who shall seal and transferred to the consultant after sending
a copy of the letter to the Director of implementation
After receiving the reply and scheduling of final receipt of work
(each section is delivered with a separate date) Project
Project Manager Receipt of final delivery schedule 2
Manager software distribution to various departments to get
ready and prepare
Project Manager, Director or a representative to meet with the
Project Manager consultant in time for delivery of the final section, where the Final receipt for the work section 3
consultant examined the business and ensure compliance
In the event of a substantial block delivery notes, received a
letter from the advisory notes and decided to postpone the
Project Manager Closing remarks 4
delivery of sufficient duration and work to close these
observations
In the case of reviews does not impede project delivery or the
lack of reviews, the consultant receiving site permanently from
Minutes of the
the project manager and the record of the final receipt Preparation of minutes of receipt of final
receipt of the last Project Manager 5
indicating all the observations and determine the duration of
Qf-75-02-26
the closure (if any) and adoption of the consultant and the
contractor and the owner's representative
Delivery model Project Manager The consultant receiving comments in accordance with the Closing and delivery notes 6
delivery model reviews the project manager prepared
reviews
The consultant after receiving notes the adoption form and
Qf-75-02-24
convert it to an owner's representative for approval
In the event of a communication after the expiration of the warranty period, it is treated as
Note:
a new project and a new decade