DAILY PLUMBING TASKS

Priority List – November


Wednesday, 11/15/2023

72. PLUMBING DRAWINGS ARE AT NO TIME FULLY COMPLETED AND THERE MAY BE SOME ITEMS
THAT REQUIRE COORDINATION DURING CONSTRUCTION BASED ON FIELD CONDITIONS.
73. SUBSTITUTION REQUESTS DURING CONSTRUCTION SHALL BE SUBMITTED IN SUBMITTAL
FORMAT. THEY ARE NOT GUARANTEED TO BE APPROVED AND MAY REQUIRE AN ADDITIONAL
SERVICE FOR REVIEW AND IMPLEMENTATION INTO THE DRAWINGS.
74. EQUIPMENT AND PRODUCTS ARE KNOWN TO BECOME OBSOLETE OR DISCONTINUED. THIS
MAY REQUIRE CURRENT/UPDATED MODELS TO BE IMPLEMENTED INTO THE DRAWINGS. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER OF RECORD AS SOON AS POSSIBLE VIA
RFI OR EMAIL.
75. UNDER NO CIRCUMSTANCES SHALL THESE DRAWINGS AND DOCUMENTS BE MODIFIED BY
ANYONE OTHER THAN THE ENGINEER OF RECORD.

1. 201101 - Huntington Plaza - Update Waste POC's and Calcs 2hrs Hải Yến

11.14.2023 Update Waste POC's and Calcs


You have the latest files. See attached for markups. When complete, send me full PDF. thank you.
Plumbing Set - 11072023

2. 230902 - LMPA - 100%CD - Waste line routing - Update 11/14/23 8hrs Sep Trang

Update 11/14/23 - Waste line routing:


1st - please make sure that MP model is aligned with structural and architectural
models - please see link on: BIM 360 Model Coordination (autodesk.com)
Plumbing and mechanical is off from Arch and Structural.

Please see markups:


V:\Projects\Projects\230902\Admin\Plumbing\Markups (Internal)\23-1114 VN
markup\220036_LifeMoves Palo Alto_MP - 23_1106 - VN markup.pdf
V:\Projects\Projects\230902\Admin\Plumbing\Markups (Internal)\23-1114 VN
markup\220036_LifeMoves Palo Alto_CP-231023 (1) - VN markup.pdf
Please publish both sets - do snapshots to support study and email me the sets.

@Vincent Dang Please see provided correspondence. This explains the request for use of 45 degree
elbows VS long 90 degree for waste and production friendly design.

1
DAILY PLUMBING TASKS

3. 220705 - Expo Point - Match Revit 24hrs Sep


Please go thru the markups below regarding Structural Coordination with Plumbing distribution pipes
on corridors.
V:\Projects\Projects\220705\Admin\Plumbing\Markups\23-1110 Structural Conflicts

for this conflict, there's no other shaft close by that can be used?

2
DAILY PLUMBING TASKS

Make sure we show the Scuppers serving as overflow for the RD's that don't have ORD. Please
indicate size and which RD's are they serving. Make sure you differentiate the AD from the AOD on
the level 8 courtyard, indicate on the riser diagrams which AOD are serving which AD's.

4. 221002 - Carmel Bundy - Address Comments - 75%CD 24hrs Yến Hiếu

@Vincent Dang please address all markups on the sheets located here:
V:\Projects\Projects\221002\Admin\Plumbing\Markups\23-1114 Markups for VN
Please provide me with updated sets and the requested SP Inlet information (inverts & flow) here in
the comments.
Thank you!

5. 220903 - Modera Melrose - 100%CD - 11.17.23 14hrs Thành

@Vincent Dang Please update the Bldg. 5 backgrounds per the files located here:
V:\Projects\Projects\220903\Drawings\Arch_archive\23-1019 Updated Bldg 5 Backgrounds
Please address the markups located here:
V:\Projects\Projects\220903\Admin\Plumbing\Markups\23-1113 Markups for VN
Please ensure that the clouding and TB update requests found on the first page of the above markups
are addressed.
The Civil files referenced in the above markup are located here:
V:\Projects\Projects\220903\Drawings\Arch_archive\23-1113 Civil Plans (CAD & PDF)
Please update the Bldg. 3 Pet Spa room (in basement level) per the CAD files located here:
V:\Projects\Projects\220903\Drawings\Arch_archive\23-1010 Building 3 Pet Spa CAD & Equipment
Specs

3
DAILY PLUMBING TASKS

Cutsheets for the equipment in the room are also located in the above folder.
Please update ALL equipment specs (if needed, specifically the SE & SP specs, but please make sure all
are current) per the files located here:
V:\Projects\Projects\220903\Admin\Plumbing\Equipment
When all previous items in the task have been addressed, please complete QC on the project.
Please provide me with progress sets each day. When completed, please publish the set and post it
here in the comments.
Thank you!

6. 230806 - Maple Drive Apartments - 50%DD - 11.17.23 11hrs Khanh

@Vincent Dang please set up drawings by extracting the info we need from the Revit files located
here:
V:\Projects\Projects\230806\Drawings\Arch_archive\23-1114 - REVIT MODEL
Please update fixture calcs as needed.
Please DO NOT do any of the plumbing design yet.
When the blank set has been created, please publish it and place it here in the comments.
Thank you!

7. 220702 - 4th & Ivy - 100%CD - 11.10.23 7hrs Quang-D


onebuildings so that individual drains are spread
@Vincent Dang please revise the SSD system for both
50' apart. Please update the riser diagrams accordingly. Additionally, please double-check the water
meter data cards to ensure that they match the drawings we have, including all unit, common area,
and garage fixtures. Please provide me with the updated set (including the updated WMDCs if needed)
here in the chat.
Thank you!

8. 230503 - 88 Long Court - 50%CD - 11.22.23 3hrs Team moi

@Vincent Dang I apologize, in yesterday's task I meant to ask your team to calculate the invert of the
southern Storm POC (not the SS POC) in the markup located here:
V:\Projects\Projects\230503\Admin\Plumbing\Markups & Sketches\23-1114 Markups for VN
That is the POC that should be no lower than 768.00' if possible. Please let me know if that will be
feasible or not. If not, please let me know what the highest possible invert for the pipe will be.
Thank you!

9. 230308 - 1047 Crenshaw - 75%CD - 11.3.23 2hrs

@Vincent Dang please update the SP-1 & SP-2 specs here (pump curves included) per the files located
here:
V:\Projects\Projects\230308\Admin\Plumbing\Equipment\SP\Current Pump Specs
When completed, please post the updated set here in the comments.
Thank you!