Download as pdf or txt
Download as pdf or txt
You are on page 1of 30

D

RENCANA PEMBANGUNAN
RUMAH DINAS 1 UNIT 2 PINTU

B
A

JALAN DUSUN MUNGKAL

LEGEND
Simbol Keterangan

A RUANG MAJELIS GURU DAN KEPALA SEKOLAH

B RUANG KELAS BELAJAR

C TOILET SISWA
00
D RUMAH DINAS
A

12.00
1
3.00 3.00 3.00 3.00

1.50

2
+ 0.80 + 0.80
KM/WC KM/WC
- 0.05 - 0.05
1.75 1.62 DAPUR DAPUR 1.75
± 0.00 ± 0.00
1.37
3

1.63 R. KELUARGA R. KELUARGA 1.63


± 0.00 ± 0.00
K. TIDUR II K. TIDUR II
± 0.00 ± 0.00

8.00 1.12 1.12

A B
R. TAMU R. TAMU
± 0.00 ± 0.00

3.00 3.00
K. TIDUR I K. TIDUR I
± 0.00 ± 0.00

6
0.50 0.50
TERAS TERAS 7
- 0.05 - 0.05

3.00 3.00 3.00 3.00

A B C D A F

bl D ENAH
SKALA 1:50

01
TAMPAK DEPAN
bl SKALA 1:50

02
TAMPAK SAMPING KIRI
bl SKALA 1:50

03
TAMPAK SAMPING KANAN
bl SKALA 1:50

04
TAMPAK BELAKANG
bl SKALA 1:50

05
PERABUNG
PAS. BATA 21 BATA 1 : 4
RANGKA BAJA RINGAN 75.75

1.20 1.20
PAS. BATA 21 BATA 1 : 4
TOP BANGUNAN
± 6.30

RANGKA BAJA RINGAN BY PRODUSEN RANGKA BAJA RINGAN BY PRODUSEN


2.50

RING BALOK
±3.80
RING BALOK 13 X 20 CM

PLAFOND TRIPLEK PLAFOND TRIPLEK


RANGKA KAYU RANGKA KAYU
+3.30 +3.30

MEJA DAPUR T : 80 CM
3.80 KERAMIK
40 X 40 CM

LANTAI COR BETON T : 8 CM


1.80 1.80 WIREMESH M8

0.80 0.80
LANTAI DASAR
±0.00

1.00
KAMAR TIDUR I R. TAMU R. TAMU KAMAR TIDUR I
DASAR PONDASI ±0.00 ±0.00 ±0.00 ±0.00
-1.00

3.00 3.00 3.00 3.00

A B C D E

bl POTONGAN
SKALA 1:50
B-B

06
PERABUNG

RANGKA BAJA RINGAN C. 75.75

ATAP SPENDEK 0,3 MM

TOP BANGUNAN
± 6.30

2.50
RANGKA BAJA RINGAN BY PRODUSEN
DAK BETON BERTULANG
Besi Ø10 - 150 TEBAL 10 CM
±3.80
RING BALOK
±3.80 LISPLANK GRC 9 MM

1.10
1.19 0.70
PLAFOND TRIPLEK
DAK BETON RANGKA KAYU
±2.70 +3.30

2.70 TERAS
-0.05

LANTAI DASAR
±0.00

1.00
R. TAMU KM / WC
DASAR PONDASI ±0.00 -0.05
-1.00

1.00 6.00 1.50

A B C D

bl POTONGAN
SKALA 1:50
A-A

07
12.00
1
3.00 3.00 3.00 3.00

1.50

2
KERAMIK + 0.80 + 0.80 KERAMIK
Uk. 25 x 25 Uk. 25 x 25
- 0.05 - 0.05
1.75 KERAMIK Uk. 40 x 40 KERAMIK Uk. 40 x 40 1.75
± 0.00 ± 0.00

