1. PURPOSE
The purpose is to document procedure to produce clarified and de-mineralized water for boiler operation

2. SCOPE
This procedure is applicable to power generation within the organization
3. DEFINITIONS
Nil
4. RESPONSIBILITY
The Head of Chemistry shall be responsible for availability of resources and other requirement for the
procedure
5. DESCRIPTION
S.No
Activity Responsibility Ref. Doc. No.
.

Water Treatment Plant

WTP Logbook &


Raw water received from River Champa to be tested In-charge Water
5.1 Daily Chemistry
regarding quality parameters Treatment Plant
report (soft copy)
The in-take water is passed into Clarifloculator for WTP Logbook
In-charge Water
5.2 treatment. Chemicals are added in this process. &Daily Chemistry
Treatment Plant
Treated water is again tested for quality analysis report (soft copy)

The sludge generated in the process is transferred to In-charge Water


5.3 ----
sludge pit Treatment Plant
In-charge Water WTP Logbook
The treated water is further guided into Gravity Sand
5.4 Treatment Plant &Daily Chemistry
Filters and output water is tested again
report (soft copy)

In-charge Water WTP Logbook


The final treated water is sent to demineralization
5.5 Treatment Plant &Daily Chemistry
Plant. Effluent is sent to Neutralization - Pit
report (soft copy)
5.6 The treated water is passed through ACF, Cation & In-charge Water WTP Logbook
IMS Procedure
Doc. No :NTPCBg-Q-P-OPR-02
Version No : 1.0
Revision No : 00

CHEMISTRY Effective Date: 14-09-2022

Page : 2 of 3

Document Issued By Document Approved by

anion exchangers and finally through mixed bed Treatment Plant &Daily Chemistry
generation DM water to DM water storage tank report (soft copy)
In-charge Water
5.7 The treated water is sent for further use – to boilers ----
Treatment Plant

Waste Water Treatment

In-charge Water WTP Log book


Entire wastewater from plant / drain is collected in
5.8 Treatment Plant & Daily Chemistry
waste water sump
report Excel sheet
The incoming water is treated in tube settler along In-charge Water
5.9 ----
with addition of chemicals required for the purpose Treatment Plant
The treated water is diverted to service water sump In-charge Water
5.10 ----
for various miscellaneous purpose Treatment Plant
Sludge generated in the process is transferred into In-charge Water
5.11 ----
sludge pit Treatment Plant
The sludge from Clarifloculator and tube settler is In-charge Water
WTP Log book
collected in sludge pit. The effluent from DM plant is Treatment Plant
5.12 & Daily Chemistry
directed to neutralization pit for neutralization and
report Excel sheet
then to Ash Slurry Pump House.

6. RISK INVOLVED AND MITIGATION


Procedure of chemistry is complicated procedure which involves certain risks as given below
a) Fire and explosion, chemical hazards
b) Wastes are disposed off in a way to pollute the environment
c) Illness and Occupational health issues
d) Chemical contamination due to use of chemicals
Mitigation involves
a) Proper training and awareness to be given to all the employees regarding
b) Sludge to be disposed in manner specified as per directive
c) Proper maintenance of the units to eliminate any occupational risks
d) Proper work permits, trainings and strict supervision while on work, especially chemicals
IMS Procedure
Doc. No :NTPCBg-Q-P-OPR-02
Version No : 1.0
Revision No : 00

CHEMISTRY Effective Date: 14-09-2022

Page : 3 of 3

Document Issued By Document Approved by

e) Regular health check up of the persons, who works in hazardous process

7. DOCUMENT INFORMATION
S.No. Title Ref.Doc. No. Custodian

1 DM Plant Log Book NTPCBg-Q-R-OPR-01 In-Charge WT Plant

2 PT Plant Log Book NTPCBg-Q-R-OPR-02 In-Charge WT Plant

3 Test Certificate External NTPCBg-Q-OPR-02 HOD Chemistry

4 Test Certificate Internal NTPCBg-Q-OPR-03 HOD Chemistry