FCM-Earthing Drawing Rev 03 - Izarul Haq (2) - 202

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

H

c SMEC(MALAYSIA) SDN. BHD. UNIT 509 PHILEO DAMANSARA II, PETALING JAYA, SELANGOR, MALAYSIA

DRAWN: MIH DATE: APR 23 PROJECT: EPCC OF 6.7 MW GAS TURBINE CO-GENERATION SYSTEM AT FATTY
CHEMICAL (MALAYSIA) SDN BHD PRAI, PULAU PINANG
DESIGNED: MIH DATE: APR 23
MALAYSIA DRAWING TITLE: EARTHING & LIGHTNING PROTECTION SYSTEM
4.0 REVISED BASED ON SDES COMMENTS ON 26.04.23 MIH AMK 27.04.23
Unit 509 Block B, Phileo Damansara 2,
DESIGN CHK: AMK DATE: APR 23 LIGHTNING PROTECTION
Sime Darby Energy Solutions Sdn Bhd Fatty Chemical (M) Sdn Bhd
3.0 REVISED BASED ON SDES COMMENTS ON 04.01.23 MFJ AMK 11.01.23 Jalan 16/11, Section16, 46350 Petaling Jaya, Kompleks Kejuruteraan Tractors1, Jalan Puchong, 2510, Prai Industrial Complex (ROOF LAYOUT)
2.0 REVISED BASED ON SDES COMMENTS MFJ AMK 27.12.22 Selangor Darul Ehsan, Malaysia Taman Perindustrian Puchong Utama Lorong Perusahan Satu DRAFTING CHK: AMK DATE: APR 23 Sheet Size Drawing Status. Drawing No.
47100 Puchong, Selangor Rev.
13600,Prai, Pulau Pinang
1.0 TENDER MFJ AMK 21.12.22 Telephone : (60-3) 79550305 Telephone : (60-3) 8068 8000
CHECKED APPROVED DATE
Facsimile : (60-3) 79552110 Facsimile : (60-3) 8064 7767
Telephone : (60-4) 399 8500
Facsimile : (60-4) 390 3858
APPROVED: AMK DATE: APR 23 A1 TENDER 7050426/ELP/LAY/202 04
No REVISION

You might also like