1.63 KERAMIK Uk. 40 x 40 KERAMIK Uk. 40 x 40 1.63


± 0.00 ± 0.00
KERAMIK Uk. 40 X 40 KERAMIK Uk. 40 X 40
± 0.00 ± 0.00

8.00 1.12 1.12

KERAMIK Uk. 40 x 40 KERAMIK Uk. 40 x 40


± 0.00 ± 0.00

3.00 3.00
KERAMIK Uk. 40 X 40 KERAMIK Uk. 40 X 40
± 0.00 ± 0.00

6
0.50 0.50
KERAMIK Uk. 40 x 40 KERAMIK Uk. 40 x 40 7
- 0.05 - 0.05

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
LANTAI

08
12.00

3.00 3.00 3.00 3.00

1
0.36
2
+ 0.80 + 0.80

DAK BETON DAK BETON


1.75 BERTULANG BERTULANG 1.75
PLAFOND MULTIPLEK 6 MM PLAFOND MULTIPLEK 6 MM
TEBAL 10 CM RANGKA KAYU TEBAL 10 CM
RANGKA KAYU
± 3.80 ± 3.30 ± 3.80
± 3.30 3

PLAFOND MULTIPLEK 6 MM PLAFOND MULTIPLEK 6 MM


1.63 PLAFOND MULTIPLEK 6 MM RANGKA KAYU RANGKA KAYU PLAFOND MULTIPLEK 6 MM 1.63
± 3.30 ± 3.30
RANGKA KAYU RANGKA KAYU
± 3.30 ± 3.30

8.00 1.12 1.12

PLAFOND MULTIPLEK 6 MM PLAFOND MULTIPLEK 6 MM


3.00 PLAFOND MULTIPLEK 6 MM RANGKA KAYU RANGKA KAYU PLAFOND MULTIPLEK 6 MM 3.00
RANGKA KAYU ± 3.30 ± 3.30 RANGKA KAYU
± 3.30 ± 3.30

1.20 1.20

0.60 0.60 6
0.50 0.50
7
0.50 0.50
8

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
PLAFOND

09
12.00

3.00 3.00 3.00 3.00

PIRI-PIRI MULTIPLEK 6 mm PIRI-PIRI MULTIPLEK 6 mm 1


0.60 RANGKA KAYU RANGKA KAYU 0.60
+3.30 +3.30
2

1.50 1.50

1.88 1.88

9.50
4

1.12 1.12

2.25 2.25

1.25 1.25

7
PIRI-PIRI MULTIPLEK 6 mm PIRI-PIRI MULTIPLEK 6 mm
RANGKA KAYU RANGKA KAYU 0.60
+3.30 +3.30
8

0.60 3.00 3.00 3.00 3.00 0.60

A B C D E F G

bl DENAH
SKALA 1:50
PIRI - PIRI

10
12.00
1
3.00 3.00 3.00 3.00

1.50

J3 J3
2
+ 0.80 + 0.80
P1 P1

1.75 V1 V1 1.75
P2 P2
3

1.63
J2 J2 1.63

P1 P1
4

8.00 1.12 1.12

5
P1 P1

3.00 3.00

P1 J1 J1 P1
6
J2 J2
0.50 0.50
7

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
KUSEN

11
bl DETAIL
SKALA 1:50
KUSEN DETAIL KUSEN

1:50

12
bl DETAIL
SKALA 1:50
KUSEN DETAIL KUSEN

1:50

13
12.00

1.50 4.50 4.50 1.50

1.75 1.75

1.63 1.63

8.00 1.12 1.12

3.00 3.00

5
0.50 0.50
6

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
KAYU CERUCUK

14
12.00

1.50 4.50 4.50 1.50

P1 P1 P1 P1 P1

1.75 1.75

P1 P1 P1 P1 P1 P1

1.63 1.63

P1 3

8.00 1.12 1.12


P1 P1 P1 P1

3.00 3.00

P1

P1 P1 P1 P1
5
0.50 0.50
6

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
PONDASI

15
bl DETAIL
SKALA 1:50
PONDASI P1

16
12.00

1.50 4.50 4.50 1.50

1.75 1.75

1.63 1.63

8.00 1.12 1.12

3.00 3.00

5
0.50 0.50
6

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
PONDASI BATA MENERUS

17
Plasteran 1:4
Pas. 21 bata 1:4
Cor Lantai ad. 1:2:3 tbl. 5cm
Balok sloof 15/18 ad. 1:2:3
Cor Lantai 1:2:3 tbl. 10cm
Wiremesh M8 Cor Lantai ad. 1:2:3 tbl. 10cm
Urugan Pasir tbl. 10cm 4Ø10 Wiremesh M8 4Ø10
Urugan Pasir tbl. 10cm

