LARSEN & TOUBRO (OMAN) LLC.

PROJECT : CONSTRUCTION OF 132/33 kV GRID STATION AND ASSOCIATED TRANSMISSION


SYSTEM IN MISFAH AREA (TENDER 175 / 2009)

CHECKLIST FOR EXCAVATION

Report No:
Date:

Sl. No. DESCRIPTION OBSERVATIONS

1 Structure

2 Location

3 Ref. Drawing No.

4 Existing ground Level

5 Final Level

6 Compaction at bottom layer

Check for layout ,alignment & size of excavation


7
marked on the ground as per drawing

Check for any underground utilities like Sewers,


8
waterpipe lines , cables.

Check for area to be excavated cleaned& cleared of


9
bushes,vegetation,trees.

Check for dewatering arrangements of waterlogged


10
area.

Check whether excavated pits are adequately


11
shored/timbered/safe slopes.

Check whether excavated material is kept away at


12
1.5 m. from the edge of pit/ trench.

Check to keep away heavy equipments such as


13 cranes , shovels , backhoe, loaders at least 6.0 m
from the edge of excavated pit / trench.

Check whether access for entry & exit adequately


14
provided at work area .

Check for lighting arrangement during night


15
adequate.

16 Are joint inspection record complete.

MISFAH-SF-C10 Page 1 of 1
L&T (OMAN) LLC ENERGOPROJEKT ENTEL LLC

MISFAH-SF-C10 Page 1 of 1