20
18
Muka Tanah Muka Tanah

Balok sloof 15/18 ad. 1:2:3


Pas 1 bata ad. 1:4 30 Pas 1 bata ad. 1:4 30
Urugan Tanah Urugan Tanah
Cor Lantai Kerja ad. 1:3:5 5 Cor Lantai Kerja ad. 1:3:5 5
Pasir urug Pasir urug
10 10
1 Bt 1 Bt

cerucuk menerus cerucuk menerus


Ø 8-10cm jarak 30 cm Ø 8-10cm jarak 30 cm
hingga tanah keras hingga tanah keras
30 30

bl DETAIL
SKALA 1:50
PONDASI BATA MENERUS

18
12.00

1.50 4.50 4.50 1.50

S1 S1 S1
S1
1

1.75 S1 1.75 S1
S1 S1

S1 S1 S1 S1
S1 2

1.63 S1 S1 1.63
S1

S1 S1 S1
3

8.00 1.12 S1 S1
S1 S1 S1 1.12
S1 S1 S1
4

S1

3.00 S1 3.00
S1 S1

S1 S1
5
0.50 S1 S1 0.50
S1 S1 6
S1

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
BALOK SLOOF

19
12.00

1.50 4.50 4.50 1.50

KP KP KP KP KP KP KP
1

1.75 1.75

KP KP KP KP KP KP
2

1.63 1.63

KP KP KP KP KP KP
3
KP

8.00 1.12 1.12

KP KP KP KP KP KP
4

3.00 3.00

KP KP KP
5
0.50 0.50
KP KP KP KP
6

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
KOLOM

20
12.00

1.50 4.50 4.50 1.50

RB RB RB RB
1

RB RB
1.75 RB 1.75RB

RB RB RB
RB
2

RB RB RB
1.63 1.63RB

RB RB RB
3

1.12 RB RB RB RB 1.12RB
8.00
RB RB RB
4

RB

RB
3.00 RB RB 3.00

RB RB
5
0.50 RB RB 0.50
RB RB 6
RB

3.00 3.00 3.00 3.00

A B C D F

bl DENAH
SKALA 1:50
RING BALOK

21
22
Sumur Resapan Sumur Resapan
Septik Tank Septik Tank
Suplay Air Suplay Air
12.00
1
3.00 3.00 3.00 3.00

1.50

2
+ 0.80 + 0.80
KM/WC KM/WC
- 0.05 - 0.05
1.75 DAPUR DAPUR 1.75
± 0.00 ± 0.00

1.63 R. KELUARGA R. KELUARGA 1.63


± 0.00 ± 0.00
K. TIDUR II K. TIDUR II
± 0.00 ± 0.00

8.00 1.12 1.12

R. TAMU R. TAMU
± 0.00 ± 0.00

3.00 3.00
K. TIDUR I K. TIDUR I
± 0.00 ± 0.00

6
0.50 0.50
TERAS TERAS 7
- 0.05 - 0.05

3.00 3.00 3.00 3.00

A B C D F

DAFTAR SANITASI
Simbol Keterangan Jumlah

DENAH SANITASI
bl
Bak Cuci Piring 2

Closet Duduk 2
SKALA 1:50
Kran Air 1/2 4

Floor Drain 2 23
Pipa PVC "3 2
4
bl DETAIL
SKALA 1:50
SEPTICTANK

24
12.00
1
3.00 3.00 3.00 3.00

1.50

2
+ 0.80 + 0.80
KM/WC
- 0.05
1.75 DAPUR 1.75
± 0.00

1.63 1.63
K. TIDUR II
± 0.00

8.00 1.12 1.12

3.00 3.00
K. TIDUR I
± 0.00

6
0.50 0.50
TERAS 7
- 0.05

3.00 3.00 3.00 3.00

A B C D F

LEGEND
Simbol Keterangan Jumlah

bl DENAH INSTALASI LISTRIK


Box Skring + MCB Set

Saklar Doble 6
SKALA 1:50
Saklar Tunggal 4

Stop Kontak 8 25
Lampu LED 30 watt 18

You might also like